CN109879522A CN201811486357.XA CN201811486357A CN109879522A CN 109879522 A CN109879522 A CN 109879522A CN 201811486357 A CN201811486357 A CN 201811486357A CN 109879522 A CN109879522 A CN 109879522A
Authority
CN
China
Prior art keywords
zone
septic tank
area
water
reaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811486357.XA
Other languages
Chinese (zh)
Inventor
于一凡
曹爱新
李林焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southern Venture (tianjin) Technology Development Co Ltd
Original Assignee
Southern Venture (tianjin) Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southern Venture (tianjin) Technology Development Co Ltd filed Critical Southern Venture (tianjin) Technology Development Co Ltd
Priority to CN201811486357.XA priority Critical patent/CN109879522A/en
Publication of CN109879522A publication Critical patent/CN109879522A/en
Pending legal-status Critical Current

Links

Landscapes

  • Water Treatment By Electricity Or Magnetism (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

It is a kind of for handling the integrated stabilization pond equipment of distributed sewage, comprising: center inner barrel and outer barrel, wherein the center inner cylinder be septic tank react the area I;The outer cylinder is to be separated into differential responses area by different angle partition to be formed around center inner cylinder periphery;Outer cylinder differential responses area is followed successively by the septic tank reaction area II, septic tank the reaction area III, moving-bed biofilm reaction zone, settling zone clockwise;Integrated stabilization pond equipment is by scientific and reasonable design, it can be achieved that the processing up to standard of distributed sewage especially remote districts and rural urbanization sanitary sewage.The equipment and its process matched therewith can not only widely adapt to the fluctuation of water quality and water, also have the characteristics that Low investment, low energy consumption, unattended, the purpose of synchronous dephosphorization is realized while efficient stable removes pollutant, makes to be discharged stably reaching standard reuse.

Description

It is a kind of for handling the integrated stabilization pond equipment and its treatment process of distributed sewage
Technical field
It is especially a kind of for handling the integrated stabilization pond of distributed sewage the present invention relates to a kind of sewage disposal device Equipment.
Background technique
With the continuous improvement of China's Living consumption, the discharge amount of sanitary sewage is also increasingly increasing.Urban life The processing of sewage uses centralized processing mode, i.e., is made of sewage collection system, centralized processing unit and disposal unit three parts: Sewage collection system needs to be equipped with corresponding collection conduit, closed conduit and necessary boost in pressure pump house so that sewage is collected to sewage Centralized processing unit in factory;And collect, expense caused by transportational process often account for cost of sewage disposal more than half. For rural area township, enterprises and institutions, scenic spot, mine and sewage network can not arrival area dispersion type domestic wastewater, by Restriction to geographical conditions and economic factor is difficult to adapt to centralized processing mode, leads to many point source sewage direct emissions.At present Traditional septic tank mode that the country continues to use always can only play the role of it pretreated, it is difficult to reach increasingly strict country's mark It is quasi-.Therefore, it designs and develops a kind of for handling the integrated stabilization pond equipment of distributed sewage, is difficult to make up sewage treatment The part of scale processing, it appears it is very necessary and efficient, and wherein the selection of dephosphorization process also becomes key technology.
In recent years, it is the principal element for causing water eutrophication that the sewage of phosphorous equal nutrients, which is largely discharged into water body,. With requiring to be increasingly stringenter to phosphorus discharge standard both at home and abroad, sewage dephosphorization technology has become the research hotspot of water treatment field. Sewage dephosphorization technology generally can be divided into bioanalysis and two kinds of physico-chemical process.Bioanalysis relies primarily on micro- life in activated sludge and biomembrane The assimilation of object absorbs the removal that residual active sludge was exhausted and realized again phosphorus by phosphorus, but the removal effect of the process is unstable Fixed, the sewage of especially high concentration phosphorus is difficult to meet qualified discharge;Chemical precipitation method is although stable, efficient, but usually can That causes secondary pollution or even chemical agent adds the corrosion etc. that will cause equipment.Compared with bioanalysis, electrolysis method dephosphorization technique Have many advantages, such as that removal rate is high, selectivity is strong, while relative to chemical precipitation method, the sludge that electrolysis method generates is few.
The sanitary sewage of distributed sewage especially remote districts and rural urbanization, difference its water quality in the water period and water Amount fluctuation is larger.Therefore, strong a kind of capacity of resisting impact load, Low investment, low energy consumption, unattended is researched and developed, and have and stablize, The decentralized type sewage treatment process of efficient dephosphorization ability is to achieve effective control the inevitable requirement of distributed sewage, and contain state The key point of interior water eutrophication trend.
Summary of the invention
The integrated stabilization pond that in order to solve the above technical problem, the present invention provides a kind of for handling distributed sewage is set It is standby, it can be achieved that distributed sewage especially remote districts and rural urbanization sanitary sewage processing;The equipment and its treatment process The fluctuation that water quality and water can not only widely be adapted to also has the characteristics that Low investment, low energy consumption, unattended, efficiently steady Surely the purpose that synchronous dephosphorization is realized while removing pollutant makes to be discharged stably reaching standard realization reuse.
It is a kind of for handling the integrated stabilization pond equipment of distributed sewage, comprising: center inner barrel and outer barrel, wherein institute The center inner cylinder stated is that septic tank reacts the area I;The outer cylinder is to be separated by different angle partition during differential responses area surrounds Intracardiac cylinder periphery and formed;Outer cylinder differential responses area is followed successively by the septic tank reaction area II, septic tank reaction III clockwise Area, moving-bed biofilm reaction zone, settling zone;The moving-bed biofilm reaction zone includes anoxic zone and aerobic zone;At center Cover plate for manhole is provided with above inner cylinder, the diameter of cover plate for manhole is greater than the diameter of center inner cylinder, and the side wall of the cover plate for manhole is pre- Stay 2 air inlets.
Further, the described septic tank reaction area I reacts the spacing board in the area II with septic tank there are the mistake mouths of a river close to bottom;Institute The spacing board middle and upper part in the area III is reacted in the septic tank reaction area II stated with septic tank, and there are the mistake mouths of a river;The septic tank reaction There are cross the mouth of a river close to bottom for the spacing board of the area III and the anoxic zone of MBBR reaction zone;Between the anoxic zone and aerobic zone There are cross the mouth of a river for partition middle and upper part;There are cross water for the spacing board middle and lower part of the aerobic zone of the MBBR reaction zone and settling zone Mouthful;There are outlet pipes and overflow weir for the settling zone.
Further, floating stuffing is loaded in the anoxic zone and aerobic zone of the MBBR reaction zone;The anoxic of MBBR reaction zone Agitating device and fluidisation impeller are installed by area, and the aerobic zone bottom of MBBR reaction zone can be aeration plate, aeration equipped with aeration part One of pipe, micro-hole aerator;Mesh electrode plate built in the aerobic reactor zone of MBBR reaction zone;The anode plate of mesh electrode plate It can be iron, aluminium, iron and apply one of titanium/netted plate of ruthenium composition metal;The aerobic zone of MBBR reaction zone and settling zone partition mistake Water baffle was set at the mouth of a river, for removing the gas of aerobic zone, prevents from entering settling zone with sewage, influences settling zone muddy water point From effect;The setting angle for crossing water baffle between the aerobic reactor zone and settling zone of MBBR reaction zone is between 30 ° to 60 °; The porous screen of setting or flase floor at the mouth of a river are crossed between the aerobic reactor zone and settling zone of MBBR reaction zone, prevents filler stream It loses;
Further, the center inner barrel and outer barrel shape is rounded cylindrical structure;In the water inlet pipe connection center Cylinder;The water inlet pipe of the center inner cylinder connection is connected with water dispensing apparatus.
Further, the septic tank reaction area II volume accounts for the 10%-30% of entire outer cylinder volume, and septic tank reacts the area III Volume accounts for the 5%-20% of entire outer cylinder volume, and MBBR reaction zone volume accounts for the 8%-50% of entire outer cylinder volume, and wherein anoxic zone holds Product accounts for the 5%-20% of entire outer cylinder volume;Settling zone volume accounts for the 10%-20% of entire outer cylinder volume;The septic tank reaction The area III is equipped with bracket;
Further, there is stripping reflux pipe in the settling zone, with the mode of stripping reflux, realize sludge by settling zone to scarce The reflux in oxygen area;Perforated pipe is arranged in the settling zone exit, connect with outlet pipe, while top is equipped with overflow weir, is used for The fluctuation of adaptive peak period water;One of the settable tube settling in the settling zone, sloping plate deposition are heavy for strengthening Shallow lake effect;
It is a kind of for handling the integrated stabilization pond treatment process of distributed sewage, include the following steps:
The first step, distributed sewage enter center inner cylinder by water inlet pipe, and septic tank reaction is sufficiently reacted in the area I, tentatively removal portion The organic matter and nitrogen phosphorus divided;
Second step, septic tank reaction the area I in water outlet through partition bottom cross the mouth of a river enter septic tank react the area II, this cross the mouth of a river close to Partition bottom effectively avoids the accumulation of bottom sludge in the septic tank reaction area I;
Third step, septic tank reaction the area II in water outlet through partition middle and upper part cross the mouth of a river enter septic tank react the area III, this crosses the mouth of a river Positioned at partition middle and upper part, short stream of the sewage between reaction zone is effectively avoided;Filling should in the area III of septic tank reaction simultaneously The fixation bed fillers of reaction zone dischargeable capacity 30%-70%, for improving biofilm rate and rate of contaminant degradation;
4th step, the water outlet that septic tank reacts in the area III cross the mouth of a river through partition bottom and enter MBBR reaction zone anoxic zone, this crosses water Close to partition bottom, the filler for effectively avoiding the chemical reaction area III is lost mouth;Loading the reaction zone in anoxic zone simultaneously has The floating stuffing for imitating volume 30%-70%, for improving pollutant removal;
5th step, the anoxic zone water outlet of MBBR reaction zone cross the mouth of a river through partition middle and upper part and enter aerobic zone, and filling should in aerobic zone The floating stuffing of reaction zone dischargeable capacity 30%-70%, while the removal through aeration reinforcing contaminant removal efficiency and phosphorus;
6th step is equipped with device for removing phosphorous by electrolysis in the aerobic reactor zone of MBBR reaction zone simultaneously, fills out in air bearing and electric field and suspending Under the multiple action of material, the mixed effect of sewage and pollutant can not only be reinforced, moreover it is possible to realize the purpose of reinforced phosphor-removing;
The aerobic zone water outlet of 7th step, MBBR reaction zone crosses the mouth of a river by partition middle and upper part after water baffle removes excessive gas Into settling zone, mud-water separation is realized, so that aqueous suspension reaches reuse standard out;
8th step, settling zone water outlet is equipped with 2 grades of water outlet water levels, for adapting to the fluctuation of water use peak period water;1 grade of water outlet Perforated pipe is set, connect with outlet pipe, 2 grades of discharging devices be at the top of overflow weir, for the fluctuation of adaptive peak period water, When water is larger, directly it is discharged through overflow weir.
Further, distributed sewage enters before the septic tank reaction area I in the first step, preferably first passes through homogeneous adjusting Pond increases the stability of entire technique;
Further, the septic tank reacts the area I, septic tank reacts the area II, the hydraulic detention time in the septic tank reaction area III is 5-10h is adjusted flexibly according to the case where water quality;The anoxic zone of MBBR reaction zone and the hydraulic detention time of aerobic zone are 5-15h, It is adjusted flexibly according to the case where water quality;The sludge of the settling zone is by way of stripping reflux, low energy consumption regurgitant volume 50%- 200%;The hydraulic detention time of the settling zone is 3-10h, is adjusted flexibly according to the case where water quality.
The object of the present invention is to provide a kind of for handling the integrated stabilization pond equipment of distributed sewage, and integration is stablized Pool equipment is by scientific and reasonable design, it can be achieved that distributed sewage especially remote districts and rural urbanization sanitary sewage reach Mark processing.The equipment and its process matched therewith can not only widely adapt to the fluctuation of water quality and water, also have Low investment, low energy Consumption, unattended feature realize the purpose of synchronous dephosphorization while efficient stable removes pollutant, make to be discharged stably reaching standard Reuse.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention
Fig. 2 is schematic diagram of internal structure
In figure: 1, water inlet;2, septic tank reacts the area I;3, septic tank reacts the area II;4, septic tank reacts the area III;5, anoxic Area;6, aerobic zone;7, settling zone;8, water hole;9, the water hole of aerobic zone and precipitating section;10, reflux pump;11, water outlet; 12, center inner cylinder;13, outer cylinder;14, stripping reflux pipe;15, cover plate for manhole.
Specific embodiment
Below in conjunction with attached drawing and preferred embodiment, to provide according to the present invention specific embodiment, structure, feature and its Effect, detailed description is as follows.
It is a kind of for handling the integrated stabilization pond equipment of distributed sewage, comprising: center inner barrel and outer barrel, wherein described Center inner cylinder is that septic tank reacts the area I;The outer cylinder is that differential responses area is separated by different angle partition in center Cylinder periphery and formed;Outer cylinder differential responses area is followed successively by the septic tank reaction area II clockwise, the septic tank reaction area III, moves Dong Chuan biomembrane reaction area, settling zone;The moving-bed biofilm reaction zone includes anoxic zone and aerobic zone;On the inner cylinder of center Side is provided with cover plate for manhole, and the diameter of cover plate for manhole is greater than the diameter of center inner cylinder, reserved 2 of the side wall of the cover plate for manhole into Port.
Further, the described septic tank reaction area I reacts the spacing board in the area II with septic tank there are the mistake mouths of a river close to bottom;Institute The spacing board middle and upper part in the area III is reacted in the septic tank reaction area II stated with septic tank, and there are the mistake mouths of a river;The septic tank reaction There are cross the mouth of a river close to bottom for the spacing board of the area III and the anoxic zone of MBBR reaction zone;Between the anoxic zone and aerobic zone There are cross the mouth of a river for partition middle and upper part;There are cross water for the spacing board middle and lower part of the aerobic zone of the MBBR reaction zone and settling zone Mouthful;There are outlet pipes and overflow weir for the settling zone.
Further, floating stuffing is loaded in the anoxic zone and aerobic zone of the MBBR reaction zone;The anoxic of MBBR reaction zone Agitating device and fluidisation impeller are installed by area, and the aerobic zone bottom of MBBR reaction zone can be aeration plate, aeration equipped with aeration part One of pipe, micro-hole aerator;Mesh electrode plate built in the aerobic reactor zone of MBBR reaction zone;The anode plate of mesh electrode plate It can be iron, aluminium, iron and apply one of titanium/netted plate of ruthenium composition metal;The aerobic zone of MBBR reaction zone and settling zone partition mistake Water baffle was set at the mouth of a river, for removing the gas of aerobic zone, prevents from entering settling zone with sewage, influences settling zone muddy water point From effect;The setting angle for crossing water baffle between the aerobic reactor zone and settling zone of MBBR reaction zone is between 30 ° to 60 °; The porous screen of setting or flase floor at the mouth of a river are crossed between the aerobic reactor zone and settling zone of MBBR reaction zone, prevents filler stream It loses;
Further, the center inner barrel and outer barrel shape is rounded cylindrical structure;In the water inlet pipe connection center Cylinder;The water inlet pipe of the center inner cylinder connection is connected with water dispensing apparatus.
Further, the septic tank reaction area II volume accounts for the 10%-30% of entire outer cylinder volume, and septic tank reacts the area III Volume accounts for the 5%-20% of entire outer cylinder volume, and MBBR reaction zone volume accounts for the 8%-50% of entire outer cylinder volume, and wherein anoxic zone holds Product accounts for the 5%-20% of entire outer cylinder volume;Settling zone volume accounts for the 10%-20% of entire outer cylinder volume;The septic tank reaction The area III is equipped with bracket;
Further, there is stripping reflux pipe in the settling zone, with the mode of stripping reflux, realize sludge by settling zone to scarce The reflux in oxygen area;Perforated pipe is arranged in the settling zone exit, connect with outlet pipe, while top is equipped with overflow weir, is used for The fluctuation of adaptive peak period water;One of the settable tube settling in the settling zone, sloping plate deposition are heavy for strengthening Shallow lake effect;
It is a kind of for handling the integrated stabilization pond treatment process of distributed sewage, include the following steps:
The first step, distributed sewage enter center inner cylinder by water inlet pipe, and septic tank reaction is sufficiently reacted in the area I, tentatively removal portion The organic matter and nitrogen phosphorus divided;
Second step, septic tank reaction the area I in water outlet through partition bottom cross the mouth of a river enter septic tank react the area II, this cross the mouth of a river close to Partition bottom effectively avoids the accumulation of bottom sludge in the septic tank reaction area I;
Third step, septic tank reaction the area II in water outlet through partition middle and upper part cross the mouth of a river enter septic tank react the area III, this crosses the mouth of a river Positioned at partition middle and upper part, short stream of the sewage between reaction zone is effectively avoided;Filling should in the area III of septic tank reaction simultaneously The fixation bed fillers of reaction zone dischargeable capacity 30%-70%, for improving biofilm rate and rate of contaminant degradation;
4th step, the water outlet that septic tank reacts in the area III cross the mouth of a river through partition bottom and enter MBBR reaction zone anoxic zone, this crosses water Close to partition bottom, the filler for effectively avoiding the chemical reaction area III is lost mouth;Loading the reaction zone in anoxic zone simultaneously has The floating stuffing for imitating volume 30%-70%, for improving pollutant removal;
5th step, the anoxic zone water outlet of MBBR reaction zone cross the mouth of a river through partition middle and upper part and enter aerobic zone, and filling should in aerobic zone The floating stuffing of reaction zone dischargeable capacity 30%-70%, while the removal through aeration reinforcing contaminant removal efficiency and phosphorus;
6th step is equipped with device for removing phosphorous by electrolysis in the aerobic reactor zone of MBBR reaction zone simultaneously, fills out in air bearing and electric field and suspending Under the multiple action of material, the mixed effect of sewage and pollutant can not only be reinforced, moreover it is possible to realize the purpose of reinforced phosphor-removing;
The aerobic zone water outlet of 7th step, MBBR reaction zone crosses the mouth of a river by partition middle and upper part after water baffle removes excessive gas Into settling zone, mud-water separation is realized, so that aqueous suspension reaches reuse standard out;
8th step, settling zone water outlet is equipped with 2 grades of water outlet water levels, for adapting to the fluctuation of water use peak period water;1 grade of water outlet Perforated pipe is set, connect with outlet pipe, 2 grades of discharging devices be at the top of overflow weir, for the fluctuation of adaptive peak period water, When water is larger, directly it is discharged through overflow weir.
Further, distributed sewage enters before the septic tank reaction area I in the first step, preferably first passes through homogeneous adjusting Pond increases the stability of entire technique;
Further, the septic tank reacts the area I, septic tank reacts the area II, the hydraulic detention time in the septic tank reaction area III is 5-10h is adjusted flexibly according to the case where water quality;The anoxic zone of MBBR reaction zone and the hydraulic detention time of aerobic zone are 5-15h, It is adjusted flexibly according to the case where water quality;The sludge of the settling zone is by way of stripping reflux, low energy consumption regurgitant volume 50%- 200%;The hydraulic detention time of the settling zone is 3-10h, is adjusted flexibly according to the case where water quality.
The object of the present invention is to provide a kind of for handling the integrated stabilization pond equipment of distributed sewage, and integration is stablized Pool equipment is by scientific and reasonable design, it can be achieved that distributed sewage especially remote districts and rural urbanization sanitary sewage reach Mark processing.The equipment and its process matched therewith can not only widely adapt to the fluctuation of water quality and water, also have Low investment, low energy Consumption, unattended feature realize the purpose of synchronous dephosphorization while efficient stable removes pollutant, make to be discharged stably reaching standard Reuse.
It is stable using a kind of integration for handling distributed sewage of the present invention now by taking certain domestic sewage in rural areas as an example Pool equipment handles it, and water quality is as follows:
Index COD SS Ammonia nitrogen Total phosphorus
Concentration (mg/L) 300-500 100-200 20-40 3-10
The septic tank that sewage enters center inner cylinder through water inlet pipe 1 reacts the area I 2, and it is successively anti-by septic tank to pass through the mouth of a river 8 later Answer the area II 3, septic tank the reaction area III 4, anoxic zone 5, aerobic zone 6.Aerobic zone is equipped with device for removing phosphorous by electrolysis, and realization, which synchronizes, to remove Phosphorus effect.There are the mouth of a river 9 is crossed, sewage, which passed through the mouth of a river 9 by aerobic zone 6, to be passed through for the spacing board middle and lower part of aerobic zone and settling zone Enter settling zone 7 after the interception of 45 ° of mistake water baffles;There are outlet pipe 11 and overflow weir, water outlets to return behind settling zone for settling zone 7 With;Settling zone sludge realizes 75% reflux ratio through the effect of stripping tube gas.
Septic tank reaction 3 volume of the area II accounts for the 26% of entire outer cylinder volume, and septic tank reaction 4 volume of the area III accounts for entire outer cylinder volume 16%, 5 volume of anoxic zone accounts for the 16% of entire outer cylinder volume, and 6 volume of aerobic zone accounts for the 26% of entire outer cylinder volume, and settling zone 7 holds Product accounts for the 16% of entire outer cylinder volume;Wherein the septic tank reaction area III 4, anoxic zone 5, aerobic zone 6 are equipped with bracket, and installation is modified Biologic packing material.
Sewage enters center inner cylinder by water inlet pipe 1, sufficiently reacts 6h in the septic tank reaction area I 2 of inner cylinder, tentatively removal part Organic matter and nitrogen phosphorus;3
Water outlet crosses the mouth of a river 8 into the septic tank reaction area II reaction 10h through partition bottom in the septic tank reaction area I 2;
Water outlet crosses the mouth of a river 8 into the septic tank reaction area III 4, septic tank reaction through partition middle and upper part in the septic tank reaction area II 3 The fixation bed fillers of the reaction zone dischargeable capacity 40%, reaction time 7h, for improving biofilm rate and dirt are loaded in the area III 4 Contaminate object degradation rate;
Water outlet in the septic tank reaction area III 4 crosses the mouth of a river 8 through partition bottom and enters anoxic zone 5;The hydraulic detention time in the area is 7h, while the fixation bed fillers of the reaction zone dischargeable capacity 50% are loaded in anoxic zone 5, for improving pollutant removal;
The water outlet of anoxic zone 5 crosses the mouth of a river 8 through partition middle and upper part and enters aerobic zone 6, loads the reaction zone dischargeable capacity in aerobic zone 6 60% fixation bed fillers, hydraulic detention time 11h, while the removal through aeration reinforcing contaminant removal efficiency and phosphorus;
Device for removing phosphorous by electrolysis is equipped in aerobic zone 6 simultaneously, pole plate spacing is 1cm, current density 30mA/cm2, in aeration air bearing Under electric current double action, the mixed effect of sewage and pollutant can not only be reinforced, realize that the removal rate of phosphorus is 96%;
The water outlet of aerobic zone 6 crosses the mouth of a river 9 into settling zone by partition middle and upper part after 45 ° are crossed water baffle effect removal excessive gas 7, the residence time is 6h in settling zone 7, and average surface load is 0.23m3/m2/h, so that effluent index reaches reuse standard, out Water water quality indicator is as follows:
Index COD SS Ammonia nitrogen Total phosphorus
Concentration (mg/L) 30-40 < 5 < 5 0.2-0.4
Of the invention is described in detail above by embodiment, but the content is only preferable implementation of the invention Example, should not be considered as limiting the scope of the invention.It is all according to all the changes and improvements made by the present patent application range Deng should still be within the scope of the patent of the present invention.

Claims (9)

1. a kind of for handling the integrated stabilization pond equipment of distributed sewage, comprising: center inner barrel and outer barrel, wherein described Center inner cylinder be septic tank react the area I;The outer cylinder is that differential responses area is separated by different angle partition around center Inner cylinder periphery and formed;Outer cylinder differential responses area is followed successively by the septic tank reaction area II clockwise, septic tank reacts the area III, Moving-bed biofilm reaction zone, settling zone;The moving-bed biofilm reaction zone includes anoxic zone and aerobic zone;In center inner cylinder Top is provided with cover plate for manhole, and the diameter of cover plate for manhole is greater than the diameter of center inner cylinder, and the side wall of the cover plate for manhole is 2 reserved Air inlet.
2. according to claim 1 a kind of for handling the integrated stabilization pond equipment of distributed sewage, it is characterised in that: The spacing board in the area II is reacted in the described septic tank reaction area I with septic tank, and close to bottom, there are the mistake mouths of a river;The septic tank is anti- Answering the area II to react the spacing board middle and upper part in the area III with septic tank, there are cross the mouth of a river;The septic tank reaction area III and MBBR are anti- Answering the spacing board of the anoxic zone in area close to bottom, there are cross the mouth of a river;The spacing board middle and upper part of the anoxic zone and aerobic zone there are Cross the mouth of a river;There are cross the mouth of a river for the spacing board middle and lower part of the aerobic zone of the MBBR reaction zone and settling zone;It stays the settling zone There are outlet pipe and overflow weir.
3. according to claim 1 a kind of for handling the integrated stabilization pond equipment of distributed sewage, it is characterised in that: Floating stuffing is loaded in the anoxic zone and aerobic zone of the MBBR reaction zone;The anoxic zone of MBBR reaction zone is installed by agitating device With fluidisation impeller, the aerobic zone bottom of MBBR reaction zone can be aeration plate, aeration tube, micro-hole aerator equipped with aeration part One of;Mesh electrode plate built in the aerobic reactor zone of MBBR reaction zone;The anode plate of mesh electrode plate can be iron, aluminium, Iron applies one of titanium/netted plate of ruthenium composition metal;The aerobic zone of MBBR reaction zone and settling zone partition, which are crossed at the mouth of a river, to be arranged Water baffle prevents from entering settling zone with sewage, influences settling zone mud-water separation effect for removing the gas of aerobic zone;MBBR The setting angle for crossing water baffle between the aerobic reactor zone and settling zone of reaction zone is between 30 ° to 60 °;MBBR reaction zone The porous screen of setting or flase floor at the mouth of a river are crossed between aerobic reactor zone and settling zone, filler is prevented to be lost.
4. according to claim 1 a kind of for handling the integrated stabilization pond equipment of distributed sewage, it is characterised in that: The center inner barrel and outer barrel shape is rounded cylindrical structure;The water inlet pipe connects center inner cylinder;In the center The water inlet pipe of cylinder connection is connected with water dispensing apparatus.
5. according to claim 1 a kind of for handling the integrated stabilization pond equipment of distributed sewage, it is characterised in that: Further, the septic tank reaction area II volume accounts for the 10%-30% of entire outer cylinder volume, and septic tank reacts the area III volume The 5%-20% of entire outer cylinder volume is accounted for, MBBR reaction zone volume accounts for the 8%-50% of entire outer cylinder volume, and wherein anoxic zone volume accounts for The 5%-20% of entire outer cylinder volume;Settling zone volume accounts for the 10%-20% of entire outer cylinder volume;The septic tank reacts the area III Bracket is installed.
6. according to claim 1 a kind of for handling the integrated stabilization pond equipment of distributed sewage, it is characterised in that: There is stripping reflux pipe in the settling zone, with the mode of stripping reflux, realizes sludge by the reflux of settling zone to anoxic zone;Institute The settling zone exit setting perforated pipe stated, connect, while top is equipped with overflow weir with outlet pipe, is used for adaptive peak period water The fluctuation of amount;One of the settable tube settling in the settling zone, sloping plate deposition are used for reinforced deposition effect.
7. a kind of for handling the integrated stabilization pond treatment process of distributed sewage, characterized by the following steps:
The first step, distributed sewage enter center inner cylinder by water inlet pipe, and septic tank reaction is sufficiently reacted in the area I, tentatively removal portion The organic matter and nitrogen phosphorus divided;
Second step, septic tank reaction the area I in water outlet through partition bottom cross the mouth of a river enter septic tank react the area II, this cross the mouth of a river close to Partition bottom effectively avoids the accumulation of bottom sludge in the septic tank reaction area I;
Third step, septic tank reaction the area II in water outlet through partition middle and upper part cross the mouth of a river enter septic tank react the area III, this crosses the mouth of a river Positioned at partition middle and upper part, short stream of the sewage between reaction zone is effectively avoided;Filling should in the area III of septic tank reaction simultaneously The fixation bed fillers of reaction zone dischargeable capacity 30%-70%, for improving biofilm rate and rate of contaminant degradation;
4th step, the water outlet that septic tank reacts in the area III cross the mouth of a river through partition bottom and enter MBBR reaction zone anoxic zone, this crosses water Close to partition bottom, the filler for effectively avoiding the chemical reaction area III is lost mouth;Loading the reaction zone in anoxic zone simultaneously has The floating stuffing for imitating volume 30%-70%, for improving pollutant removal;
5th step, the anoxic zone water outlet of MBBR reaction zone cross the mouth of a river through partition middle and upper part and enter aerobic zone, and filling should in aerobic zone The floating stuffing of reaction zone dischargeable capacity 30%-70%, while the removal through aeration reinforcing contaminant removal efficiency and phosphorus;
6th step is equipped with device for removing phosphorous by electrolysis in the aerobic reactor zone of MBBR reaction zone simultaneously, fills out in air bearing and electric field and suspending Under the multiple action of material, the mixed effect of sewage and pollutant can not only be reinforced, moreover it is possible to realize the purpose of reinforced phosphor-removing;
The aerobic zone water outlet of 7th step, MBBR reaction zone crosses the mouth of a river by partition middle and upper part after water baffle removes excessive gas Into settling zone, mud-water separation is realized, so that aqueous suspension reaches reuse standard out;
8th step, settling zone water outlet is equipped with 2 grades of water outlet water levels, for adapting to the fluctuation of water use peak period water;1 grade of water outlet Perforated pipe is set, connect with outlet pipe, 2 grades of discharging devices be at the top of overflow weir, for the fluctuation of adaptive peak period water, When water is larger, directly it is discharged through overflow weir.
8. according to claim 7 a kind of for handling the integrated stabilization pond treatment process of distributed sewage, feature Be: distributed sewage enters before the septic tank reaction area I in the first step, preferably first passes through homogeneous conditioning tank, increases The stability of entire technique.
9. according to claim 7 a kind of for handling the integrated stabilization pond treatment process of distributed sewage, feature Be: the area II is reacted in the septic tank reaction area I, septic tank, the hydraulic detention time in the septic tank reaction area III is 5-10h, root It is adjusted flexibly according to the case where water quality;The anoxic zone of MBBR reaction zone and the hydraulic detention time of aerobic zone are 5-15h, according to water quality The case where be adjusted flexibly;The sludge of the settling zone is by way of stripping reflux, low energy consumption regurgitant volume 50%-200%;It is described Settling zone hydraulic detention time be 3-10h.
CN201811486357.XA 2018-12-06 2018-12-06 It is a kind of for handling the integrated stabilization pond equipment and its treatment process of distributed sewage Pending CN109879522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811486357.XA CN109879522A (en) 2018-12-06 2018-12-06 It is a kind of for handling the integrated stabilization pond equipment and its treatment process of distributed sewage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811486357.XA CN109879522A (en) 2018-12-06 2018-12-06 It is a kind of for handling the integrated stabilization pond equipment and its treatment process of distributed sewage

Publications (1)

Publication Number Publication Date
CN109879522A true CN109879522A (en) 2019-06-14

Family

ID=66924968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811486357.XA Pending CN109879522A (en) 2018-12-06 2018-12-06 It is a kind of for handling the integrated stabilization pond equipment and its treatment process of distributed sewage

Country Status (1)

Country Link
CN (1) CN109879522A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112010507A (en) * 2020-08-31 2020-12-01 如皋国创环保设备有限公司 Household domestic sewage treatment device
CN113998777A (en) * 2021-11-29 2022-02-01 安徽工业大学 Biofilm reactor and mobile in-situ stripping method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519234A (en) * 2009-04-16 2009-09-02 湖南融城环保技术有限公司 Sewage dephosphorization method
CN102531272A (en) * 2010-12-31 2012-07-04 苏州嘉净环保科技股份有限公司 Integrated device for treating decentralized domestic sewage
CN104496025A (en) * 2014-12-11 2015-04-08 深圳市环境科学研究院 Enhanced simultaneous phosphorus and nitrogen removal sewage-treatment method and device
CN106348447A (en) * 2016-11-09 2017-01-25 泓天(大连)环境科技发展有限公司 Small-size integrated sewage treatment device capable of automatically returning mixed liquor and sludge
CN107857362A (en) * 2016-09-22 2018-03-30 常熟市国科爱维乡村排水工程技术有限公司 A kind of integrated apparatus and method of residents country life sewage disposal
CN108298686A (en) * 2018-02-05 2018-07-20 北京化工大学 A kind of purifying processing device for high COD concentration domestic sewage in rural areas
CN207845267U (en) * 2017-12-08 2018-09-11 福建省三净环保科技有限公司 A kind of Intelligent purifying tank

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519234A (en) * 2009-04-16 2009-09-02 湖南融城环保技术有限公司 Sewage dephosphorization method
CN102531272A (en) * 2010-12-31 2012-07-04 苏州嘉净环保科技股份有限公司 Integrated device for treating decentralized domestic sewage
CN104496025A (en) * 2014-12-11 2015-04-08 深圳市环境科学研究院 Enhanced simultaneous phosphorus and nitrogen removal sewage-treatment method and device
CN107857362A (en) * 2016-09-22 2018-03-30 常熟市国科爱维乡村排水工程技术有限公司 A kind of integrated apparatus and method of residents country life sewage disposal
CN106348447A (en) * 2016-11-09 2017-01-25 泓天(大连)环境科技发展有限公司 Small-size integrated sewage treatment device capable of automatically returning mixed liquor and sludge
CN207845267U (en) * 2017-12-08 2018-09-11 福建省三净环保科技有限公司 A kind of Intelligent purifying tank
CN108298686A (en) * 2018-02-05 2018-07-20 北京化工大学 A kind of purifying processing device for high COD concentration domestic sewage in rural areas

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112010507A (en) * 2020-08-31 2020-12-01 如皋国创环保设备有限公司 Household domestic sewage treatment device
CN113998777A (en) * 2021-11-29 2022-02-01 安徽工业大学 Biofilm reactor and mobile in-situ stripping method thereof

Similar Documents

Publication Publication Date Title
Lettinga et al. UASB-process design for various types of wastewaters
CN101591064B (en) Anaerobic built-in zero-valent iron reactor
CN102775025B (en) Municipal life wastewater treatment system with high efficiency and low energy consumption
CN101792228B (en) Double-layer artificial wetland system for strengthening sewage denitrification and dephosphorization and operation method thereof
CN101774732B (en) Integral air-lift circumfluent suspended filler dispersed sewage biological treatment device
CN102260021A (en) Process and device for deep denitrogenation of domestic wastewater without additional carbon source
CN106116045A (en) A kind of efficiently villages and small towns waste water treating and reutilizing device and technique thereof
CN113511779A (en) Organic nitrogen wastewater treatment system and process
CN101704608B (en) Distributed sewage advanced treatment device with sludge treatment and method thereof
CN102351382B (en) Combined treatment method of leachate and excrement wastewater
CN102897975A (en) Sewage treatment method of town blocks
CN208327525U (en) A2O process integration sewage-treatment plant
CN109607938A (en) A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage
CN109879522A (en) It is a kind of for handling the integrated stabilization pond equipment and its treatment process of distributed sewage
CN101254979B (en) Domestic sewage dispersant type anaerobic contact treatment technique
CN202543002U (en) Sewage treatment system
CN104045157B (en) A kind of permeability response wall system for the treatment of refuse percolate
CN209890436U (en) Integrated stabilization pond equipment for treating dispersive sewage
CN203866153U (en) Improved reinforced A2/O denitrogenation and dephosphorization treating device for municipal sewage
CN109775936A (en) A kind of low energy consumption domestic sewage processing system
CN105417890A (en) Constructed wetland heavy metal deionization purification system based on super capacitor
CN215627425U (en) New rural domestic sewage treatment system based on MBR membrane reactor
CN210393887U (en) Small-size sewage treatment integration equipment
CN113860671A (en) Kitchen waste wastewater treatment system and treatment process thereof
CN209537220U (en) A kind of integrated stabilization pond equipment handling distributed sewage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190614