CN109915141A - The control method of not wide protection pillar mining roadway bump - Google Patents

The control method of not wide protection pillar mining roadway bump Download PDF

Info

Publication number
CN109915141A
CN109915141A CN201910296251.1A CN201910296251A CN109915141A CN 109915141 A CN109915141 A CN 109915141A CN 201910296251 A CN201910296251 A CN 201910296251A CN 109915141 A CN109915141 A CN 109915141A
Authority
CN
China
Prior art keywords
release
chamber
relieving
mining roadway
way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910296251.1A
Other languages
Chinese (zh)
Inventor
潘立友
李彩荣
陈理强
战玉宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201910296251.1A priority Critical patent/CN109915141A/en
Publication of CN109915141A publication Critical patent/CN109915141A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention proposes a kind of control method of not wide protection pillar mining roadway bump, it is as follows: before mining roadway driving, Relieving way is arranged on the top plate of not wide protection pillar first, then blasting boreholes are beaten into coal seam on the bottom plate of Relieving way and manufacture a loose distressed zone, when working face mining is advanced in the danger zone of mining roadway, along towards the side of Relieving way, at interval of 12-15m, tunnel release chamber, drillhole blasting is carried out to the direction of Relieving way in chamber, by forming crannied body dissipation coal column impact energy between explosion chamber, play the role of buffer protection to mining roadway, ensure the safety during the entire use in tunnel.

Description

The control method of not wide protection pillar mining roadway bump
Technical field
The invention belongs to coal mining technology fields.
Background technique
China's deep coalmine is more and more, and mine pressure is on the rise with pressure bump behavior, and especially bump problem is Dynamic disaster urgently to be solved, China's Deep Mine complex geologic conditions are changeable, more arrive geology of deep part factor more play decision and make With.When arranging Stope face before coal mining, need to open up mining roadway, mining roadway mainly includes air return way and fortune Defeated crossheading.Some deep old mines are since geological condition is complicated, and often there are not wide shield lane coals between about two working faces Column.Since mining roadway is arranged in coal seam, not wide protection pillar size is big, buried depth is big, the quiet Dynamic stress field of working face compared with Greatly, there is thump tendency, be easy to happen bump during mining roadway driving, and attached again during working face mining Add dynamic stress, the shock hazard of mining roadway more increases.Take conventional coal-bed flooding, strong supporting, coal seam strong at present The measures such as release, disconnected top, disconnected bottom, it is difficult to achieve the effect that clear.Up to the present, there are no be directed to these specific coal seams Condition forms the Control Technology system of system.Especially not wide coal column will lead to high-level punching due to lateral high stress Energy release is hit, is easy to cause locality stress to concentrate in coal column region, presses possibility to greatly increase damaging impact occurs. Therefore the bump prevention and control problem of not wide coal column mining roadway, up to the present there are no really fundamentally solved Certainly.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes a kind of control method of not wide protection pillar mining roadway bump. This method passes through the technical measures for taking in advance and changing stress distribution, energy segmentation, dissipate, and reaches the mesh of prevention and treatment bump 's.
The technical scheme is that
A kind of control method of not wide protection pillar mining roadway bump, as follows:
One, the broken top Relieving way of driving
Before mining roadway driving, arrange Relieving way on the top plate of not wide protection pillar first, Relieving way with adopt Field tunnel is arranged in parallel, and between 12-15m between level, blasting boreholes are then beaten into coal seam on the bottom plate of Relieving way, It destroys ground coal to form crushing medium after explosion, manufactures a loose distressed zone, thus change lateral high stress distribution, It carries out preventing bump when the tunneling construction of mining roadway;
Two, coal column release drainage is manufactured
In working face mining, when in the danger zone for being advanced to mining roadway, along towards the side of Relieving way, every Every 12-15m, release chamber is tunneled, release chamber depth 5-6m carries out drillhole blasting to the direction of Relieving way in chamber, By forming crannied body between explosion chamber, relieving roadway tunnel couples to form weak structure with chamber group, and it is larger to produce width Plane release drainage, stop and absorb external impact distortional stress in invading, dissipation coal column impact energy plays mining roadway The effect of buffer protection;
Three, release validity check
After release drainage is formed, detects and drill in two chamber intermediate arrangements, mount stress meter in drilling, monitor stress variation, with Relative stress, which mutates, is used as judgment criterion, illustrates no complete pressure release if any jumping phenomenon;Meanwhile in entire coal column region Release validity check is carried out using common drilling cuttings method, with 42 drill bit of ф in the perforating of tunnel two sides, eye depth 7.0-8.0m, the elevation angle 0 ~ 3 °, eye distance 5.0-10m, illustrate no complete pressure release when occurring exceeded such as test effect;At this point, it is quick-fried to continue perforating in chamber It is broken, release is carried out, until risk is thoroughly eliminated, it is ensured that the safety during the entire use in tunnel.
The positive effect of the present invention is:
1, by implementing broken top technology to top plate, stress distribution is changed, by stress to mined out to transfer, is belonged to from coal seam top Stress relief is carried out, fundamentally cuts off and changes stress and gather range;
2, the protection of heading forms software by explosion in chamber group, plays the role of protecting wall to tunnel, ensured tunnel The way of escape and its safety for using whole process.
Detailed description of the invention
Fig. 1 is Relieving way and chamber plan view;Fig. 2 is Fig. 1 A-A to enlarged drawing, shows relieving roadway in figure Road and chamber facade deployment scenarios.
Specific embodiment
Certain mine exploits not wide protection pillar stope, arranges Stope face before exploiting, tunnels mining roadway, mining roadway Including tunneling air return way and haulage gate etc..Below for tunneling air return way, the present invention is further illustrated in conjunction with attached drawing Technical solution.
As shown in Figure 1, 2, the control method of not wide protection pillar mining roadway bump is as follows:
One, the broken top Relieving way of driving
Before stope air return way driving, Relieving way, Relieving way are arranged on the top plate of not wide protection pillar first It is arranged in parallel with air return way (mining roadway), between horizontal space a=12-15m, then to coal on the bottom plate of Relieving way Blasting boreholes are beaten in layer, destroy ground coal to form crushing medium after explosion, manufacture a loose distressed zone, to change lateral high Stress distribution prevents bump when carrying out the tunneling construction of air return way;
Two, coal column release drainage is manufactured
In working face mining, when in the danger zone for being advanced to mining roadway, along towards the side of Relieving way, at interval of 12-15m tunnels release chamber, and release chamber depth 5-6m carries out drillhole blasting to the direction of Relieving way in chamber, leads to It crosses between explosion chamber and forms crannied body, relieving roadway tunnel couples to form weak structure with chamber group, and it is biggish to produce width Plane release drainage stops and absorbs the interior of external impact distortional stress to invade, and dissipation coal column impact energy plays air return way slow Rush the effect of protection;
Three, release validity check
After release drainage is formed, drilling, mount stress meter in drilling are detected in the intermediate arrangement of two chambers, monitoring stress of coal seam becomes Change, is mutated using relative stress as judgment criterion, illustrate no complete pressure release if any jumping phenomenon;Meanwhile in entire coal Columnar region carries out release validity check using common drilling cuttings method, with diameter 42mm drill bit in the perforating of tunnel two sides, eye depth 7.0- 8.0m, 0 ~ 3 °, eye distance 5.0-10m of the elevation angle illustrate no complete pressure release when occurring exceeded such as test effect;At this point, should be in chamber Middle continuation perforating explosion carries out release, until risk is thoroughly eliminated, it is ensured that the safety during the entire use of air return way.

Claims (1)

1. a kind of control method of not wide protection pillar mining roadway bump, as follows:
(1) the broken top Relieving way of driving
Before mining roadway driving, arrange Relieving way on the top plate of not wide protection pillar first, Relieving way with adopt Field tunnel is arranged in parallel, and between 12-15m between level, blasting boreholes are then beaten into coal seam on the bottom plate of Relieving way, It destroys ground coal to form crushing medium after explosion, manufactures a loose distressed zone, thus change lateral high stress distribution, It carries out preventing bump when the tunneling construction of mining roadway;
(2) coal column release drainage is manufactured
In working face mining, when in the danger zone for being advanced to mining roadway, along towards the side of Relieving way, every Every 12-15m, release chamber is tunneled, release chamber depth 5-6m carries out drillhole blasting to the direction of Relieving way in chamber, By forming crannied body between explosion chamber, relieving roadway tunnel couples to form weak structure with chamber group, and it is larger to produce width Plane release drainage, stop and absorb external impact distortional stress in invading, dissipation coal column impact energy plays mining roadway The effect of buffer protection;
(3) release validity check
After release drainage is formed, detects and drill in two chamber intermediate arrangements, mount stress meter in drilling, monitor stress variation, with Relative stress, which mutates, is used as judgment criterion, illustrates no complete pressure release if any jumping phenomenon;Meanwhile in entire coal column region Release validity check is carried out using common drilling cuttings method, with 42 drill bit of ф in the perforating of tunnel two sides, eye depth 7.0-8.0m, the elevation angle 0 ~ 3 °, eye distance 5.0-10m, illustrate no complete pressure release when occurring exceeded such as test effect;At this point, it is quick-fried to continue perforating in chamber It is broken, release is carried out, until risk is thoroughly eliminated, it is ensured that the safety during the entire use in tunnel.
CN201910296251.1A 2019-04-13 2019-04-13 The control method of not wide protection pillar mining roadway bump Withdrawn CN109915141A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910296251.1A CN109915141A (en) 2019-04-13 2019-04-13 The control method of not wide protection pillar mining roadway bump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910296251.1A CN109915141A (en) 2019-04-13 2019-04-13 The control method of not wide protection pillar mining roadway bump

Publications (1)

Publication Number Publication Date
CN109915141A true CN109915141A (en) 2019-06-21

Family

ID=66969728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910296251.1A Withdrawn CN109915141A (en) 2019-04-13 2019-04-13 The control method of not wide protection pillar mining roadway bump

Country Status (1)

Country Link
CN (1) CN109915141A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236942A (en) * 2020-03-09 2020-06-05 天地科技股份有限公司 Pressure relief method for rock burst coal seam
CN111502662A (en) * 2020-04-28 2020-08-07 中煤能源研究院有限责任公司 Prevention and control method for deep pressure relief shallow part reinforcement of rock burst mine advanced coal body
CN112483182A (en) * 2020-12-18 2021-03-12 山东科技大学 Method for judging impact risk of high-homogeneity coal seam by window intervention method
CN112483180A (en) * 2020-12-18 2021-03-12 山东科技大学 Method for judging impact risk of lateral large mining roof slab structure type by window intervention method
CN112554952A (en) * 2020-12-18 2021-03-26 山东科技大学 Method for judging impact risk of three hard coal seams by window strong-damage method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296958A (en) * 2011-07-22 2011-12-28 山东科技大学 Method for preventing rock burst by artificial space defect body
CN102383728A (en) * 2011-09-12 2012-03-21 山东科技大学 Coal mine rockburst defect segmentation and control method
CN102425418A (en) * 2011-11-14 2012-04-25 山东科技大学 Method for controlling rock burst in artificial defect body of coal mine structural area
CN102425416A (en) * 2011-09-12 2012-04-25 山东科技大学 Coal mine high stress area roadway driving face impact ground pressure control method
CN102518471A (en) * 2011-11-14 2012-06-27 山东科技大学 Rock burst energy releasing method of roadway of high stress area in coal mine
CN102797492A (en) * 2012-08-31 2012-11-28 中国矿业大学 Arrangement method for precracking roof for roof-cutting roadway
CN105350965A (en) * 2015-11-27 2016-02-24 西安科技大学 Rock burst control method for coal mining tunnel
CN105626070A (en) * 2015-12-14 2016-06-01 辽宁工程技术大学 Rock burst prevention method through deep hole blasting and depressurizing
CN106368705A (en) * 2016-10-20 2017-02-01 山东科技大学 Method for controlling rock burst during roadway tunneling in fault fracture zone
CN106437711A (en) * 2016-10-20 2017-02-22 山东科技大学 Coal seam impact type mine earthquake prevention and control method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296958A (en) * 2011-07-22 2011-12-28 山东科技大学 Method for preventing rock burst by artificial space defect body
CN102383728A (en) * 2011-09-12 2012-03-21 山东科技大学 Coal mine rockburst defect segmentation and control method
CN102425416A (en) * 2011-09-12 2012-04-25 山东科技大学 Coal mine high stress area roadway driving face impact ground pressure control method
CN102425418A (en) * 2011-11-14 2012-04-25 山东科技大学 Method for controlling rock burst in artificial defect body of coal mine structural area
CN102518471A (en) * 2011-11-14 2012-06-27 山东科技大学 Rock burst energy releasing method of roadway of high stress area in coal mine
CN102797492A (en) * 2012-08-31 2012-11-28 中国矿业大学 Arrangement method for precracking roof for roof-cutting roadway
CN105350965A (en) * 2015-11-27 2016-02-24 西安科技大学 Rock burst control method for coal mining tunnel
CN105626070A (en) * 2015-12-14 2016-06-01 辽宁工程技术大学 Rock burst prevention method through deep hole blasting and depressurizing
CN106368705A (en) * 2016-10-20 2017-02-01 山东科技大学 Method for controlling rock burst during roadway tunneling in fault fracture zone
CN106437711A (en) * 2016-10-20 2017-02-22 山东科技大学 Coal seam impact type mine earthquake prevention and control method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
潘立友等: "基于缺陷法孤岛工作面冲击地压防治技术研究", 《煤炭科学技术》 *
潘立友等: "断层夹持型不规则工作面冲击地压成因与防控.pdf", 《煤炭科学技术》 *
陈法兵等: "不规则煤柱影响下旋采工作面冲击地压防治技术", 《煤炭科学技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236942A (en) * 2020-03-09 2020-06-05 天地科技股份有限公司 Pressure relief method for rock burst coal seam
CN111502662A (en) * 2020-04-28 2020-08-07 中煤能源研究院有限责任公司 Prevention and control method for deep pressure relief shallow part reinforcement of rock burst mine advanced coal body
CN111502662B (en) * 2020-04-28 2021-12-14 中煤能源研究院有限责任公司 Prevention and control method for deep pressure relief shallow part reinforcement of rock burst mine advanced coal body
CN112483182A (en) * 2020-12-18 2021-03-12 山东科技大学 Method for judging impact risk of high-homogeneity coal seam by window intervention method
CN112483180A (en) * 2020-12-18 2021-03-12 山东科技大学 Method for judging impact risk of lateral large mining roof slab structure type by window intervention method
CN112554952A (en) * 2020-12-18 2021-03-26 山东科技大学 Method for judging impact risk of three hard coal seams by window strong-damage method

Similar Documents

Publication Publication Date Title
CN109915141A (en) The control method of not wide protection pillar mining roadway bump
CN102678120B (en) Method for releasing pressure and removing danger of rock burst
CN104100266B (en) The method of preventing and treating gob side entry bump
CN108386192A (en) A kind of method of active Enhanced support and active release prevention bump
CN103397883B (en) Mutil-coal seam mining Rock Burst method for integrated control
CN103939099B (en) The prevention and controls of the dangerous coal seam group bump of a kind of thump
CN106401588B (en) Bump preventing control method during fault zone inner working face is exploited
CN105350965A (en) Rock burst control method for coal mining tunnel
CN106014407B (en) Utilize the roof fracture water method that reduction master control coal rock layer controls disaster in situ
CN102518471A (en) Rock burst energy releasing method of roadway of high stress area in coal mine
CN104314610A (en) Outburst eliminating method for coal roadway stripe region
CN102425418A (en) Method for controlling rock burst in artificial defect body of coal mine structural area
CN107304676A (en) A kind of prevention and controls for leaving bump under coal column
CN102383728A (en) Coal mine rockburst defect segmentation and control method
CN106948817A (en) Rock burst prevention and control method combining bottom coal drilling with blasting pressure relief
CN111335892A (en) Strong-impact coal seam pressure relief prevention and control method
CN109915143A (en) The control method of not wide protection pillar working face bump
CN110005431A (en) A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method
CN105804750A (en) Prevention method for pressure bump of approximately-vertical super-thick coal seams
CN102296957B (en) Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst
CN103411493A (en) Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting
CN104329113A (en) Gas drainage method by pressure relief of coal bed bottom plate through ground drilling and loosening blasting
CN104847401A (en) Regional coal and gas outburst coal seam coal face outburst preventing and controlling method
CN106285674A (en) The method of impact soft seam tunnel with meeting head on release pressure energy
CN108086977A (en) A kind of coal seam prevents water-resisting floor coal-mining method for water-bearing layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 266590 No. 579, Bay Road, Huangdao District, Shandong, Qingdao

Applicant after: Shandong University of Science and Technology

Address before: 271000 Shandong Province, Tai'an city Taishan District mountain Street No. 223 Tai'an campus of Shandong University of Science and Technology

Applicant before: Shandong University of Science and Technology

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190621