CN109909694A CN201910342324.6A CN201910342324A CN109909694A CN 109909694 A CN109909694 A CN 109909694A CN 201910342324 A CN201910342324 A CN 201910342324A CN 109909694 A CN109909694 A CN 109909694A
Authority
CN
China
Prior art keywords
sealing surface
flange sealing
skive
tower
tower section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910342324.6A
Other languages
Chinese (zh)
Other versions
CN109909694B (en
Inventor
梁显军
赵庆立
高峰
翟跃光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG ORIENT TITANIUM INDUSTRY Co Ltd
Original Assignee
SHENYANG ORIENT TITANIUM INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG ORIENT TITANIUM INDUSTRY Co Ltd filed Critical SHENYANG ORIENT TITANIUM INDUSTRY Co Ltd
Priority to CN201910342324.6A priority Critical patent/CN109909694B/en
Publication of CN109909694A publication Critical patent/CN109909694A/en
Application granted granted Critical
Publication of CN109909694B publication Critical patent/CN109909694B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)
  • Polishing Bodies And Polishing Tools (AREA)

Abstract

The method that more piece tower type container end flange sealing surface is processed with boring machine, belong to pressure vessel manufacturing technical field, overcoming boring machine in the prior art does not have the problem of ability of the tower equipment both ends flange sealing surface of Precision Machining large scale, be characterized in include tower section clamping and centering, flange sealing surface step is finished with boring cutter roughing tower section flange sealing surface and with skive, beneficial effect is that installation is simple, it is easy to operate, with same boring machine, clamped one time centering can be finished in the realization simultaneously of a station with boring cutter roughing and with skive, and it only needs through replacement boring cutter and skive and No. 2 clamping centerings, the roughing and finishing on numerical control borer to the tower section both ends flange sealing surface of more piece tower type container can be realized, surface roughness has reached the requirement of Ra0.8~1.6, it protects The straightness and seal request for having demonstrate,proved tower body entirety after the tower body that more piece tower section forms assembles, improve production efficiency.

Description

The method that more piece tower type container end flange sealing surface is processed with boring machine
Technical field
The invention belongs to pressure vessel manufacturing technical fields, in particular to close to more piece tower type container end flange with boring machine The method of cover processing.
Background technique
Flange is the important component of more piece tower type container, to the rough surface of more piece tower type container end flange end sealing surface Spend it is more demanding, be Ra0.8~1.6, in the prior art, single flange sealing surface may be implemented in general-purpose grinder and center lathe Precision Machining, but after flange and shell ring are welded into tower section, the length of each tower section is longer, generally 4~6 meters, and flange Be relatively large in diameter, generally higher than 1 meter, general-purpose grinder and center lathe can not clamping, if more piece tower type container end flange list Part is individually integral using welding again with shell ring after existing center lathe and general-purpose grinder processing, then not can guarantee tower body group postwelding The requirement of final entirety verticality, and boring machine itself is also without tower two end flanges of equipment of Precision Machining large scale in the prior art The ability of sealing surface.
Application No. is a kind of flange sealing trough grinding device of the disclosure of the invention of CN201610587602.0 and its users Method, structure have positioning screw, jackscrew, bracket, grinding ring handle etc.;The shape and pressure vessel Work piece sealing to be added of grinding ring The shape of slot is adapted, and selects the grinding ring of corresponding specification, device is fixed on workpiece to be added, and adjusting positioning screw makes to grind Ring touches the seal groove of workpiece to be added, installs abrasive pastes additional;The handle that can be manually rotated on grinding ring is ground.The invention is method The grinding of blue seal groove and to can be manually rotated grinding, large labor intensity, low efficiency can only also realize single flange components seal groove Processing.
Summary of the invention
Problem to be solved by this invention is to overcome the deficiencies of the prior art and provide to guarantee that tower body group postwelding is final The method that more piece tower type container end flange sealing surface is processed with boring machine that whole verticality requires.
What the present invention took includes as follows with technical solution of the boring machine to the method that more piece tower type container end flange is processed Step:
Step 1, the clamping and centering of tower section:
Fixing seat and bracket are installed on the workbench of numerical control borer, the upper surface of the fixing seat at both ends is connected on V-arrangement Tower section is placed on intermediate bracket by fixture block and V-arrangement lower fixture block, while passing through the V-arrangement upper fixture block at both ends and V-arrangement lower fixture block folder Firmly tower section and centering, keep the axis of tower section parallel with the upper surface of numerical control borer workbench, and the flange sealing surface at tower section both ends It is vertical with the upper surface of numerical control borer workbench, wherein one end of tower section is right flange sealing surface, and the other end is left flange seal Face, the right flange sealing surface are parallel to each other with left flange sealing surface, and the adjustment right both ends of good position rear left are locked with long threaded rod respectively It fastens;
Step 2, the right flange sealing surface of roughing:
After the completion of the clamping of tower section and centering, boring cutter is installed on the chuck of numerical control borer spindle box;With boring cutter roughing tower Save the right flange sealing surface of end flange sealing surface;
Step 3 replaces skive:
Roughing finishes, and after the requirement through examining surface roughness to meet finishing, boring cutter is removed, in numerical control borer spindle box Skive is replaced on chuck;
Step 4 finishes right flange sealing surface:
On the basis of roughing right flange sealing surface, right flange sealing surface is finished using skive, keeps right flange close The surface roughness of cover reaches Ra0.8~1.6;
Step 5, the left flange sealing surface of roughing:
Specific method is identical as step 1 and step 2;
Step 6 finishes left flange sealing surface:
Specific method is identical as step 3 and step 4.
Step 3: skive described in step 4 and step 6 includes skive connecting rod, in boart boart The left side center of wheel connecting rod is threaded hole, is fixedly connected with bowl-type by soket head cap screw and briquetting in the threaded hole Metallic matrix is equipped with annular diamond grinding head in the end of bowl-type metallic matrix.
The diameter of the skive connecting rod is identical as the diameter of boring cutter handle.
The surface roughness of right flange sealing surface and left flange sealing surface described in step 4 and step 6 is Ra 0.4.
Compared with prior art, the beneficial effects of the present invention are:
(1) present invention solves in the prior art that more piece tower type container diameter is big, and length is long, the flange at more piece tower type container both ends Sealing surface is wanted to reach the higher depth of parallelism and high surface roughness, and center lathe and grinding machine, which cannot achieve, to be loaded, commonly Boring machine can be realized clamping, but the problem of be unable to reach the surface roughness of requirement, realize on numerical control borer to more piece tower The roughing and finishing of the tower section both ends flange sealing surface of formula container, surface roughness have reached the requirement of Ra0.8~1.6, Actual measurement can reach the processing request of the higher surface roughness of Ra0.4, and with same boring machine, clamped one time centering can be real simultaneously Current boring cutter roughing and with skive finish two kinds of processing methods, and equipment do not have to displacement, it is only necessary to pass through replacement Boring cutter and skive can realize the processing of two steps in a station, ensure that machining benchmark is constant, not will cause secondary dress Press from both sides bring accumulated error;
(2) present invention, which only needs clamping twice, can be completed the finishing of two end faces of tower section, ensure that tower section both ends flange seal The verticality in face and tower body axis, so ensure that more piece tower section composition tower body assembling after tower body entirety straightness and sealing It is required that;
(3) present invention installation is simple, and easy to operate, labor intensity is low, saves time cost, improves production efficiency, can be extensive Finishing for middle pressure, high pressure, the various pressure vessel group postwelding tower section flange sealing surfaces of super-pressure.
Detailed description of the invention
Fig. 1 is the schematic diagram of roughing device of the present invention,
Fig. 2 is the schematic diagram of precise machining device of the present invention,
Fig. 3 is the left view of Fig. 1 or Fig. 2,
Fig. 4 is the structural schematic diagram of skive of the present invention,
Fig. 5 is the left view of Fig. 4,
Fig. 6 is the assembling schematic diagram of more piece tower section of the present invention.
In figure:
1. numerical control borer,
1-1. workbench,
1-2. numerical control borer spindle box,
2. boring cutter,
3. tower section,
The right flange sealing surface of 3-1.,
The left flange sealing surface of 3-2.,
3-3. shell ring,
4-1. V-arrangement upper fixture block,
4-2. V-arrangement lower fixture block,
5. fixing seat,
6. short stud,
7. fixed block,
8. bracket,
9. long threaded rod,
10. skive,
10-1. skive connecting rod,
10-2. briquetting,
10-3. bowl-type metallic matrix,
10-4. soket head cap screw,
10-5. annular diamond grinding head.
Specific embodiment
Specific embodiment 1
What the present invention took is included the following steps: with technical solution of the boring machine to the method that more piece tower type container end flange is processed
Step 1, the clamping and centering of tower section
As shown in figures 1 and 3, the present invention carries out the clamping and centering of tower section first, on the workbench 1-1 of numerical control borer 1 Dovetail groove in fixed block 7 is installed, short stud 6 is installed in fixed block 7, fixation is connected with by the short stud 6 at both ends Seat 5 is connected with bracket 8 by intermediate short stud 6, is connected on V-arrangement in the upper surface of the fixing seat 5 at both ends by long threaded rod 9 The tower section that the both ends shell ring 3-3 are welded with end flange is fixed on intermediate bracket 8, together by fixture block 4-1 and V-arrangement lower fixture block 4-2 When Ta Jie and centering clamped by the V-arrangement upper fixture block 4-1 and V-arrangement lower fixture block 4-2 at both ends, make the axis and numerical control borer work of tower section The upper surface for making platform 1-1 is parallel, and the flange sealing surface at tower section both ends is vertical with the upper surface of numerical control borer workbench 1-1, In, one end of tower section is right flange sealing surface 3-1, and the other end is left flange sealing surface 3-2, the right flange sealing surface 3-1 with Left flange sealing surface 3-2 is parallel to each other, and the adjustment right both ends of good position rear left with long threaded rod 9 with being locked respectively;
Step 2, the right flange sealing surface 3-1 of roughing:
After the completion of the clamping of tower section and centering, installation is by boring cutter handle and cutter head on the chuck of numerical control borer spindle box 1-2 The boring cutter 2 of composition;It is mutually perpendicular to the axis of the boring cutter handle of boring cutter 2 and the right flange sealing surface 3-1 of tower section, is slightly added with boring cutter 2 The right flange sealing surface 3-1 of work makes the sealing surface surface roughness of right flange sealing surface 3-1 meet the requirement of finishing;
Step 3 replaces skive 10:
As shown in Figures 2 and 3, roughing finishes, and after the requirement through examining surface roughness to meet finishing, removes boring cutter 2, Skive 10 is replaced on the chuck of numerical control borer spindle box 1-2, makes the skive connecting rod of skive 10 The right flange sealing surface 3-1 of axis and tower section is mutually perpendicular to;
Step 4 finishes right flange sealing surface 3-1:
On the basis of roughing right flange sealing surface 3-1, right flange seal is finished using the small amount of feeding of skive 10 Face 3-1 makes the surface roughness of right flange sealing surface 3-1 reach the requirement in the range of Ra0.8~1.6, and the present invention one specific Embodiment is that surface roughness has reached Ra0.4;
Step 5, the left flange sealing surface 3-2 of roughing:
Specific method is identical as step 1 and step 2,
Step 6 finishes left flange sealing surface 3-2:
Specific method is identical as step 3 and step 4.
As shown in fig. 6, the sealing surface of other tower section end flanges is processed according to the identical method of above-mentioned steps, it finally will be more Jie Tajie 3 is got up by flanged joint, due to ensure that right flange sealing surface 3-1 and the left side of each tower section 3 in process The requirement of the depth of parallelism and surface roughness that flange sealing surface 3-2 is parallel to each other, to ensure that the tower body that more piece tower section 3 forms Whole straightness and seal request.
Specific embodiment 2
As shown in Figure 4 and Figure 5, Step 3: step 4 is connected with skive 10 described in step 6 including skive Bar 10-1 is threaded hole at the left side center of skive connecting rod 10-1, passes through interior hexagonal spiral shell in the threaded hole Nail 10-4 and briquetting 10-2 is fixedly connected with bowl-type metallic matrix 10-3, is equipped with annular in the end of bowl-type metallic matrix 10-3 Diamond grinding head 10-5;In order to guarantee the interchangeability of hard rock grinding wheel connecting rod 10-1 and boring cutter handle, the skive connection The diameter of bar 10-1 is identical as the ruler diameter of boring cutter handle.

Claims (4)

1. the method processed with boring machine to more piece tower type container end flange sealing surface, which comprises the steps of:
Step 1, the clamping and centering of tower section:
Fixing seat (5) and bracket (8) are installed on the workbench (1-1) of numerical control borer (1), the fixing seat (5) at both ends The upper surface of be connected with V-arrangement upper fixture block (4-1) and V-arrangement lower fixture block (4-2), tower section is placed on intermediate bracket (8), is led to simultaneously The V-arrangement upper fixture block (4-1) and V-arrangement lower fixture block (4-2) for crossing both ends clamp Ta Jie and centering, make the axis and numerical control borer work of tower section The upper surface for making platform (1-1) is parallel, and the upper surface of the flange sealing surface at tower section both ends and numerical control borer workbench (1-1) are hung down Directly, wherein one end of tower section is right flange sealing surface (3-1), and the other end is left flange sealing surface (3-2), and the right flange is close Cover (3-1) is parallel to each other with left flange sealing surface (3-2), and the adjustment right both ends of good position rear left use long threaded rod (9) to lock respectively It is fixed;
Step 2, the right flange sealing surface of roughing (3-1):
After the completion of the clamping of tower section and centering, boring cutter (2) are installed on the chuck of numerical control borer spindle box (1-2);Use boring cutter (2) the right flange sealing surface (3-1) of roughing tower section end flange sealing surface;
Step 3 is replaced skive (10):
Roughing finishes, and after the requirement through examining surface roughness to meet finishing, boring cutter (2) is removed, in numerical control borer main shaft Skive (10) are replaced on the chuck of case (1-2);
Step 4 finishes right flange sealing surface (3-1):
On the basis of the right flange sealing surface of roughing (3-1), right flange sealing surface (3- is finished using skive (10) 1) surface roughness of right flange sealing surface (3-1), is made to reach 0.8 μm~1.6 μm;
Step 5, the left flange sealing surface of roughing (3-2):
Specific method is identical as step 1 and step 2;
Step 6 finishes left flange sealing surface (3-2):
Specific method is identical as step 3 and step 4.
2. the method according to claim 1 processed with boring machine to more piece tower type container end flange sealing surface, feature It is, Step 3: skive described in step 4 and step 6 (10) includes skive connecting rod (10-1), in gold The left side center of hard rock grinding wheel connecting rod (10-1) is threaded hole, in the threaded hole by soket head cap screw (10-4) and Briquetting (10-2) is fixedly connected with bowl-type metallic matrix (10-3), is equipped with annular gold in the end of bowl-type metallic matrix (10-3) Hard rock bistrique (10-5).
3. the method according to claim 2 processed with boring machine to more piece tower type container end flange sealing surface, feature It is, the diameter of the skive connecting rod (10-1) is identical as the diameter of boring cutter handle.
4. the method according to claim 1 processed with boring machine to more piece tower type container end flange sealing surface, feature It is, the surface roughness of right flange sealing surface (3-1) and left flange sealing surface (3-2) described in step 4 and step 6 It is 0.4 μm.
CN201910342324.6A 2019-04-26 2019-04-26 Method for processing flange sealing surface of end part of multi-section tower type container by using boring mill Active CN109909694B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910342324.6A CN109909694B (en) 2019-04-26 2019-04-26 Method for processing flange sealing surface of end part of multi-section tower type container by using boring mill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910342324.6A CN109909694B (en) 2019-04-26 2019-04-26 Method for processing flange sealing surface of end part of multi-section tower type container by using boring mill

Publications (2)

Publication Number Publication Date
CN109909694A true CN109909694A (en) 2019-06-21
CN109909694B CN109909694B (en) 2020-12-29

Family

ID=66978477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910342324.6A Active CN109909694B (en) 2019-04-26 2019-04-26 Method for processing flange sealing surface of end part of multi-section tower type container by using boring mill

Country Status (1)

Country Link
CN (1) CN109909694B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110561329A (en) * 2019-08-30 2019-12-13 北京星航机电装备有限公司 Rapid assembly method of large flange beam structure assembly
CN115255951A (en) * 2022-08-31 2022-11-01 上海中船三井造船柴油机有限公司 Machining tool and method for double-wall gas pipe of marine diesel engine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3930301A (en) * 1972-03-17 1976-01-06 Schiess Aktiengesellschaft Heavy machine tool and device for depositing and placing a tool head in readiness for use
CN202144019U (en) * 2011-05-24 2012-02-15 龙工(上海)液压有限公司 Tool clamp for boring holes and milling surface for piston rod
CN202240452U (en) * 2011-09-08 2012-05-30 福建鼎川机床有限公司 Boring mill of numerical control vehicle for brake valve sealing surface
CN202763660U (en) * 2012-08-30 2013-03-06 欧达宜昌机电设备制造有限公司 Right-angle grinding head of numerical-control boring and milling machine
CN203356647U (en) * 2013-05-14 2013-12-25 沈阳北方特种机床设计院有限公司 Valve boring lathe machine tool
CN203843549U (en) * 2014-04-30 2014-09-24 重庆康汇动力科技发展有限公司 Shaft hole boring tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3930301A (en) * 1972-03-17 1976-01-06 Schiess Aktiengesellschaft Heavy machine tool and device for depositing and placing a tool head in readiness for use
CN202144019U (en) * 2011-05-24 2012-02-15 龙工(上海)液压有限公司 Tool clamp for boring holes and milling surface for piston rod
CN202240452U (en) * 2011-09-08 2012-05-30 福建鼎川机床有限公司 Boring mill of numerical control vehicle for brake valve sealing surface
CN202763660U (en) * 2012-08-30 2013-03-06 欧达宜昌机电设备制造有限公司 Right-angle grinding head of numerical-control boring and milling machine
CN203356647U (en) * 2013-05-14 2013-12-25 沈阳北方特种机床设计院有限公司 Valve boring lathe machine tool
CN203843549U (en) * 2014-04-30 2014-09-24 重庆康汇动力科技发展有限公司 Shaft hole boring tool

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110561329A (en) * 2019-08-30 2019-12-13 北京星航机电装备有限公司 Rapid assembly method of large flange beam structure assembly
CN110561329B (en) * 2019-08-30 2021-07-02 北京星航机电装备有限公司 Rapid assembly method of large flange beam structure assembly
CN115255951A (en) * 2022-08-31 2022-11-01 上海中船三井造船柴油机有限公司 Machining tool and method for double-wall gas pipe of marine diesel engine

Also Published As

Publication number Publication date
CN109909694B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
CN102513803B (en) Technical method for constructing reference surface of assembled folio cartridge receiver and special clamp
CN201231318Y (en) End cover turning device for motor flange
CN102658493B (en) Groove machining fixture for Omega-type straight pipes
CN108480923B (en) Method for precisely machining large thin-wall revolving body part
CN103386621B (en) Angle hatch method in a kind of composite cabin section
CN108747520A (en) A kind of adjustable fixture based on blade root contour localization
CN109909694A (en) The method that more piece tower type container end flange sealing surface is processed with boring machine
CN208663512U (en) A kind of special fixture of abrasive flows four-way interface macropore inner wall polishing
CN111375850B (en) Multi-station synchronous precise electrolytic forming processing device and method for involute internal spline
CN104889758A (en) Universal fixture device and method for machining fan-shaped workpiece combinations
CN110328567A (en) A kind of big aspect ratio hole measurement grinding integral processing method
CN205111323U (en) A anchor clamps that is used for turbine guide blade toper air film spot facing work
CN103418993B (en) The complete processing of a kind of large-scale distributor top cover
CN110153870A (en) A kind of TiC base steel bonded carbide end cap inner bore honing device and its Honing process method
CN205870003U (en) Eccentric car anchor clamps can reset
CN205593507U (en) Deep hole keyway slotting attachment based on symmetry detects control
CN102350646B (en) Typical curved part milling fixture
CN201940827U (en) Clamping tool for processing marine diesel connecting rod
CN101391358A (en) Method for processing welding frame device using bolt, pun bush as positioning reference
CN202780636U (en) Machining fixture for inner hole of pad
CN109500430A (en) A kind of two-way process tool guaranteeing concentricity
CN204735961U (en) General fixture device of fan -shaped work piece combination processing
CN210189477U (en) Special device for dressing grinding wheel of grinding machine
CN203751791U (en) Disc type special-shaped part two-end-surface turning and inclined hole processing clamp
CN102179713B (en) Turning fixture for once clamping processing of valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant