CN109958423A CN201711400731.5A CN201711400731A CN109958423A CN 109958423 A CN109958423 A CN 109958423A CN 201711400731 A CN201711400731 A CN 201711400731A CN 109958423 A CN109958423 A CN 109958423A
Authority
CN
China
Prior art keywords
proppant
closed
time
support section
multiple fracturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711400731.5A
Other languages
Chinese (zh)
Inventor
蒋廷学
吴峙颖
曾义金
刘建坤
吴春方
眭世元
贾文峰
肖博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering
Original Assignee
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Research Institute of Petroleum Engineering filed Critical China Petroleum and Chemical Corp
Priority to CN201711400731.5A priority Critical patent/CN109958423A/en
Publication of CN109958423A publication Critical patent/CN109958423A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Abstract

The invention discloses a kind of forced closed methods for improving multiple fracturing fracture support section.It include: (1) crucial Cook method;(2) layering crack propagation law simulation;(3) selection of super-low-density proppant;Proppant average grain diameter is the 1/10~1/6 of minimum fracture width;The bulk density of proppant is less than 1.4g/cm3(4) simulation of closed-in time after pressing: by the fracturing parameter of offset well around the well, closed-in time after different pressures is set, observe the variation of the proppant concentration section in different time, proppant concentration section such as certain two closed-in time is very close, then taking the previous time is the final closed-in time.The present invention carries out complex optimum to closed-in time after proppant partial size, pressure etc., improves multiple fracturing fracture support section, solves current technology limitation, realizes the maximization of effect of increasing production after pressure.

Description

A kind of forced closed method improving multiple fracturing fracture support section
Technical field
The present invention relates to drilling technology fields, further say, are to be related to a kind of improvement multiple fracturing fracture support section Forced closed method.The present invention can be used for the reservoirs such as carbonate rock, sandstone, shale, can be used to straight well, it can also be used to horizontal Well hydraulic fracturing.
Background technique
Currently, the either general pressure break of straight well multilayer or horizontal well is worn lamination and split, forced after requiring pressure using crack Closure techniques accelerate the row of returning of fracturing fluid and the closure process in crack, prevented replacement band to reduce the filtrate injury of fracturing fluid The serious damage of flow conductivity at the sealing come.It because of the backflow effeet of proppant, such as controls proper, can make far from the branch at sealing Agent is supportted, before crack closure, is migrated again to support at sealing.
Existing more than 20 years developing histories of crack forced closed technology, at that time mainly for pressure break target zone only one Or even if there are multiple layers, after all being pressed off, also think to be equal to simple layer pressure break, i.e. hypothesis layer intrinsic permeability and stress etc. All homogeneous distributions.The technology all obtains expected effect in applying at the scene.But for multiple fracturing, each layer of infiltration Rate and stress etc. are all different, and also difference greatly, in this context, such as also uses previous crack forced closed skill sometimes Art certainly will have following limitation:
(1) Extending Law in crack is not consistent close to the Extending Law of identical but different interlayer in same layer, i.e., Penetrate through crack entirely on vertical.It is apparent that the layer that stress is high or permeability is good, fracture width is relatively low, final Fracture condudtiviy may be lower, and in the opposite case, fracture condudtiviy is relatively higher.This will lead to permeability it is good or The fracture condudtiviy of the high layer of stress is insufficient or it is fast to reduce, so that the excavation of production capacity after pressure is influenced, and permeability difference or stress The fracture condudtiviy of low layer could possibly be higher than actual needs, also result in unnecessary waste.How to act in a diametrically opposite way, is then Improve the free-revving engine of multiple fracturing potentiality.
(2) proppant selection is improper.When horizontal well, which wears lamination, to be split, when using conventional particle size and the proppant of density, water The support effect of the above reservoir of horizontal well cylinder can be because of the proppant migration big and big heavy discount of resistance.It in extreme circumstances, may be big absolutely Part proppant is all only distributed in the reservoir where horizontal wellbore, and other reservoirs may have new split having been pressed off Seam extends, but proppant migration is entered and the probability effectively laid substantially reduces.Therefore, say it is that horizontal well is worn lamination and split, it is practical On be still single layer pressure break;For straight well multiple fracturing, it is higher may to be suitable only for fracture width for the proppant of conventional particle size Crack needs, and the ratio migrated and laid in relatively narrow crack also has the reduction of suitable amplitude.It forces to close in crack at this time Conjunction technology is lost meaning for the crack for having no or only small part proppant in pressure break target zone.Because of forced closed The original intention of technology is exactly to improve the distribution of crack inner support agent, the improvement of effect after making it be more advantageous to support section and pressure.
Therefore, it is necessary to study and propose a kind of new crack forced closed method suitable for multilayer.
Summary of the invention
To solve the problem in the prior art, the present invention provides a kind of improvement multiple fracturing fracture support sections Forced closed method.For the biggish multiple fracturing of the difference such as every layer of permeability and stress, in the base of crucial Cook method On plinth, research layering crack propagation law carries out complex optimum to closed-in time after proppant partial size, pressure etc., improves multilayer pressure Fracture support section is split, current technology limitation is solved, realizes the maximization of effect of increasing production after pressure.
General thought of the invention:
(1) multilayer crack proppant is uniformly distributed technology
Either straight well multiple fracturing or horizontal well are worn lamination and are split, all using the super-low-density proppant compared with small particle (vertical depth, which is less than 2000m, can be used super-low-density proppant, and vertical depth is greater than based on the use super-low-density proppant of 200m, is hot on the trail of Conventional density proppant).Why super-low-density proppant is selected, and main cause is to improve the supporting efficiency in crack, especially Remote well area crack has a very important significance to fracture support agent area and volume is improved, and cooperation thinking (2) It is required that.
As for the selection of partial size, using the accurate simulation calculated result of longitudinal crack width section as foundation, with minimum widith Subject to, proppant average grain diameter takes the 1/10~1/6 of minimum fracture width.No matter, all can be true in this way, how high construction sand liquor ratio It protects proppant and passes through most narrow crack.
Certainly, the reduction of proppant partial size is the reduction of corresponding flow conductivity, should be analyzed in conjunction with numerical simulation for oil-gas reservoir, with Subject to specific pressure break purpose layer data, influence of the different fracture condudtiviy of sunykatuib analysis to yield after pressure, such as water conservancy diversion energy Power influences less, then the size of partial size also influences less.And partial size is small, and at the scene under execution conditions, higher sand can be added Liquor ratio and support dosage, therefore, the flow conductivity actually provided may be unlike the flow conductivity of relatively large partial size proppant.And The result of flow conductivity is all based on identical proppant and lays concentration and rock in laboratory.In fact, to fracture planes pair It is more to require to be fracture length, complexity and transformation volume for low-permeability reservoir, and the requirement to flow conductivity is not It is high.It therefore, is also suitable for the selection theoretically of small particle proppant.
Proppant in multilayer crack can be achieved close to uniform distribution using above-mentioned technology substantially.
(2) appropriate closing well carries out crack forced closed measure again after pressure break
Previous crack forced closed technology is to carry out drain measure, after causing crack closure, different layers after having pressed immediately Between fracture condudtiviy close to identical.Therefore, after pressure break, appropriate closing well for a period of time, in well shut-in period, different layers Because of permeability difference, filtration rate is also different, and the good layer of permeability is bound to cause the proppant in crack toward herein because leak-off is big Migration.Permeability is better, and the ratio of proppant migration is bigger, and final proppant lays concentration and flow conductivity is also higher.And The layer of permeability difference, leak-off is also small, also few toward the support dosage migrated herein, in some instances it may even be possible to hypotonic because of the influence of high leak-off layer It is lower that proppant at reservoir lays concentration.As long as the time of closing well is suitble to, it is final the result is that hypertonic reservoir obtain it is higher Fracture condudtiviy, low permeability reservoir obtain the lower flow conductivity being adapted with its permeability, and therefore, support section is than previous Typical crack forced closed technology lays concentration profile close to uniform proppant, more conducively excavates the productive potentialities of multilayer.
It is simulated in the seam under the different closed-in times as the determination of closed-in time after pressure with mature results of fracture simulation software Proppant concentration situation of change, as long as the sign that the laying concentration of proppant is also improved at analog result discovery high permeability formation, It can continue to extend the closed-in time, until the laying concentration of proppant no longer occurs significantly to change.
The super-low-density proppant when proppant of stage application, and all pressures in crack are required after pressing crack construction It splits liquid uniform and complete and breaks glue, therefore, the viscosity of fracturing fluid is also low, and the density of proppant is also low, the migration resistance in crack It is low, therefore, in the moving distribution again because of permeability and leak-off crack inner support agent caused by different, it is easier to realize.
The object of the present invention is to provide a kind of forced closed methods for improving multiple fracturing fracture support section.
Include:
(1) crucial Cook method;
(2) layering crack propagation law simulation;
(3) selection of super-low-density proppant;
(4) simulation of closed-in time after pressing.
Wherein, preferably:
Step (2), it is each up and down to pressure break target zone to take 20-50m distance on the basis of (1) more, it carries out layering crack and expands Exhibition rule simulation.
Step (3), proppant average grain diameter are the 1/10~1/6 of minimum fracture width.The bulk density of proppant is less than 1.4g/cm3
The closed-in time after different pressures is arranged by the fracturing parameter of offset well around the well in step (4), and observation is different The variation of proppant concentration section in time, the proppant concentration section such as certain two closed-in time is very close, then before taking One time is the final closed-in time.
According to the closed-in time that step (4) are designed, the closing well after pressure.
The method also includes:
Perforation, pressure break, replacement, drain and seek production process.
Following steps specifically can be used in the present invention:
(1) crucial Cook method
Interlayer up and down to pressure break target zone and intermediate interlayer and target zone top bottom etc. carries out the evaluation of system, obtains longitudinal direction On various parameters continuously distributed data, including lithology, physical property, oil-gas possibility, sensibility, rock mechanics, crustal stress and day Right distribution situations of cracks etc..It is main to carry out comprehensive assessment using the means such as well logging, well logging, core analysis.
The assessment of especially longitudinal profile of geostress and intrinsic fracture etc., influences to Guan Chong the crack propagation law of multilayer It wants, or even the method that well log interpretation crustal stress and on-the-spot test crustal stress can be taken to correct, obtains accurately layering crustal stress etc. Data.
The data such as temperature logging data or underground microseism after offset well pressure can also be used, the height of fracture is monitored, The data that layering crustal stress is corrected with this keep subsequent analog result more accurate reliable.
(2) layering crack propagation law simulation
It is each up and down to pressure break target zone to take 20-50m distance on the basis of (1) more, using multilayer crack extended simulation Software GOFHER is simulated, and simulates workload to reduce, using orthogonal design method, simulate different pressing crack construction discharge capacities, Crack propagation law under liquid measure, support dosage and fracturing fluid viscosity etc., especially fracture width is in longitudinal regularity of distribution, i.e., The width section in crack.
(3) partial size of super-low-density proppant is preferred
On the basis of (2), it is 6-10 times of proppant average grain diameter by fracture width and carrys out the average grain of preferred proppant Diameter, to realize proppant being uniformly distributed in fracture height.
(4) simulation of closed-in time after pressing
By the requirement of thinking (2), using above-mentioned GOFHER simulation softward, by the fracturing parameter of offset well around the well, Closed-in time after different pressures, such as 0,30min, 60min, 90min, 120min, 150min, 180min are set, when observing different The variation of interior proppant concentration section, the proppant concentration section such as certain two closed-in time is very close, then before can use One time is the final closed-in time.
Do not change substantially if the proppant of different time lays concentration profile, illustrates that the difference for being layered permeability is insufficient So that seam inner support agent generates moving distribution again, at this time then still using conventional crack forced closed technology.
(5) other perforations, pressure break, replacement, drain and production process is sought, executes referring to conventional process, does not go to live in the household of one's in-laws on getting married herein.
The effect of invention:
It is of the present invention to use completely new processing technique compared with forced closed technology in crack after existing pressure, no longer Using being directed to only one layer of target zone or thinking the technology for being equal to simple layer, on the basis of crucial Cook method, grind Study carefully the crack propagation law under the conditions of different pressing crack construction discharge capacities, liquid measure, proppant dosage, fracturing fluid viscosity etc., and then to branch Closed-in time etc. carries out complex optimum after support agent partial size, pressure.
The present invention can be effectively improved multiple fracturing fracture support section, improve multiple fracturing potentiality to the maximum extent.
Site operation has operability.
Specific embodiment
Below with reference to embodiment, the present invention is further illustrated.
Embodiment
A well, interval of interest lithology are canescence gassiness glutenite, and intrinsic fracture is relatively developed.Target zone pressure break well section is 2437.9-2502.6m, point two layers of pressure break, reservoir be averaged Young's modulus 47.6GPa, and be averaged Poisson's ratio 0.20;Target zone and top The stress difference of interlayer is about 4.7MPa, is about 6.5MPa with lower part barrier stress difference;Target zone temperature is 102 DEG C.It should to understand The gas-bearing property and production capacity of target zone, and lower step exploration assessment work is carried out to the block, the process that this patent proposes is used for reference, In conjunction with this well actual conditions, the design of hydraulic fracturing scheme and site pilot test of the well are carried out, specific implementation method and effect are such as Under:
(1) by means such as core analysis and well log interpretations, it is longitudinal various Cook method: to analyze target zone The continuously distributed situation of reservoir parameter, wherein lithology is canescence gassiness glutenite, and oil-gas possibility is gassiness, and intrinsic fracture is relatively sent out It educates, and has answered distribution situation, strata pressure 25.4-27.2MPa, Young's modulus average out in conjunction with simulation with being calculated The stress difference of 47.6GPa, Poisson's ratio average out to 0.20, target zone and top interlayer is about 4.7MPa, poor with lower part barrier stress About 6.5MPa, target zone temperature are 109 DEG C.
(2) crack propagation law is simulated: it is obtained on parameter basis in (1), takes 20m more on pressure break target zone, it is lower to take more 30m.Using GOFHER software, using orthogonal design method to pressing crack construction discharge capacity, liquid measure, fracturing fluid viscosity, support dosage etc. Crack propagation law under different construction parameters carries out analog study, and preferably corresponding construction is joined under best fracture support section out Number.
(3) partial size of super-low-density proppant is preferred: simulating calculated result according to (2), pressing crack construction preliminary stage is selected 70/140 mesh powder pottery, mid-term select sand in 40/70 mesh, and the later period selects 30/50 mesh coarse sand.
Density 1.33g/cm3, minimum fracture width be 3mm, 300 μm of proppant average grain diameter.
(4) closed-in time optimizes after pressing: referring to offset well fracturing parameter, after calculating pressure using the simulation of GOFHER software Closed-in time is respectively proppant concentration profile change under the conditions of 0,30min, 60min, 90min, 120min, 150min, simulation As a result it is closer to for proppant concentration profile change under the conditions of 90min and 120min, selection 90min is the closed-in time.
Pressing crack construction is carried out to the well by above-mentioned steps, site construction technology is succeeded.In conjunction with well temperature after the well pressure The secondary analog result in crack after result of log interpretation and pressure, it was demonstrated that fracture support section obtains obviously compared to offset well after the well pressure Improve, be concentrated mainly in target zone and extend on the longitudinal direction of crack, high stress is suitable with the fracture width on low stress stratum, main to collect In between 0.4~0.6cm;Proppant lays more uniform in crack, and sanding concentration concentrates on 4-5kg/m3.It is taken after the well pressure Preferable effect was obtained, initial stage daily output tolerance is 3.0*10 after pressure4m3/ d, the daily output is stablized in 1.6*10 after half a year4m3/ d is left It is right.
It is proved by the pilot test of the well: using for reference the process that this patent proposes, fracture support section is compared after pressure In offset well be improved significantly, initial stage daily output tolerance reaches 2 times of offset well or so, and after pressing production decline considerably slower than offset well or Adjacent area block, stable yields and validity period rise appreciably after pressure, achieve significant oil increasing effect, improve the fracturing reform effect of such reservoir Fruit.

Claims (7)

1. a kind of forced closed method for improving multiple fracturing fracture support section, it is characterised in that the described method includes:
(1) crucial Cook method;
(2) layering crack propagation law simulation;
(3) selection of super-low-density proppant;
(4) simulation of closed-in time after pressing.
2. improving the forced closed method of multiple fracturing fracture support section as described in claim 1, it is characterised in that:
Step (2), it is each up and down to pressure break target zone to take 20-50m distance on the basis of (1) more, carry out layering crack extension rule Rule simulation.
3. improving the forced closed method of multiple fracturing fracture support section as claimed in claim 2, it is characterised in that:
Step (3), proppant average grain diameter are the 1/10~1/6 of minimum fracture width.
4. improving the forced closed method of multiple fracturing fracture support section as claimed in claim 3, it is characterised in that:
The bulk density of proppant is less than 1.4g/cm3
5. improving the forced closed method of multiple fracturing fracture support section as claimed in claim 4, it is characterised in that:
The closed-in time after different pressures is arranged by the fracturing parameter of offset well around the well in step (4), observes different time The variation of interior proppant concentration section, the proppant concentration section such as certain two closed-in time is very close, then takes previous Time is the final closed-in time.
6. improving the forced closed method of multiple fracturing fracture support section as claimed in claim 5, it is characterised in that:
According to the closed-in time that step (4) are designed, the closing well after pressure.
7. improving the forced closed method of multiple fracturing fracture support section as described in claim 1, it is characterised in that described Method includes:
Perforation, pressure break, replacement, drain and seek production process.
CN201711400731.5A 2017-12-22 2017-12-22 A kind of forced closed method improving multiple fracturing fracture support section Pending CN109958423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711400731.5A CN109958423A (en) 2017-12-22 2017-12-22 A kind of forced closed method improving multiple fracturing fracture support section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711400731.5A CN109958423A (en) 2017-12-22 2017-12-22 A kind of forced closed method improving multiple fracturing fracture support section

Publications (1)

Publication Number Publication Date
CN109958423A true CN109958423A (en) 2019-07-02

Family

ID=67018875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711400731.5A Pending CN109958423A (en) 2017-12-22 2017-12-22 A kind of forced closed method improving multiple fracturing fracture support section

Country Status (1)

Country Link
CN (1) CN109958423A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114233261A (en) * 2021-12-23 2022-03-25 西南石油大学 Method for realizing uniform transformation of oil and gas well by low-cost staged fracturing

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4421167A (en) * 1980-11-05 1983-12-20 Exxon Production Research Co. Method of controlling displacement of propping agent in fracturing treatments
US6582819B2 (en) * 1998-07-22 2003-06-24 Borden Chemical, Inc. Low density composite proppant, filtration media, gravel packing media, and sports field media, and methods for making and using same
CN1443268A (en) * 2000-07-18 2003-09-17 埃克森美孚上游研究公司 Method for treating multiple wellbore intervals
CN103306660A (en) * 2012-03-13 2013-09-18 中国石油化工股份有限公司 Shale gas reservoir hydraulic fracturing production increasing method
CN103422835A (en) * 2013-08-19 2013-12-04 中国石油集团川庆钻探工程有限公司 Solidifiable flow sand bridge plugging method for shaft of oil and gas well
CN106907137A (en) * 2015-12-23 2017-06-30 中国石油化工股份有限公司 A kind of method of the effective water conservancy diversion in shale oil reservoir volume fracturing crack

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4421167A (en) * 1980-11-05 1983-12-20 Exxon Production Research Co. Method of controlling displacement of propping agent in fracturing treatments
US6582819B2 (en) * 1998-07-22 2003-06-24 Borden Chemical, Inc. Low density composite proppant, filtration media, gravel packing media, and sports field media, and methods for making and using same
CN1443268A (en) * 2000-07-18 2003-09-17 埃克森美孚上游研究公司 Method for treating multiple wellbore intervals
CN103306660A (en) * 2012-03-13 2013-09-18 中国石油化工股份有限公司 Shale gas reservoir hydraulic fracturing production increasing method
CN103422835A (en) * 2013-08-19 2013-12-04 中国石油集团川庆钻探工程有限公司 Solidifiable flow sand bridge plugging method for shaft of oil and gas well
CN106907137A (en) * 2015-12-23 2017-06-30 中国石油化工股份有限公司 A kind of method of the effective water conservancy diversion in shale oil reservoir volume fracturing crack

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董自强: "直罗长6油层压裂工艺研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114233261A (en) * 2021-12-23 2022-03-25 西南石油大学 Method for realizing uniform transformation of oil and gas well by low-cost staged fracturing

Similar Documents

Publication Publication Date Title
CN103835691B (en) A kind of natural selection dessert temporarily blocks up volume fracturing method
CN104727798B (en) A kind of low permeability gas reservoir turns to refracturing process
CN105952427B (en) A kind of prediction of low-permeability oil deposit water filling induced fractures and evaluation method
CN108009705A (en) A kind of shale reservoir compressibility evaluation method based on support vector machines technology
CN104266913B (en) Mining failure simulation test device for mine working face floor
CN107965305A (en) One kind layering refracturing method
CN108180004A (en) A kind of horizontal well natural selection dessert temporarily blocks up volume refracturing method
CN107355206B (en) A kind of shale gas horizontal well refracturing temporarily blocks up critical pressure test method
CN105604534A (en) Hydraulically affected fracturing process method for increasing production of coal-bed gas reservoir
CN106437674A (en) Imitation horizontal well waterflooding well pattern adapting method
CN110359899A (en) A kind of method that shale gas horizontal well refracturing improves effectively transformation volume
CN107939368A (en) The real-time control method of hydraulic fracture complexity in a kind of same fracturing section of well of improving the standard
CN106295095A (en) New method based on Conventional Logs prediction low permeability sandstone reservoir production capacity
CN107194101B (en) Horizontal well fracturing crack layer-crossing layer number diagnosis method
CN108661616B (en) Layered fracturing method suitable for sandstone oil and gas reservoir
CN107762475A (en) Aquation induction pretreatment and evaluation method before a kind of shale reservoir pressure break
CN113177322B (en) Fracturing single well control reserve calculation method
CN109577938A (en) A kind of compact oil reservoir horizontal well wears lamination cracking method
Jianchun et al. Reservoir stimulation techniques to minimize skin factor of Longwangmiao Fm gas reservoirs in the Sichuan Basin
CN103048184A (en) Testing method of breakthrough pressure of repeated fracturing plugging agent
RU2424425C1 (en) Procedure for development of deposit of oil in carbonate collectors
Zuo et al. Experimental study on gas adsorption and drainage of gas-bearing coal subjected to tree-type hydraulic fracturing
CN116128084A (en) Prediction method for volume fracture network control reserves of tight oil reservoir horizontal well
US9784090B2 (en) Method for selecting the location of a stimulating geothermal well
Zhang et al. Investigation of water-flow fracture zone height in fully mechanized cave mining beneath thick alluvium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190702

RJ01 Rejection of invention patent application after publication