CN109919328A - A kind of low pressure branch line power failure analysis method based on multi-source power-off event - Google Patents

A kind of low pressure branch line power failure analysis method based on multi-source power-off event Download PDF

Info

Publication number
CN109919328A
CN109919328A CN201910101366.0A CN201910101366A CN109919328A CN 109919328 A CN109919328 A CN 109919328A CN 201910101366 A CN201910101366 A CN 201910101366A CN 109919328 A CN109919328 A CN 109919328A
Authority
CN
China
Prior art keywords
power failure
power
low pressure
branch line
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910101366.0A
Other languages
Chinese (zh)
Other versions
CN109919328B (en
Inventor
裘华东
郎建
王伟峰
洪健山
沈皓
叶盛
孙钢
吴春华
蒋群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Zhejiang Huayun Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910101366.0A priority Critical patent/CN109919328B/en
Publication of CN109919328A publication Critical patent/CN109919328A/en
Application granted granted Critical
Publication of CN109919328B publication Critical patent/CN109919328B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of low pressure branch line power failure analysis method based on multi-source power-off event, is related to electric power O&M field.The data source of low pressure branch line is complicated, and it is low to study and judge complicated and accuracy to power failure.The invention includes the following steps: receiving terminal and meter event, start to study and judge under the area Fei Tai power-off condition;Judge whether the junior's level power failure data source for occurring low pressure branch line lower 2 or more;If so, carrying out studying and judging for concentrator and meter;If it is not, then carrying out the power failure of subordinate's level according to the subordinate relation of concentrator and meter and studying and judging;If confirming that low pressure branch has a power failure by studying and judging for concentrator and meter, if it is not, then carrying out the power failure of subordinate's level according to the subordinate relation of concentrator and meter and studying and judging;Situation confirmation low pressure branch line power-off condition is studied and judged according to power failure.A variety of power failure data sources are applied in combination in the technical program, and active power-off event and power failure, which are called together, surveys as a result, to improve the accuracy and real time problems of studying and judging the power failure of low pressure branch line.

Description

A kind of low pressure branch line power failure analysis method based on multi-source power-off event
Technical field
The present invention relates to electric power O&M fields more particularly to a kind of low pressure branch line power failure based on multi-source power-off event to grind Sentence method.
Background technique
With the fast development of electric power science and technology and the continuous quickening of IT application process, the whole world deeply promotes the optimization energy Structure realizes that an energy strategy transition new round is changed, and smart grid has become the important trend of International Power development.Acquisition system A large amount of business and data supporting are provided always in terms of supporting distribution operation management, and are played the part of in outage analysis service application Drill key player.
Up to now, Guo Wang company use power information acquisition scheme in can by acquisition terminal stop power on event Power down with intelligent electric meter is recorded in the power-off condition for judging the area Liao Tai and meter afterwards, it is determined that specially public to become the effective of power failure Property, and further management has been done for power supply reliability.Low pressure branch line is the public lines branch for becoming transformer subordinate, scene Repeatedly there is the area Liao Tai not have a power failure but the case where low pressure branch line has a power failure, the data source of low pressure branch line is complicated, grinds power failure It is low to sentence complicated and accuracy.
Summary of the invention
The technical problem to be solved in the present invention and the technical assignment of proposition are to be improved and improved to prior art, A kind of low pressure branch line power failure analysis method based on multi-source power-off event is provided, with reach can be accurately to multi-source power failure data Carry out the purpose studied and judged that has a power failure.For this purpose, the present invention takes following technical scheme.
A kind of low pressure branch line power failure analysis method based on multi-source power-off event, it is characterised in that the following steps are included:
1) low pressure branched line information stores, and point of low pressure branch line and concentrator, meter under each acquisition scheme is summarized in combing Cloth situation confirms the subordinate relation of concentrator and meter;
2) terminal and meter event are received, starts to study and judge whether low pressure branch line has a power failure in the case where confirming the area Fei Tai power-off condition;
3) judge whether the junior's level power failure data source for occurring low pressure branch line lower 2 or more;If so, carry out concentrator and The multiclass power failure data combination of meter is studied and judged;If it is not, then carrying out the power failure of subordinate's level according to the subordinate relation of concentrator and meter It studies and judges;Subordinate's level unit is building or electricity box;
When the multiclass power failure data combination for carrying out concentrator and meter is studied and judged:
A) the existing power-off event of level under terminal and the subordinate relation and low pressure branch line of meter is combined to be studied and judged, preferentially Directly it is judged as power failure when there are the II type concentrator and meter of active reporting power-off event in main website using active power-off event, The number for surveying meter is called together to reduce;
B) when main website is without II type concentrator active reporting power-off event, II type concentrator is all called together and surveys A phase voltage;
C) it when being less than 3 II type concentrators under low pressure branch line, then needs to call together at random and surveys the non-II of power failure type concentrator subordinate relation Another n table, the quantity of n depends on the non-II of power failure type concentrator number;
D) power-off event is reported when having more than three next levels under low pressure branch line, then need 3 different ownership levels Terminal or meter carry out studying and judging power failure with regard to power-off condition;If being less than 3, the whole terminals for belonging to the level or table are needed Count power-off condition;
If 4) study and judge by the combination of the multiclass power failure data of concentrator and meter, confirm that low pressure branch has a power failure, if it is not, then basis The subordinate relation of concentrator and meter carries out the power failure of subordinate's level and studies and judges;
5) situation confirmation low pressure branch line power-off condition is studied and judged according to power failure.
The technical program first eliminates the item of platform area power failure, prevents the generation of erroneous judgement, and improves what power failure was studied and judged again Speed;Meanwhile after the technical program has a power failure and studies and judges in platform area, and judge whether the junior for occurring low pressure branch line lower 2 or more Level power failure data source;If so, the multiclass power failure data combination for carrying out concentrator and meter is studied and judged;If it is not, then according to concentration The subordinate relation of device and meter carries out the power failure of subordinate's level and studies and judges;The case where failing to judge is prevented again.
As optimization technique means: in step 3), power-off event is studied and judged, and the power-off event including terminal and meter is ground Sentence, the power-off event of terminal study and judge comprising steps of
301) it obtains terminal and reports power-off event;
302) same period power cut record is judged whether there is;If so, terminating;If it is not, then entering in next step;
303) judge whether to replace process on way in marketing;If so, terminating;If it is not, then entering in next step;
304) blacklist judges, judges that terminal belongs to blacklist, reports for the first time if so, only handling the terminal same day, and count The number reported;
305) available time judgement and correction are carried out, is empty perhaps the time-delay system time or 3 days for alarm time The terminal of preceding alarm time takes the current time in system as power off time, is modified to effectively;Other are effective, and press reported event Subject to time;
306) it calls together and surveys terminal A phase voltage;
307) whether have a power failure and carry out efficiency analysis, work as satisfaction: terminal voltage calls the survey nothing person of returning, terminal voltage value zero or whole together When terminal voltage value is not more than 132, it is believed that have a power failure;When effectively to have a power failure, then enters in next step, otherwise terminate;
308) terminal reports power-off event.
As optimization technique means: the power-off event of meter study and judge comprising steps of
311) collector or meter are obtained and power-off event is reported by terminal;
312) same period power cut record is judged whether there is;If it is not, blacklist judgement is then carried out, if it is not, then directly terminating;
313) blacklist judge, judge whether reporting equipment belongs to blacklist, if so, only handle the equipment same day for the first time on Report;
314) available time judgement and correction are carried out, is that empty or the time-delay system time terminal takes for alarm time Current time in system is as power off time;Alarm time judgement before 3 days is invalid, confirmation wrong report, excludes to be the existing period Have a power failure;Other are effective;
315) whether have a power failure and carry out efficiency analysis, work as satisfaction: terminal voltage calls the survey nothing person of returning, terminal voltage value zero or whole together When terminal voltage value is not more than 132, it is believed that effectively have a power failure;When effectively to have a power failure, then enters in next step, otherwise terminate;
316) when effectively to have a power failure, label has a power failure, and is included in outage analysis unit.
As optimization technique means: before carrying out the power failure of low pressure branch line and studying and judging, first judging whether to carry out low pressure branch line Power failure is studied and judged, and the condition studied and judged that has a power failure is carried out are as follows: the area Fei Tai has a power failure, non-public transformer terminals have a power failure, I type concentrator has a power failure but excludes platform In the case that area has a power failure;Lower 2 levels of low pressure branch line have terminal or meter active event, just trigger low pressure branch line and have a power failure It studies and judges.
As optimization technique means: when development low pressure branch line is studied and judged, distinguishing I type concentrator platform area and II type concentrator platform Area;For II type concentrator platform area, by the way of calling survey whole II type concentrator A phase voltage together;By power-off event and call survey thing together Part information is studied and judged as having a power failure according to basis;When low pressure branch line subordinate level unit is more than 3, three subordinate's level units are taken Equipment is such as less than 3 equipment for taking whole level units.
As optimization technique means: in step 3), low pressure branch line study and judge comprising steps of
31) there are the II type concentrator and meter of active reporting event in main website, then is directly judged as power failure;
32) judge I type concentrator platform area or II type concentrator platform area;It is then entered step 37) when for I type concentrator platform area, if For II type concentrator platform area, then enter step 33);
33) the II type concentrator surveyed and do not report power failure under low pressure branch line is called together;
34) judge whether II type concentrator has a power failure;
When II type concentrator A phase voltage is 0 or is power failure less than 132V;II type concentrator A phase voltage, which is called together, not to be detected, and is judged II type concentrator has a power failure;
35) when II type concentrator does not have a power failure, then judge whether low pressure branch line has a power failure;Judging whether low pressure branch line has a power failure When, determine that subordinate's level unit, subordinate's level can be electricity box when no building unit for building;When there is 3 or more level units, It then include to need 3 concentrators, or at least belong to 3 next level units and carry out judgement power failure;There are 3 or more level lists as being less than Position, then need whole concentrators to carry out judgement power failure;If whole concentrators be less than 2, need to relay again call together survey 1 table confirmed;
36) when low pressure branch line has a power failure, confirmation low pressure branch line has a power failure;
37) 3 or more subordinate's level units are judged whether there is;If it is not, studying and judging all next level unit random table notes;If It is then to enter step 38) to study and judge 3 next level unit random table notes;
38) 3 next level unit random table notes are studied and judged;When ammeter has event priority event that need to relay and call together such as without active event Survey A phase voltage;When meter A phase voltage is 0 or is less than 132V or meter A phase voltage is called together and do not detected as power failure;
39) confirmation low pressure branch line has a power failure.
The utility model has the advantages that
One, the power supply relationship according to low pressure branch line of the invention and the I type concentrator in low pressure branch line, II type concentrator, Meter distribution situation, power-off event and relevant data in conjunction with relevant device study and judge basis by research low pressure branch line Trigger condition, reduction are failed to judge, and are improved efficiency, and showing for main website outage information in different acquisition scheme is studied in low pressure branch line Situation establishes practical, accurately and rapidly low pressure branch line power failure comprehensive analysis method.
Two, the technical program solves following problems simultaneously
1, it solves the problems, such as to study and judge the power failure of low pressure branch line under different acquisition scheme;
2, it solves how different power failure data sources are applied in combination, efficiently uses active power-off event and power failure calls survey together as a result, effectively Using terminal and meter active power-off event, to improve the accuracy and real time problems of studying and judging the power failure of low pressure branch line;
3, it solves the problems, such as under the low pressure branch line of part that data source is very few to lead to not study and judge.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Fig. 2 is that flow chart is studied and judged in terminal power failure of the invention.
Fig. 3 is that flow chart is studied and judged in meter power failure of the invention.
Fig. 4 is second of flow chart of the invention.
Specific embodiment
Technical solution of the present invention is described in further detail below in conjunction with Figure of description.
Embodiment one:
As shown in Figure 1, the present invention the following steps are included:
1) low pressure branched line information stores, and point of low pressure branch line and concentrator, meter under each acquisition scheme is summarized in combing Cloth situation confirms the subordinate relation of concentrator and meter;
2) terminal and meter event are received, starts to study and judge whether low pressure branch line has a power failure in the case where confirming the area Fei Tai power-off condition;
3) judge whether the junior's level power failure data source for occurring low pressure branch line lower 2 or more;If so, carry out concentrator and The multiclass power failure data combination of meter is studied and judged;If it is not, then carrying out the power failure of subordinate's level according to the subordinate relation of concentrator and meter It studies and judges;Subordinate's level unit is building or electricity box;
When the multiclass power failure data combination for carrying out concentrator and meter is studied and judged:
A) the existing power-off event of level under terminal and the subordinate relation and low pressure branch line of meter is combined to be studied and judged, preferentially Directly it is judged as power failure when there are the II type concentrator and meter of active reporting power-off event in main website using active power-off event, The number for surveying meter is called together to reduce;
B) when main website is without II type concentrator active reporting power-off event, II type concentrator is all called together and surveys A phase voltage;
C) it when being less than 3 II type concentrators under low pressure branch line, then needs to call together at random and surveys the non-II of power failure type concentrator subordinate relation Another n table, the quantity of n depends on the non-II of power failure type concentrator number;
D) power-off event is reported when having more than three next levels under low pressure branch line, then need 3 different ownership levels Terminal or meter carry out studying and judging power failure with regard to power-off condition;If being less than 3, the whole terminals for belonging to the level or table are needed Count power-off condition;
If 4) study and judge by the combination of the multiclass power failure data of concentrator and meter, confirm that low pressure branch has a power failure, if it is not, then basis The subordinate relation of concentrator and meter carries out the power failure of subordinate's level and studies and judges;
5) situation confirmation low pressure branch line power-off condition is studied and judged according to power failure.
The technical program first eliminates the item of platform area power failure, prevents the generation of erroneous judgement, and improves what power failure was studied and judged again Speed;Meanwhile after the technical program has a power failure and studies and judges in platform area, and judge whether the junior for occurring low pressure branch line lower 2 or more Level power failure data source;If so, the multiclass power failure data combination for carrying out concentrator and meter is studied and judged;If it is not, then according to concentration The subordinate relation of device and meter carries out the power failure of subordinate's level and studies and judges;The case where failing to judge is prevented again.
The power failure of low pressure branch line is studied and judged in development, should be in conjunction with level under terminal and the subordinate relation and low pressure branch line of meter Existing power-off event studied and judged, as far as possible use active power-off event, reduce call together survey meter number.
Three next levels (can be electricity box or building) are had more than under low pressure branch line when meeting, then have needed 3 differences The terminal or meter power-off condition (support event and call together survey result) for belonging to level study and judge powers failure, less than 3, then have needed to belong to The terminal or meter power-off condition of whole levels (1-2).Under-enumeration is effectively prevented, the case where mistake is looked into.
For studying and judging for power-off event, the confirmation of terminal and meter is divided to judge that in step 3), power-off event is ground first Sentence, the power-off event including terminal and meter is studied and judged, as shown in Fig. 2, the power-off event of terminal study and judge comprising steps of
301) it obtains terminal and reports power-off event;
302) same period power cut record is judged whether there is;If so, terminating;If it is not, then entering in next step;
303) judge whether to replace process on way in marketing;If so, terminating;If it is not, then entering in next step;
304) blacklist judges, judges that terminal belongs to blacklist, reports for the first time if so, only handling the terminal same day, and count The number reported;
305) available time judgement and correction are carried out, is empty perhaps the time-delay system time or 3 days for alarm time The terminal of preceding alarm time takes the current time in system as power off time, is modified to effectively;Other are effective, and press reported event Subject to time;
306) it calls together and surveys terminal A phase voltage;
307) whether have a power failure and carry out efficiency analysis, work as satisfaction: terminal voltage calls the survey nothing person of returning, terminal voltage value zero or whole together When terminal voltage value is not more than 132, it is believed that have a power failure;When effectively to have a power failure, then enters in next step, otherwise terminate;
308) terminal reports power-off event.
As shown in figure 3, the power-off event of meter study and judge comprising steps of
311) collector or meter are obtained and power-off event is reported by terminal;
312) same period power cut record is judged whether there is;If it is not, blacklist judgement is then carried out, if it is not, then directly terminating;
313) blacklist judge, judge whether reporting equipment belongs to blacklist, if so, only handle the equipment same day for the first time on Report;
314) available time judgement and correction are carried out, is that empty or the time-delay system time terminal takes for alarm time Current time in system is as power off time;Alarm time judgement before 3 days is invalid, confirmation wrong report, excludes to be the existing period Have a power failure;Other are effective;
315) whether have a power failure and carry out efficiency analysis, work as satisfaction: terminal voltage calls the survey nothing person of returning, terminal voltage value zero or whole together When terminal voltage value is not more than 132, it is believed that effectively have a power failure;When effectively to have a power failure, then enters in next step, otherwise terminate;
316) when effectively to have a power failure, label has a power failure, and is included in outage analysis unit.
Judge whether that whether carrying out the power failure of low pressure branch line studies and judges, and there are the following conditions:
The power failure of platform area is excluded, non-public affairs transformer terminals have a power failure, in the case that I type concentrator has a power failure but excludes the power failure of platform area
Lower 2 levels of low pressure branch line are needed to have terminal or meter active event, just triggering is studied and judged.
Processing speed is effectively improved, memory spending is reduced.
Embodiment two:
When development low pressure branch line is studied and judged, I type concentrator platform area and II type concentrator platform area are distinguished;For II type concentrator platform Area, by the way of calling survey whole II type concentrator A phase voltage together;Using power-off event and call together survey event information as power failure study and judge according to According to basis;When low pressure branch line subordinate level unit is more than 3, take three subordinate's level unit equipments, such as less than 3 taking it is complete The equipment of portion's level unit.As shown in figure 4, in step 3), low pressure branch line study and judge comprising steps of
31) there are the II type concentrator and meter of active reporting event in main website, then is directly judged as power failure;
32) judge I type concentrator platform area or II type concentrator platform area;It is then entered step 37) when for I type concentrator platform area, if For II type concentrator platform area, then enter step 33);
33) the II type concentrator surveyed and do not report power failure under low pressure branch line is called together;
34) judge whether II type concentrator has a power failure;
When II type concentrator A phase voltage is 0 or is power failure less than 132V;II type concentrator A phase voltage, which is called together, not to be detected, and is judged II type concentrator has a power failure;
35) when II type concentrator does not have a power failure, then judge whether low pressure branch line has a power failure;Judging whether low pressure branch line has a power failure When, determine that subordinate's level unit, subordinate's level can be electricity box when no building unit for building;When there is 3 or more level units, It then include to need 3 concentrators, or at least belong to 3 next level units and carry out judgement power failure;There are 3 or more level lists as being less than Position, then need whole concentrators to carry out judgement power failure;If whole concentrators be less than 2, need to relay again call together survey 1 table confirmed;
36) when low pressure branch line has a power failure, confirmation low pressure branch line has a power failure;
37) 3 or more subordinate's level units are judged whether there is;If it is not, studying and judging all next level unit random table notes;If It is then to enter step 38) to study and judge 3 next level unit random table notes;
38) 3 next level unit random table notes are studied and judged;When ammeter has event priority event that need to relay and call together such as without active event Survey A phase voltage;When meter A phase voltage is 0 or is less than 132V or meter A phase voltage is called together and do not detected as power failure;
39) confirmation low pressure branch line has a power failure.
A kind of low pressure branch line power failure analysis method based on multi-source power-off event shown in figure 1 above -4 is of the invention Specific embodiment has embodied substantive distinguishing features of the present invention and progress, can use needs according to actual, open in of the invention Under showing, the equivalent modifications of shape, structure etc., the column in the protection scope of this programme are carried out to it.

Claims (6)

1. a kind of low pressure branch line power failure analysis method based on multi-source power-off event, it is characterised in that the following steps are included:
1) low pressure branched line information stores, and point of low pressure branch line and concentrator, meter under each acquisition scheme is summarized in combing Cloth situation confirms the subordinate relation of concentrator and meter;
2) terminal and meter event are received, starts to study and judge whether low pressure branch line has a power failure in the case where confirming the area Fei Tai power-off condition;
3) judge whether the junior's level power failure data source for occurring low pressure branch line lower 2 or more;If so, carry out concentrator and The multiclass power failure data combination of meter is studied and judged;If it is not, then carrying out the power failure of subordinate's level according to the subordinate relation of concentrator and meter It studies and judges;Subordinate's level unit is building or electricity box;
When the multiclass power failure data combination for carrying out concentrator and meter is studied and judged:
A) the existing power-off event of level under terminal and the subordinate relation and low pressure branch line of meter is combined to be studied and judged, preferentially Directly it is judged as power failure when there are the II type concentrator and meter of active reporting power-off event in main website using active power-off event, The number for surveying meter is called together to reduce;
B) when main website is without II type concentrator active reporting power-off event, II type concentrator is all called together and surveys A phase voltage;
C) it when being less than 3 II type concentrators under low pressure branch line, then needs to call together at random and surveys the non-II of power failure type concentrator subordinate relation Another n table, the quantity of n depends on the non-II of power failure type concentrator number;
D) power-off event is reported when having more than three next levels under low pressure branch line, then need 3 different ownership levels Terminal or meter carry out studying and judging power failure with regard to power-off condition;If being less than 3, the whole terminals for belonging to the level or table are needed Count power-off condition;
If 4) study and judge by the combination of the multiclass power failure data of concentrator and meter, confirm that low pressure branch has a power failure, if it is not, then basis The subordinate relation of concentrator and meter carries out the power failure of subordinate's level and studies and judges;
5) situation confirmation low pressure branch line power-off condition is studied and judged according to power failure.
2. a kind of low pressure branch line power failure analysis method based on multi-source power-off event according to claim 1, feature Be: in step 3), power-off event is studied and judged, and the power-off event including terminal and meter is studied and judged, and the power-off event of terminal is ground Sentence comprising steps of
301) it obtains terminal and reports power-off event;
302) same period power cut record is judged whether there is;If so, terminating;If it is not, then entering in next step;
303) judge whether to replace process on way in marketing;If so, terminating;If it is not, then entering in next step;
304) blacklist judges, judges that terminal belongs to blacklist, reports for the first time if so, only handling the terminal same day, and count The number reported;
305) available time judgement and correction are carried out, is empty perhaps the time-delay system time or 3 days for alarm time The terminal of preceding alarm time takes the current time in system as power off time, is modified to effectively;Other are effective, and press reported event Subject to time;
306) it calls together and surveys terminal A phase voltage;
307) whether have a power failure and carry out efficiency analysis, work as satisfaction: terminal voltage calls the survey nothing person of returning, terminal voltage value zero or whole together When terminal voltage value is not more than 132, it is believed that have a power failure;When effectively to have a power failure, then enters in next step, otherwise terminate;
308) terminal reports power-off event.
3. a kind of low pressure branch line power failure analysis method based on multi-source power-off event according to claim 2, feature Be: the power-off event of meter study and judge comprising steps of
311) collector or meter are obtained and power-off event is reported by terminal;
312) same period power cut record is judged whether there is;If it is not, blacklist judgement is then carried out, if it is not, then directly terminating;
313) blacklist judge, judge whether reporting equipment belongs to blacklist, if so, only handle the equipment same day for the first time on Report;
314) available time judgement and correction are carried out, is that empty or the time-delay system time terminal takes for alarm time Current time in system is as power off time;Alarm time judgement before 3 days is invalid, confirmation wrong report, excludes to be the existing period Have a power failure;Other are effective;
315) whether have a power failure and carry out efficiency analysis, work as satisfaction: terminal voltage calls the survey nothing person of returning, terminal voltage value zero or whole together When terminal voltage value is not more than 132, it is believed that effectively have a power failure;When effectively to have a power failure, then enters in next step, otherwise terminate;
316) when effectively to have a power failure, label has a power failure, and is included in outage analysis unit.
4. a kind of low pressure branch line power failure analysis method based on multi-source power-off event according to claim 1, feature It is: before carrying out the power failure of low pressure branch line and studying and judging, first judges whether that carrying out the power failure of low pressure branch line studies and judges, and have a power failure and studies and judges Condition are as follows: the area Fei Tai has a power failure, non-public transformer terminals have a power failure, I type concentrator has a power failure but excludes in the case that platform area has a power failure;Low pressure point Lower 2 levels of branch line have terminal or meter active event, just trigger the power failure of low pressure branch line and study and judge.
5. a kind of low pressure branch line power failure analysis method based on multi-source power-off event according to claim 1, feature It is: when development low pressure branch line is studied and judged, distinguishes I type concentrator platform area and II type concentrator platform area;For II type concentrator platform Area, by the way of calling survey whole II type concentrator A phase voltage together;Using power-off event and call together survey event information as power failure study and judge according to According to basis;When low pressure branch line subordinate level unit is more than 3, take three subordinate's level unit equipments, such as less than 3 taking it is complete The equipment of portion's level unit.
6. a kind of low pressure branch line power failure analysis method based on multi-source power-off event according to claim 5, feature Be: in step 3), low pressure branch line study and judge comprising steps of
31) there are the II type concentrator and meter of active reporting event in main website, then is directly judged as power failure;
32) judge I type concentrator platform area or II type concentrator platform area;It is then entered step 37) when for I type concentrator platform area, if For II type concentrator platform area, then enter step 33);
33) the II type concentrator surveyed and do not report power failure under low pressure branch line is called together;
34) judge whether II type concentrator has a power failure;
When II type concentrator A phase voltage is 0 or is power failure less than 132V;II type concentrator A phase voltage, which is called together, not to be detected, and is judged II type concentrator has a power failure;
35) when II type concentrator does not have a power failure, then judge whether low pressure branch line has a power failure;Judging whether low pressure branch line has a power failure When, determine that subordinate's level unit, subordinate's level can be electricity box when no building unit for building;When there is 3 or more level units, It then include to need 3 concentrators, or at least belong to 3 next level units and carry out judgement power failure;There are 3 or more level lists as being less than Position, then need whole concentrators to carry out judgement power failure;If whole concentrators be less than 2, need to relay again call together survey 1 table confirmed;
36) when low pressure branch line has a power failure, confirmation low pressure branch line has a power failure;
37) 3 or more subordinate's level units are judged whether there is;If it is not, studying and judging all next level unit random table notes;If It is then to enter step 38) to study and judge 3 next level unit random table notes;
38) 3 next level unit random table notes are studied and judged;When ammeter has event priority event that need to relay and call together such as without active event Survey A phase voltage;When meter A phase voltage is 0 or is less than 132V or meter A phase voltage is called together and do not detected as power failure;
39) confirmation low pressure branch line has a power failure.
CN201910101366.0A 2019-01-31 2019-01-31 Low-voltage branch line power failure research and judgment method based on multi-source power failure event Active CN109919328B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910101366.0A CN109919328B (en) 2019-01-31 2019-01-31 Low-voltage branch line power failure research and judgment method based on multi-source power failure event

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910101366.0A CN109919328B (en) 2019-01-31 2019-01-31 Low-voltage branch line power failure research and judgment method based on multi-source power failure event

Publications (2)

Publication Number Publication Date
CN109919328A true CN109919328A (en) 2019-06-21
CN109919328B CN109919328B (en) 2022-08-02

Family

ID=66961151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910101366.0A Active CN109919328B (en) 2019-01-31 2019-01-31 Low-voltage branch line power failure research and judgment method based on multi-source power failure event

Country Status (1)

Country Link
CN (1) CN109919328B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110082618A (en) * 2019-04-16 2019-08-02 国网湖南省电力有限公司 A kind of optimization method of area's power-off event concentrator active reporting
CN111142047A (en) * 2019-12-31 2020-05-12 国网河北省电力有限公司 Automatic studying and judging method based on power distribution internet of things power failure
CN111813824A (en) * 2020-06-02 2020-10-23 国网江西省电力有限公司电力科学研究院 Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line
CN112444687A (en) * 2019-08-29 2021-03-05 北京科东电力控制***有限责任公司 Effective power failure event studying and judging method and device
CN112505478A (en) * 2020-11-17 2021-03-16 国网山东省电力公司青岛供电公司 Non-contact type low-voltage transformer area power failure and recovery detection device and power failure and recovery detection method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103901317A (en) * 2012-12-24 2014-07-02 天津市电力公司 Power distribution fault studying and judging method based on multisystem collaboration
CN103941158A (en) * 2014-04-17 2014-07-23 国家电网公司 Power distribution network fault diagnosis system and method based on multi-source information
US20160011252A1 (en) * 2014-07-11 2016-01-14 Abb Inc. Decision Support System for Outage Management and Automated Crew Dispatch
CN105445617A (en) * 2015-11-18 2016-03-30 国网天津市电力公司 Automatic studying and determination method of power distribution fault
CN106814267A (en) * 2016-12-07 2017-06-09 珠海许继电气有限公司 The implementation method that a kind of power distribution station failure based on topology is studied and judged
CN107505537A (en) * 2017-09-04 2017-12-22 贵州电网有限责任公司电力科学研究院 A kind of failure analysis methods abnormal based on line loss
CN108765187A (en) * 2018-04-11 2018-11-06 国网山东省电力公司 A kind of power-off fault auxiliary analysis method, apparatus and system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103901317A (en) * 2012-12-24 2014-07-02 天津市电力公司 Power distribution fault studying and judging method based on multisystem collaboration
CN103941158A (en) * 2014-04-17 2014-07-23 国家电网公司 Power distribution network fault diagnosis system and method based on multi-source information
US20160011252A1 (en) * 2014-07-11 2016-01-14 Abb Inc. Decision Support System for Outage Management and Automated Crew Dispatch
CN105445617A (en) * 2015-11-18 2016-03-30 国网天津市电力公司 Automatic studying and determination method of power distribution fault
CN106814267A (en) * 2016-12-07 2017-06-09 珠海许继电气有限公司 The implementation method that a kind of power distribution station failure based on topology is studied and judged
CN107505537A (en) * 2017-09-04 2017-12-22 贵州电网有限责任公司电力科学研究院 A kind of failure analysis methods abnormal based on line loss
CN108765187A (en) * 2018-04-11 2018-11-06 国网山东省电力公司 A kind of power-off fault auxiliary analysis method, apparatus and system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
D. WAERESCH 等: "Topology fault detection in low voltage grids based on statistical analyses of smart meter data", 《 2016 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE》 *
F. C. L. TRINDADE 等: "Low Voltage Zones to Support Fault Location in Distribution Systems With Smart Meters", 《IEEE TRANSACTIONS ON SMART GRID》 *
耿俊成 等: "基于多源信息的配电网停电故障研判", 《上海电力学院学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110082618A (en) * 2019-04-16 2019-08-02 国网湖南省电力有限公司 A kind of optimization method of area's power-off event concentrator active reporting
CN112444687A (en) * 2019-08-29 2021-03-05 北京科东电力控制***有限责任公司 Effective power failure event studying and judging method and device
CN111142047A (en) * 2019-12-31 2020-05-12 国网河北省电力有限公司 Automatic studying and judging method based on power distribution internet of things power failure
CN111813824A (en) * 2020-06-02 2020-10-23 国网江西省电力有限公司电力科学研究院 Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line
CN111813824B (en) * 2020-06-02 2022-09-02 国网江西省电力有限公司电力科学研究院 Method and system for automatically detecting missing report of power failure event of 10kV line outgoing line
CN112505478A (en) * 2020-11-17 2021-03-16 国网山东省电力公司青岛供电公司 Non-contact type low-voltage transformer area power failure and recovery detection device and power failure and recovery detection method

Also Published As

Publication number Publication date
CN109919328B (en) 2022-08-02

Similar Documents

Publication Publication Date Title
CN109919328A (en) A kind of low pressure branch line power failure analysis method based on multi-source power-off event
CN109687590B (en) Grading outage and restoration reporting method and system
CN105427039A (en) Efficient processing method of distribution network repair work orders based on responsibility areas
CN110490762A (en) A kind of user based on big data analysis reports the automatic analysis method of failure for repairment
CN104751305A (en) Trouble analysis and repair-based intelligent interaction system and control method thereof
CN105139118A (en) Distribution network fault first-aid repair power failure information reporting system and method
CN102928808A (en) Power consumer on-site electric energy meter fault remote judging method
CN107368543A (en) A kind of electric power acquisition data restorative procedure based on MCMC algorithms
CN109345786A (en) A kind of non-resident user power utilization abnormal conditions automatic alarm system of low pressure
CN109934458A (en) A kind of power failure real-time analysis method based on the minimum common analytical unit that has a power failure
CN202939301U (en) Remote monitoring diagnosis system of electric energy metering device
CN102419903A (en) Semiautomatic meter reading device and meter reading method thereof
CN107944661B (en) Integrated regulation and control system for main network and distribution network
CN110244163A (en) Stop send a telegram in reply event hierarchy intelligence analysis method and device in a kind of area
CN106485835A (en) A kind of intelligent charging method based on Third-party payment
CN102709905A (en) Power supply reliability automatic calculation and analysis device and method for low-voltage distribution network
CN206292332U (en) Heterogeneous wireless network leakage current early warning system
CN108093039B (en) Method for processing sleeping electric meter based on national network Q/GDW3761 protocol
Kawano et al. Intelligent protection relay system for smart grid
CN104880601A (en) Low-voltage user low voltage investigation method based on normal distribution statistics
CN105321331B (en) The processing method of ammeter information, apparatus and system
CN113902583A (en) Distribution network side operation and maintenance method and system using low-voltage network equipment data
CN106557986B (en) Photovoltaic power station equipment maintenance method
CN201918003U (en) Wireless low-voltage meter-reading monitoring concentrator
CN105204466A (en) Online electric energy managing device based on CDMA network telecommunication

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant