CN109882206A - It is a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock - Google Patents

It is a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock Download PDF

Info

Publication number
CN109882206A
CN109882206A CN201910280169.XA CN201910280169A CN109882206A CN 109882206 A CN109882206 A CN 109882206A CN 201910280169 A CN201910280169 A CN 201910280169A CN 109882206 A CN109882206 A CN 109882206A
Authority
CN
China
Prior art keywords
rock
cementing
contractibility
frame
country rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910280169.XA
Other languages
Chinese (zh)
Other versions
CN109882206B (en
Inventor
王平
冯涛
余伟健
朱永建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University of Science and Technology
Original Assignee
Hunan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology filed Critical Hunan University of Science and Technology
Priority to CN201910280169.XA priority Critical patent/CN109882206B/en
Publication of CN109882206A publication Critical patent/CN109882206A/en
Application granted granted Critical
Publication of CN109882206B publication Critical patent/CN109882206B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock, on support time, contractibility trellis supports country rock is used first, and then cementing to the progress slip casting of breaking surrounding rock part, finally using may extend away anchor rod anchored cementing breaking surrounding rock and original complete country rock;In support space, contractibility trellis supports limit country rock surface initial deformation, table is protected using antiseep flexible layer in country rock surface simultaneously, prevent grouting serous fluid from leaking, country rock superficial part breaking surrounding rock is cementing using slip casting, then is coupled the cementing breaking surrounding rock of superficial part and the anchoring of original complete country rock using extensible anchor pole toward deep;On supporting intensity, the gravity of contractibility trellis supports broken segment country rock, make broken range that Quick Extended not occur, cementing country rock overall structure is capable of forming after breaking surrounding rock slip casting is cementing, and intensity can carry self gravity, it may extend away anchor rod anchored intensity to be determined according to surrouding rock deformation rate, for the purpose of reaching more supporting Collaborative Control country rock stead deformations.

Description

It is a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock
Technical field
It is specifically a kind of for controlling coal mine breaking surrounding rock the present invention relates to a kind of method for protecting support of coal mine breaking surrounding rock More supporting Synergistic methods.
Background technique
Deep mining is that current coal resources in China utilizes the important topic faced.Under the condition of high ground stress of deep, tunnel It excavates off-load rear perimeter edge country rock to be crushed rapidly, under working face extraction disturbing influence, roadway surrounding rock fracture area is constantly expanded, and is formed A wide range of fracture area.If not taking effective control measure, deep tunnel large deformation unstable failure is easily caused.Current Engineering practice shows that existing support theory and technology have been not applied for the control of a wide range of breaking surrounding rock of deep tunnel, has Body are as follows: (use bolt and cable anchor supporting) in terms of active support theory and supporting construction: there are supporting intensities for it not enough, branch Protect the problems such as range is too small and the compatible deformation scarce capacity of supporting construction.Since the above problem leads to a large amount of anchor occurred The phenomenon that bar, anchor cable are broken or anchor pole, anchor cable are with breaking surrounding rock entirety inbreak.In addition the active supports such as existing anchor pole, anchor cable The elongation percentage of structure is generally difficult to adapt to the deformation of a wide range of breaking surrounding rock in deep.Passive protecting theory and configuration aspects (i.e. Supporting is carried out using frame): it is all difficult by field research and the either rigid frame of theoretical calculation discovery or contractibility frame To contend with huge crustal stress, due to the effect of crustal stress, so that deep crush rock deformation is big, and deforms unevenly, Frame is ultimately caused to lose, distort and be broken.It sees on the whole, main problem existing for existing support theory is sufficiently to adjust The self-bearing capacity in dynamic tunnel deep and superficial country rock could not form supporting-country rock collaboration bearing structure, to cannot achieve height The Quadratic Stability of stress breaking surrounding rock.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides a kind of for controlling more supportings of coal mine breaking surrounding rock Synergistic method is carried using frame supporting, the cementing country rock of slip casting and anchor rod anchored collaboration, to guarantee high stress breaking surrounding rock Stability.
To achieve the goals above, the technical solution adopted by the present invention is that: it is a kind of for controlling the more of coal mine breaking surrounding rock Supporting Synergistic method, specific steps are as follows:
A, frame supporting:
A, during tunnelling, the empty top zone formed after development machine cutting, before being used as using more seamless steel pipes Visit beam gib;Horizontal 1~2 single u-shaped girder steel above forestope gib, is successively laid with one layer of metal mesh on girder steel With one layer of antiseep flexible layer, then the gap between antiseep flexible layer and back country rock is filled out using timber wedge or bamboo chip Fill fastening;As the cutting of development machine is after empty top zone range reaches the placement space of a contractibility frame, using contractibility Frame applies certain pre- support force and is supported to empty top zone;Inclined gallery use anti-skid device;
B, the embedded bar of 1 meter of multiple length or more is installed in wall, wherein the pre-buried depth of reinforcing bar is not less than overall length The 2/3 of degree;It is in forestope Forward, the exposed parts of one end of seamless steel pipe each in forestope and embedded bar are fixed slotting Fixation is connect, then the other end of each seamless steel pipe is fixed using scraper chain, and the Forward of forestope is fixed in completion;
C, after forestope completes fixed, staff, which enters in temporary support area, at this time builds contractibility frame, can contract Property frame to empty top zone stablize supporting after, gib is removed;Spacing between contractibility frame is according to different country rock items Part and its required support resistance are determined;
D, according to the changing rule of stress during the experimental determination frame changing of the relative positions, resistance is supported on real-time judgment frame Variation, then according to the requirement of trellis supports resistance, by tightening or loosening adjustment trellis supports resistance;
B, the cementing country rock of slip casting:
I, after completing tunnelling, the rock sample of live breaking surrounding rock is chosen, carries out slip casting cementitious test in laboratory, from And obtain different cementing match the corresponding breaking surrounding rock it is cementing after intensity, the final proportion for determining that slip casting is cementing, so that slurry The cementing rock mass strength that liquid-country rock is formed is not less than original Surrounding Rock Strength;
II, the country rock superficial part after contractibility frame supporting lays a certain number of Shallow hole grouting pipes, then by each Shallow hole grouting pipe is cementing cementing with the progress slip casting of tunnel superficial breaking surrounding rock is compared using the slip casting that step I determines, until country rock The completely cementing rear stopping of the breaking surrounding rock of surface to superficial part, makes breaking surrounding rock form the cementing rock mass of country rock;
C, anchor rod anchored:
1. after country rock cement rock body is formed, drilling is set in the country rock between two contractibility frames, using extensible Anchor pole protrudes into drilling and carries out end anchorage;The length of the extensible anchor pole is determined according to rock crusher range;
2. real-time monitoring may extend away the stress value on anchor pole and contractibility frame, so the prestressing force both adjusted make this two After stress in kind supporting construction is close, and stress variation and deflection reach unanimity, adjustment process is completed, finally realizes frame The integrated bearing system of supporting, the cementing country rock of slip casting and anchor rod anchored collaboration.
Further, roadway's sides control two using mode identical with empty top zone supporting and help country rock surface in step a Deformation.
Further, the scraper plate Similarity Between Line Segments are ellipse, and each seamless steel pipe is equipped with no less than 2 scraper chains.
Further, the contractibility frame is arch contractibility frame or trapezoidal contractibility frame.
Compared with prior art, the present invention using frame supporting, the cementing country rock of slip casting and it is anchor rod anchored combine mode,
1) on support time, first using country rock broken immediately behind contractibility trellis supports pick lane.Then, to broken Country rock part carries out superficial slip casting.Finally, using may extend away anchor rod anchored cementing breaking surrounding rock and original complete country rock.
2) in support space, country rock surface initial deformation is limited using contractibility trellis supports, while country rock surface is adopted Table is protected with antiseep flexible layer, prevents superficial wall rock grouting slurries from leaking.Country rock superficial part breaking surrounding rock is cementing then past using slip casting The cementing breaking surrounding rock of superficial part and the anchoring of original complete country rock are coupled by deep using extensible anchor pole.
3) on supporting intensity, the gravity of contractibility trellis supports broken segment country rock does not occur that broken range quickly Extension.Cementing country rock overall structure is capable of forming after breaking surrounding rock slip casting is cementing, and intensity can carry self gravity.It is extensible Anchor rod anchored intensity is determined according to surrouding rock deformation rate, is reached for the purpose of controlling country rock stead deformation.
4) in integer support structure, after three kinds of support forms apply, the axle power on anchor pole is cooperateed with trellis supports resistance Unanimously, the cementing rock deformation of slip casting and frame can contracting amount and anchor pole elongation it is harmonious;It is final to realize frame supporting, note It starches cementing country rock and anchor rod anchored collaboration integration carries out coal mine deep crush Surrounding Rock Control.
This monolithic construction is in roadway surrounding rock load bearing process, and initial stage, higher support resistance was from trellis supports And the breaking surrounding rock structural body support recombinated after cementing-anchoring, collaboration carrying and deformability are then due in breaking surrounding rock The noncontinuity in portion itself and the contractibility of support construction and the extendability of anchor structure are realized.Further, since broken For country rock by centainly cementing and anchoring, breaking surrounding rock is capable of forming larger block (such as anchoring string body), shrinks in compression In the process can be engaged, it is capable of forming the bearing structure of " class arch " or " combination rock beam type ", so that it is broken to reach control The supporting purpose of broken country rock.
Detailed description of the invention
Fig. 1 is the cross-sectional view of gib in the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the schematic diagram that the present invention carries out the contractibility frame supporting stage;
Fig. 4 is the schematic diagram that the present invention carries out the slip casting cementing stage;
Fig. 5 is the schematic diagram that the present invention carries out the anchor rod anchored stage;
Fig. 6 is the structural schematic diagram that integer support is completed using trapezoidal contractibility frame;
Fig. 7 is the structural schematic diagram that integer support is completed using arch contractibility frame.
In figure: 1, embedded bar;2, antiseep flexible layer;3, scraper chain;4, pressure network material;5, U-shaped steel beam;6, metal Net;7, seamless steel pipe;8, roadway floor country rock;9, contractibility frame;10, breaking surrounding rock;11, roadway's sides country rock;12, tunnel Roof rock;13, the cementing rock mass of country rock;14, Shallow hole grouting pipe;15, it may extend away anchor pole;16, it may extend away anchor rod anchored end.
Specific embodiment
The present invention will be further described below.
As shown, specific steps of the invention are as follows:
A, frame supporting:
A, during tunnelling, the empty top zone formed after development machine cutting, before being used as using more seamless steel pipes 7 Visit beam gib;Horizontal 1~2 single u-shaped girder steel 5, is successively laid with one layer of metal on girder steel above forestope gib Net 6 and one layer of antiseep flexible layer 2 (it uses the antiseeps flexible material such as air duct fabric to be made), then (such as using pressure network material 4 Timber wedge or bamboo chip) gap filling between antiseep flexible layer 2 and back country rock 12 is fastened;With the cutting of development machine After range reaches the placement space of a contractibility frame 9 when empty top zone, apply certain pre- support force using contractibility frame 9 Empty top zone is supported;Inclined gallery use anti-skid device;
B, the embedded bar 1 of 1 meter of multiple length or more is installed in wall, wherein the pre-buried depth of reinforcing bar is not less than overall length The 2/3 of degree;In forestope Forward, the exposed parts of one end of seamless steel pipe 7 each in forestope and embedded bar 1 are fixed It is plugged and fixed, then the other end of each seamless steel pipe 7 is fixed using scraper chain 3, and the Forward of forestope is fixed in completion;
C, after forestope completes fixed, staff, which enters in temporary support area, at this time builds contractibility frame 9, can contract Property frame 9 to empty top zone stablize supporting after, gib is removed;Spacing between contractibility frame 9 is according to different country rocks Condition and its required support resistance are determined;
D, according to the changing rule of stress during the experimental determination frame changing of the relative positions, resistance is supported on real-time judgment frame Variation, then according to the requirement of trellis supports resistance, by tightening or loosening adjustment trellis supports resistance;
B, the cementing country rock of slip casting:
I, after completing tunnelling, the rock sample of live breaking surrounding rock 10 is chosen, carries out slip casting cementitious test in laboratory, To obtain different cementing match the corresponding breaking surrounding rock 10 it is cementing after intensity, the final proportion for determining that slip casting is cementing makes It obtains the cementing rock mass strength that slurries-country rock is formed and is not less than original Surrounding Rock Strength;
II, the country rock superficial part after 9 supporting of contractibility frame lays a certain number of Shallow hole grouting pipes 14, then by each A Shallow hole grouting pipe 14 carries out the cementing (note of slip casting with comparison tunnel superficial breaking surrounding rock 10 using the slip casting that step I determines is cementing Slurry pressure should not be too large, in order to avoid the bulging of country rock surface is caused to destroy), until breaking surrounding rock 10 complete glue of the country rock surface to superficial part Stop after knot, breaking surrounding rock is made to form the cementing rock mass 13 of country rock;
C, anchor rod anchored:
1. after the cementing rock mass 13 of country rock is formed, drilling is set in the country rock between two contractibility frames 9, use can prolong It stretches anchor pole 15 and protrudes into drilling progress end anchorage;The length of the extensible anchor pole 15 is determined according to rock crusher range;If Broken range is excessive, then needs the extensible anchor pole 15 using extensible;Extensible anchor pole 15 need to apply certain prestressing force, but not More than the stress value for extending it;Extensible anchor pole 15 is that existing structure is provided simultaneously with biggish with certain Support Resistance Elongation percentage;
2. real-time monitoring may extend away the stress value on anchor pole 15 and contractibility frame 9, and then the prestressing force for adjusting the two makes After stress in both supporting construction is close, and stress variation and deflection reach unanimity, adjustment process is completed, it is final to realize The integrated bearing system of frame supporting, the cementing country rock of slip casting and anchor rod anchored collaboration.
Further, roadway's sides control two using mode identical with empty top zone supporting and help country rock surface in step a Deformation.
Further, 3 shape of scraper chain is ellipse, and each seamless steel pipe 7 is equipped with no less than 2 scraper chains.
Further, the contractibility frame 9 is arch contractibility frame or trapezoidal contractibility frame.

Claims (4)

1. a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock, which is characterized in that specific steps are as follows:
A, frame supporting:
A, during tunnelling, the empty top zone formed after development machine cutting, using more seamless steel pipes as forestope Gib;Horizontal 1~2 single u-shaped girder steel above forestope gib, is successively laid with one layer of metal mesh and one on girder steel Layer antiseep flexible layer is then tight by the gap filling between antiseep flexible layer and back country rock using timber wedge or bamboo chip Gu;As the cutting of development machine is after empty top zone range reaches the placement space of a contractibility frame, using contractibility frame Apply certain pre- support force to be supported empty top zone;
B, the embedded bar of 1 meter of multiple length or more is installed in wall, wherein the pre-buried depth of reinforcing bar is not less than total length 2/3;In forestope Forward, the fixed grafting of the exposed parts of one end of seamless steel pipe each in forestope and embedded bar is consolidated Fixed, then the other end of each seamless steel pipe is fixed using scraper chain, and the Forward of forestope is fixed in completion;
C, after forestope completes fixed, staff, which enters in temporary support area, at this time builds contractibility frame, contractibility canopy After frame stablizes supporting to empty top zone, gib is removed;Spacing between contractibility frame according to different wall rock condition and Support resistance needed for it is determined;
D, according to the changing rule of stress during the experimental determination frame changing of the relative positions, the change of resistance is supported on real-time judgment frame Change, then according to the requirement of trellis supports resistance, by tightening or loosening adjustment trellis supports resistance;
B, the cementing country rock of slip casting:
I, after completing tunnelling, the rock sample of live breaking surrounding rock is chosen, carries out slip casting cementitious test in laboratory, thus Out different cementing match the corresponding breaking surrounding rock it is cementing after intensity, the final proportion for determining that slip casting is cementing, so that slurries-enclose The cementing rock mass strength that rock is formed is not less than original Surrounding Rock Strength;
II, the country rock superficial part after contractibility frame supporting lays a certain number of Shallow hole grouting pipes, then passes through each shallow bore hole Grouting Pipe is cementing cementing with the progress slip casting of tunnel superficial breaking surrounding rock is compared using the slip casting that step I determines, until country rock surface To the completely cementing rear stopping of breaking surrounding rock of superficial part, breaking surrounding rock is made to form the cementing rock mass of country rock;
C, anchor rod anchored:
1. after country rock cement rock body is formed, drilling is set in the country rock between two contractibility frames, using extensible anchor pole It protrudes into drilling and carries out end anchorage;The length of the extensible anchor pole is determined according to rock crusher range;
2. real-time monitoring may extend away the stress value on anchor pole and contractibility frame, and then the prestressing force for adjusting the two makes both branch After stress on protection structure is close, and stress variation and deflection reach unanimity, adjustment process is completed, it is final to realize frame branch The integrated bearing system of shield, the cementing country rock of slip casting and anchor rod anchored collaboration.
2. according to claim 1 a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock, which is characterized in that Roadway's sides control two deformations for helping country rock surface using mode identical with empty top zone supporting in step a.
3. according to claim 1 a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock, which is characterized in that The scraper plate Similarity Between Line Segments are ellipse, and each seamless steel pipe is equipped with no less than 2 scraper chains.
4. according to claim 1 a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock, which is characterized in that The contractibility frame is arch contractibility frame or trapezoidal contractibility frame.
CN201910280169.XA 2019-04-09 2019-04-09 Multi-support cooperative method for controlling coal mine broken surrounding rock Active CN109882206B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910280169.XA CN109882206B (en) 2019-04-09 2019-04-09 Multi-support cooperative method for controlling coal mine broken surrounding rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910280169.XA CN109882206B (en) 2019-04-09 2019-04-09 Multi-support cooperative method for controlling coal mine broken surrounding rock

Publications (2)

Publication Number Publication Date
CN109882206A true CN109882206A (en) 2019-06-14
CN109882206B CN109882206B (en) 2020-05-22

Family

ID=66936564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910280169.XA Active CN109882206B (en) 2019-04-09 2019-04-09 Multi-support cooperative method for controlling coal mine broken surrounding rock

Country Status (1)

Country Link
CN (1) CN109882206B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983462A (en) * 2019-12-12 2021-06-18 南京宝地梅山产城发展有限公司 Method for supporting integral arch body of underground roadway

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08210098A (en) * 1995-11-01 1996-08-13 Sumitomo Osaka Cement Co Ltd Invert structure
CN103174435A (en) * 2013-02-26 2013-06-26 中国矿业大学(北京) Roadway support method adopting U-shaped canopy frame support structure body
CN104895583A (en) * 2015-04-28 2015-09-09 河南理工大学 Tunnel surrounding rock control technology combining pressure relief and slip-casting reinforcement
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
WO2016095629A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Advanced support structure for oversized variable-cross-section tunnel
CN106761867A (en) * 2016-12-23 2017-05-31 四川广旺能源发展(集团)有限责任公司 High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process
CN106948842A (en) * 2017-03-31 2017-07-14 兖州煤业股份有限公司 A kind of scaffolding structure for being used under thin dirt band cover coal road
CN109372556A (en) * 2018-09-30 2019-02-22 淮阴工学院 A kind of sandwich arch and construction method suitable for high stressed soft rock tunnel supporting roadway surrounding rock

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08210098A (en) * 1995-11-01 1996-08-13 Sumitomo Osaka Cement Co Ltd Invert structure
CN103174435A (en) * 2013-02-26 2013-06-26 中国矿业大学(北京) Roadway support method adopting U-shaped canopy frame support structure body
WO2016095629A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Advanced support structure for oversized variable-cross-section tunnel
CN104895583A (en) * 2015-04-28 2015-09-09 河南理工大学 Tunnel surrounding rock control technology combining pressure relief and slip-casting reinforcement
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN106761867A (en) * 2016-12-23 2017-05-31 四川广旺能源发展(集团)有限责任公司 High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process
CN106948842A (en) * 2017-03-31 2017-07-14 兖州煤业股份有限公司 A kind of scaffolding structure for being used under thin dirt band cover coal road
CN109372556A (en) * 2018-09-30 2019-02-22 淮阴工学院 A kind of sandwich arch and construction method suitable for high stressed soft rock tunnel supporting roadway surrounding rock

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983462A (en) * 2019-12-12 2021-06-18 南京宝地梅山产城发展有限公司 Method for supporting integral arch body of underground roadway

Also Published As

Publication number Publication date
CN109882206B (en) 2020-05-22

Similar Documents

Publication Publication Date Title
CN102996149B (en) Support method for bolt-grouting composite crushing dynamic-pressure roadway soft rock roof by high-pre-stressed anchor cable
CN103233740B (en) Top-cutting roadway coal-pillar-free mining method of close-range thin coal seam
CN108412542A (en) A kind of wide lane digging gangue paste body filling of high seam is at lane method
CN108915720B (en) A kind of large cross-section tunnel passes through fault belt construction method
Xie et al. Stability analysis of integral load-bearing structure of surrounding rock of gob-side entry retention with flexible concrete formwork
CN106481343A (en) A kind of Soft Rock Tunnel Excavation and preliminary bracing method
CN104895073B (en) Can being dismounted for multiple times anchor cable construction system and its construction method
CN108775252A (en) The supporting construction and method for protecting support in Deep Soft Rock tunnel
CN103388481A (en) Combined prefabricated slab for governing floor heave and method for governing floor heave
RU2125652C1 (en) Method of extracting operations
CN106246191B (en) A kind of hole body is dredged, fills plentiful large-scale karst cave treatment and tunnel excavation method deeply
CN109555548A (en) A kind of supporting construction that high-ground stress Support System in Soft Rock Tunnels is formed using overlength enlarged footing anchor cable
CN112252342A (en) Steel wire grid net protection and construction method for rock slope broken rock mass
CN114635720A (en) Large-section deep-buried soft rock tunnel combined supporting system and construction method
CN109838253B (en) Large-circulation combined beam type temporary support roof control device and construction method thereof
CN105952459B (en) A kind of tunnel pin-connected panel preliminary bracing method
CN212359785U (en) Yielding primary support structure for controlling large deformation of high-ground-stress soft rock tunnel
CN109882206A (en) It is a kind of for controlling more supporting Synergistic methods of coal mine breaking surrounding rock
CN109958454A (en) Stope drift active workings pucking control system and its control method
CN107503768B (en) The method of the oblique Soil-nailed of overlying strata soil on Small Data Sets shallow embedding tunnel
CN106761841B (en) Working face tailgate fractured coal grouting reinforcement method
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN205532652U (en) Rock cross -cut coal uncovering 's enhancement supporting construction under complex geological condition
CN111852505A (en) Yielding primary support system for large deformation control of high-ground-stress soft rock tunnel
CN208534512U (en) The supporting construction in Deep Soft Rock tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant