CN109930593A - A kind of Structural Engineering stake and construction method and its application in middle hard place matter soil layer - Google Patents
A kind of Structural Engineering stake and construction method and its application in middle hard place matter soil layer Download PDFInfo
- Publication number
- CN109930593A CN109930593A CN201910229708.7A CN201910229708A CN109930593A CN 109930593 A CN109930593 A CN 109930593A CN 201910229708 A CN201910229708 A CN 201910229708A CN 109930593 A CN109930593 A CN 109930593A
- Authority
- CN
- China
- Prior art keywords
- pile
- stake
- prefabricated tubular
- pressure
- soil layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a kind of Structural Engineering stake and construction method and its application in middle hard place matter soil layer, the composite pile that the Structural Engineering stake is collectively formed by high-pressure rotary jet grouting pile and prefabricated tubular pile;The compound pile construction method is first with triple-pipe high pressure jet grouting stake machine in middle hard place matter soil layer construction high-pressure rotary jet grouting pile, the cement consumption of strict control rotary churning pile, cement consumption is no less than the 15% of whirl spraying quality of pile, after the completion of rotary churning pile pile, interval 1 ~ 3 hour, prefabricated tubular pile is pressed into high-pressure rotary jet grouting pile with static pressure machine before cement does not solidify, prefabricated tubular pile stake is long identical with Pile of High-pressure Spiral Jet length, forms the cores composite piles such as high-pressure rotary-spray+prefabricated tubular pile.The present invention solves the problems, such as that prefabricated tubular pile should not be used in middle hard place matter soil layer, while having promoted the application range of composite pile significantly, is no longer limited to the use of Soft Soil Ground And Foundation reinforcing, while can be used for high-rise and Super High house pile foundation.
Description
Technical field
The present invention relates to foundation fields in civil engineering, are specifically for use in high-rise or Super High house engineering pile.
Background technique
Composite pile is a kind of novel pile-type developed on the basis of cement mixing method, be cement earth pile at
After stake, then sink to prefabricated concrete core pile, form a kind of concrete core and soil cement work together, common bearing load.Coagulation
The advantages of core column generallys use precast prestressed concrete pipe stake, and concrete-cored cement earth pile is provided simultaneously with cement earth pile and tubular pole,
With compared with high-bearing capacity, can effective control settlement, be a kind of ideal soft clay area ground base enforcement method.It is compound
Since the 1990s is applied for the first time at home, many scholars research and analyse it for stake, find concrete core+water
For soil stake working method close to friction pile, stake end only undertakes 7% or so total load head, and cement earth pile and soil around pile interface
Limit in mean frictional resistance is much higher than general cement mixing method.
Country's composite pile is largely to add prefabricated tubular pile using cement mixing method at present, is relatively specific for soft clay area
Ground base enforcement, and bearing capacity is lower, is not suitable for high-rise or Super High house pile foundation, in middle hard place matter soil layer
Area, cement mixing method are difficult pile, and simple prefabricated tubular pile is also difficult to be implanted into, and design pile-type at present and mainly select drill-pouring
Stake, higher cost.And high-pressure rotary jet grouting pile can in middle hard place matter soil layer pile, and pile stake is long is greatly improved, thus
It can be implanted into prefabricated tubular pile, form the composite pile of common stress, by adjusting rotary churning pile diameter and prefabricated tubular pile diameter, can be made
Compound pile bearing capacity is greatly improved, and meets requirement of the high-rise or super high-rise building to bearing capacity of pile.
Summary of the invention
Place in order to overcome the above-mentioned deficiencies of the prior art, the present invention provide a kind of Structural Engineering stake and construction method and its
Application in middle hard place matter soil layer, resulting structures engineering pile structural principle is simple, easy for construction, it can effectively solve commonly
Composite pile is not suitable for the problem of middle hard place matter soil layer, while by adjusting high-pressure rotary jet grouting pile and prefabricated tubular pile diameter, can make
The bearing capacity of this kind of composite pile is greatly improved, and meets requirement of the skyscraper to bearing capacity of pile.
To achieve the above object, the present invention adopts the following technical scheme: a kind of construction method of Structural Engineering stake, the knot
The composite pile that structure engineering pile is collectively formed by high-pressure rotary jet grouting pile and prefabricated tubular pile;The compound pile construction method is first high with triple tube
Pressure rotary-spraying stake machine is in middle hard place matter soil layer construction high-pressure rotary jet grouting pile, and the cement consumption of strict control rotary churning pile, cement consumption is not
Less than the 15% of whirl spraying quality of pile, after the completion of rotary churning pile pile, it is spaced 1 ~ 3 hour, it will be pre- with static pressure machine before cement does not solidify
Tubulation stake is pressed into high-pressure rotary jet grouting pile, and prefabricated tubular pile stake is long identical with Pile of High-pressure Spiral Jet length, forms high-pressure rotary-spray+prefabricated tubular pile
Equal cores composite pile.
Clay in middle hard place matter soil layer of the present invention be it is plastic arrive hard plastic state, sand be in low close state, rock stratum
For strongly weathered sand-rock.
The present invention also provides the equal cores composite piles by high-pressure rotary-spray+prefabricated tubular pile obtained by the above method.
The cores composite piles such as the high-pressure rotary-spray+prefabricated tubular pile are built as Structural Engineering stake in the room of middle hard place matter soil layer
Application in engineering.
Uplift pile of the equal cores composite pile as high-rise or Super High house pressure bearing pile or basement.
Structure of the invention engineering pile structural principle is simple, easy for construction, be from the cement mixing method of current technology maturation+
The composite pile of prefabricated tubular pile extends, it can effectively solve that composite pile is not suitable for the problem of middle hard place matter soil layer, simultaneously
By adjusting high-pressure rotary jet grouting pile and prefabricated tubular pile diameter, the compound pile bearing capacity of high-pressure rotary-spray+prefabricated tubular pile can be made to obtain very
Big promotion meets requirement of the skyscraper to bearing capacity of pile.
The present invention solves the problems, such as that prefabricated tubular pile should not be used in middle hard place matter soil layer, while having promoted composite pile significantly
Application range, be no longer limited to the use of Soft Soil Ground And Foundation reinforcing, while can be used for high-rise and Super High house pile foundation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of structure of the invention engineering pile.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the B-B sectional view of Fig. 1.
Specific embodiment
Referring to figures 1-3, the construction method of structure of the invention engineering pile, the Structural Engineering stake is by high-pressure rotary jet grouting pile
And prefabricated tubular pileIt is collectively formed and (is made of equal cores composite pile high-pressure rotary-spray+prefabricated tubular pile);Compound pile construction method is first
Constructed high-pressure rotary jet grouting pile with triple-pipe high pressure jet grouting stake machine in middle hard place matter soil layer, for compared with Soft Soil Layer can using single tube or
Two-tube whirl spraying guarantees to reach designed elevation across soil layer, forms Fig. 1 and high-pressure rotary jet grouting pile shown in Fig. 2, whirl spraying of constructing
When stake, strict control cement consumption, cement consumption cannot be less than the 15% of whirl spraying quality of pile, after the completion of rotary churning pile pile, interval
1 ~ 3 hour, with static pressure machine by prefabricated tubular pile before cement does not solidifyIt is pressed into high-pressure rotary jet grouting pile, when construction, needs to configure two
Platform rotary churning pile and a static pressed pile are constructed simultaneously.Fig. 1 and Fig. 2 is both needed to the C30 concrete of filling H1 thickness at stake bottomIt is sealed
Bottom, H1 are not less than 1.5m.Stake top fills C30 concrete thickness H1, and H1 is not less than 1.5m, and anchor bar need to be arrangedAnd hoop
Muscle, anchor barAnd stirrupReinforcing bar determined according to prefabricated tubular pile diameter referring to related tubular pole atlas, supporting plateFor
The Q235B round plate of 5mm thickness.
The equal cores composite pile of high-pressure rotary-spray+prefabricated tubular pile of the present invention is as Structural Engineering stake in middle hard place matter soil layer
House construction engineering in application.The equal cores composite pile is as high-rise or Super High house pressure bearing pile or the resistance to plucking of basement
Stake.
Claims (5)
1. a kind of method of middle hard place matter soil layer constructing structure engineering pile, it is characterized in that: the Structural Engineering stake is by high-pressure rotary-spray
Stake and prefabricated tubular pile are collectively formed;Compound pile construction method is first to be applied with triple-pipe high pressure jet grouting stake machine in middle hard place matter soil layer
Work high-pressure rotary jet grouting pile, the cement consumption of strict control rotary churning pile, cement consumption is no less than the 15% of whirl spraying quality of pile, to rotary churning pile
After the completion of pile, prefabricated tubular pile is pressed into rotary churning pile after 1 ~ 3 hour with static pressure machine by interval, and prefabricated tubular pile stake is long and high-pressure rotary-spray
Stake stake is long identical, forms the cores composite piles such as high-pressure rotary-spray+prefabricated tubular pile.
2. according to the method described in claim 1, it is characterized in that: the clay in the middle hard place matter soil layer is plastic to hard plastic shape
State, sand be in low close state, rock stratum is strongly weathered sand-rock.
3. by the equal cores composite pile of high-pressure rotary-spray+prefabricated tubular pile that method as claimed in claim 1 or 2 obtains.
4. the equal cores composite pile of high-pressure rotary-spray+prefabricated tubular pile as claimed in claim 3 is as Structural Engineering stake in middle hard place matter soil
Application in the house construction engineering of layer.
5. application according to claim 4, it is characterized in that: the equal cores composite pile is as high-rise or Super High house work
Journey stake.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910229708.7A CN109930593A (en) | 2019-03-25 | 2019-03-25 | A kind of Structural Engineering stake and construction method and its application in middle hard place matter soil layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910229708.7A CN109930593A (en) | 2019-03-25 | 2019-03-25 | A kind of Structural Engineering stake and construction method and its application in middle hard place matter soil layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109930593A true CN109930593A (en) | 2019-06-25 |
Family
ID=66988290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910229708.7A Pending CN109930593A (en) | 2019-03-25 | 2019-03-25 | A kind of Structural Engineering stake and construction method and its application in middle hard place matter soil layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109930593A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117932715A (en) * | 2023-11-15 | 2024-04-26 | 中信建筑设计研究总院有限公司 | Method for determining optimal design control pile length of pressure-bearing engineering pile |
CN117932715B (en) * | 2023-11-15 | 2024-07-16 | 中信建筑设计研究总院有限公司 | Method for determining optimal design control pile length of pressure-bearing engineering pile |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858079A (en) * | 2010-06-02 | 2010-10-13 | 山东省建筑科学研究院 | Core filling tubular pile cement composite foundation pile and construction method |
CN202830918U (en) * | 2012-04-20 | 2013-03-27 | 天津宝丰混凝土桩杆有限公司 | Bearing platform anti-seismic tubular pile provided with sectional pile cavity and filled core |
CN203200746U (en) * | 2013-04-02 | 2013-09-18 | 中国水电顾问集团中南勘测设计研究院 | High-pressure jet grouting hollow reinforced tubular pile |
CN204753567U (en) * | 2015-05-29 | 2015-11-11 | 中建五局第三建设有限公司 | Reinforcement high-pressure jet grouting support pile structure |
CN205382482U (en) * | 2016-02-05 | 2016-07-13 | 云南建工基础工程有限责任公司 | Bored concrete pile structure with it spouts stake soon to add core enlarged footing |
CN106049466A (en) * | 2016-06-30 | 2016-10-26 | 朱建新 | Construction method for pile |
JP2017057637A (en) * | 2015-09-17 | 2017-03-23 | 株式会社トーヨーアサノ | Pile foundation structure, device for burying precast pile and method for constructing pile foundation structure by device for burying precast pile |
-
2019
- 2019-03-25 CN CN201910229708.7A patent/CN109930593A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858079A (en) * | 2010-06-02 | 2010-10-13 | 山东省建筑科学研究院 | Core filling tubular pile cement composite foundation pile and construction method |
CN202830918U (en) * | 2012-04-20 | 2013-03-27 | 天津宝丰混凝土桩杆有限公司 | Bearing platform anti-seismic tubular pile provided with sectional pile cavity and filled core |
CN203200746U (en) * | 2013-04-02 | 2013-09-18 | 中国水电顾问集团中南勘测设计研究院 | High-pressure jet grouting hollow reinforced tubular pile |
CN204753567U (en) * | 2015-05-29 | 2015-11-11 | 中建五局第三建设有限公司 | Reinforcement high-pressure jet grouting support pile structure |
JP2017057637A (en) * | 2015-09-17 | 2017-03-23 | 株式会社トーヨーアサノ | Pile foundation structure, device for burying precast pile and method for constructing pile foundation structure by device for burying precast pile |
CN205382482U (en) * | 2016-02-05 | 2016-07-13 | 云南建工基础工程有限责任公司 | Bored concrete pile structure with it spouts stake soon to add core enlarged footing |
CN106049466A (en) * | 2016-06-30 | 2016-10-26 | 朱建新 | Construction method for pile |
Non-Patent Citations (4)
Title |
---|
叶书麟: "《地基处理工程实例应用手册》", 31 March 1998, 中国建筑工业出版社 * |
吴立等: "《岩土加固技术与方法》", 30 June 2015, 武汉大学出版社 * |
张华东等: "高喷插芯组合桩技术在工业项目中的应用", 《第八届全国工程地质大会论文集》 * |
江苏宁沪高速公路股份有限公司等: "《交通土建软土地基工程手册》", 30 April 2001, 人民交通出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117932715A (en) * | 2023-11-15 | 2024-04-26 | 中信建筑设计研究总院有限公司 | Method for determining optimal design control pile length of pressure-bearing engineering pile |
CN117932715B (en) * | 2023-11-15 | 2024-07-16 | 中信建筑设计研究总院有限公司 | Method for determining optimal design control pile length of pressure-bearing engineering pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350584B (en) | A kind of construction method of anti-float anchor rod | |
CN206941608U (en) | A kind of diaphram wall foundation pit supporting construction | |
CN102864777A (en) | Fast prestress anchor stock structure and construction method | |
CN102330436B (en) | Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank | |
CN103603379A (en) | Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system | |
CN207998838U (en) | A kind of compound pile pile of resistance to plucking | |
CN101793027A (en) | Core-grouted static pressure anchor rod pile | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN208517977U (en) | A kind of anti-float anchor rod that existing basement bottom board is reinforced | |
CN109930593A (en) | A kind of Structural Engineering stake and construction method and its application in middle hard place matter soil layer | |
CN203361182U (en) | Unequal-length bottom-expanded rock anchor pile of power transmission pole tower | |
CN109183786A (en) | A kind of post-tensioned prestressing resistance to plucking small diameter long screw pouring piles and its construction method | |
CN109853730A (en) | A kind of novel precast reinforced concrete frame joint and its method of construction | |
CN201635072U (en) | Centrally grouted static-pressured anchor pile former | |
CN2673944Y (en) | Prestressed pipe pile with large end filled with sand | |
CN104895090B (en) | Combined ladder key structure and construction method thereof | |
CN204080797U (en) | The composite pile of a kind of PHC stake and YTSC stake | |
CN205999879U (en) | Borehole thin-walled rubble fills out core slip casting pile composite foundation | |
CN207362837U (en) | A kind of concrete filled steel tube carrier pile | |
CN203701128U (en) | Micro pile-reinforced bridge foundation and bridge | |
CN206815321U (en) | A kind of anxious pilework of hydraulic engineering | |
CN206495202U (en) | A kind of top expansion type cement-soil composite pile | |
CN201943071U (en) | Implantable steel tube anchor rod with stabs | |
CN204418208U (en) | Anchor rod foundation | |
CN106978808B (en) | A kind of antidetonation anti-pulling pipe piles construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190625 |