CN109904814A - A kind of bus duct fixed installation structure - Google Patents
A kind of bus duct fixed installation structure Download PDFInfo
- Publication number
- CN109904814A CN109904814A CN201711303404.8A CN201711303404A CN109904814A CN 109904814 A CN109904814 A CN 109904814A CN 201711303404 A CN201711303404 A CN 201711303404A CN 109904814 A CN109904814 A CN 109904814A
- Authority
- CN
- China
- Prior art keywords
- channel steel
- bus duct
- fixing piece
- steel
- trough rim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Installation Of Bus-Bars (AREA)
Abstract
The present invention relates to a kind of bus ducts, and structure is fixedly mounted, between preceding angle steel (21) and preceding channel steel (31), pass through several middle spring fixing piece (4) connections between rear angle steel (22) and rear channel steel (32) respectively, it is characterised in that: the coefficient of elasticity of flexible fastening piece (42) after the coefficient of elasticity of preceding flexible fastening piece (41) is greater than in middle spring fixing piece (4) each of on the outside of drop end (12) each of on the outside of preceding frid (11) in middle spring fixing piece (4);Structure is simple, be able to bear and buffer it is certain it is external shake or vibration, it is applied widely, convenient for adjusting, firmly install.
Description
Technical field
The present invention relates to a kind of mounting structures more particularly to a kind of bus duct, and structure is fixedly mounted.
Background technique
Bus duct is a kind of closed metal device being made of copper, aluminium busbar column, is used to be each element of decentralized system
Relatively high power is distributed, indoors more and more instead of wire and cable in the power Transmission trunk project project of low pressure.?
In the prior art, often structure is complicated for the fixed installation of bus duct, and cannot bear certain external shaking or vibration, while one
Structure, which is fixedly mounted, in kind can only often adapt to a kind of single bus duct model and structure, poor for applicability.
Summary of the invention
The technical problem to be solved by the present invention is in order to overcome the deficiencies in the prior art and defect, the present invention is mentioned
Supply a kind of structure is simple, be able to bear and buffers certain outside to shake or shake, is applied widely, be convenient for adjusting, install
Structure is fixedly mounted in firm bus duct.
The technical solution adopted by the present invention to solve the technical problems is: a kind of bus duct fixed installation structure, including mother
Wire casing ontology, the first fixed installation portion and the second fixed installation portion, wherein the first fixed installation portion is symmetrically disposed on bus duct sheet
On the outside of the preceding frid and drop end of body, the first fixed installation portion includes preceding angle steel and rear angle steel, and preceding angle steel is respectively by being located at it
The preceding fastener of left and right ends is snapped connection with preceding frid, is passed through after fastener and preceding angle steel before fixing piece sequentially passes through before first
Nut is fixed;Angle steel is snapped connection by being located at the rear fastener of its left and right ends with drop end respectively afterwards, solid after first
Determine to be fixed after part sequentially passes through rear fastener and rear angle steel by nut;Second fixed installation portion includes being symmetrically arranged
Left part, the right part of preceding channel steel and rear channel steel on the outside of preceding frid and drop end, preceding channel steel and rear channel steel pass through respectively
Fixing piece is fixedly connected with left channel steel, right channel steel after fixing piece and second before two, between preceding angle steel and preceding channel steel, rear angle steel and and
Pass through several middle spring fixing piece connections between channel steel respectively afterwards, it is characterised in that: before being located in middle spring fixing piece
The coefficient of elasticity of preceding flexible fastening piece is greater than in middle spring fixing piece each of on the outside of drop end each of on the outside of frid
The coefficient of elasticity of flexible fastening piece afterwards.
Further, in preceding flexible fastening piece and rear flexible fastening piece, positioned at the elasticity of the flexible fastening piece of left and right ends
Coefficient is greater than the coefficient of elasticity of centrally located flexible fastening piece.
Further, preceding fastener and rear fastener section are in groove profile, and notch direction is respectively directed to preceding angle steel and relief angle
Steel is respectively arranged with card slot for frid and pit before accommodating close to the side of bus duct ontology in preceding fastener and rear fastener
The edge flanging of plate.
Further, left and right ends offer preceding upper fixation hole respectively on trough rim under preceding channel steel, left on trough rim under rear channel steel
Right both ends upper fixation hole after offering respectively, and size of the preceding upper fixation hole under preceding channel steel on trough rim left and right directions is greater than second
The size of preceding fixing piece, the ruler of fixing piece after rear upper size of the fixation hole under rear channel steel on trough rim left and right directions is greater than second
It is very little.
Further, the position of corresponding preceding upper fixation hole offers preceding lower fixed hole on the upper trough rim of left channel steel, right channel steel,
The position of upper fixation hole offers rear lower fixed hole, and ruler of the preceding lower fixed hole on left channel steel on trough rim front-rear direction after correspondence
It is very little be greater than second before fixing piece size, size of the rear lower fixed hole on left channel steel on trough rim front-rear direction be solid after being greater than second
Determine the size of part.
Further, position closer to the front relative to preceding lower fixed hole on the lower trough rim of left channel steel, right channel steel also opens up
There is front lower mounting hole.
Further, left channel steel, right channel steel rear end be additionally provided with mounting plate, offered on mounting plate rear upper installing hole and
Mounting hole is descended afterwards, and rear upper installing hole is located above the upper trough rim of left channel steel, right channel steel, and lower mounting hole is located at left channel steel, right slot afterwards
Between the upper trough rim of steel and lower trough rim.
Further, left channel steel, right channel steel upper trough rim be additionally provided with inner recess close to the rear end of mounting plate.
Further, middle spring fixing piece includes the elastic portion being located above and underlying fixed part, is located at upper
Adjusting nut is additionally provided between the elastic portion and underlying fixed part of side.
Further, the length of preceding angle steel in the lateral direction is greater than the length of rear angle steel in the lateral direction.
The beneficial effects of the present invention are:
(1) it is connected respectively by several middle spring fixing pieces between preceding angle steel and preceding channel steel, between rear angle steel and rear channel steel,
When structure, which is fixedly mounted, in the bus duct suffers from external shaking or vibration in use, buffering is played by elastic portion and is subtracted
The effect of shake is able to bear certain external shaking or vibration, avoids shaking because of outside or vibration is straight to the fixed installation structure
It connects and damages;
(2) middle spring fixing piece includes the elastic portion being located above and underlying fixed part, the elastic portion being located above
It is additionally provided with adjusting nut between underlying fixed part, it, can be according to different installations by the setting of adjusting nut
Position and installation need, and below adjusting while fixed part length, adjust pre-stretching/reduction length of top elastic portion;
(3) size of fixation hole is both greater than the size of fixing piece on left and right and front-rear direction, convenient for according to different model and ruler
Very little bus duct ontology adjusts the installation site in the second fixed installation portion (3), applied widely.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that structure is fixedly mounted in a kind of bus duct of the present invention;
In figure, frid, 12--- drop end, the first fixed installation of 2--- portion, 21--- anterior angle before 1--- bus duct ontology, 11---
After steel, 22--- before angle steel, 211--- before fastener, 212--- first after fixing piece, 221--- after fastener, 222--- first
Channel steel after channel steel, 32--- before fixing piece, the second fixed installation of 3--- portion, 31---, the right channel steel of 33---, the left channel steel of 34---,
Before 341--- second after fixing piece, 342--- second after fixing piece, the front lower mounting hole of 343---, 35--- mounting plate, 351--- on
Flexible fastening after flexible fastening piece, 42--- before lower mounting hole, the middle spring fixing piece of 4---, 41--- after mounting hole, 352---
Part.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These attached drawings are simplified schematic diagram, only with
Illustration illustrates basic structure of the invention, therefore it only shows the composition relevant to the invention.
As shown in Figure 1, a kind of bus duct is fixedly mounted structure, including bus duct ontology 1, the first fixed installation portion 2 and the
Two fixed installation portions 3, wherein the first fixed installation portion 2 is symmetrically disposed on outside the preceding frid 11 and drop end 12 of bus duct ontology 1
Side, the first fixed installation portion 2 include preceding angle steel 21 and rear angle steel 22, and preceding angle steel 21 passes through the preceding card positioned at its left and right ends respectively
Fastener 211 is snapped connection with preceding frid 11, is passed through after fastener 211 and preceding angle steel 21 before fixing piece 212 sequentially passes through before first
Nut is fixed;Angle steel 22 is snapped connection by being located at the rear fastener 221 of its left and right ends with drop end 12 respectively afterwards, the
Fixing piece 222 is fixed after sequentially passing through rear fastener 221 and rear angle steel 22 by nut after one;Second fixed installation portion 3
Including being symmetrically arranged in the preceding channel steel 31 and rear channel steel 32 in 12 outside of preceding frid 11 and drop end, preceding channel steel 31 and rear channel steel
Fixing piece 342 and left channel steel 34, right channel steel 33 after fixing piece 341 and second before 32 left part, right part pass through second respectively
It is fixedly connected, it is middle spring to pass through several between preceding angle steel 21 and preceding channel steel 31, between rear angle steel 22 and rear channel steel 32 respectively
Fixing piece 4 connects, and the coefficient of elasticity that the preceding flexible fastening piece 41 in each of preceding 11 outside of frid is located in middle spring fixing piece 4 is big
It is located at the coefficient of elasticity of the rear flexible fastening piece 42 in each of 12 outside of drop end in middle spring fixing piece 4;Because of the bus
Structure is fixedly mounted by the rear upper installing hole 351 on mounting plate 35 and when lower mounting hole 352 is installed afterwards in slot, when suffering from the external world
When shaking or shaking, the mounting fixing parts in rear upper installing hole 351 and rear lower mounting hole 352 can be used as fulcrum, and it is micro- to there is generation
The trend of thin tail sheep, and since the torque of each preceding flexible fastening piece 41 is longer, the torque of each rear flexible fastening piece 42 is shorter,
Therefore each preceding flexible fastening piece 41 is more easily also more likely to generate compared with long displacement, and each rear flexible fastening piece 42 is easier
Also it is more likely to generate compared with short essay, therefore is arranged in middle spring fixing piece 4 and is located at the preceding elasticity in each of preceding 11 outside of frid
The coefficient of elasticity of fixing piece 41, which is greater than, is located at the rear flexible fastening piece 42 in each of 12 outside of drop end in middle spring fixing piece 4
Coefficient of elasticity is more advantageous to the fixed installation structure and integrally plays the role of damping vibration, thus the Global Macros fixed installation
Structure prolongs its service life.
Specifically, in preceding flexible fastening piece 41 and rear flexible fastening piece 42, positioned at the bullet of the flexible fastening piece of left and right ends
Property coefficient is greater than the coefficient of elasticity of centrally located flexible fastening piece, this is because preceding channel steel 31 and rear channel steel 32 lead to respectively
Cross before the second of its both ends that fixing piece 342 is fixed on left channel steel 34 and right channel steel 33 after fixing piece 341 and second, when suffering from
The external world shakes or when vibration, is both greater than located at positioned at the trend that is subjected to displacement of flexible fastening piece and displacement of left and right ends
Between position flexible fastening piece trend and displacement, therefore specific setting is located at the elasticity system of the flexible fastening piece of left and right ends
Number is greater than the coefficient of elasticity of centrally located flexible fastening piece, is more advantageous to the fixed installation structure and integrally plays buffering shake
Dynamic effect, so that the Global Macros fixed installation structure, prolongs its service life.
Specifically, preceding fastener 211 and 221 section of rear fastener are in groove profile, and notch direction is respectively directed to preceding angle steel 21
With rear angle steel 22, card slot is respectively arranged with close to the side of bus duct ontology 1 in preceding fastener 211 and rear fastener 221 and is used for
The edge flanging of frid 11 and drop end 12 before accommodating.
Specifically, left and right ends offer preceding upper fixation hole respectively on the lower trough rim of preceding channel steel 31, under rear channel steel 32 on trough rim
Left and right ends upper fixation hole after offering respectively, and size of the preceding upper fixation hole under preceding channel steel 31 on trough rim left and right directions is greater than
The size of fixing piece 341 before second, upper size of the fixation hole under rear channel steel 32 on trough rim left and right directions is solid after being greater than second afterwards
Determine the size of part 342, in order to according to the fixation of different model and the bus duct ontology of size and installation needs, to adjust left slot
The position of steel 34 and right channel steel 33 on the lower trough rim of preceding channel steel 31 and right channel steel 32 on left and right directions.
Specifically, the position of corresponding preceding upper fixation hole offers front lower fixation on the upper trough rim of left channel steel 34, right channel steel 33
Hole, the position of upper fixation hole offers rear lower fixed hole, and preceding lower fixed hole trough rim front-rear direction on left channel steel 34 after corresponding
On size be greater than second before fixing piece 341 size, size of the rear lower fixed hole on left channel steel 34 on trough rim front-rear direction
The size of fixing piece 342 after greater than second, in order to according to the fixation of different model and the bus duct ontology of size and installation need
It wants, to adjust the position of preceding channel steel 31 and rear channel steel 32 on the upper trough rim of left channel steel 34 and right channel steel 33 on front-rear direction.
Specifically, position closer to the front relative to preceding lower fixed hole on the lower trough rim of left channel steel 34, right channel steel 33 is also opened
It is after the installation is completed with the mounting fixing parts in rear upper installing hole 351 and rear lower mounting hole 352, preceding equipped with front lower mounting hole 343
Lower mounting hole 343 is to meet the location and installation needs in another face.
Specifically, left channel steel 34, right channel steel 33 rear end be additionally provided with mounting plate 35, upper peace after being offered on mounting plate 35
It fills hole 351 and lower mounting hole 352, rear upper installing hole 351 is located above the upper trough rim of left channel steel 34, right channel steel 33 afterwards, rear lower peace
Dress hole 352 is located between the upper trough rim and lower trough rim of left channel steel 34, right channel steel 33, sets preferably, mounting plate 35 divides for left and right
2 pieces set, and the mounting plate 35 on the left side is molded as one with left channel steel 34, the mounting plate 35 on the right and right channel steel 33 are shaped to one
Body.
Specifically, left channel steel 34, right channel steel 33 upper trough rim be additionally provided with inner recess close to the rear end of mounting plate 35.
Specifically, middle spring fixing piece 4 includes the elastic portion being located above and underlying fixed part, is located above
Elastic portion and underlying fixed part between be additionally provided with adjusting nut, can be according to not by the setting of adjusting nut
Same installation site and installation needs, below adjusting while fixed part length, pre-stretching/compression of elastic portion above adjusting
Length.
For example, as a further preference, the predeterminated position positioned at the adjusting nut of the flexible fastening piece of left and right ends is wanted
Higher than the predeterminated position of the adjusting nut of centrally located flexible fastening piece;It is located at preceding frid in middle spring fixing piece 4
The predeterminated position of each of the 11 outsides adjusting nut of preceding flexible fastening piece 41, which is higher than in middle spring fixing piece 4, is located at pit
The predeterminated position of the adjusting nut of flexible fastening piece 42 behind each of 12 outside of plate.
Specifically, the length of preceding angle steel 21 in the lateral direction is greater than the length of rear angle steel 22 in the lateral direction.
Taking the above-mentioned ideal embodiment according to the present invention as inspiration, through the above description, relevant staff is complete
Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention
Property range is not limited to the contents of the specification, it is necessary to which the technical scope thereof is determined according to the scope of the claim.
Claims (10)
1. structure, including the fixed peace of bus duct ontology (1), the first fixed installation portion (2) and second is fixedly mounted in a kind of bus duct
Dress portion (3), wherein the first fixed installation portion (2) is symmetrically disposed on the preceding frid (11) and drop end (12) of bus duct ontology (1)
Outside, the first fixed installation portion (2) include preceding angle steel (21) and rear angle steel (22), and preceding angle steel (21) is respectively by being located at its left and right
The preceding fastener (211) at both ends is snapped connection with preceding frid (11), and fixing piece (212) sequentially passes through preceding fastener before first
(211) it is fixed afterwards by nut with preceding angle steel (21);Angle steel (22) passes through the rear buckle positioned at its left and right ends respectively afterwards
Part (221) is snapped connection with drop end (12), and fixing piece (222) sequentially passes through rear fastener (221) and rear angle steel after first
(22) it is fixed afterwards by nut;Second fixed installation portion (3) includes being symmetrically arranged in preceding frid (11) and drop end
(12) left part, the right part of preceding channel steel (31) and rear channel steel (32) on the outside of, preceding channel steel (31) and rear channel steel (32) lead to respectively
Fixing piece (342) is fixedly connected with left channel steel (34), right channel steel (33) after fixing piece (341) and second before crossing second, preceding angle steel
(21) pass through several middle spring fixing pieces respectively between preceding channel steel (31), between rear angle steel (22) and rear channel steel (32)
(4) connect, it is characterised in that: in middle spring fixing piece (4) be located at preceding frid (11) on the outside of each of preceding flexible fastening piece
(41) flexible fastening piece (42) after coefficient of elasticity is greater than in middle spring fixing piece (4) each of on the outside of drop end (12)
Coefficient of elasticity.
2. structure is fixedly mounted in bus duct according to claim 1, it is characterised in that: the preceding flexible fastening piece (41) and
Afterwards in flexible fastening piece (42), the coefficient of elasticity positioned at the flexible fastening piece of left and right ends is solid greater than centrally located elasticity
Determine the coefficient of elasticity of part.
3. structure is fixedly mounted in bus duct according to claim 1, it is characterised in that: the preceding fastener (211) and after
Fastener (221) section is in groove profile, and notch direction is respectively directed to preceding angle steel (21) and rear angle steel (22), in preceding fastener
(211) and rear fastener (221) close to bus duct ontology (1) side be respectively arranged with card slot for accommodate preceding frid (11) and
The edge flanging of drop end (12).
4. structure is fixedly mounted in bus duct according to claim 1, it is characterised in that: under the preceding channel steel (31) on trough rim
Left and right ends offer preceding upper fixation hole, upper fixation after left and right ends offer respectively on trough rim under the rear channel steel (32) respectively
Hole, and size of the preceding upper fixation hole under the preceding channel steel (31) on trough rim left and right directions be greater than second before fixing piece (341)
Size, fixing piece (342) after size of the rear upper fixation hole under the rear channel steel (32) on trough rim left and right directions is greater than second
Size.
5. structure is fixedly mounted in bus duct according to claim 4, it is characterised in that: the left channel steel (34), right channel steel
(33) position of corresponding preceding upper fixation hole offers preceding lower fixed hole on upper trough rim, and the position of upper fixation hole offers after corresponding
Lower fixed hole afterwards, and size of the preceding lower fixed hole on the left channel steel (34) on trough rim front-rear direction be greater than second before fixing piece
(341) size, fixing piece after size of the rear lower fixed hole on the left channel steel (34) on trough rim front-rear direction is greater than second
(342) size.
6. structure is fixedly mounted in bus duct according to claim 5, it is characterised in that: the left channel steel (34), right channel steel
(33) position closer to the front relative to preceding lower fixed hole is also provided with front lower mounting hole (343) on lower trough rim.
7. structure is fixedly mounted in bus duct according to claim 1, it is characterised in that: the left channel steel (34), right channel steel
(33) rear end is additionally provided with mounting plate (35), and rear upper installing hole (351) and rear lower installation are offered on the mounting plate (35)
Hole (352), rear upper installing hole (351) are located above the upper trough rim of left channel steel (34), right channel steel (33), descend mounting hole (352) afterwards
Positioned at left channel steel (34), right channel steel (33) upper trough rim and lower trough rim between.
8. structure is fixedly mounted in bus duct according to claim 7, it is characterised in that: the left channel steel (34), right channel steel
(33) upper trough rim is additionally provided with inner recess close to the rear end of the mounting plate (35).
9. structure is fixedly mounted in bus duct according to claim 1, it is characterised in that: the middle spring fixing piece (4)
Including the elastic portion being located above and underlying fixed part, between the elastic portion being located above and underlying fixed part
It is additionally provided with adjusting nut.
10. structure is fixedly mounted in bus duct according to claim 1, it is characterised in that: the preceding angle steel (21) is in left and right
Length on direction is greater than the length of rear angle steel (22) in the lateral direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711303404.8A CN109904814A (en) | 2017-12-11 | 2017-12-11 | A kind of bus duct fixed installation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711303404.8A CN109904814A (en) | 2017-12-11 | 2017-12-11 | A kind of bus duct fixed installation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109904814A true CN109904814A (en) | 2019-06-18 |
Family
ID=66941502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711303404.8A Pending CN109904814A (en) | 2017-12-11 | 2017-12-11 | A kind of bus duct fixed installation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109904814A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113199233A (en) * | 2021-04-25 | 2021-08-03 | 国网安徽省电力有限公司明光市供电公司 | Dismounting bus duct structure applied to power system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102231505A (en) * | 2011-04-02 | 2011-11-02 | 成都振中电气有限公司 | Intensive plug-in type busbar |
CN204271561U (en) * | 2014-11-19 | 2015-04-15 | 江苏博尔特电力科技有限公司 | Bus duct floor gap mounting structure |
CN205565626U (en) * | 2016-04-07 | 2016-09-07 | 广东众联兴电力设备有限公司 | Novel spring bracket |
CN206195292U (en) * | 2016-11-08 | 2017-05-24 | 浩翔电气集团有限公司 | Spring bearing structure based on installation of generating line shaft |
-
2017
- 2017-12-11 CN CN201711303404.8A patent/CN109904814A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102231505A (en) * | 2011-04-02 | 2011-11-02 | 成都振中电气有限公司 | Intensive plug-in type busbar |
CN204271561U (en) * | 2014-11-19 | 2015-04-15 | 江苏博尔特电力科技有限公司 | Bus duct floor gap mounting structure |
CN205565626U (en) * | 2016-04-07 | 2016-09-07 | 广东众联兴电力设备有限公司 | Novel spring bracket |
CN206195292U (en) * | 2016-11-08 | 2017-05-24 | 浩翔电气集团有限公司 | Spring bearing structure based on installation of generating line shaft |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113199233A (en) * | 2021-04-25 | 2021-08-03 | 国网安徽省电力有限公司明光市供电公司 | Dismounting bus duct structure applied to power system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20170016189A1 (en) | Flexible Moment Connection Device for Mast Arm Signal Mounting | |
RU2011103968A (en) | SEISMIC FASTENING FOR THE T-SHAPED DETAIL OF THE STRINGED SEAM OF THE LATTICE DESIGN | |
US20110084179A1 (en) | Line fastening device | |
WO2007135264A8 (en) | Separation and/or reinforcement device for a wire cable duct | |
CN105186320A (en) | Wall switch cabinet | |
CN109904814A (en) | A kind of bus duct fixed installation structure | |
CN204592147U (en) | The rope tightening device of a kind of wire rope or wirerope | |
CN107628038A (en) | Bogie with the motor installation for linear induction motor | |
CN106612600B (en) | Sliding rail assembly for machine frame system | |
US8985535B1 (en) | Wind resilient mast arm mounting assembly | |
CN207875774U (en) | Tail-gate gas strut mounting assembly and vehicle | |
CN201060955Y (en) | Mounting frame for electric appliance connecting terminal bus | |
JP2014156764A (en) | Fixture of rooftop-mounting apparatus | |
CN110994513A (en) | Strain drainage wire supports roll adjustment fastener | |
CN103342267A (en) | Novel elevator car guide rail support | |
CN205047991U (en) | Prevent abnormal sound and fix pipe clamp | |
CN203348423U (en) | Elastic pressing sheet of fixed-power-amplification amplifier | |
CN110994512A (en) | Strain drainage wire supports roll adjustment fastener | |
CN202227939U (en) | Blind window | |
CN208188180U (en) | A kind of switch mounting assembly for ammeter box | |
KR100739043B1 (en) | Arm band for angle electric pole | |
CN204220808U (en) | The two-sided intermediate plate fixture of bender | |
CN220435641U (en) | Fire control pipeline fixed bolster | |
US20190176592A1 (en) | Three-point support of a sliding door | |
CN202597488U (en) | Connecting rod bearing component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190618 |
|
WD01 | Invention patent application deemed withdrawn after publication |