CN109928467A - A kind of intelligent control electrodialysis processing electroplating wastewater equipment - Google Patents

A kind of intelligent control electrodialysis processing electroplating wastewater equipment Download PDF

Info

Publication number
CN109928467A
CN109928467A CN201910291139.9A CN201910291139A CN109928467A CN 109928467 A CN109928467 A CN 109928467A CN 201910291139 A CN201910291139 A CN 201910291139A CN 109928467 A CN109928467 A CN 109928467A
Authority
CN
China
Prior art keywords
groups
plate
bottom end
electrodialysis
clamp device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910291139.9A
Other languages
Chinese (zh)
Inventor
曾飞虎
王志文
张少杰
叶森波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liming Vocational University
Original Assignee
Liming Vocational University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liming Vocational University filed Critical Liming Vocational University
Priority to CN201910291139.9A priority Critical patent/CN109928467A/en
Publication of CN109928467A publication Critical patent/CN109928467A/en
Pending legal-status Critical Current

Links

Landscapes

  • Water Treatment By Electricity Or Magnetism (AREA)
  • Separation Using Semi-Permeable Membranes (AREA)

Abstract

The invention belongs to wastewater treating technology fields, more particularly to a kind of intelligent control electrodialysis handles electroplating wastewater equipment, it carries out internal cleaning convenient for being disassembled and installed between electrodialysis plant and mounting rack, convenient for carrying out integral demounting to electrodialysis plant, improves washing and cleaning operation efficiency;Bradyseism processing can be carried out to water pump simultaneously, reduce the pollution of equipment operation noise, improve use reliability;And its entirety is convenient for changing operation using the band of position, improves adaptability, reduces and use limitation, including waste liquid tank, electrodialysis plant, PC controller and mounting rack;Including clamp device after clamp device before hinged seat after hinged seat before two groups, two groups, two groups and two groups;It further include drum steel, four groups of damping rubber pads and vibration damper plate;It further include four groups of universal rolling wheels, four groups of lead screws and four groups of baffles, the corner location region on bottom plate top is vertically arranged with perforative adjusting through-hole up and down, and four groups of lead screws extend through and are arranged inside four groups of adjusting through-holes.

Description

A kind of intelligent control electrodialysis processing electroplating wastewater equipment
Technical field
The invention belongs to wastewater treating technology fields more particularly to a kind of intelligent control electrodialysis processing electroplating wastewater to set It is standby.
Background technique
As China's rapid economic development and labour market expand, China has become manufacture kingdom, the world, but makes It makes industry development and but brings a large amount of pollution, in various pollution sources, electroplating wastewater is big with its toxicity, and discharge amount is big, refractory reason Especially meriting attention, electroplating industry is the important processing industry in China, it is widely used in the industries such as mechanical, electronics and hardware, according to Estimation, the industry work force of the existing plating factory in the whole nation are more than 500,000 people, and production line 5000 is a plurality of and area production is electroplated Hundred million m2 of ability 2.5-3, electroplating industry annual value of production are about 10,000,000,000 yuans, and the development of electroplating industry is so that corresponding electricity The amount of waste electroplating is also increasing, in electroplating wastewater containing the toxicity such as heavy metal ion and cyanide such as chromium, nickel, cadmium, copper, zinc compared with Big substance, some belong to carcinogen, do great harm to human beings, therefore must be recycled to such waste water, thus The pollution to environment is eliminated or reduced, is 19.95 hundred million/m3 according to electroplating industry waste water annual emissions in China's known to above-mentioned statistics, such as Reason total amount so big electroplating wastewater in where becomes a problem.
At present common electroplating effluent treatment method have chemical precipitation method, ion-exchange, absorption method, membrane separation process and Electroosmose process etc., currently, the main problem that electroplating industry wastewater treatment faces concentrates on low degree of specialized division of labor, mechanized equipment is horizontal The problems such as low, pollution control level is low, and effective improvement rate is low, and operating cost is high and wastewater recycle rate is low, so seeking a kind of warp The method of the efficient processing electroplating wastewater of Ji is particularly significant, generally carries out electroplating wastewater processing using electroosmose process in the prior art Main method, existing intelligent control electrodialysis processing electroplating wastewater equipment includes waste liquid tank, electrodialysis plant, PC controller And mounting rack, mounting rack includes top plate and bottom plate, and pushes up the top for being located at bottom plate, and the bottom end of top plate and the top of bottom plate pass through Two groups of support plate connections, the bottom end of bottom plate are provided with stabilizer blade, and the bottom end of waste liquid tank and the top left hand of top plate connect, and electric osmose Analysis apparatus is mounted on the right side of the top of top plate, passes through communicating pipe with the left part input terminal of electrodialysis plant on the downside of the right end of waste liquid tank Connection, and water pump is provided on communicating pipe, PC controller is fixedly mounted on the top left hand of bottom plate, water pump and electrodialysis plant It is electrically connected with PC controller, is equipped with the filter core group being made of a plurality of filter core units in electrodialysis plant, before filter core unit End is equipped with outer layer securing plate afterwards, and outer layer securing plate is corresponding in turn to inside equipped with graphite electrode and sealing ring, two sealing rings Between be equipped with the anion-exchange membrane and cation-exchange membrane of a plurality of alternate settings, each anion-exchange membrane is exchanged with cationic There are water conservancy diversion splinting layer in film two sides;Existing intelligent control electrodialysis processing electroplating wastewater equipment when in use, first will plating Waste water is delivered to inside waste liquid tank, and then PC controller is powered and opens, and controls pump operation, and the waste liquid inside waste liquid tank is defeated Send to electrodialysis plant, at the same by PC controller control electrodialysis plant work, by electrodialysis plant to waste water into Row processing, using the amberplex in electrodialysis plant to the selective penetrated property of waste liquid intermediate ion, makes anions and canons in waste liquid Ion transfer occurs, achievees the purpose that purify electroplating wastewater or concentration respectively by anions and canons exchange membrane;It is existing Intelligent control electrodialysis processing electroplating wastewater equipment find in actual use, needed inside electrodialysis plant often periodically clear Reason, it is inconvenient to dismantle in order to preferably carry out electrodialysis use, between electrodialysis plant and mounting rack in the prior art, in turn Influence the internal washing operating efficiency to electrodialysis plant;Water pump during operation, is easy to produce vibration, whole bradyseism simultaneously Property is poor, there are biggish equipment operation noise pollution, causes its use reliability lower;And it is integrally not easy to change its work Industry uses the band of position, and adaptability is poor, causes it higher using limitation.
Summary of the invention
For the problems in background, the purpose of the present invention is to provide one kind convenient between electrodialysis plant and mounting rack into Row disassembly and installation carries out internal cleaning convenient for carrying out integral demounting to electrodialysis plant, improves washing and cleaning operation efficiency;Simultaneously Bradyseism processing can be carried out to water pump, reduce the pollution of equipment operation noise, improve use reliability;And its entirety is convenient for changing Industry is changed into using the band of position, improves adaptability, reduces and is set using the intelligent control electrodialysis processing electroplating wastewater of limitation It is standby.
To achieve the above object, the present invention provides a kind of intelligent control electrodialysis to handle electroplating wastewater equipment, including useless Liquid bath, electrodialysis plant, PC controller and mounting rack, mounting rack includes top plate and bottom plate, and pushes up the top for being located at bottom plate, top The bottom end of plate and the top of bottom plate are connected by two groups of support plates, and the bottom end of bottom plate is provided with stabilizer blade, the bottom end and top of waste liquid tank The top left hand of plate connects, and is connected to the left part input terminal of electrodialysis plant by communicating pipe on the downside of the right end of waste liquid tank, and Water pump is provided on communicating pipe, PC controller is fixedly mounted on the top left hand of bottom plate, and water pump and electrodialysis plant are controlled with PC Device processed is electrically connected, and the filter core group being made of a plurality of filter core units is equipped in electrodialysis plant, and end is set before and after filter core unit There is outer layer securing plate, outer layer securing plate is corresponding in turn to inside equipped with graphite electrode and sealing ring, is equipped between two sealing rings The anion-exchange membrane and cation-exchange membrane of a plurality of alternate settings, each anion-exchange membrane and cation-exchange membrane two sides are equal There is water conservancy diversion splinting layer;Including clamp device after clamp device before hinged seat after hinged seat before two groups, two groups, two groups and two groups, institute The bottom end of hinged seat is connect with the front left side of top plate top central region and forward right side respectively before stating two groups, and described two Before group the bottom end of clamp device respectively with described two groups before hinged seat be rotatably connected, the bottom end difference of hinged seat after described two groups Connect with the left rear side of top plate top central region and right lateral side, and after described two groups clamp device bottom end respectively with Hinged seat is rotatably connected after two groups, and the electrodialysis plant stablizes the top middle portion region for being placed on top plate, and electrodialysis For device between hinged seat after hinged seat before two groups and two groups, the top of electrodialysis plant is horizontally arranged with fastening plates, and The front end left and right side of fastening plates is provided with front bayonet slot, and the rear end left and right side of fastening plates be provided with after block Slot, the upper-side area of clamp device is not located inside two groups of front bayonet slots before two groups, the upper-side area difference of clamp device after two groups Inside card slot after two groups, the top of clamp device is provided with limit plate after the top of clamp device and two groups before two groups, And top of the bottom end of limit plate with the fastening plates is adjacent to, and preceding clamp device and rear clamp device described in every group are equal Including upper screw rod, lower screw rod and adjusting sleeve pipe, the upper inside of the adjusting sleeve pipe and downside are symmetrically arranged with oppositely oriented Upper internal whorl and lower internal whorl, and spiral shell dress is inserted into adjusting set respectively for the bottom end of the upper screw rod and the top of lower screw rod In the upper inside and downside of pipe;Further include drum steel, four groups of damping rubber pads and vibration damper plate, the top of the vibration damper plate with it is described The bottom end of water pump connects, and the drum steel is located at the lower section of vibration damper plate, the top weldering of the bottom end of drum steel and the top plate It connects, and the top corner location region of drum steel is provided with perforative lower installation through-hole up and down, the vibration damper plate bottom end Corner location region is provided with perforative upper installation through-hole up and down, and the top of four groups of damping rubber pads is provided with Shank of bolt, and the bottom end of four groups of damping rubber pads is provided with lower shank of bolt, the top and bottom end of four groups of damping rubber pads respectively with The bottom end of the vibration damper plate and the top of drum steel are adjacent to, and the insertion respectively of shank of bolt and are pierced by upwards to four groups on four groups Inside upper installation through-hole, shank of bolt is inserted into respectively and is pierced by downwards to installation through-hole under four groups, bolt on four groups under four groups Bar passes through top nut and is fastenedly connected with vibration damper plate, and shank of bolt passes through lower nut and is fastenedly connected with drum steel under four groups; It further include four groups of universal rolling wheels, four groups of lead screws and four groups of baffles, the corner location region on the bottom plate top is vertically arranged with Upper and lower perforative adjusting through-hole, and four groups of lead screws extend through and are arranged inside four groups of adjusting through-holes, four groups of lead screws Bottom end is connect with the top of four groups of universal rolling wheels respectively, and the equal spiral shell encapsulation of the outer lower side of four groups of lead screws is equipped with adjusting nut, And bottom end of the top of adjusting nut with the bottom plate is adjacent to, and support bullet is arranged with outside the upper half area of four groups of lead screws Spring, and the bottom end of every group of support spring is connect with the top of bottom plate, the center bottom of four groups of baffles respectively with it is described The top connection of four groups of lead screws, and bottom end of the top of four groups of support springs respectively with four groups of baffles is adjacent to.
In order to facilitate up and down adjustment universal rolling wheel, prevent idler wheel from arbitrarily rotating with lead screw, present invention improvement has, described in every group The longitudinally disposed orientation limiting device of the bottom end corner location of baffle, and orient the bottom end of limiting device with the bottom plate Top connection, and every group of orientation limiting device includes inserting column and intubation, and the bottom end of every group of inserting column is slidably inserted respectively Enter to every group of cannula interior.
In order to improve the whole integration of device, while convenient for collecting the electroplating wastewater of electrodialysis plant processing, the present invention Improvement has, and the right part output end of the electrodialysis plant is provided with drain pipe, and liquidceiver, institute are arranged on the right side of the top of bottom plate The bottom end for stating drain pipe is inserted into inside liquidceiver.
In order to improve shelf-stability of the electrodialysis plant on top plate, increase is placed into contact with area, and present invention improvement has, The bottom end left and right side of the electrodialysis plant is provided with placement plate.
In order to facilitate the electrodialysis plant after disassembly the same position to top plate is installed every time, connects convenient for pipeline alignment It connects, reduces position debugging operations, improve installation effectiveness, present invention improvement has, and the bottom end of placement plate described in every group is provided with fixed Position pin, and location hole is correspondingly arranged on the top plate, positioning pin is longitudinally inserted into respectively to corresponding location hole.
In order to improve the frictional force between limit plate and fastening plates, prevent from falling off between limit plate and fastening plates, the present invention Improvement has, and the bottom end of limit plate described in every group is provided with multiple groups anti-slop serrations.
In order to facilitate the waste liquid level condition inside observation waste liquid tank, present invention improvement has, outside the front end of the waste liquid tank Transparent observing plate is provided on wall.
In order to improve the observation clarity of transparent observing plate, convenient for when transparent observing plate be plated waste liquid it is dirty when and carry out Wiping observation, present invention improvement have, and the transparent observing is provided in round, and are provided with front and back in the middle part of transparent observing plate and pass through The rotated through-hole worn, rotated through-hole inside are rotatably provided with shaft by mechanical seal, and the front end of shaft has been arranged concentrically hand Wheel, and handwheel is located at the front side external world of waste liquid tank, and the rear end of shaft is vertically arranged with brush holder support, and the front end of brush holder support is provided with sea Silk floss, and the front end of sponge and the rear end of transparent observing plate are adjacent to.
Position after adjusting between adjusting sleeve pipe in order to facilitate raising upper screw rod and lower screw rod carries out locking fastening, prevents It only loosens, present invention improvement has, and the external spiral shell encapsulation respectively of upper screw rod described in every group and lower screw rod is equipped with upper fastening nut under Fastening nut, and the bottom end of upper fastening nut and the top of lower fastening nut respectively with the top of adjusting sleeve pipe described in every group and Bottom end locking contact.
PC controller is protected in order to improve, reduces the influence of extraneous factor, present invention improvement has, the PC controller External fixing sleeve is equipped with water-proof protection cover.
The beneficial effects of the present invention are as follows: new structural intelligent control electrodialysis handles electroplating wastewater equipment, can pass through Rotate adjusting sleeve pipe, keep upper screw rod synchronous with lower screw rod to precession inside adjusting sleeve pipe or back-out, so as to before adjusting tightly It is fixedly mounted with the length set with rear clamp device, when being screwed out upper screw rod and lower screw rod to adjusting sleeve pipe respectively, before making two groups Clamp device extends after clamp device and two groups, so that limit plate be made to separate with fastening plates, passes through hinged seat before two groups and two groups The effect of hinged seat afterwards, clamp device after clamp device and two groups before respectively forwardly rotating two groups, so as to so that electrodialysis fills It sets and is separated with top plate, unload electrodialysis plant finally by detaching pipelines, by aforesaid operations, consequently facilitating electrodialysis It is disassembled and installed between device and mounting rack, carries out internal cleaning convenient for carrying out integral demounting to electrodialysis plant, mention Height cleaning operating efficiency;Water pump can be supported by vibration damper plate, drum steel and damping rubber pad simultaneously, pass through fixed installation Damping rubber pad resiliency, to water pump carry out bradyseism processing, reduce equipment operation noise pollution, improve use reliability; And when integrally needing to change using position, four groups of lead screws are pulled separately down, make every group of lead screw respectively to the lower right of bottom plate Elongation is screwed out, until four groups of universal rolling wheels are with ground face contact, then upward rotating adjusting nut respectively, it is extraneous will to extend bottom plate out Lead screw and bottom plate between relative position locked, then proceed to be rotated up four groups of adjusting nuts, make stabilizer blade and ground It is detached from, to pass through the rotation of four groups of universal rolling wheels, pushes and move integrally, to make its entirety that change operation is convenient for use position Adaptability is improved in region, reduces and uses limitation.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the partial enlargement structural representation in Fig. 1 of the present invention at A.
Fig. 3 is the partial enlargement structural representation in Fig. 1 of the present invention at B.
Fig. 4 is the partial enlargement structural representation in Fig. 1 of the present invention at C.
Fig. 5 is the partial enlargement structural representation in Fig. 1 of the present invention at D.
Fig. 6 is the overlooking structure diagram of fastening plates of the present invention and front bayonet slot.
Fig. 7 is the structural schematic diagram of the connections such as universal rolling wheel, lead screw, baffle and support spring of the present invention.
Fig. 8 is the right view cross section structure schematic diagram that transparent baffle of the present invention, brush holder support, sponge connect with handwheel.
Detailed description of the invention: 1- waste liquid tank;2- electrodialysis plant;3-PC controller;4- top plate;5- bottom plate;6- support plate;7- branch Foot;8- communicating pipe;9- water pump;Hinged seat before 10-;11- fastening plates;12- front bayonet slot;13- limit plate;14- upper screw rod;15- tune Save casing;16- drum steel;17- damping rubber pad;18- vibration damper plate;The upper shank of bolt of 19-;20- top nut;21- universal rolling wheel;22- Lead screw;23- baffle;24- support spring;25- inserting column;26- intubation;27- drain pipe;28- liquidceiver;29- placement plate;30- is fixed Position pin;31- anti-slop serrations;32- transparent observing plate;33- handwheel;34- brush holder support;35- sponge;The upper fastening nut of 36-;37- waterproof is protected Shield;38- adjusting nut.
Specific embodiment
In order to be more clearly understood that technical solution of the present invention, the present invention is carried out further specifically in conjunction with following instance It is bright.It should be appreciated that specific embodiment described herein is only used to explain invention, it is not intended to limit the present invention.
Referring to figs. 1 to Fig. 8, a kind of intelligent control electrodialysis processing electroplating wastewater equipment of the invention, including waste liquid tank 1, Electrodialysis plant 2, PC controller 3 and mounting rack, mounting rack includes top plate 4 and bottom plate 5, and pushes up the top for being located at bottom plate 5, top The bottom end of plate 4 is connect with the top of bottom plate 5 by two groups of support plates 6, and the bottom end of bottom plate 5 is provided with stabilizer blade 7, the bottom of waste liquid tank 1 End is connect with the top left hand of top plate 4, passes through communicating pipe 8 with the left part input terminal of electrodialysis plant 2 on the downside of the right end of waste liquid tank 1 Connection, and water pump 9 is provided on communicating pipe 8, PC controller 3 is fixedly mounted on the top left hand of bottom plate 5, water pump 9 and electric osmose Analysis apparatus 2 is electrically connected with PC controller 3, and the filter core group being made of a plurality of filter core units, filter are equipped in electrodialysis plant 2 End is equipped with outer layer securing plate before and after core unit, and outer layer securing plate is corresponding in turn to inside equipped with graphite electrode and sealing ring, and two The anion-exchange membrane and cation-exchange membrane of a plurality of alternate settings, each anion-exchange membrane and sun are equipped between a sealing ring There are water conservancy diversion splinting layer in amberplex two sides;Including clamp device before hinged seat after before two groups 10, two groups of hinged seat, two groups and Clamp device after two groups, before described two groups the bottom end of hinged seat 10 respectively with the front left side in the 4 top middle portion region of top plate and Forward right side connection, and before described two groups clamp device bottom end respectively with described two groups before hinged seat 10 be rotatably connected, institute The bottom end of hinged seat is connect with the left rear side in the 4 top middle portion region of top plate and right lateral side respectively after stating two groups, and described After two groups the bottom end of clamp device respectively with two groups after hinged seat be rotatably connected, the stabilization of electrodialysis plant 2 is placed on top The top middle portion region of plate 4, and electrodialysis plant 2 be located at two groups before after hinged seat 10 and two groups between hinged seat, electrodialysis The top of device 2 is horizontally arranged with fastening plates 11, and the front end left and right side of fastening plates 11 is provided with front bayonet slot 12, and And the rear end left and right side of fastening plates 11 is provided with rear card slot, before the upper-side area of clamp device is not located at two groups before two groups Inside card slot 12, after the upper-side area of clamp device is located at two groups after two groups inside card slot, the top of clamp device before two groups The top of clamp device is provided with limit plate 13 after end and two groups, and the bottom end of limit plate 13 with the fastening plates 11 Top is adjacent to, and preceding clamp device and rear clamp device described in every group include upper screw rod 14, lower screw rod and adjusting sleeve pipe 15, The upper inside of the adjusting sleeve pipe 15 and downside are symmetrically arranged with oppositely oriented upper internal whorl and lower internal whorl, and Spiral shell dress is inserted into the upper inside and downside of adjusting sleeve pipe 15 respectively for the bottom end of the upper screw rod 14 and the top of lower screw rod;Also Including 16, four groups of damping rubber pads 17 of drum steel and vibration damper plate 18, the bottom end of the top of the vibration damper plate 18 and the water pump 9 connects It connecing, and the drum steel 16 is located at the lower section of vibration damper plate 18, the bottom end of drum steel 16 and the top of the top plate 4 are welded, and And the top corner location region of drum steel 16 be provided with up and down perforative lower installation through-hole, the four of 18 bottom end of vibration damper plate Angle Position region is provided with perforative upper installation through-hole up and down, and the top of four groups of damping rubber pads 17 is provided with Shank of bolt 19, and the bottom end of four groups of damping rubber pads 17 is provided with lower shank of bolt, the top and bottom end of four groups of damping rubber pads 17 The top with the bottom end of the vibration damper plate 18 and drum steel 16 is adjacent to respectively, and on four groups the insertion respectively of shank of bolt 19 and to On be pierced by installation through-hole on four groups, shank of bolt is inserted into respectively and is pierced by downwards to installation through-hole under four groups under four groups Portion, shank of bolt 19 is fastenedly connected by top nut 20 with vibration damper plate 18 on four groups, and shank of bolt passes through lower spiral shell under four groups Mother is fastenedly connected with drum steel 16;It further include four groups of universal rolling wheels, 21, four groups of lead screws 22 and four groups of baffles 23, the bottom plate 5 pushes up The corner location region at end is vertically arranged with perforative adjusting through-hole up and down, and four groups of lead screws 22 extend through setting Inside four groups of adjusting through-holes, the bottom end of four groups of lead screws 22 is connect with the top of four groups of universal rolling wheels 21 respectively, four groups of silks The equal spiral shell encapsulation of the outer lower side of thick stick 22 is equipped with adjusting nut 38, and bottom end of the top of adjusting nut 38 with the bottom plate 5 Be adjacent to, be arranged with support spring 24 outside the upper half area of four groups of lead screws 22, and the bottom end of every group of support spring 24 with The top of bottom plate 5 connects, and the center bottom of four groups of baffles 23 is connect with the top of four groups of lead screws 22 respectively, and four Bottom end of the top of group support spring 24 respectively with four groups of baffles 23 is adjacent to;It can make upper screw rod by rotating adjusting sleeve pipe 15 14 is synchronous with lower screw rod to 15 inside precession of adjusting sleeve pipe or back-out, so as to adjust preceding clamp device and rear clamp device Length, when being screwed out upper screw rod 14 and lower screw rod respectively to 15 inside of adjusting sleeve pipe, clamp device and two groups before making two groups Clamp device extends afterwards, so that limit plate 13 be made to separate with fastening plates 11, passes through hinged seat after hinged seat 10 before two groups and two groups Effect, clamp device after clamp device and two groups before respectively forwardly rotating two groups, so as to so that electrodialysis plant 2 and top plate 4 separation, unload electrodialysis plant 2 finally by detaching pipelines, by aforesaid operations, consequently facilitating electrodialysis plant 2 It is disassembled and installed between mounting rack, carries out internal cleaning convenient for carrying out integral demounting to electrodialysis plant 2, improved clear Wash operating efficiency;Water pump 9 can be supported by vibration damper plate 18, drum steel 16 and damping rubber pad 17 simultaneously, pass through fixation The resiliency of the damping rubber pad 17 of installation carries out bradyseism processing to water pump 9, reduces the pollution of equipment operation noise, improves and use Reliability;And when integrally needing to change using position, pull four groups of lead screws 22 separately down, make every group of lead screw 22 respectively to The lower of bottom plate 5 is extended to screwing out, until four groups of universal rolling wheels 21 with ground face contact, then upward rotating adjusting nut 38 respectively, The relative position extended between the lead screw 22 and bottom plate 5 that bottom plate 5 is extraneous out is locked, then proceedes to be rotated up four groups of tune Nut 38 is saved, stabilizer blade 7 and ground are detached from, to pass through the rotation of four groups of universal rolling wheels 21, pushes and moves integrally, to make it It is whole to use the band of position convenient for changing operation, adaptability is improved, reduces and uses limitation.
Further, in order to facilitate up and down adjustment universal rolling wheel 21, prevent idler wheel from arbitrarily rotating with lead screw 22, described in every group The longitudinally disposed orientation limiting device of the bottom end corner location of baffle 23, and orient the bottom end of limiting device with the bottom plate 5 top connection, and every group of orientation limiting device includes inserting column 25 and intubation 26, and the bottom end of every group of inserting column 25 is distinguished It can be slidably inserted into every group of intubation 26.
Further, in order to improve the whole integration of device, while being convenient for the plating for collecting the processing of electrodialysis plant 2 useless Water, the right part output end of the electrodialysis plant 2 is provided with drain pipe 27, and liquidceiver 28 is arranged on the right side of the top of bottom plate 5, The bottom end of the drain pipe 27 is inserted into inside liquidceiver 28.
Further, in order to improve the shelf-stability of electrodialysis plant 2 on the top plate 4, increase is placed into contact with area, institute The bottom end left and right side for stating electrodialysis plant 2 is provided with placement plate 29.
Further, the electrodialysis plant 2 after dismantling for convenience every time be convenient for the same position on top plate 4 by installation Pipeline alignment connection, reduces position debugging operations, improves installation effectiveness, the bottom end of placement plate 29 described in every group is provided with positioning Pin 30, and location hole is correspondingly arranged on the top plate 4, positioning pin 30 is longitudinally inserted into respectively to corresponding location hole.
Further, in order to improve the frictional force between limit plate 13 and fastening plates 11, limit plate 13 and fastening plates are prevented It falls off between 11, the bottom end of limit plate 13 described in every group is provided with multiple groups anti-slop serrations 31.
Further, the waste liquid level condition inside waste liquid tank 1, the front end outer wall of the waste liquid tank 1 are observed for convenience On be provided with transparent observing plate 32.
Further, in order to improve the observation clarity of transparent observing plate 32, convenient for when transparent observing plate 32 be plated it is useless Wiping observation is carried out when liquid is dirty, before the transparent observing is provided in round, and the middle part of transparent observing plate 32 is provided with Perforative rotated through-hole afterwards, rotated through-hole inside are rotatably provided with shaft by mechanical seal, and the front end of shaft is arranged concentrically There is handwheel 33, and handwheel 33 is located at the front side external world of waste liquid tank 1, the rear end of shaft is vertically arranged with brush holder support 34, brush holder support 34 Front end is provided with sponge 35, and the front end of sponge 35 and the rear end of transparent observing plate 32 are adjacent to.
Further, improve for convenience the position after upper screw rod 14 and lower screw rod are adjusted between adjusting sleeve pipe 15 into Row locking fastening, prevents from loosening, and the external spiral shell encapsulation respectively of upper screw rod 14 described in every group and lower screw rod is equipped with upper fastening nut 36 With lower fastening nut, and the bottom end of upper fastening nut 36 and the top of lower fastening nut respectively with adjusting sleeve pipe 15 described in every group Top and bottom end locking contact.
Further, PC controller 3 is protected in order to improve, reduces the influence of extraneous factor, the PC controller 3 it is outer Portion's fixing sleeve is equipped with water-proof protection cover 37.
The course of work: pulling downward on four groups of lead screws 22 first, stretches every group of lead screw 22 to the lower of bottom plate 5 to back-out respectively Long, until four groups of universal rolling wheels 21 are with ground face contact, then upward rotating adjusting nut 38 respectively, it is extraneous will to extend bottom plate 5 out Lead screw 22 and bottom plate 5 between relative position locked, then proceed to be rotated up four groups of adjusting nuts 38, make stabilizer blade 7 It is detached from ground, to pass through the rotation of four groups of universal rolling wheels 21, pushes and move integrally, used moving integrally to needed for user Job position region, then rotate four groups of adjusting bolts separately down, make four groups of universal rolling wheels 21 in the work of support spring 24 It moves up under and is detached from ground, by being slidably matched between inserting column 25 and intubation 26, prevent lead screw 22 from arbitrarily rotating, it will Electroplating wastewater is delivered to inside waste liquid tank 1, and then PC controller 3 is powered and opens, and control water pump 9 operates, inside waste liquid tank 1 Waste liquid be delivered to inside electrodialysis plant 2, while by PC controller 3 control electrodialysis plant 2 work, filled by electrodialysis It sets 2 pairs of waste water to handle, using the amberplex in electrodialysis plant 2 to the selective penetrated property of waste liquid intermediate ion, makes to give up Ion transfer occurs for anions and canons in liquid, reaches purification electroplating wastewater or concentration by anions and canons exchange membrane respectively, Then treated liquid is delivered to inside liquidceiver 28 by drain pipe 27, then rotates handwheel 33, rotate brush holder support 34, It is wiped by rear end of the sponge 35 to transparent baffle 23, the waste liquid level condition inside waste liquid tank 1 is observed by transparent baffle 23, When electrodialysis plant 2 needs to dismantle cleaning, by rotating adjusting sleeve pipe 15, keep upper screw rod 14 synchronous with lower screw rod to adjusting set 15 inside precession of pipe or back-out, so as to adjust the length of preceding clamp device and rear clamp device, when by 14 He of upper screw rod When lower screw rod is screwed out respectively to 15 inside of adjusting sleeve pipe, clamp device extends after clamp device and two groups before making two groups, to make Limit plate 13 is separated with fastening plates 11, by the effect of hinged seat after hinged seat 10 before two groups and two groups, respectively forwardly rotates two Clamp device after clamp device and two groups before group, so as to so that electrodialysis plant 2 is separated with top plate 4, finally by disassembly pipe Electrodialysis plant 2 is unloaded on road, is supported by vibration damper plate 18, drum steel 16 and damping rubber pad 17 to water pump 9, passes through fixation The resiliency of the damping rubber pad 17 of installation carries out bradyseism processing to water pump 9, reduces the pollution of equipment operation noise, work as electrodialysis When device 2 is installed again, electrodialysis plant 2 can be correspondingly placed at by original by the cooperation between positioning pin 30 and location hole Beginning installation site, clamp device after then respectively forwardly overturn and turn over before two groups clamp device and two groups, and turn respectively Dynamic adjusting sleeve pipe 15 contacts the bottom end of limit plate 13 with the locking of the top of fastening plates 11, finally rotates upper fastening nut respectively 36 and lower fastening nut, the relative position between upper screw rod 14 and lower screw rod and adjusting sleeve pipe 15 is locked.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating current, and main controller can be meter Calculation machine etc. plays the conventionally known equipment of control.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of intelligent control electrodialysis handles electroplating wastewater equipment, including waste liquid tank, electrodialysis plant, PC controller and installation Frame, mounting rack includes top plate and bottom plate, and pushes up the top for being located at bottom plate, and the bottom end of top plate and the top of bottom plate pass through two groups of branch Fagging connection, the bottom end of bottom plate are provided with stabilizer blade, and the bottom end of waste liquid tank and the top left hand of top plate connect, under the right end of waste liquid tank Side is connected to the left part input terminal of electrodialysis plant by communicating pipe, and water pump is provided on communicating pipe, and PC controller is fixed Be mounted on the top left hand of bottom plate, water pump and electrodialysis plant are electrically connected with PC controller, be equipped in electrodialysis plant by The filter core group of a plurality of filter core units composition, end is equipped with outer layer securing plate before and after filter core unit, outer layer securing plate inside according to It is secondary to be correspondingly provided with graphite electrode and sealing ring, the anion-exchange membrane and sun of a plurality of alternate settings are equipped between two sealing rings There are water conservancy diversion splinting layer in amberplex, each anion-exchange membrane and cation-exchange membrane two sides;It is characterized by comprising two groups Preceding hinged seat, hinged seat after two groups, clamp device after clamp device and two groups before two groups, the bottom end point of hinged seat before described two groups It is not connect with the front left side of top plate top central region and forward right side, and the bottom end of clamp device is distinguished before described two groups Hinged seat is rotatably connected before with described two groups, after described two groups the bottom end of hinged seat respectively with top plate top central region Left rear side connected with right lateral side, and after described two groups clamp device bottom end respectively with two groups after hinged seat rotatably connect It connects, the electrodialysis plant stablizes the top middle portion region for being placed on top plate, and electrodialysis plant is positioned at hinged seat before two groups After with two groups between hinged seat, the top of electrodialysis plant is horizontally arranged with fastening plates, and on the left of the front end of fastening plates and right Side is provided with front bayonet slot, and the rear end left and right side of fastening plates is provided with rear card slot, and clamp device is upper before two groups Side region is not located inside two groups of front bayonet slots, after the upper-side area of clamp device is located at two groups after two groups inside card slot, two The top of clamp device and the top of clamp device after two groups are provided with limit plate before group, and the bottom end of limit plate is and institute The top for stating fastening plates is adjacent to, and preceding clamp device and rear clamp device described in every group include upper screw rod, lower screw rod and tune Casing is saved, the upper inside of the adjusting sleeve pipe and downside are symmetrically arranged with oppositely oriented upper internal whorl and lower internal spiral shell Line, and spiral shell fills upper inside and the downside for being inserted into adjusting sleeve pipe respectively for the bottom end of the upper screw rod and the top of lower screw rod In;Further include that drum steel, four groups of damping rubber pads and vibration damper plate, the top of the vibration damper plate are connect with the bottom end of the water pump, and And the drum steel is located at the lower section of vibration damper plate, the top welding of the bottom end of drum steel and the top plate, and the top of drum steel End corner location region is provided with perforative lower installation through-hole up and down, and the corner location region of the vibration damper plate bottom end is respectively provided with There is perforative upper installation through-hole up and down, and the top of four groups of damping rubber pads is provided with shank of bolt, and four groups subtract The bottom end of shake rubber mat is provided with lower shank of bolt, the top and bottom end of four groups of damping rubber pads respectively with the bottom end of the vibration damper plate and The top of drum steel is adjacent to, and the insertion respectively of shank of bolt and is pierced by installation through-hole on four groups upwards, four on four groups The lower shank of bolt of group is inserted into respectively and is pierced by downwards to installation through-hole under four groups, and shank of bolt passes through top nut and subtracts on four groups Shake plate is fastenedly connected, and shank of bolt passes through lower nut and is fastenedly connected with drum steel under four groups;Further include four groups of universal rolling wheels, Four groups of lead screws and four groups of baffles, the corner location region on the bottom plate top are vertically arranged with perforative adjusting through-hole up and down, And four groups of lead screws extend through be arranged inside four groups of adjusting through-holes, the bottom end of four groups of lead screws respectively with described four group ten thousand The top of way roller connects, and the equal spiral shell encapsulation of the outer lower side of four groups of lead screws is equipped with adjusting nut, and the top of adjusting nut is equal It is adjacent to the bottom end of the bottom plate, support spring, and every group of support spring is arranged with outside the upper half area of four groups of lead screws Bottom end connect with the top of bottom plate, the center bottom of four groups of baffles is connect with the top of four groups of lead screws respectively, And bottom end of the top of four groups of support springs respectively with four groups of baffles is adjacent to.
2. a kind of intelligent control electrodialysis according to claim 1 handles electroplating wastewater equipment, it is characterised in that: every group of institute State the longitudinally disposed orientation limiting device of bottom end corner location of baffle, and orient the bottom end of limiting device with the bottom plate Top connection, and every group of orientation limiting device includes inserting column and intubation, and the bottom end of every group of inserting column is respectively slidably It is inserted into every group of cannula interior.
3. a kind of intelligent control electrodialysis according to claim 1 handles electroplating wastewater equipment, it is characterised in that: the electricity The right part output end of electrodialysis apparatus is provided with drain pipe, and liquidceiver, the bottom of the drain pipe are arranged on the right side of the top of bottom plate End is inserted into inside liquidceiver.
4. a kind of intelligent control electrodialysis according to claim 1 handles electroplating wastewater equipment, it is characterised in that: the electricity The bottom end left and right side of electrodialysis apparatus is provided with placement plate.
5. a kind of intelligent control electrodialysis according to claim 4 handles electroplating wastewater equipment, it is characterised in that: every group of institute The bottom end for stating placement plate is provided with positioning pin, and location hole is correspondingly arranged on the top plate, and positioning pin is longitudinal respectively to be inserted Enter to corresponding location hole.
6. a kind of intelligent control electrodialysis according to claim 1 handles electroplating wastewater equipment, it is characterised in that: every group of institute The bottom end for stating limit plate is provided with multiple groups anti-slop serrations.
7. a kind of intelligent control electrodialysis according to claim 1 handles electroplating wastewater equipment, it is characterised in that: described useless Transparent observing plate is provided on the front end outer wall of liquid bath.
8. a kind of intelligent control electrodialysis according to claim 7 handles electroplating wastewater equipment, it is characterised in that: described Bright observation is provided in round, and pre-and post perforative rotated through-hole is provided in the middle part of transparent observing plate, logical inside rotated through-hole It crosses mechanical seal and is rotatably provided with shaft, the front end of shaft has been arranged concentrically handwheel, and handwheel is located at the front side of waste liquid tank The external world, the rear end of shaft are vertically arranged with brush holder support, and the front end of brush holder support is provided with sponge, and the front end of sponge and transparent observing plate Rear end be adjacent to.
9. a kind of intelligent control electrodialysis according to claim 1 handles electroplating wastewater equipment, it is characterised in that: every group of institute The external spiral shell encapsulation respectively for stating upper screw rod and lower screw rod is equipped with upper fastening nut and lower fastening nut, and the bottom of upper fastening nut End and the top of lower fastening nut are contacted with the top of adjusting sleeve pipe described in every group and bottom end locking respectively.
10. a kind of intelligent control electrodialysis according to claim 1 handles electroplating wastewater equipment, it is characterised in that: described The external fixing sleeve of PC controller is equipped with water-proof protection cover.
CN201910291139.9A 2019-04-11 2019-04-11 A kind of intelligent control electrodialysis processing electroplating wastewater equipment Pending CN109928467A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910291139.9A CN109928467A (en) 2019-04-11 2019-04-11 A kind of intelligent control electrodialysis processing electroplating wastewater equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910291139.9A CN109928467A (en) 2019-04-11 2019-04-11 A kind of intelligent control electrodialysis processing electroplating wastewater equipment

Publications (1)

Publication Number Publication Date
CN109928467A true CN109928467A (en) 2019-06-25

Family

ID=66989813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910291139.9A Pending CN109928467A (en) 2019-04-11 2019-04-11 A kind of intelligent control electrodialysis processing electroplating wastewater equipment

Country Status (1)

Country Link
CN (1) CN109928467A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111924944A (en) * 2020-09-22 2020-11-13 山东龙安泰环保科技有限公司 Intelligent control electrodialysis treatment electroplating wastewater equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204034569U (en) * 2014-06-27 2014-12-24 黎明职业大学 A kind of Intelligent electric dialysis control system
CN104454662A (en) * 2013-09-23 2015-03-25 天津市能信科技有限公司 Damping and noise-lowering buffering base for water pump
US20150368125A1 (en) * 2010-11-12 2015-12-24 Evoqua Water Technologies Pte., Ltd. Techniques for promoting current efficiency in electrochemical separation systems and methods
CN106946365A (en) * 2017-05-11 2017-07-14 杨奥 A kind of sanitary wastewater microbial treatment device
CN207614657U (en) * 2017-04-05 2018-07-17 合肥科佳高分子材料科技有限公司 A kind of fully-automatic thermostatic electrodialysis integrating device
CN207697392U (en) * 2017-12-29 2018-08-07 河间市振华农机汽车配件有限公司 A kind of adjustable tool box wheel
CN208041457U (en) * 2018-02-11 2018-11-02 长春市柏达医疗设备有限责任公司 A kind of fixing device of Medical Devices
CN109048632A (en) * 2018-09-14 2018-12-21 江苏宝创科技有限公司 A kind of tablet computer production metal shell surface burnishing device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150368125A1 (en) * 2010-11-12 2015-12-24 Evoqua Water Technologies Pte., Ltd. Techniques for promoting current efficiency in electrochemical separation systems and methods
CN104454662A (en) * 2013-09-23 2015-03-25 天津市能信科技有限公司 Damping and noise-lowering buffering base for water pump
CN204034569U (en) * 2014-06-27 2014-12-24 黎明职业大学 A kind of Intelligent electric dialysis control system
CN207614657U (en) * 2017-04-05 2018-07-17 合肥科佳高分子材料科技有限公司 A kind of fully-automatic thermostatic electrodialysis integrating device
CN106946365A (en) * 2017-05-11 2017-07-14 杨奥 A kind of sanitary wastewater microbial treatment device
CN207697392U (en) * 2017-12-29 2018-08-07 河间市振华农机汽车配件有限公司 A kind of adjustable tool box wheel
CN208041457U (en) * 2018-02-11 2018-11-02 长春市柏达医疗设备有限责任公司 A kind of fixing device of Medical Devices
CN109048632A (en) * 2018-09-14 2018-12-21 江苏宝创科技有限公司 A kind of tablet computer production metal shell surface burnishing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111924944A (en) * 2020-09-22 2020-11-13 山东龙安泰环保科技有限公司 Intelligent control electrodialysis treatment electroplating wastewater equipment

Similar Documents

Publication Publication Date Title
CN105016505A (en) Stirring type water purification device
CN109928467A (en) A kind of intelligent control electrodialysis processing electroplating wastewater equipment
CN110090483B (en) Impurity filtering device is used in production of pyridine quaternary ammonium salt water treatment agent
CN107473464A (en) A kind of industrial waste water purifying handling machine people
CN215855556U (en) Nickel-containing waste liquid electrolysis recovery equipment
CN208308484U (en) A kind of rotary drum stainless steel membrane filtration device
CN217103210U (en) Normal temperature deaerator with sponge iron filter material
CN220142710U (en) Electroplating wastewater pretreatment device
CN215439987U (en) Brine purification device for salt production
CN205676250U (en) High-quality domestic water device
CN215161714U (en) Cleaning wastewater treatment device
CN219807877U (en) Silt treatment salt-reducing equipment
CN110683684B (en) Electroplating copper-containing sewage treatment system and treatment process
CN220245842U (en) Bathing washing wastewater water treatment ware
CN212151983U (en) Equipment for separating suspended matters and particles in water and removing ammonia nitrogen
CN221141497U (en) Anti-blocking heavy metal sewage treatment device
CN211536827U (en) A filter equipment for sewage treatment
CN213537513U (en) Water-saving stainless steel welding piece washing equipment
CN212931147U (en) Closed cooling tower with water purifying device
CN218043538U (en) Yellow croaker scaling treatment device with structure of decontaminating
CN210825701U (en) Electrolytic foil-generating foil-washing water recycling device
CN211921725U (en) Electroplating wash bowl convenient to wash
CN213446738U (en) Centralized treatment's laboratory sewage treatment device
CN215251254U (en) A high-efficient electroplating device for metal surface treatment
CN220514921U (en) Ore cleaning water circulation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190625

RJ01 Rejection of invention patent application after publication