CN109888672B - Double split wire takeup device - Google Patents

Double split wire takeup device Download PDF

Info

Publication number
CN109888672B
CN109888672B CN201910172354.7A CN201910172354A CN109888672B CN 109888672 B CN109888672 B CN 109888672B CN 201910172354 A CN201910172354 A CN 201910172354A CN 109888672 B CN109888672 B CN 109888672B
Authority
CN
China
Prior art keywords
pulley
wire
frame
fixing frame
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910172354.7A
Other languages
Chinese (zh)
Other versions
CN109888672A (en
Inventor
吴能锦
郑学樑
陈文彬
张世炼
张明滔
廖肇葵
庄学平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Yili Power Engineering Co ltd
State Grid Fujian Electric Power Co Ltd
Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
Fuzhou Yili Power Engineering Co ltd
State Grid Fujian Electric Power Co Ltd
Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Yili Power Engineering Co ltd, State Grid Fujian Electric Power Co Ltd, Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical Fuzhou Yili Power Engineering Co ltd
Priority to CN201910172354.7A priority Critical patent/CN109888672B/en
Publication of CN109888672A publication Critical patent/CN109888672A/en
Application granted granted Critical
Publication of CN109888672B publication Critical patent/CN109888672B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)
  • Basic Packing Technique (AREA)

Abstract

The invention discloses a double-split wire tightening device.A sub-wire following pulley is of a human-shaped structure, fixing holes are formed in two side pieces of a small end of the human-shaped structure, a pulley is arranged at a large end of the human-shaped structure, and the two side pieces can rotate relative to a pulley fixing shaft; the lower sub-wire pulley fixer comprises a frame-shaped pulley fixing frame, a pulley is fixed on the upper portion of the frame-shaped fixing frame, a movable door for clamping wires is arranged on one side face of the pulley fixing frame, a locking device for locking after the wires are clamped into the pulley is arranged on the movable door, and a fixing hole for fixing the upper sub-wire tightener and the lower sub-wire tightener is formed in the bottom of the frame-shaped fixing frame. The invention has reasonable structure, simple structure and convenient operation, the installation of the whole tool only needs two steps, and the spring pull bolt rod is stirred for fixing, and generally, the whole tool can be independently and quickly installed by only knowing the mechanism principle of the personnel who just engage in live working.

Description

Double split wire takeup device
Technical Field
The present invention relates to a wire takeup device, and more particularly to a double split wire takeup device.
Background
The topography of coastal mountain areas is large in height difference of the power transmission line, and after the vibration damper blows and vibrates, the wire clamps are loosened, so that the vibration damper slides along the line from the high-topography towers to the low-topography towers. Because the wire clamp loosens and is influenced by wind power and can shake, the wire is rubbed continuously, and the damage and strand breakage of the wire are caused for a long time. Meanwhile, in typhoons on coastal sides, sharp foreign matters such as iron sheets of workshops fly to cause strand breakage of the wires. These lead damage conditions occur on the lead between the two towers, and the defect positions are not fixed randomly, so that the lead needs to be repaired by operators.
The 220kV transmission line adopts double split conductors, and as no spacing rod is arranged between the upper sub-conductor and the lower sub-conductor, in the outgoing process of operators, the longer the outgoing line is, the larger the separation distance between the upper sub-conductor and the lower sub-conductor is, as the lower sub-conductor is subjected to the extra load of the weight of the operators and the weight of an outgoing tool. One of the traditional methods is that an operator shifts to the lower part of an operation place through the lower sub-conductor, and tightens the upper sub-conductor and the lower sub-conductor to operate by using an insulating rope and manpower; and the second method is to use insulating ropes to bind upper and lower sub-wires at intervals of 15 meters to avoid wire separation until the operation point is reached. The traditional method is complicated in operation steps, high in physical strength requirement on operators and low in operation efficiency.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide the double-split wire tightener capable of conveniently and rapidly tightening the upper sub-wires and the lower sub-wires, so that the operation processes of repairing the upper sub-wires and resetting the damper of a power transmission line are simplified, the physical consumption of operators is reduced, the personal safety is ensured, and the operation efficiency is improved.
The double-split wire tightening device comprises an upper sub-wire following pulley, a lower sub-wire pulley fixer and an upper sub-wire tightener and a lower sub-wire tightener, wherein the upper sub-wire following pulley comprises two side pieces, one end of each side piece is provided with a fixing hole for hanging the upper sub-wire tightener and the lower sub-wire tightener, a pulley is arranged at the other end of each side piece, and the side pieces can rotate relative to a pulley fixing shaft; the lower sub-wire pulley fixer comprises a frame-shaped pulley fixing frame, the pulley is fixed on the upper portion of the frame-shaped fixing frame, a positioning piece is further arranged in the frame-shaped fixing frame and fixed by a screw rod, the screw rod extends out from the upper top of the frame-shaped fixing frame, a threaded through hole is formed in the upper top, the position of the positioning piece in the frame-shaped fixing frame is adjusted by an adjusting screw rod, a movable door for a wire to be clamped in is formed in one side surface of the pulley fixing frame, the movable door is hinged to the side surface of the frame-shaped fixing frame, a locking device for locking after the wire is clamped in the pulley is arranged on the movable door, and a fixing hole for fixing the upper sub-wire tightener and the lower sub-wire tightener is formed in the bottom of the frame-shaped fixing frame.
When the double-split wire tightening device is used, the upper sub-wire tightener and the lower sub-wire tightener are mounted on the lower sub-wire pulley fixer, the movable door of the lower sub-wire pulley fixer is opened, the lower sub-wire is clamped into the movable door, the movable door is locked, then the insulating ropes in the upper sub-wire tightener and the lower sub-wire tightener are strung into the fixing holes of the side plates of the upper sub-wire following pulley, the two side plates of the upper sub-wire following pulley are hung on the wires in a staggered angle, then the insulating endless ropes are penetrated out of the upper through holes of the inclined sections of the side plates of the other side and then are bound and fixed, after the double-split wire tightening device moves to the right after the worker moves to the right, the staff rotates the screw tightening locating piece, and then the insulating ropes of the tightener are tightened again, so that the tightening of the upper sub-wire and the lower sub-wire is realized.
The locating piece is an arc-shaped face on the locating face facing the pulley.
The positioning surface is arranged to be an arc surface, so that the movement of the lower sub-wire pulley fixer relative to the wire is smoother.
The locating piece is of a U-shaped structure, one side of two sides of the U-shaped structure is used for fixing the screw rod, and the other side of the U-shaped structure is used as a locating surface.
By adopting the U-shaped structure, the bottom edge of the U-shaped structure can lean against the side edge of the frame-shaped fixing frame, so that the stability of the positioning piece can be improved.
The lower sub-wire pulley fixer is characterized in that two pulleys are arranged in the frame-shaped fixing frame in a front-back mode, and the positioning piece is arranged between the two pulleys.
Two pulleys are arranged in the lower sub-wire pulley fixer, so that the stability of the double-split wire tightening device can be improved.
The locking device of the movable door is locked by adopting a spring bolt rod, one side surface of the frame-shaped fixing frame is provided with the spring bolt rod, and the movable door is provided with a hole for the spring bolt rod to pass through.
By adopting the spring pull bolt rod, the quick installation of operators is facilitated.
In summary, compared with the prior art, the invention has the following advantages:
the double-split wire tightening device can realize the repair of wires with different wires and different wire outlet distances and the operation of resetting the damper, can conveniently and quickly tighten the double-split wire tightener of the upper sub-wires and the lower sub-wires, simplifies the operation process of repairing the upper sub-wires and resetting the damper of the power transmission line, reduces the physical consumption of operators, ensures the personal safety and improves the operation efficiency. The invention has reasonable structure, simple structure and convenient operation, the installation of the whole tool only needs two steps, and the spring pull bolt rod is stirred for fixing, and generally, the whole tool can be independently and quickly installed by only knowing the mechanism principle of the personnel who just engage in live working.
Drawings
Fig. 1 is a schematic view of the lower sub-wire pulley holder of the present invention.
Fig. 2 is a side view of the lower sub-wire pulley holder of the present invention.
Fig. 3 is a schematic view of the structure of the positioning member of the present invention.
Fig. 4 is a schematic view of the upper sub-wire following trolley of the present invention.
The reference numeral 1 indicates that the sub-wire follows the fixed hole 13 of the side piece 12 of the pulley 11, the lower sub-wire pulley fixer 21, the pulley fixing frame 22, the positioning piece 23, the screw 24, the movable door 25, the locking device 26, the spring bolt rod 3, and the hole for the spring bolt rod to pass through on the movable door of the lower sub-wire tightener 27.
Detailed Description
The present invention will be described in more detail with reference to examples.
Example 1
The double-split wire tightening device comprises an upper sub-wire following pulley 1, a lower sub-wire pulley fixer 2 and an upper sub-wire tightener 3, wherein the upper sub-wire following pulley is of a human-shaped structure and comprises two side pieces 11, fixing holes 12 for hanging the upper sub-wire tightener and the lower sub-wire tightener are formed in two side pieces of the small end of the human-shaped structure, the pulley 13 is arranged at the large end of the human-shaped structure, and the two side pieces can rotate relative to a pulley fixing shaft; the lower sub-wire pulley fixer comprises a frame-shaped pulley fixing frame 21, a pulley is fixed on the upper portion of the frame-shaped fixing frame, a positioning piece 22 is further arranged in the frame-shaped fixing frame and is fixed by a screw 23, the screw extends out of the upper top of the frame-shaped fixing frame, a threaded through hole is formed in the upper top, the position of the positioning piece in the frame-shaped fixing frame is adjusted by adjusting the screw, a movable door 24 for clamping wires is formed in one side surface of the pulley fixing frame, the movable door is hinged to the side surface of the frame-shaped fixing frame, a locking device 25 for locking after the wires are clamped into the pulley is arranged on the movable door, and a fixing hole for fixing the upper sub-wire tightener and the lower sub-wire tightener is formed in the bottom of the frame-shaped fixing frame. The locating piece is of a U-shaped structure, one side of two sides of the U-shaped structure is used for fixing the screw rod, and the other side of the U-shaped structure is used as a locating surface. The lower sub-wire pulley fixer is characterized in that two pulleys are arranged in the frame-shaped fixing frame in a front-back mode, and the positioning piece is arranged between the two pulleys. The locking device of the movable door adopts a spring bolt rod for locking, a spring bolt rod 26 is arranged on one side surface of the frame-shaped fixing frame, and a hole 27 for the spring bolt rod to pass through is arranged on the movable door.
The undescribed portion of this embodiment is identical to the prior art.

Claims (4)

1. A double split wire takeup device characterized by: the upper sub-wire following pulley comprises two side pieces, one end of each side piece is provided with a fixing hole for hanging the upper sub-wire tightener and the lower sub-wire tightener, the pulley is arranged at the other end of each side piece, and the two side pieces can rotate relative to a pulley fixing shaft; the lower sub-wire pulley fixer comprises a frame-shaped pulley fixing frame, the pulley is fixed on the upper portion of the frame-shaped fixing frame, a positioning piece is further arranged in the frame-shaped fixing frame and fixed by a screw rod, the screw rod extends out from the upper top of the frame-shaped fixing frame, a threaded through hole is formed in the upper top, the position of the positioning piece in the frame-shaped fixing frame is adjusted by an adjusting screw rod, a movable door for a wire to be clamped in is formed in one side surface of the pulley fixing frame, the movable door is hinged to the side surface of the frame-shaped fixing frame, a locking device for locking after the wire is clamped in the pulley is arranged on the movable door, and a fixing hole for fixing the upper sub-wire tightener and the lower sub-wire tightener is formed in the bottom of the frame-shaped fixing frame.
2. The double split wire takeup device according to claim 1, wherein: the locating piece is an arc-shaped face on the locating face facing the pulley.
3. The double split wire takeup device according to any one of claims 1 to 2, characterized in that: the lower sub-wire pulley fixer is characterized in that two pulleys are arranged in the frame-shaped fixing frame in a front-back mode, and the positioning piece is arranged between the two pulleys.
4. The double split wire takeup device according to claim 3, wherein: the locking device of the movable door is locked by adopting a spring bolt rod, one side surface of the frame-shaped fixing frame is provided with the spring bolt rod, and the movable door is provided with a hole for the spring bolt rod to pass through.
CN201910172354.7A 2019-03-07 2019-03-07 Double split wire takeup device Active CN109888672B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910172354.7A CN109888672B (en) 2019-03-07 2019-03-07 Double split wire takeup device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910172354.7A CN109888672B (en) 2019-03-07 2019-03-07 Double split wire takeup device

Publications (2)

Publication Number Publication Date
CN109888672A CN109888672A (en) 2019-06-14
CN109888672B true CN109888672B (en) 2024-04-02

Family

ID=66931148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910172354.7A Active CN109888672B (en) 2019-03-07 2019-03-07 Double split wire takeup device

Country Status (1)

Country Link
CN (1) CN109888672B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110556742A (en) * 2019-10-14 2019-12-10 武汉纺织大学 Full-automatic optical cable paying-off and bundling machine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5586611A (en) * 1995-10-13 1996-12-24 Cypress Services, Inc. Drill bit having dual split bushings for cutter support and retention
CN101820144A (en) * 2010-03-26 2010-09-01 福建省电力有限公司莆田电业局 Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire
CN102545100A (en) * 2012-01-19 2012-07-04 福建省电力有限公司厦门电业局 Live installation tool for space bar of twin-bundled conductor
CN106711848A (en) * 2016-12-22 2017-05-24 国网河北省电力公司衡水供电分公司 Vertical double-bundled line outgoing operation platform
CN209402075U (en) * 2019-03-07 2019-09-17 国网福建省电力有限公司福州供电公司 Double bundle conductor tightener

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5586611A (en) * 1995-10-13 1996-12-24 Cypress Services, Inc. Drill bit having dual split bushings for cutter support and retention
CN101820144A (en) * 2010-03-26 2010-09-01 福建省电力有限公司莆田电业局 Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire
CN102545100A (en) * 2012-01-19 2012-07-04 福建省电力有限公司厦门电业局 Live installation tool for space bar of twin-bundled conductor
CN106711848A (en) * 2016-12-22 2017-05-24 国网河北省电力公司衡水供电分公司 Vertical double-bundled line outgoing operation platform
CN209402075U (en) * 2019-03-07 2019-09-17 国网福建省电力有限公司福州供电公司 Double bundle conductor tightener

Also Published As

Publication number Publication date
CN109888672A (en) 2019-06-14

Similar Documents

Publication Publication Date Title
CN102095634B (en) Whole-rope powerless winding and clamping device of wire rope
JP4307235B2 (en) Overhead wire lifting device
CN109888672B (en) Double split wire takeup device
CN213585109U (en) Pipeline supporting mechanism for weak current engineering
CN204144784U (en) A kind of adjustable strain insulator wire load replacing insulator protective device
CN203850726U (en) Wire lifter on 10 kV power distribution telegraph pole
CN116581688B (en) Overhead cable tightening device
CN210604154U (en) Clamping fixture for testing tensile property of steel wire rope
CN209402075U (en) Double bundle conductor tightener
CN112382983A (en) Electric power turn-buckle
CN107732789B (en) Overhead line wire-stringing device
CN211629820U (en) Overhead ground wire clamp adjuster for goaf tower
CN210372800U (en) Electric power overhauls instrument fixed bolster
CN111786230B (en) Grounding ring mounting device, grounding ring mounting robot and grounding ring mounting method
CN211262640U (en) Glass insulator falling test device
KR101472980B1 (en) Weight clamping type Gondola Hanger for Building facade maintenance
CN208148146U (en) Vertical cutting machine steel wire tensioning positioning device
CN203423430U (en) Insulator maintenance device
CN203787862U (en) 66KV-220KV tip beam universal suspension wire clamping apparatus
CN220317073U (en) TRD shaped steel hoist and mount stability fixture and hoist thereof
CN219592093U (en) Shockproof hammer for preventing birds from standing
CN215171947U (en) Industrial robot belt tensioning device
CN216489666U (en) Power transmission tower ground wire bracket made of aluminum-based composite reinforced material
CN210956301U (en) Insulator string suspension device for salt density test
CN221318959U (en) Detachable steel construction lifting clamp

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant