CN109945428A - Progress control method, device, air conditioner and computer readable storage medium - Google Patents

Progress control method, device, air conditioner and computer readable storage medium Download PDF

Info

Publication number
CN109945428A
CN109945428A CN201910186010.1A CN201910186010A CN109945428A CN 109945428 A CN109945428 A CN 109945428A CN 201910186010 A CN201910186010 A CN 201910186010A CN 109945428 A CN109945428 A CN 109945428A
Authority
CN
China
Prior art keywords
blower
air conditioner
air
revolving speed
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910186010.1A
Other languages
Chinese (zh)
Other versions
CN109945428B (en
Inventor
黄延聪
鲁健
周向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea Refrigeration Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea Refrigeration Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201910186010.1A priority Critical patent/CN109945428B/en
Priority to PCT/CN2019/080160 priority patent/WO2020181589A1/en
Publication of CN109945428A publication Critical patent/CN109945428A/en
Application granted granted Critical
Publication of CN109945428B publication Critical patent/CN109945428B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/56Remote control
    • F24F11/58Remote control using Internet communication
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/65Electronic processing for selecting an operating mode
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • F24F11/77Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity by controlling the speed of ventilators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/79Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling the direction of the supplied air
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Human Computer Interaction (AREA)
  • Fluid Mechanics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention proposes a kind of progress control method, device, air conditioner and computer readable storage mediums, wherein progress control method includes: the location distribution information according to specified time interval detection target area intra domain user;Detect the environmental parameter of target area and the operating parameter of air conditioner;According to location distribution information, environmental parameter and operating parameter, the revolving speed of blowing component is adjusted, and/or the outer machine running frequency of air conditioner is adjusted.According to the technical solution of the present invention, the effect that temperature regulation is carried out to target area is improved, in addition, also improving the blowing experience of user.

Description

Progress control method, device, air conditioner and computer readable storage medium
Technical field
The present invention relates to air conditioner technical fields, in particular to a kind of progress control method, a kind of operation control dress It sets, a kind of air conditioner and a kind of computer readable storage medium.
Background technique
As the improvement of people's living standards, air conditioner is more more and more universal, and becoming must not in daily life The household electrical appliances that can lack require the comfort of air conditioner also higher and higher as the consumption idea of people updates.
In the related technology, user most significantly is influenced to be blowing feeling by order to promote the use of user due to air conditioner Experience, those skilled in the art propose the concept of blowing feeling index, and blowing feeling index passes through the temperature and unlatching of target area Flow relocity calculation obtains, and still, the blowing component of existing air conditioner is usually cross flow fan and centrifugal blower, at least exists following Technical problem:
For remote air supply pattern (for example, the distance between user and air conditioner are more than ten meters) and calm sense air-supply mould For formula, wherein when air conditioner runs on remote air supply pattern, the distance between user and air conditioner are more than ten meters, at this time It is required that the blowing feeling index of the target area intra domain user in short distance is larger, and when calm sense air supply pattern, user and air conditioner The distance between usually less than four meters, require the blowing feeling index of the target area intra domain user in short distance less than 5% at this time, separately Outside, under calm sense operational mode, it will usually air conditioner be caused to decline indoor temperature control efficiency.
Specifically, cross flow fan is blown soft at the low rotational speed, but in overlength distance air-supply, blowing feeling index is relatively low, In addition, the air supplying distance of centrifugal blower is farther out, but still air-supply is concentrated at the low rotational speed, cannot achieve soft on a large scale send Wind, therefore, above-mentioned existing blowing component and its operation control program are unable to satisfy remote air supply pattern and calm sense air-supply The blowing feeling index requirement of mode.
Further, when user is poor to the blowing of air conditioner experience, can set air conditioner work or keep always compared with High running frequency, this results in the power consumption of air conditioner excessively high.
In addition, any discussion of the whole instruction to background technique, not representing the background technique must be fields The prior art that technical staff is known, not representing in the whole instruction to any discussion of the prior art think that this is existing Technology must be widely known or certain common knowledge for constituting this field.
Summary of the invention
At least one in order to solve the above-mentioned technical problem, it is an object of the present invention to provide a kind of operation controlling parties Method.
It is another object of the present invention to provide a kind of operating control devices.
It is yet a further object of the present invention to provide a kind of air conditioners.
It is yet a further object of the present invention to provide a kind of computer readable storage mediums.
To achieve the above object, the embodiment of first aspect present invention provides a kind of progress control method, comprising: according to The location distribution information of specified time interval detection target area intra domain user;Detect the environmental parameter of the target area with it is described The operating parameter of air conditioner;According to the location distribution information, the environmental parameter and the operating parameter, to the blowing group The revolving speed of part is adjusted, and/or is adjusted to the outer machine running frequency of the air conditioner.
In the present solution, target area for air conditioner, generally includes the sensor on air conditioner to examine The region of survey further includes the region influenced by operational parameter control, therefore, passes through the correlation of the user in detection target area Information is conducive to the usage experience for promoting user using the relevant information of user as a reference conditions of fan operation.
In addition, operating parameter mainly is also used to adjust the parameters such as humidity, temperature and the blowing feeling in target area, at this Can be understood as the target operating parameters of air conditioner in application, and environmental parameter generally include temperature in target area, humidity, Air quantity etc., but not limited to this.
The application is determined based on lot of experimental data, can be with when cooperating between a counter-rotating fan of component of drying Realize the air-supply of narrow angle or Wide blowing angle, wherein carry out narrow angle air-supply and wind is sent to farther target area (such as 10 meters are dissipated with windward Open, wind is blowed almost along horizontal line in 10 meters), i.e. expansion air supplying distance, when carrying out Wide blowing angle, the wind that blows of blowing component It scatters in the distance to a declared goal (such as 1.5 meters, 2.5 meters and 3.5 meters) of air conditioner.
Therefore, according to the location distribution information, the environmental parameter and the operating parameter, to the blowing component Revolving speed is adjusted, namely is blown by adjusting the fan of blowing component to execute Wide blowing angle or narrow angle, with blowing feeling index Requirement, while also reducing the structure design difficulty and software control difficulty of air conditioner, that is, do not need for cross flow fan and Centrifugal blower carries out structure design, and respectively two kinds of blowers are carried out with debugging and design in software algorithm.
In addition, the outer machine running frequency of air conditioner depends primarily on compressor, it is logical to the frequency control system of compressor It is often to limit running frequency maximum value to be therefore adjusted by the outer machine running frequency frequency to the air conditioner, mainly The running frequency maximum value of compressor is limited, this not only contributes to reduce time liquid probability of the compressor of air conditioner, meanwhile, also have Conducive to power consumption of the promotion air conditioner under different air-supply demands.
Wherein, location distribution information includes the opposite side between the distance between user and air conditioner, user and air conditioner The scope of activities of parallactic angle, user in target area, but not limited to this.
It is worth it is emphasized that any blower can be rotated in a first direction, i.e., to evaporator blower, any blower It (opposite with first direction) in a second direction can rotate, i.e., inside machine air outlet blowing is sent carrying out wide-angle to target area When wind, the revolving speed for being generally proximal to the blower of evaporator is greater than or equal to the revolving speed of the blower close to interior machine air outlet, especially leans on The revolving speed of the blower of machine air outlet plays the effect of relieve heat in close, and then realizes Wide blowing angle, and then improves of blowing range Angle, similarly, when carrying out the air-supply of narrow angle to target area, the revolving speed for being generally proximal to the blower of evaporator is less than to be gone out close to interior machine The effect that the revolving speed of the blower in air port, the especially revolving speed close to the blower of interior machine air outlet play wind gathering, and then realize narrow angle Wind, is sent to the target area of farther place by air-supply.
In addition, the progress control method in above-described embodiment provided by the invention can also have following supplementary technology special Sign:
In above-mentioned technical proposal, further includes: acquire the image information in the target area, and/or the acquisition target Acoustic information in region, and/or by the way of wireless signal acquisition, determine the position point of the target area intra domain user Cloth, wherein the location distribution information includes the distance between the user and the air conditioner and/or the user in institute State the distribution orientation in target area.
In the present solution, above-mentioned determining user position distribution specific implementation and effect it is as follows:
(1) Image Acquisition is to realize that the image of acquisition can be infrared image by the camera being arranged on air conditioner Or color image, reliability and accuracy are higher, not only can determine that the distributing position of user, additionally it is possible to be excluded based on image information Interfering object, for example, furniture, ornaments, moveable household appliance, pet and lamps and lanterns etc. do not need adjustment air conditioner at this time Operating parameter, or air conditioner shutdown is directly controlled, to reduce the power consumption and hardware deterioration of air conditioner.
(2) mode of wireless communication detection includes that (Wireless Fidelity, is based on by infrared, radar, bluetooth and Wi-Fi The WLAN of IEEE 802.11b standard) etc., in addition, wireless communication detection can also pass through wearable device and air conditioner Between data interaction realize that detection speed is fast and high reliablity.
(3) a kind of of sound detection is achieved in that by the way that at least four sound pick-ups, sound are arranged on the panel of air conditioner Speed that sound is propagated can determine the position of user, in turn it is known that then receive the time difference of acoustic information based on four sound pick-ups The distributing position of user is determined indirectly, although the poor reliability of sound detection, however, it is possible to further analyze voice signal Determine user identity or affiliated crowd, and then by blowing component revolving speed and/or compressor running frequency threshold value, come Pointedly promote the personalized blowing demand of different user.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower is denoted as the second blower close to the blower of the air outlet, according to the location distribution information, the environmental parameter and The operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency threshold value of the air conditioner It is adjusted, specifically includes: if determining that the air conditioner runs on remote air supply pattern according to the operating parameter, judging Size relation between the distance between the user and the air conditioner and any pre-determined distance;According to the size relation Determine result and the pre-determined distance, adjusts the revolving speed of first blower and the revolving speed of the second blower;And/or according to described Pre-determined distance adjusts the corresponding maximum frequency values of the outer machine running frequency.
In the present solution, being mainly the need to ensure that blowing feeling index can be greater than 6 under remote air supply pattern, passing through Judge the size relation between the distance between user and the air conditioner and any pre-determined distance, on the one hand, pass through control the The raising of the revolving speed of the revolving speed of one blower and the second blower determines the distance that wind blows, on the other hand, by calculating the first blower Revolving speed and the second blower revolving speed between rotational speed difference, determine the distance between wind fan out locations and air conditioner.
Wherein, pre-determined distance is history data and blowing feeling the index determination based on air conditioner.
Specifically, the distance between user and air conditioner are remoter, and the revolving speed of the revolving speed of the first blower and the second blower is higher, And the first rotational speed difference between blower and the second blower is smaller.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower is denoted as the second blower close to the blower of the air outlet, according to the location distribution information, the environmental parameter and The operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency threshold value of the air conditioner It is adjusted, specifically further include: if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, sentence Break a pre-determined distance range belonging to the distance between the user and the air conditioner;According to the pre-determined distance range tune The revolving speed of whole first blower and the revolving speed of the second blower, until the rotational speed difference between first blower and second blower Until reaching preset rotation speed difference, or reaches preset ratio value to the ratio value between first blower and second blower and be Only.
In the present solution, if the air conditioner runs on calm sense air supply pattern, based between user and air conditioner Distance determines range of the blowing feeling index less than 5, and for example, the distance between user and air conditioner are 1.5 meters, is referred to based on calm sense Mark is calculated and be can determine, the revolving speed between the revolving speed of the first blower, the revolving speed of the second blower, the first blower and second blower Ratio value between difference, the first blower and second blower, and in order to balance the contradiction between calm sense and temperature control efficiency, The maximum value of the revolving speed of the maximum value and the second blower of the revolving speed of the first blower in calculated result is chosen, usually with raising pair The temperature control efficiency of target area.
Wherein, pre-determined distance range is history data and blowing feeling the index determination based on air conditioner, for example, 0 Rice~1.5 meters, 1.5 meters~2.5 meters, 2.5 meters~3.5 meters are determined as when distance is exactly the endpoint value of pre-determined distance range Lesser pre-determined distance range, for example, when distance is 1.5 meters, corresponding pre-determined distance range is 0 meter~1.5 meters.
In addition, preset rotation speed difference and preset ratio value be all based on air conditioner history data and blowing feeling index it is true Fixed.
Optionally, the value range of the preset rotation speed absolute value of the difference is 0 rev/min~300 revs/min.
Optionally, the value range of the preset ratio value is 0.2~4.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower is denoted as the second blower close to the blower of the air outlet, according to the location distribution information, the environmental parameter and The operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency threshold value of the air conditioner It is adjusted, specifically further include: if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, sentence Break a pre-determined distance range belonging to the distance between the user and the air conditioner;According to the pre-determined distance range tune The maximum (top) speed of first blower of the whole air conditioner, and/or adjust the maximum (top) speed of the second blower of the air conditioner.
In the present solution, if the air conditioner runs on calm sense air supply pattern, based between user and air conditioner Distance and calm sense index can be calculated and be determined when meeting calm sense index, the maximum (top) speed of the first blower and/or the second wind The maximum (top) speed of machine utmostly to improve air output, and then promotes air conditioner to the temperature control effect in target area.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower is denoted as the second blower close to the blower of the air outlet, according to the location distribution information, the environmental parameter and The operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency threshold value of the air conditioner It is adjusted, specifically further include: if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, sentence Break a pre-determined distance range belonging to the distance between the user and the air conditioner;According to the pre-determined distance range tune The corresponding maximum frequency values of outer machine running frequency of the whole air conditioner.
In the present solution, if determining that the air conditioner runs on calm sense air supply pattern, root according to the operating parameter The corresponding maximum frequency values of outer machine running frequency of the air conditioner are adjusted according to the pre-determined distance range, and then are guaranteeing to meet While calm sense index, the reliability of the compressor of air conditioner can also be protected.
In above-mentioned technical proposal, if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, Then the rotational speed difference between the corresponding counter-rotating fan of the same air outlet subtracts with the increase of the pre-determined distance range It is small, and/or, then the maximum (top) speed between the corresponding counter-rotating fan of the same air outlet is with the pre-determined distance range Increase and increase, and/or, then the outer machine running frequency threshold value of the air conditioner with the increase of the pre-determined distance range and Increase.
In the present solution, being determined based on a large amount of experimental data, under calm sense air supply pattern, between a counter-rotating fan Rotational speed difference reduce with the increase of the pre-determined distance range, maximum (top) speed with the increase of the pre-determined distance range and Increase, can guarantee to meet calm sense index within the scope of pre-determined distance, and then be conducive to be promoted the calm sense experience of user, separately Outside, outer machine running frequency threshold value increases with the increase of the pre-determined distance range, is conducive to the reliability for promoting compressor, It reduces compressor and a possibility that liquid occurs back.
Optionally, the counter-rotating fan includes the axial flow blower to rotation setting and/or the diagonal flow fan to rotation setting.
Optionally, an air outlet of the air conditioner is provided with single blower, and the list blower is axial flow blower, oblique flow wind One of machine, cross flow fan and centrifugal blower blower.
The embodiment of second aspect of the present invention provides a kind of operating control device, and operating control device includes processor, Processor is able to carry out following steps: according to the location distribution information of specified time interval detection target area intra domain user;Detection The operating parameter of the environmental parameter of the target area and the air conditioner;Joined according to the location distribution information, the environment The several and operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency of the air conditioner It is adjusted.
In the present solution, target area for air conditioner, generally includes the sensor on air conditioner to examine The region of survey further includes the region influenced by operational parameter control, therefore, passes through the correlation of the user in detection target area Information is conducive to the usage experience for promoting user using the relevant information of user as a reference conditions of fan operation.
In addition, operating parameter mainly is also used to adjust the parameters such as humidity, temperature and the blowing feeling in target area, at this Can be understood as the target operating parameters of air conditioner in application, and environmental parameter generally include temperature in target area, humidity, Air quantity etc., but not limited to this.
The application is determined based on lot of experimental data, can be with when cooperating between a counter-rotating fan of component of drying Realize narrow angle air-supply or Wide blowing angle, wherein carry out narrow angle air-supply for wind and be sent to farther target area (such as 10 meters or more), i.e., Expand air supplying distance, when carrying out Wide blowing angle, distance to a declared goal (such as 1.5 meters, 2.5 meters of the wind that blows of blowing component in air conditioner With 3.5 meters etc.) in scatter.
Therefore, according to the location distribution information, the environmental parameter and the operating parameter, to the blowing component Revolving speed is adjusted, namely is blown by adjusting the fan of blowing component to execute Wide blowing angle or narrow angle, with blowing feeling index Requirement, while also reducing the structure design difficulty and software control difficulty of air conditioner, that is, do not need for cross flow fan and Centrifugal blower carries out structure design, and respectively two kinds of blowers are carried out with debugging and design in software algorithm.
In addition, the outer machine running frequency of air conditioner depends primarily on compressor, it is logical to the frequency control system of compressor It is often to limit running frequency maximum value to be therefore adjusted by the outer machine running frequency frequency to the air conditioner, mainly The running frequency maximum value of compressor is limited, this not only contributes to reduce time liquid probability of the compressor of air conditioner, meanwhile, also have Conducive to power consumption of the promotion air conditioner under different air-supply demands.
Wherein, location distribution information includes the opposite side between the distance between user and air conditioner, user and air conditioner The scope of activities of parallactic angle, user in target area, but not limited to this.
It is worth it is emphasized that any blower can be rotated in a first direction, i.e., to evaporator blower, any blower It (opposite with first direction) in a second direction can rotate, i.e., inside machine air outlet blowing is sent carrying out wide-angle to target area When wind, the revolving speed for being generally proximal to the blower of evaporator is greater than or equal to the revolving speed of the blower close to interior machine air outlet, especially leans on The revolving speed of the blower of machine air outlet plays the effect of relieve heat in close, and then realizes Wide blowing angle, and then improves of blowing range Angle, similarly, when carrying out the air-supply of narrow angle to target area, the revolving speed for being generally proximal to the blower of evaporator is less than to be gone out close to interior machine The effect that the revolving speed of the blower in air port, the especially revolving speed close to the blower of interior machine air outlet play wind gathering, and then realize narrow angle Wind, is sent to the target area of farther place by air-supply.
In addition, the operating control device in above-described embodiment provided by the invention can also have following supplementary technology special Sign:
In above-mentioned technical proposal, the processor execute the step of further include: acquire in the target area image letter Acoustic information in breath, and/or the acquisition target area, and/or by the way of wireless signal acquisition, determine the target The position distribution of area's intra domain user, wherein the location distribution information includes the distance between the user and the air conditioner, Distribution orientation of the user in the target area and/or.
In the present solution, above-mentioned determining user position distribution specific implementation and effect it is as follows:
(1) Image Acquisition is to realize that the image of acquisition can be infrared image by the camera being arranged on air conditioner Or color image, reliability and accuracy are higher, not only can determine that the distributing position of user, additionally it is possible to be excluded based on image information Interfering object, for example, furniture, ornaments, moveable household appliance, pet and lamps and lanterns etc. do not need adjustment air conditioner at this time Operating parameter, or air conditioner shutdown is directly controlled, to reduce the power consumption and hardware deterioration of air conditioner.
(2) mode of wireless communication detection includes that (Wireless Fidelity, is based on by infrared, radar, bluetooth and Wi-Fi The WLAN of IEEE 802.11b standard) etc., in addition, wireless communication detection can also pass through wearable device and air conditioner Between data interaction realize that detection speed is fast and high reliablity.
(3) a kind of of sound detection is achieved in that by the way that at least four sound pick-ups, sound are arranged on the panel of air conditioner Speed that sound is propagated can determine the position of user, in turn it is known that then receive the time difference of acoustic information based on four sound pick-ups The distributing position of user is determined indirectly, although the poor reliability of sound detection, however, it is possible to further analyze voice signal Determine user identity or affiliated crowd, and then by blowing component revolving speed and/or compressor running frequency threshold value, come Pointedly promote the personalized blowing demand of different user.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower, the blower close to the air outlet are denoted as the second blower, and the processor is according to the location distribution information, described Environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component, and/or transport to the outer machine of the air conditioner Line frequency threshold value is adjusted, specifically includes the following steps: if determining that the air conditioner is run on far according to the operating parameter Apart from air supply pattern, then judge that the size between the distance between the user and the air conditioner and any pre-determined distance is closed System;According to the judgement result of the size relation and the pre-determined distance, the revolving speed and the second blower of first blower are adjusted Revolving speed;And/or according to the pre-determined distance, adjust the corresponding maximum frequency values of the outer machine running frequency.
In the present solution, being mainly the need to ensure that blowing feeling index can be greater than 6 under remote air supply pattern, passing through Judge the size relation between the distance between user and the air conditioner and any pre-determined distance, on the one hand, pass through control the The raising of the revolving speed of the revolving speed of one blower and the second blower determines the distance that wind blows, on the other hand, by calculating the first blower Revolving speed and the second blower revolving speed between rotational speed difference, determine the distance between wind fan out locations and air conditioner.
Wherein, pre-determined distance is history data and blowing feeling the index determination based on air conditioner.
Specifically, the distance between user and air conditioner are remoter, and the revolving speed of the revolving speed of the first blower and the second blower is higher, And the first rotational speed difference between blower and the second blower is smaller.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower, the blower close to the air outlet are denoted as the second blower, and the processor is according to the location distribution information, described Environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component, and/or transport to the outer machine of the air conditioner Line frequency threshold value is adjusted, specific further comprising the steps of: if determining that the air conditioner is run on according to the operating parameter Calm sense air supply pattern then judges a pre-determined distance range belonging to the distance between the user and the air conditioner;Root The revolving speed of first blower and the revolving speed of the second blower are adjusted according to the pre-determined distance range, until first blower with it is described Until rotational speed difference between second blower reaches preset rotation speed difference, or the ratio extremely between first blower and second blower Until example value reaches preset ratio value.
In the present solution, if the air conditioner runs on calm sense air supply pattern, based between user and air conditioner Distance determines range of the blowing feeling index less than 5, and for example, the distance between user and air conditioner are 1.5 meters, is referred to based on calm sense Mark is calculated and be can determine, the revolving speed between the revolving speed of the first blower, the revolving speed of the second blower, the first blower and second blower Ratio value between difference, the first blower and second blower, and in order to balance the contradiction between calm sense and temperature control efficiency, The maximum value of the revolving speed of the maximum value and the second blower of the revolving speed of the first blower in calculated result is chosen, usually with raising pair The temperature control efficiency of target area.
Wherein, pre-determined distance range is history data and blowing feeling the index determination based on air conditioner, for example, 0 Rice~1.5 meters, 1.5 meters~2.5 meters, 2.5 meters~3.5 meters are determined as when distance is exactly the endpoint value of pre-determined distance range Lesser pre-determined distance range, for example, when distance is 1.5 meters, corresponding pre-determined distance range is 0 meter~1.5 meters.
In addition, preset rotation speed difference and preset ratio value be all based on air conditioner history data and blowing feeling index it is true Fixed.
Optionally, the value range of the preset rotation speed absolute value of the difference is 0 rev/min~300 revs/min.
Optionally, the value range of the preset ratio value is 0.2~4.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower, the blower close to the air outlet are denoted as the second blower, and the processor is according to the location distribution information, described Environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component, and/or transport to the outer machine of the air conditioner Line frequency threshold value is adjusted, specific further comprising the steps of: if determining that the air conditioner is run on according to the operating parameter Calm sense air supply pattern then judges a pre-determined distance range belonging to the distance between the user and the air conditioner;Root Adjust the maximum (top) speed of the first blower of the air conditioner according to the pre-determined distance range, and/or the adjustment air conditioner the The maximum (top) speed of two blowers.
In the present solution, if the air conditioner runs on calm sense air supply pattern, based between user and air conditioner Distance and calm sense index can be calculated and be determined when meeting calm sense index, the maximum (top) speed of the first blower and/or the second wind The maximum (top) speed of machine utmostly to improve air output, and then promotes air conditioner to the temperature control effect in target area.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower, the blower close to the air outlet are denoted as the second blower, and the processor is according to the location distribution information, described Environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component, and/or transport to the outer machine of the air conditioner Line frequency threshold value is adjusted, specific further comprising the steps of: if determining that the air conditioner is run on according to the operating parameter Calm sense air supply pattern then judges a pre-determined distance range belonging to the distance between the user and the air conditioner;Root The corresponding maximum frequency values of outer machine running frequency of the air conditioner are adjusted according to the pre-determined distance range.
In the present solution, if determining that the air conditioner runs on calm sense air supply pattern, root according to the operating parameter The corresponding maximum frequency values of outer machine running frequency of the air conditioner are adjusted according to the pre-determined distance range, and then are guaranteeing to meet While calm sense index, the reliability of the compressor of air conditioner can also be protected.
In above-mentioned technical proposal, if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, Then the rotational speed difference between the corresponding counter-rotating fan of the same air outlet subtracts with the increase of the pre-determined distance range It is small, and/or, then the maximum (top) speed between the corresponding counter-rotating fan of the same air outlet is with the pre-determined distance range Increase and increase, and/or, then the outer machine running frequency threshold value of the air conditioner with the increase of the pre-determined distance range and Increase.
In the present solution, being determined based on a large amount of experimental data, under calm sense air supply pattern, between a counter-rotating fan Rotational speed difference reduce with the increase of the pre-determined distance range, maximum (top) speed with the increase of the pre-determined distance range and Increase, can guarantee to meet calm sense index within the scope of pre-determined distance, and then be conducive to be promoted the calm sense experience of user, separately Outside, outer machine running frequency threshold value increases with the increase of the pre-determined distance range, is conducive to the reliability for promoting compressor, It reduces compressor and a possibility that liquid occurs back.
Optionally, the counter-rotating fan includes the axial flow blower to rotation setting and/or the diagonal flow fan to rotation setting.
Optionally, an air outlet of the air conditioner is provided with single blower, and the list blower is axial flow blower, oblique flow wind One of machine, cross flow fan and centrifugal blower blower.
The embodiment of third aspect present invention provides a kind of air conditioner, comprising: as any of the above-described technical solution limits Operating control device.
The air conditioner that the above embodiment of the present invention provides, due to the operation control dress being provided in any of the above-described technical solution It sets, to have all of the above beneficial effect, details are not described herein.
The embodiment of fourth aspect present invention provides a kind of computer readable storage medium, computer readable storage medium On be stored with operation control program, operation control program be performed realize as any of the above-described technical solution limit operation control Method processed.
Additional aspect and advantage of the invention will become obviously in following description section, or practice through the invention Recognize.
Detailed description of the invention
Above-mentioned and/or additional aspect of the invention and advantage will become from the description of the embodiment in conjunction with the following figures Obviously and it is readily appreciated that, in which:
Fig. 1 is the schematic flow diagram of the progress control method of one embodiment of the invention;
Fig. 2 is the schematic block diagram of the operating control device of one embodiment of the invention;
Fig. 3 is the perspective view of the explosion of the air conditioner of one embodiment of the invention;
Fig. 4 is the diagrammatic cross-section of the air conditioner of one embodiment of the invention;
Fig. 5 is the schematic block diagram of the computer readable storage medium of another embodiment of the present invention.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real Applying mode, the present invention is further described in detail.It should be noted that in the absence of conflict, the implementation of the application Feature in example and embodiment can be combined with each other.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, still, the present invention may be used also To be implemented using other than the one described here other modes, therefore, protection scope of the present invention is not by described below Specific embodiment limitation.
Embodiment one:
Fig. 1 is the schematic flow diagram of the progress control method of one embodiment of the invention.
As shown in Figure 1, the progress control method of one embodiment of the invention, comprising: step S102, according between specified time Every the location distribution information of detection target area intra domain user;Step S104, detect the environmental parameter of the target area with it is described The operating parameter of air conditioner;Step S106 is right according to the location distribution information, the environmental parameter and the operating parameter The revolving speed of the blowing component is adjusted, and/or is adjusted to the outer machine running frequency of the air conditioner.
In the present solution, target area for air conditioner, generally includes the sensor on air conditioner to examine The region of survey further includes the region influenced by operational parameter control, therefore, passes through the correlation of the user in detection target area Information is conducive to the usage experience for promoting user using the relevant information of user as a reference conditions of fan operation.
In addition, operating parameter mainly is also used to adjust the parameters such as humidity, temperature and the blowing feeling in target area, at this Can be understood as the target operating parameters of air conditioner in application, and environmental parameter generally include temperature in target area, humidity, Air quantity etc., but not limited to this.
The application is determined based on lot of experimental data, can be with when cooperating between a counter-rotating fan of component of drying Realize narrow angle air-supply or Wide blowing angle, wherein carry out narrow angle air-supply for wind and be sent to farther target area (such as 10 meters or more), i.e., Expand air supplying distance, when carrying out Wide blowing angle, distance to a declared goal (such as 1.5 meters, 2.5 meters of the wind that blows of blowing component in air conditioner With 3.5 meters etc.) in scatter.
Therefore, according to the location distribution information, the environmental parameter and the operating parameter, to the blowing component Revolving speed is adjusted, namely is blown by adjusting the fan of blowing component to execute Wide blowing angle or narrow angle, with blowing feeling index Requirement, while also reducing the structure design difficulty and software control difficulty of air conditioner, that is, do not need for cross flow fan and Centrifugal blower carries out structure design, and respectively two kinds of blowers are carried out with debugging and design in software algorithm.
In addition, the outer machine running frequency of air conditioner depends primarily on compressor, it is logical to the frequency control system of compressor It is often to limit running frequency maximum value to be therefore adjusted by the outer machine running frequency frequency to the air conditioner, mainly The running frequency maximum value of compressor is limited, this not only contributes to reduce time liquid probability of the compressor of air conditioner, meanwhile, also have Conducive to power consumption of the promotion air conditioner under different air-supply demands.
Wherein, location distribution information includes the opposite side between the distance between user and air conditioner, user and air conditioner The scope of activities of parallactic angle, user in target area, but not limited to this.
It is worth it is emphasized that any blower can be rotated in a first direction, i.e., to evaporator blower, any blower It (opposite with first direction) in a second direction can rotate, i.e., inside machine air outlet blowing is sent carrying out wide-angle to target area When wind, the revolving speed for being generally proximal to the blower of evaporator is greater than or equal to the revolving speed of the blower close to interior machine air outlet, especially leans on The revolving speed of the blower of machine air outlet plays the effect of relieve heat in close, and then realizes Wide blowing angle, and then improves of blowing range Angle, similarly, when carrying out the air-supply of narrow angle to target area, the revolving speed for being generally proximal to the blower of evaporator is less than to be gone out close to interior machine The effect that the revolving speed of the blower in air port, the especially revolving speed close to the blower of interior machine air outlet play wind gathering, and then realize narrow angle Wind, is sent to the target area of farther place by air-supply.
In addition, the progress control method in above-described embodiment provided by the invention can also have following supplementary technology special Sign:
In above-mentioned technical proposal, further includes: acquire the image information in the target area, and/or the acquisition target Acoustic information in region, and/or by the way of wireless signal acquisition, determine the position point of the target area intra domain user Cloth, wherein the location distribution information includes the distance between the user and the air conditioner and/or the user in institute State the distribution orientation in target area.
In the present solution, above-mentioned determining user position distribution specific implementation and effect it is as follows:
(1) Image Acquisition is to realize that the image of acquisition can be infrared image by the camera being arranged on air conditioner Or color image, reliability and accuracy are higher, not only can determine that the distributing position of user, additionally it is possible to be excluded based on image information Interfering object, for example, furniture, ornaments, moveable household appliance, pet and lamps and lanterns etc. do not need adjustment air conditioner at this time Operating parameter, or air conditioner shutdown is directly controlled, to reduce the power consumption and hardware deterioration of air conditioner.
(2) mode of wireless communication detection includes that (Wireless Fidelity, is based on by infrared, radar, bluetooth and Wi-Fi The WLAN of IEEE 802.11b standard) etc., in addition, wireless communication detection can also pass through wearable device and air conditioner Between data interaction realize that detection speed is fast and high reliablity.
(3) a kind of of sound detection is achieved in that by the way that at least four sound pick-ups, sound are arranged on the panel of air conditioner Speed that sound is propagated can determine the position of user, in turn it is known that then receive the time difference of acoustic information based on four sound pick-ups The distributing position of user is determined indirectly, although the poor reliability of sound detection, however, it is possible to further analyze voice signal Determine user identity or affiliated crowd, and then by blowing component revolving speed and/or compressor running frequency threshold value, come Pointedly promote the personalized blowing demand of different user.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower is denoted as the second blower close to the blower of the air outlet, according to the location distribution information, the environmental parameter and The operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency threshold value of the air conditioner It is adjusted, specifically includes: if determining that the air conditioner runs on remote air supply pattern according to the operating parameter, judging Size relation between the distance between the user and the air conditioner and any pre-determined distance;According to the size relation Determine result and the pre-determined distance, adjusts the revolving speed of first blower and the revolving speed of the second blower;And/or according to described Pre-determined distance adjusts the corresponding maximum frequency values of the outer machine running frequency.
In the present solution, being mainly the need to ensure that blowing feeling index can be greater than 6 under remote air supply pattern, passing through Judge the size relation between the distance between user and the air conditioner and any pre-determined distance, on the one hand, pass through control the The raising of the revolving speed of the revolving speed of one blower and the second blower determines the distance that wind blows, on the other hand, by calculating the first blower Revolving speed and the second blower revolving speed between rotational speed difference, determine the distance between wind fan out locations and air conditioner.
Wherein, pre-determined distance is history data and blowing feeling the index determination based on air conditioner.
Specifically, the distance between user and air conditioner are remoter, and the revolving speed of the revolving speed of the first blower and the second blower is higher, And the first rotational speed difference between blower and the second blower is smaller.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower is denoted as the second blower close to the blower of the air outlet, according to the location distribution information, the environmental parameter and The operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency threshold value of the air conditioner It is adjusted, specifically further include: if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, sentence Break a pre-determined distance range belonging to the distance between the user and the air conditioner;According to the pre-determined distance range tune The revolving speed of whole first blower and the revolving speed of the second blower, until the rotational speed difference between first blower and second blower Until reaching preset rotation speed difference, or reaches preset ratio value to the ratio value between first blower and second blower and be Only.
In the present solution, if the air conditioner runs on calm sense air supply pattern, based between user and air conditioner Distance determines range of the blowing feeling index less than 5, and for example, the distance between user and air conditioner are 1.5 meters, is referred to based on calm sense Mark is calculated and be can determine, the revolving speed between the revolving speed of the first blower, the revolving speed of the second blower, the first blower and second blower Ratio value between difference, the first blower and second blower, and in order to balance the contradiction between calm sense and temperature control efficiency, The maximum value of the revolving speed of the maximum value and the second blower of the revolving speed of the first blower in calculated result is chosen, usually with raising pair The temperature control efficiency of target area.
Wherein, pre-determined distance range is history data and blowing feeling the index determination based on air conditioner, for example, 0 Rice~1.5 meters, 1.5 meters~2.5 meters, 2.5 meters~3.5 meters are determined as when distance is exactly the endpoint value of pre-determined distance range Lesser pre-determined distance range, for example, when distance is 1.5 meters, corresponding pre-determined distance range is 0 meter~1.5 meters.
In addition, preset rotation speed difference and preset ratio value be all based on air conditioner history data and blowing feeling index it is true Fixed.
Optionally, the value range of the preset rotation speed absolute value of the difference is 0 rev/min~300 revs/min.
Optionally, the value range of the preset ratio value is 0.2~4.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower is denoted as the second blower close to the blower of the air outlet, according to the location distribution information, the environmental parameter and The operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency threshold value of the air conditioner It is adjusted, specifically further include: if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, sentence Break a pre-determined distance range belonging to the distance between the user and the air conditioner;According to the pre-determined distance range tune The maximum (top) speed of first blower of the whole air conditioner, and/or adjust the maximum (top) speed of the second blower of the air conditioner.
In the present solution, if the air conditioner runs on calm sense air supply pattern, based between user and air conditioner Distance and calm sense index can be calculated and be determined when meeting calm sense index, the maximum (top) speed of the first blower and/or the second wind The maximum (top) speed of machine utmostly to improve air output, and then promotes air conditioner to the temperature control effect in target area.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower is denoted as the second blower close to the blower of the air outlet, according to the location distribution information, the environmental parameter and The operating parameter is adjusted the revolving speed of the blowing component, and/or to the outer machine running frequency threshold value of the air conditioner It is adjusted, specifically further include: if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, sentence Break a pre-determined distance range belonging to the distance between the user and the air conditioner;According to the pre-determined distance range tune The corresponding maximum frequency values of outer machine running frequency of the whole air conditioner.
In the present solution, if determining that the air conditioner runs on calm sense air supply pattern, root according to the operating parameter The corresponding maximum frequency values of outer machine running frequency of the air conditioner are adjusted according to the pre-determined distance range, and then are guaranteeing to meet While calm sense index, the reliability of the compressor of air conditioner can also be protected.
In above-mentioned technical proposal, if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, Then the rotational speed difference between the corresponding counter-rotating fan of the same air outlet subtracts with the increase of the pre-determined distance range It is small, and/or, then the maximum (top) speed between the corresponding counter-rotating fan of the same air outlet is with the pre-determined distance range Increase and increase, and/or, then the outer machine running frequency threshold value of the air conditioner with the increase of the pre-determined distance range and Increase.
In the present solution, being determined based on a large amount of experimental data, under calm sense air supply pattern, between a counter-rotating fan Rotational speed difference reduce with the increase of the pre-determined distance range, maximum (top) speed with the increase of the pre-determined distance range and Increase, can guarantee to meet calm sense index within the scope of pre-determined distance, and then be conducive to be promoted the calm sense experience of user, separately Outside, outer machine running frequency threshold value increases with the increase of the pre-determined distance range, is conducive to the reliability for promoting compressor, It reduces compressor and a possibility that liquid occurs back.
Optionally, the counter-rotating fan includes the axial flow blower to rotation setting and/or the diagonal flow fan to rotation setting.
Optionally, an air outlet of the air conditioner is provided with single blower, and the list blower is axial flow blower, oblique flow wind One of machine, cross flow fan and centrifugal blower blower.
Embodiment two:
Fig. 2 is the schematic block diagram of the operating control device of one embodiment of the invention.
As shown in Fig. 2, the operating control device 200 of one embodiment of the invention includes processor 202,202 energy of processor Enough execute following steps: according to the location distribution information of specified time interval detection target area intra domain user;Detect the target The operating parameter of the environmental parameter in region and the air conditioner;According to the location distribution information, the environmental parameter and described Operating parameter is adjusted the revolving speed of the blowing component, and/or adjusts to the outer machine running frequency of the air conditioner It is whole.
In the present solution, target area for air conditioner, generally includes the sensor on air conditioner to examine The region of survey further includes the region influenced by operational parameter control, therefore, passes through the correlation of the user in detection target area Information is conducive to the usage experience for promoting user using the relevant information of user as a reference conditions of fan operation.
In addition, operating parameter mainly is also used to adjust the parameters such as humidity, temperature and the blowing feeling in target area, at this Can be understood as the target operating parameters of air conditioner in application, and environmental parameter generally include temperature in target area, humidity, Air quantity etc., but not limited to this.
The application is determined based on lot of experimental data, can be with when cooperating between a counter-rotating fan of component of drying Realize narrow angle air-supply or Wide blowing angle, wherein carry out narrow angle air-supply for wind and be sent to farther target area (such as 10 meters or more), i.e., Expand air supplying distance, when carrying out Wide blowing angle, distance to a declared goal (such as 1.5 meters, 2.5 meters of the wind that blows of blowing component in air conditioner With 3.5 meters etc.) in scatter.
Therefore, according to the location distribution information, the environmental parameter and the operating parameter, to the blowing component Revolving speed is adjusted, namely is blown by adjusting the fan of blowing component to execute Wide blowing angle or narrow angle, with blowing feeling index Requirement, while also reducing the structure design difficulty and software control difficulty of air conditioner, that is, do not need for cross flow fan and Centrifugal blower carries out structure design, and respectively two kinds of blowers are carried out with debugging and design in software algorithm.
In addition, the outer machine running frequency of air conditioner depends primarily on compressor, it is logical to the frequency control system of compressor It is often to limit running frequency maximum value to be therefore adjusted by the outer machine running frequency frequency to the air conditioner, mainly The running frequency maximum value of compressor is limited, this not only contributes to reduce time liquid probability of the compressor of air conditioner, meanwhile, also have Conducive to power consumption of the promotion air conditioner under different air-supply demands.
Wherein, location distribution information includes the opposite side between the distance between user and air conditioner, user and air conditioner The scope of activities of parallactic angle, user in target area, but not limited to this.
It is worth it is emphasized that any blower can be rotated in a first direction, i.e., to evaporator blower, any blower It (opposite with first direction) in a second direction can rotate, i.e., inside machine air outlet blowing is sent carrying out wide-angle to target area When wind, the revolving speed for being generally proximal to the blower of evaporator is greater than or equal to the revolving speed of the blower close to interior machine air outlet, especially leans on The revolving speed of the blower of machine air outlet plays the effect of relieve heat in close, and then realizes Wide blowing angle, and then improves of blowing range Angle, similarly, when carrying out the air-supply of narrow angle to target area, the revolving speed for being generally proximal to the blower of evaporator is less than to be gone out close to interior machine The effect that the revolving speed of the blower in air port, the especially revolving speed close to the blower of interior machine air outlet play wind gathering, and then realize narrow angle Wind, is sent to the target area of farther place by air-supply.
In addition, the operating control device 200 in above-described embodiment provided by the invention can also have following supplementary technology Feature:
In above-mentioned technical proposal, the processor 202 execute the step of further include: acquire the image in the target area Acoustic information in information, and/or the acquisition target area, and/or by the way of wireless signal acquisition, determine the mesh Mark area's intra domain user position distribution, wherein the location distribution information include between the user and the air conditioner away from From and/or distribution orientation of the user in the target area.
In the present solution, above-mentioned determining user position distribution specific implementation and effect it is as follows:
(1) Image Acquisition is to realize that the image of acquisition can be infrared image by the camera being arranged on air conditioner Or color image, reliability and accuracy are higher, not only can determine that the distributing position of user, additionally it is possible to be excluded based on image information Interfering object, for example, furniture, ornaments, moveable household appliance, pet and lamps and lanterns etc. do not need adjustment air conditioner at this time Operating parameter, or air conditioner shutdown is directly controlled, to reduce the power consumption and hardware deterioration of air conditioner.
(2) mode of wireless communication detection includes that (Wireless Fidelity, is based on by infrared, radar, bluetooth and Wi-Fi The WLAN of IEEE 802.11b standard) etc., in addition, wireless communication detection can also pass through wearable device and air conditioner Between data interaction realize that detection speed is fast and high reliablity.
(3) a kind of of sound detection is achieved in that by the way that at least four sound pick-ups, sound are arranged on the panel of air conditioner Speed that sound is propagated can determine the position of user, in turn it is known that then receive the time difference of acoustic information based on four sound pick-ups The distributing position of user is determined indirectly, although the poor reliability of sound detection, however, it is possible to further analyze voice signal Determine user identity or affiliated crowd, and then by blowing component revolving speed and/or compressor running frequency threshold value, come Pointedly promote the personalized blowing demand of different user.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower, the blower close to the air outlet are denoted as the second blower, the processor 202 according to the location distribution information, The environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component, and/or to the outer of the air conditioner Machine running frequency threshold value is adjusted, specifically includes the following steps: if determining that the air conditioner is run according to the operating parameter In remote air supply pattern, then the size between the distance between the user and the air conditioner and any pre-determined distance is judged Relationship;According to the judgement result of the size relation and the pre-determined distance, the revolving speed and the second wind of first blower are adjusted The revolving speed of machine;And/or according to the pre-determined distance, adjust the corresponding maximum frequency values of the outer machine running frequency.
In the present solution, being mainly the need to ensure that blowing feeling index can be greater than 6 under remote air supply pattern, passing through Judge the size relation between the distance between user and the air conditioner and any pre-determined distance, on the one hand, pass through control the The raising of the revolving speed of the revolving speed of one blower and the second blower determines the distance that wind blows, on the other hand, by calculating the first blower Revolving speed and the second blower revolving speed between rotational speed difference, determine the distance between wind fan out locations and air conditioner.
Wherein, pre-determined distance is history data and blowing feeling the index determination based on air conditioner.
Specifically, the distance between user and air conditioner are remoter, and the revolving speed of the revolving speed of the first blower and the second blower is higher, And the first rotational speed difference between blower and the second blower is smaller.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower, the blower close to the air outlet are denoted as the second blower, the processor 202 according to the location distribution information, The environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component, and/or to the outer of the air conditioner Machine running frequency threshold value is adjusted, specific further comprising the steps of: if determining that the air conditioner is transported according to the operating parameter Row then judges a pre-determined distance model belonging to the distance between the user and the air conditioner in calm sense air supply pattern It encloses;The revolving speed of first blower and the revolving speed of the second blower are adjusted according to the pre-determined distance range, until first blower Until rotational speed difference between second blower reaches preset rotation speed difference, or to first blower and second blower it Between ratio value reach preset ratio value until.
In the present solution, if the air conditioner runs on calm sense air supply pattern, based between user and air conditioner Distance determines range of the blowing feeling index less than 5, and for example, the distance between user and air conditioner are 1.5 meters, is referred to based on calm sense Mark is calculated and be can determine, the revolving speed between the revolving speed of the first blower, the revolving speed of the second blower, the first blower and second blower Ratio value between difference, the first blower and second blower, and in order to balance the contradiction between calm sense and temperature control efficiency, The maximum value of the revolving speed of the maximum value and the second blower of the revolving speed of the first blower in calculated result is chosen, usually with raising pair The temperature control efficiency of target area.
Wherein, pre-determined distance range is history data and blowing feeling the index determination based on air conditioner, for example, 0 Rice~1.5 meters, 1.5 meters~2.5 meters, 2.5 meters~3.5 meters are determined as when distance is exactly the endpoint value of pre-determined distance range Lesser pre-determined distance range, for example, when distance is 1.5 meters, corresponding pre-determined distance range is 0 meter~1.5 meters.
In addition, preset rotation speed difference and preset ratio value be all based on air conditioner history data and blowing feeling index it is true Fixed.
Optionally, the value range of the preset rotation speed absolute value of the difference is 0 rev/min~300 revs/min.
Optionally, the value range of the preset ratio value is 0.2~4.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower, the blower close to the air outlet are denoted as the second blower, the processor 202 according to the location distribution information, The environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component, and/or to the outer of the air conditioner Machine running frequency threshold value is adjusted, specific further comprising the steps of: if determining that the air conditioner is transported according to the operating parameter Row then judges a pre-determined distance model belonging to the distance between the user and the air conditioner in calm sense air supply pattern It encloses;The maximum (top) speed of the first blower of the air conditioner, and/or the adjustment air conditioner are adjusted according to the pre-determined distance range The second blower maximum (top) speed.
In the present solution, if the air conditioner runs on calm sense air supply pattern, based between user and air conditioner Distance and calm sense index can be calculated and be determined when meeting calm sense index, the maximum (top) speed of the first blower and/or the second wind The maximum (top) speed of machine utmostly to improve air output, and then promotes air conditioner to the temperature control effect in target area.
In above-mentioned technical proposal, the blowing component includes a counter-rotating fan, and the blower close to the evaporator is denoted as First blower, the blower close to the air outlet are denoted as the second blower, the processor 202 according to the location distribution information, The environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component, and/or to the outer of the air conditioner Machine running frequency threshold value is adjusted, specific further comprising the steps of: if determining that the air conditioner is transported according to the operating parameter Row then judges a pre-determined distance model belonging to the distance between the user and the air conditioner in calm sense air supply pattern It encloses;The corresponding maximum frequency values of outer machine running frequency of the air conditioner are adjusted according to the pre-determined distance range.
In the present solution, if determining that the air conditioner runs on calm sense air supply pattern, root according to the operating parameter The corresponding maximum frequency values of outer machine running frequency of the air conditioner are adjusted according to the pre-determined distance range, and then are guaranteeing to meet While calm sense index, the reliability of the compressor of air conditioner can also be protected.
In above-mentioned technical proposal, if determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, Then the rotational speed difference between the corresponding counter-rotating fan of the same air outlet subtracts with the increase of the pre-determined distance range It is small, and/or, then the maximum (top) speed between the corresponding counter-rotating fan of the same air outlet is with the pre-determined distance range Increase and increase, and/or, then the outer machine running frequency threshold value of the air conditioner with the increase of the pre-determined distance range and Increase.
In the present solution, being determined based on a large amount of experimental data, under calm sense air supply pattern, between a counter-rotating fan Rotational speed difference reduce with the increase of the pre-determined distance range, maximum (top) speed with the increase of the pre-determined distance range and Increase, can guarantee to meet calm sense index within the scope of pre-determined distance, and then be conducive to be promoted the calm sense experience of user, separately Outside, outer machine running frequency threshold value increases with the increase of the pre-determined distance range, is conducive to the reliability for promoting compressor, It reduces compressor and a possibility that liquid occurs back.
Optionally, the counter-rotating fan includes the axial flow blower to rotation setting and/or the diagonal flow fan to rotation setting.
Optionally, an air outlet of the air conditioner is provided with single blower, and the list blower is axial flow blower, oblique flow wind One of machine, cross flow fan and centrifugal blower blower.
Embodiment three:
Fig. 3 is the perspective view of the explosion of the air conditioner of one embodiment of the invention.
Fig. 4 is the diagrammatic cross-section of the air conditioner of one embodiment of the invention.
As shown in Figure 3 and Figure 4, the air conditioner of one embodiment of the invention, comprising: as any of the above-described technical solution limits Operating control device 200.
As shown in Figure 3 and Figure 4, the indoor unit in the present embodiment includes upper interior machine air outlet and lower interior machine air outlet, is such as schemed Machine air outlet position has the second blower and the first blower in upper, and the fan blade form of two blowers is set as axis stream to rotation form, under Interior machine air outlet position has a blower, and fan blade form is set as axial-flow leaf form, and lower interior machine air outlet structure goes out for oblique flow Air port.
Section A-A as shown in Figure 3 is it is found that the rear cabinet body component of the internal machine of air-conditioner of embodiment according to the present invention and face Space between plate component is successively arranged evaporator part 5, ducting part, outlet air frame part, uptake switch gate and lower air port Switch gate, specifically, internal machine of air-conditioner further include: sensor module 1, for example, camera (infrared or visual light imaging), radar Sensor and infrared detector;Panel 2 is also used to show operating parameter for receiving the touch command of user;Machine outlet air in upper The counter-rotating fan component 3 of mouth;Second blower motor 301 of machine air outlet in upper;Second impeller of blower of machine air outlet in upper 302;First impeller of blower 303 of machine air outlet in upper;First blower motor 304 of machine air outlet in upper;Machine air outlet in lower Counter-rotating fan component 4;Single blower motor 401 of machine air outlet in lower;Single impeller of blower 402 of machine air outlet in lower;Air inlet Grid part 6 is set on rear cabinet body component;Wind guide strip mechanism 7 is set in outlet air frame part.
Wherein, the second blower of upper interior machine air outlet includes the second blower motor 301 and upper interior machine of upper interior machine air outlet Second impeller of blower 302 of air outlet, the first blower of upper interior machine air outlet include the first impeller of blower of upper interior machine air outlet 303 and upper interior machine air outlet the first blower motor 304, single blower of lower interior machine air outlet includes single wind of lower interior machine air outlet Single impeller of blower 402 of electromechanical machine 401 and lower interior machine air outlet, the list blower is axial flow blower, diagonal flow fan, cross flow fan With one of centrifugal blower blower.
Optionally, the first blower and the second blower are the axial flow blower or diagonal flow fan of same type, and for rotation is arranged.
Embodiment 3.1:
When the corresponding distance of calm sense air supply pattern is 1.5 meters, the revolving speed drop-out value of the first blower be 400rpm~ The revolving speed drop-out value of 500rpm, the second blower are 300rpm~350rpm, and the revolving speed drop-out value of single blower of lower air outlet is 600rpm~650rpm, the maximum (top) speed value Vmax=450rpm for component of drying, outer machine running frequency maximum value are 30hz.
Embodiment 3.2:
When the corresponding distance of calm sense air supply pattern is 2.5 meters, the revolving speed drop-out value of the first blower be 400rpm~ The revolving speed drop-out value of 500rpm, the second blower are 200rpm~250rpm, and the revolving speed drop-out value of single blower of lower air outlet is 500rpm~600rpm, the maximum (top) speed value Vmax=500rpm for component of drying, outer machine running frequency maximum value are 35hz.
Embodiment 3.3:
When the corresponding distance of calm sense air supply pattern is 3.5 meters, the revolving speed drop-out value of the first blower be 300rpm~ The revolving speed drop-out value of 400rpm, the second blower are 150rpm~200rpm, and the revolving speed drop-out value of single blower of lower air outlet is 500rpm~600rpm, the maximum (top) speed value Vmax=550rpm for component of drying, outer machine running frequency maximum value are 40hz.
Embodiment 3.4:
When the corresponding distance of calm sense air supply pattern is 2 meters, the revolving speed of the first blower is 100rpm, the revolving speed of the second blower For 250rpm.
Embodiment 3.5:
It is poor to meet preset rotation speed for rotational speed difference between the revolving speed of first blower and the revolving speed of second blower, described pre- If the value range of revolving speed absolute value of the difference is 0 rev/min~300 revs/min.
Embodiment 3.6:
Ratio value meets preset ratio value between the revolving speed of first blower and the revolving speed of second blower, described pre- If the value range of ratio value is 0.2~4.
Embodiment 3.7:
When the remote corresponding distance of air supply pattern is 6 meters, the revolving speed of the first blower is 500rpm, the revolving speed of the second blower For 600rpm.
Embodiment 3.8:
When the remote corresponding distance of air supply pattern is 12 meters, the revolving speed of the first blower is 800rpm, and the second blower turns Speed is 700rpm.
Embodiment 3.9:
When the remote corresponding distance of air supply pattern is 10 meters, the revolving speed of the first blower is 600rpm, and the second blower turns Speed is that the ratio value range between the revolving speed of 600rpm or the first blower and the revolving speed of the second blower is 0.5~1.5, at this point, one A counter-rotating fan can make the wind produced by boasting send distant cyclone leaf, and then promote remote air-supply effect, meanwhile, it adjusts Whole outer machine running frequency maximum value is to 50Hz.
Example IV:
Fig. 5 is the schematic block diagram of the computer readable storage medium of another embodiment of the present invention.
As shown in figure 5, according to an embodiment of the invention, also proposed a kind of computer readable storage medium 502, computer Operation control program is stored on readable storage medium storing program for executing 502, operation control program is realized any of the above-described when being executed by processor 202 The step of progress control method that item technical solution limits.
Wherein, the operating control device 200 of the embodiment of the present invention can be PC (Personal Computer, personal electricity Brain), smart phone, tablet computer, E-book reader, MP4 (Mobile Pentium 4, video player) and portable calculating The packaged type terminal device having a display function such as machine.
As described in Figure 5, operating control device 200 includes (for example, CPU (the Central Processing of processor 202 Unit, CPU), MCU (Microprogrammed Control Unit, microprogram control unit), DSP (Digital Signal Processor, digital signal processor) and embedded device etc.), memory 204, network communication module 206 and connect Mouth mold block 208, in addition, being additionally provided with communication bus, user interface 504 and network interface 506 on air conditioner.
Wherein, communication bus may include display screen for realizing the connecting communication between these components, user interface 504 (Display) and input unit keyboard, for example, keyboard (Keyboard) and touch screen etc., network interface 506 optionally be can wrap Include standard wireline interface and wireless interface (such as Wi-Fi (Wireless Fidelity, the nothing based on IEEE 802.11b standard Line local area network), blue tooth interface and infrared interface etc.), memory 204 can be high-speed RAM (random access memory, Random access memory), it is also possible to solid-state memory (non-volatile memory), memory 204 can also be independent In the storage device of above-mentioned processor 202.
As shown in figure 5, network interface 506 is mainly used for connecting Cloud Server, data interaction is carried out with Cloud Server, and hand over For mutual data feedback to network communication module 206, user interface 504 can connect client (user terminal), carry out with client Data interaction, and by interactive data feedback to interface module 208, and processor 202 can be used for calling and deposit in memory 204 The operation of the air conditioner of storage controls program.
The technical issues of in view of proposing in the related technology, the invention proposes a kind of progress control methods, operation control Device, air conditioner and computer readable storage medium are joined according to the location distribution information, the environmental parameter and the operation Number is adjusted the revolving speed of the blowing component, namely executes Wide blowing angle or narrow by adjusting the fan of blowing component Not angle air-supply, with the requirement of blowing feeling index, while also reducing the structure design difficulty and software control difficulty of air conditioner, i.e., It needs to carry out structure design for cross flow fan and centrifugal blower, and respectively two kinds of blowers is carried out with the debugging in software algorithm And design.
In addition, the outer machine running frequency of air conditioner depends primarily on compressor, it is logical to the frequency control system of compressor It is often to limit running frequency maximum value to be therefore adjusted by the outer machine running frequency frequency to the air conditioner, mainly The running frequency maximum value of compressor is limited, this not only contributes to reduce time liquid probability of the compressor of air conditioner, meanwhile, also have Conducive to power consumption of the promotion air conditioner under different air-supply demands.
In the present invention, term " first ", " second ", " third " are only used for the purpose of description, and should not be understood as indicating Or imply relative importance;Term " multiple " then refers to two or more, unless otherwise restricted clearly.Term " installation ", The terms such as " connected ", " connection ", " fixation " shall be understood in a broad sense, for example, " connection " may be a fixed connection, being also possible to can Dismantling connection, or be integrally connected;" connected " can be directly connected, can also be indirectly connected through an intermediary.For this For the those of ordinary skill in field, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
In description of the invention, it is to be understood that the instructions such as term " on ", "lower", "left", "right", "front", "rear" Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of the description present invention and simplification is retouched It states, rather than the device of indication or suggestion meaning or module must have specific direction, be constructed and operated in a specific orientation, It is thus impossible to be interpreted as limitation of the present invention.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc. Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the invention It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or reality Example.Moreover, description particular features, structures, materials, or characteristics can in any one or more of the embodiments or examples with Suitable mode combines.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (14)

1. a kind of progress control method is suitable for air conditioner, is equipped with multiple blowing groups between the top and bottom of the air conditioner Part, at least one described blowing component include a counter-rotating fan, and any blowing component is set to the evaporation of the air conditioner Between device and a corresponding air outlet, which is characterized in that the progress control method includes:
According to the location distribution information of specified time interval detection target area intra domain user;
Detect the environmental parameter of the target area and the operating parameter of the air conditioner;
According to the location distribution information, the environmental parameter and the operating parameter, the revolving speed of the blowing component is carried out Adjustment, and/or the outer machine running frequency of the air conditioner is adjusted.
2. progress control method according to claim 1, which is characterized in that further include:
The acoustic information in the image information in the target area, and/or the acquisition target area is acquired, and/or is used The mode of wireless signal acquisition determines the position distribution of the target area intra domain user,
Wherein, the location distribution information includes the distance between the user and the air conditioner and/or the user in institute State the distribution orientation in target area.
3. progress control method according to claim 1, which is characterized in that the blowing component includes one to whirlwind Machine, the blower close to the evaporator are denoted as the first blower, and the blower close to the air outlet is denoted as the second blower, according to described Location distribution information, the environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component and/or right The outer machine running frequency of the air conditioner is adjusted, and is specifically included:
If determining that the air conditioner runs on remote air supply pattern according to the operating parameter, judge the user with it is described Size relation between the distance between air conditioner and any pre-determined distance;
According to the judgement result of the size relation and the pre-determined distance, the revolving speed and the second blower of first blower are adjusted Revolving speed;
And/or according to the pre-determined distance, adjust the corresponding maximum frequency values of the outer machine running frequency.
4. progress control method according to claim 1, which is characterized in that the blowing component includes one to whirlwind Machine, the blower close to the evaporator are denoted as the first blower, and the blower close to the air outlet is denoted as the second blower, according to described Location distribution information, the environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component and/or right The outer machine running frequency of the air conditioner is adjusted, specifically further include:
If determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, judge the user with it is described A pre-determined distance range belonging to the distance between air conditioner;
The revolving speed of first blower and the revolving speed of the second blower are adjusted according to the pre-determined distance range, until first blower Until rotational speed difference between second blower reaches preset rotation speed difference, or to first blower and second blower it Between ratio value reach preset ratio value until.
5. progress control method according to claim 4, which is characterized in that
The value range of the preset rotation speed absolute value of the difference is 0 rev/min~300 revs/min.
6. progress control method according to claim 4, which is characterized in that
The value range of the preset ratio value is 0.2~4.
7. progress control method according to claim 1, which is characterized in that the blowing component includes one to whirlwind Machine, the blower close to the evaporator are denoted as the first blower, and the blower close to the air outlet is denoted as the second blower, according to described Location distribution information, the environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component and/or right The outer machine running frequency of the air conditioner is adjusted, specifically further include:
If determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, judge the user with it is described A pre-determined distance range belonging to the distance between air conditioner;
The maximum (top) speed of the first blower of the air conditioner, and/or the adjustment air-conditioning are adjusted according to the pre-determined distance range The maximum (top) speed of second blower of device.
8. progress control method according to claim 1, which is characterized in that the blowing component includes one to whirlwind Machine, the blower close to the evaporator are denoted as the first blower, and the blower close to the air outlet is denoted as the second blower, according to described Location distribution information, the environmental parameter and the operating parameter are adjusted the revolving speed of the blowing component and/or right The outer machine running frequency of the air conditioner is adjusted, specifically further include:
If determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, judge the user with it is described A pre-determined distance range belonging to the distance between air conditioner;
The corresponding maximum frequency values of outer machine running frequency of the air conditioner are adjusted according to the pre-determined distance range.
9. progress control method according to any one of claims 4 to 8, which is characterized in that
If determining that the air conditioner runs on calm sense air supply pattern according to the operating parameter, the same air outlet is corresponding A counter-rotating fan between rotational speed difference reduce with the increase of the pre-determined distance range, and/or, then it is same it is described go out Maximum (top) speed between the corresponding counter-rotating fan in air port increases with the increase of the pre-determined distance range, and/or, then The maximum frequency values of the outer machine running frequency of the air conditioner increase with the increase of the pre-determined distance range.
10. progress control method according to any one of claims 4 to 8, which is characterized in that
The counter-rotating fan includes two axial flow blowers to rotation setting or two diagonal flow fans to rotation setting.
11. progress control method according to any one of claim 1 to 8, which is characterized in that
One air outlet of the air conditioner is provided with single blower, and the list blower is axial flow blower, diagonal flow fan, cross flow fan With one of centrifugal blower blower.
12. a kind of operating control device is suitable for air conditioner, is equipped with multiple blowing groups between the top and bottom of the air conditioner Part, at least one described blowing component include a counter-rotating fan, and any blowing component is set to the evaporation of the air conditioner Between device and a corresponding air outlet, which is characterized in that
The operating control device includes processor, and the processor can be realized such as claim 1 when executing computer program The step of being limited to progress control method described in any one of 11.
13. a kind of air conditioner characterized by comprising
Operating control device as described in claim requires 12.
14. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of being performed, realizing the progress control method as described in any one of claims 1 to 11.
CN201910186010.1A 2019-03-12 2019-03-12 Operation control method, operation control device, air conditioner and computer readable storage medium Active CN109945428B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910186010.1A CN109945428B (en) 2019-03-12 2019-03-12 Operation control method, operation control device, air conditioner and computer readable storage medium
PCT/CN2019/080160 WO2020181589A1 (en) 2019-03-12 2019-03-28 Operation control method and device, air conditioner, and computer-readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910186010.1A CN109945428B (en) 2019-03-12 2019-03-12 Operation control method, operation control device, air conditioner and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN109945428A true CN109945428A (en) 2019-06-28
CN109945428B CN109945428B (en) 2020-09-22

Family

ID=67009696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910186010.1A Active CN109945428B (en) 2019-03-12 2019-03-12 Operation control method, operation control device, air conditioner and computer readable storage medium

Country Status (2)

Country Link
CN (1) CN109945428B (en)
WO (1) WO2020181589A1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260491A (en) * 2019-07-01 2019-09-20 芜湖美智空调设备有限公司 Progress control method, device, air conditioner and computer readable storage medium
CN110345610A (en) * 2019-07-23 2019-10-18 珠海格力电器股份有限公司 The control method and device of air conditioner, air-conditioning equipment
CN110749057A (en) * 2019-10-31 2020-02-04 广东美的制冷设备有限公司 Air conditioner control method and system and air conditioner
CN110762797A (en) * 2019-11-05 2020-02-07 广东美的制冷设备有限公司 Control method of air conditioner
CN110779179A (en) * 2019-11-11 2020-02-11 广东美的制冷设备有限公司 Air conditioner and control method and control device thereof
CN110779090A (en) * 2019-08-28 2020-02-11 广东美的制冷设备有限公司 Air conditioner control method and system and air conditioner
CN111023522A (en) * 2019-12-31 2020-04-17 广州华凌制冷设备有限公司 Operation method, device, air conditioner and computer readable storage medium
CN111023516A (en) * 2019-12-31 2020-04-17 广州华凌制冷设备有限公司 Operation method, device, air conditioner and computer readable storage medium
CN111023520A (en) * 2019-12-31 2020-04-17 广州华凌制冷设备有限公司 Operation method, device, air conditioner and computer readable storage medium
CN112212478A (en) * 2020-10-19 2021-01-12 珠海格力电器股份有限公司 Air conditioner control method for intelligent blowing and air conditioning unit
WO2021227432A1 (en) * 2020-08-28 2021-11-18 青岛海尔空调器有限总公司 Control method and apparatus for air-conditioning device, and storage medium and electronic device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107120813A (en) * 2017-06-29 2017-09-01 广东美的制冷设备有限公司 Air conditioner air blowing control method, electronic equipment and computer-readable recording medium
CN107313968A (en) * 2017-07-13 2017-11-03 浙江双阳风机有限公司 A kind of control method of convection rotary type axial flow fan with adjustable moving blades
CN108224705A (en) * 2017-12-28 2018-06-29 广东美的制冷设备有限公司 The calm sense autocontrol method of air-conditioning, air-conditioning and computer readable storage medium
CN108317613A (en) * 2018-03-20 2018-07-24 广东美的制冷设备有限公司 Cabinet air-conditioner and air conditioner
US10054128B2 (en) * 2013-03-04 2018-08-21 Mitsubishi Electric Corporation Blower and air conditioner using same
CN109084440A (en) * 2018-10-26 2018-12-25 美的集团武汉制冷设备有限公司 Air conditioner and its control method, device and computer readable storage medium

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1266428C (en) * 2002-04-29 2006-07-26 上海日立电器有限公司 Digital direct-current variable frequency air conditioner controller
CN105423502B (en) * 2015-12-31 2019-02-19 广东美的制冷设备有限公司 Air-conditioning control method and device
CN107781950A (en) * 2016-08-25 2018-03-09 珠海格力电器股份有限公司 Air supply method, device and the air-conditioning and its system of air-conditioning
CN107631354A (en) * 2017-09-07 2018-01-26 青岛海尔空调器有限总公司 Wall-hanging air conditioner indoor unit and its control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10054128B2 (en) * 2013-03-04 2018-08-21 Mitsubishi Electric Corporation Blower and air conditioner using same
CN107120813A (en) * 2017-06-29 2017-09-01 广东美的制冷设备有限公司 Air conditioner air blowing control method, electronic equipment and computer-readable recording medium
CN107313968A (en) * 2017-07-13 2017-11-03 浙江双阳风机有限公司 A kind of control method of convection rotary type axial flow fan with adjustable moving blades
CN108224705A (en) * 2017-12-28 2018-06-29 广东美的制冷设备有限公司 The calm sense autocontrol method of air-conditioning, air-conditioning and computer readable storage medium
CN108317613A (en) * 2018-03-20 2018-07-24 广东美的制冷设备有限公司 Cabinet air-conditioner and air conditioner
CN109084440A (en) * 2018-10-26 2018-12-25 美的集团武汉制冷设备有限公司 Air conditioner and its control method, device and computer readable storage medium

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260491A (en) * 2019-07-01 2019-09-20 芜湖美智空调设备有限公司 Progress control method, device, air conditioner and computer readable storage medium
CN110345610A (en) * 2019-07-23 2019-10-18 珠海格力电器股份有限公司 The control method and device of air conditioner, air-conditioning equipment
CN110779090A (en) * 2019-08-28 2020-02-11 广东美的制冷设备有限公司 Air conditioner control method and system and air conditioner
CN110779090B (en) * 2019-08-28 2022-02-25 广东美的制冷设备有限公司 Air conditioner control method and system and air conditioner
CN110749057A (en) * 2019-10-31 2020-02-04 广东美的制冷设备有限公司 Air conditioner control method and system and air conditioner
CN110762797A (en) * 2019-11-05 2020-02-07 广东美的制冷设备有限公司 Control method of air conditioner
CN110779179A (en) * 2019-11-11 2020-02-11 广东美的制冷设备有限公司 Air conditioner and control method and control device thereof
CN111023522A (en) * 2019-12-31 2020-04-17 广州华凌制冷设备有限公司 Operation method, device, air conditioner and computer readable storage medium
CN111023516A (en) * 2019-12-31 2020-04-17 广州华凌制冷设备有限公司 Operation method, device, air conditioner and computer readable storage medium
CN111023520A (en) * 2019-12-31 2020-04-17 广州华凌制冷设备有限公司 Operation method, device, air conditioner and computer readable storage medium
WO2021227432A1 (en) * 2020-08-28 2021-11-18 青岛海尔空调器有限总公司 Control method and apparatus for air-conditioning device, and storage medium and electronic device
CN112212478A (en) * 2020-10-19 2021-01-12 珠海格力电器股份有限公司 Air conditioner control method for intelligent blowing and air conditioning unit

Also Published As

Publication number Publication date
CN109945428B (en) 2020-09-22
WO2020181589A1 (en) 2020-09-17

Similar Documents

Publication Publication Date Title
CN109945428A (en) Progress control method, device, air conditioner and computer readable storage medium
CN109974230A (en) Progress control method, device, air conditioner and computer readable storage medium
CN110017587B (en) Operation control method, operation control device, air conditioner and computer readable storage medium
CN109945429A (en) Progress control method, device, air conditioner and computer readable storage medium
CN109708201A (en) Air-conditioning, blowing control method, device and storage medium
CN110017586A (en) Progress control method, device, air conditioner and computer readable storage medium
CN109974217A (en) Progress control method, device, air conditioner and computer readable storage medium
CN109974215A (en) Progress control method, device, air conditioner and computer readable storage medium
CN108413580A (en) Air-conditioner control method, device and readable storage medium storing program for executing, air conditioner
CN109974216A (en) Progress control method, device, air conditioner and computer readable storage medium
CN109668255A (en) Air conditioner and its control method and computer readable storage medium
CN108759003A (en) Control method, air conditioner and the computer readable storage medium of air conditioner
CN108759002A (en) Control method, air conditioner and the computer readable storage medium of air conditioner
CN108180606B (en) Control method and device of air conditioner, storage medium and processor
CN110260491A (en) Progress control method, device, air conditioner and computer readable storage medium
CN109595761A (en) Control method, device and the air conditioner with it of air conditioner
CN109323377A (en) Air conditioner and its control method and control device
CN107401777A (en) Wall-hanging air conditioner indoor unit
CN110848806B (en) Air conditioner and control method and device thereof
CN109668278A (en) Control method, air conditioner and the storage medium of air conditioner
CN109668279A (en) Control method, air conditioner and the storage medium of air conditioner
CN107560081A (en) Air-conditioning and its control method
CN109612039A (en) Control method, air conditioner and the computer readable storage medium of air conditioner
CN109612033A (en) Control method, air conditioner and the computer readable storage medium of air conditioner
CN109855266B (en) Method for independently designing air direction of air conditioner by user

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant