CN109878996A - A kind of ramp finished product material transportation system and its method for arranging - Google Patents

A kind of ramp finished product material transportation system and its method for arranging Download PDF

Info

Publication number
CN109878996A
CN109878996A CN201910184702.2A CN201910184702A CN109878996A CN 109878996 A CN109878996 A CN 109878996A CN 201910184702 A CN201910184702 A CN 201910184702A CN 109878996 A CN109878996 A CN 109878996A
Authority
CN
China
Prior art keywords
transport vehicle
hawser
transport
hoisting equipment
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910184702.2A
Other languages
Chinese (zh)
Inventor
张华�
吴彬
邬志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201910184702.2A priority Critical patent/CN109878996A/en
Publication of CN109878996A publication Critical patent/CN109878996A/en
Pending legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

A kind of ramp finished product material transportation system, including, the first transport vehicle, the second transport vehicle, hawser, track and charging hopper, system further include fixed pulley, hoisting equipment, buffer unit and limiting device;First transport vehicle and the second transport vehicle are arranged on different tracks and are connected by hawser;Fixed pulley is installed on fixed cylinder, and hawser is around fixed pulley and fixed pulley is driven to rotate;Hoisting equipment is arranged in along hawser, and for cable takeup on hoisting equipment, hoisting equipment is used to control the operation of the first transport vehicle and the second transport vehicle;Buffer unit is arranged in loading area, for limiting the parking position of the first transport vehicle or the second transport vehicle.Transportation system of the invention does not generate that impact, route is short, range is small for expropriation of land, small investment and low energy consumption to finished product material.

Description

A kind of ramp finished product material transportation system and its method for arranging
Technical field
The present invention relates to a kind of ramp finished product material transportation system and its method for arranging, are suitable for Construction for Hydroelectric Project Field.
Background technique
It often needs to transport broken finished product material in hydraulic and hydroelectric engineering.Since building stones field or mine are past in certain engineerings Toward be located at elevation massif on, and lack arrangement Preservation for Aggregate Production System place, need finished product material transporting to needs from mountain Near the working face utilized.
Hydraulic and hydroelectric engineering mostly uses the modes such as sliding dreg tube (well) to transport the woollen of elevation, often passes through during transportation The modes such as shock consume extra potential energy, hit meeting so that woollen is further crushed.But if transporting finished product in this way Material, the partial size that will lead to finished product material changes, to be unsatisfactory for quality requirement.Frequently with the side of arrangement transport routes in engineering Formula transports finished product material using dump truck, or arrangement belt feeder carries out finished product material transport.
But above two means of transportation requires the gradient of road and the gradient of belt, the wherein slope of transport routes Than being usually no more than 10%, the arrangement gradient of belt is usually no more than 15%.There is line in road transport and belt feeder means of transportation The features such as road long (expropriation of land range is big), investment are greatly, energy consumption is high.
Summary of the invention
The present invention provides a kind of ramp finished product material transportation system and its method for arranging, finished product material generation is not impacted, Route short (expropriation of land range small), small investment and low energy consumption.The present invention uses following technical scheme.
A kind of ramp finished product material transportation system, including, the first transport vehicle, the second transport vehicle, hawser, track and charging Bucket, the system also includes fixed pulley, hoisting equipment, buffer unit and limiting devices;
First transport vehicle and the second transport vehicle are arranged on different tracks and are connected by the hawser;The fixed pulley It is installed on fixed cylinder, the hawser is around the fixed pulley and the fixed pulley is driven to rotate;
The hoisting equipment is arranged in along the hawser, and on hoisting equipment, the hoisting equipment is used for the cable takeup Control the operation of first transport vehicle and the second transport vehicle;The buffer unit is arranged in loading area, for limiting described The parking position of one transport vehicle or the second transport vehicle;
The limiting device is arranged in the edge of loading area, and the buffer unit is connect with the limiting device, when described first When transport vehicle or the second transport vehicle touch the buffer unit, the limiting device is opened, by first transport vehicle or second Transport vehicle is limited in the edge of loading area.
Preferably, support pulley is arranged in slope section top arc section, be used to support the hawser.
Preferably, first transport vehicle and the second transport vehicle are connect by position-limited wheel or buckle with the track.
Preferably, the charging hopper is arranged in above the parking stall of the loading area.
Preferably, the gradient of the ramp is 25 ° ~ 45 °.
Preferably, the hoisting equipment is hoist engine.
The present invention also provides a kind of ramp finished product material arrangement of conveying system methods, comprising the following steps:
Step 1 suitably corrects the natural hillside slope of arrangement transportation system, and armored concrete is built on slope Basis and steel rail laying track;The bolster stake of fixed pulley is built, and fixed pulley is installed;The basis of hoisting equipment is built, and is installed Hoisting equipment;The top ground setting support pulley on slope installs buffer unit in loading area, in charging area edge installation limit Device;
Step 2, installation hawser, the first transport vehicle and the second transport vehicle;The hawser sets around the fixed pulley and the elevator Standby, first transport vehicle and the second transport vehicle are connected by the hawser;The limiting device is opened, described first is transported Vehicle is arranged in charging area edge, and second transport vehicle is arranged in loading dock, is pacified above first transport vehicle parking stall Fill charging hopper;
Step 3 charges to first transport vehicle, after the first transport vehicle charging, closes the limiting device, Start the first transport vehicle glide downwards, first transport vehicle transport from elevation to low elevation during by described Two transport vehicles transport supreme elevation;The speed of service of first transport vehicle is controlled by hoisting equipment;
When step 4, second transport vehicle touch the buffer unit, the limiting device is opened, by second transport vehicle It is limited in the edge of loading area;When first transport vehicle is out of service, unload first transport vehicle;
Step 5 charges to second transport vehicle, after the second transport vehicle charging, closes the limiting device, Start the second transport vehicle glide downwards, second transport vehicle transport from elevation to low elevation during by described One transport vehicle transports supreme elevation;The speed of service of second transport vehicle is controlled by hoisting equipment;
When step 6, first transport vehicle touch the buffer unit, the limiting device is opened, by first transport vehicle It is limited in the edge of loading area;When second transport vehicle is out of service, unload second transport vehicle;
Step 7 repeats the above steps, until transport terminates.
The beneficial effects of the present invention are: 1) finished product material can be properly transported from elevation to low elevation by slope, and Impact failure is not generated to finished product material;2) limiting device is set, transport vehicle can be limited in charging area edge, is preferably reduced Energy consumption in transportational process;3) it can be applicable in the biggish slope of the gradient, transit route length can be reduced, to reduce expropriation of land model It encloses, saves the area;4) potential energy for taking full advantage of cargo reduces the energy consumption in transportational process;5) cost economic, and have aobvious The economic results in society of work.
Detailed description of the invention
Fig. 1 is ramp finished product material of the present invention transportation system schematic top plan view.
Fig. 2 is ramp finished product material of the present invention transportation system direction along ng a path schematic cross-sectional view.
Description of symbols: 1, the first transport vehicle;11, the second transport vehicle;2, hawser;3, fixed pulley;4, hoisting equipment;5, Track;6, pulley is supported;7, buffer unit;8, charging hopper;9, limiting device.
Specific embodiment
The embodiment of the present invention is explained in detail below, examples of the embodiments are shown in the accompanying drawings, wherein identical from beginning to end Or similar label indicates same or similar element or element with the same or similar functions.It is retouched below with reference to attached drawing The embodiment stated is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
As shown in Figure 1 to Figure 2, a kind of ramp finished product material transportation system, including, the first transport vehicle 1, the second transport vehicle 11, hawser 2, track 5, charging hopper 8, fixed pulley 3, support pulley 6, hoisting equipment 4, buffer unit 7 and limiting device 9.First Transport vehicle 1 and the second transport vehicle 11 are arranged on different tracks and are interconnected by hawser, and hawser 2 can be high strength steel Cord.Fixed pulley 3 is installed on fixed cylinder, and hawser is around fixed pulley and fixed pulley is driven to rotate, and fixed pulley can reduce cable The abrasion of rope.Hoisting equipment 4 is arranged in along hawser, and cable takeup reaches control fortune on hoisting equipment, by controlling hawser The purpose of defeated vehicle, hoisting equipment are used to control the operation of the first transport vehicle and the second transport vehicle.Buffer unit 7 is arranged in charging Area, for limiting the parking position of the first transport vehicle or the second transport vehicle.Pulley 6 is supported in hawser and the setting of ground contact position, To reduce the abrasion of hawser, support pulley arrangements in slope section top arc section, be used to support hawser so that hawser not with ground Contact friction.Transport vehicle is connect by position-limited wheel or buckle with track, and charging hopper 8 is arranged in above the parking stall of loading area.
Limiting device 9 is arranged in the edge of loading area, and buffer unit is connect with limiting device, when the first transport vehicle or second When transport vehicle touches buffer unit, the first transport vehicle or the second transport vehicle are limited in the edge of loading area by spacing unit in unlocking.
Hoisting equipment can be hoist engine, transport vehicle can be designed as lid or uncovered according to the characteristics of finished product material Transport vehicle.Track and basis are the rail and reinforced concrete foundation being arranged on ramp, and transport vehicle is arranged on track, and It is connect by devices such as position-limited wheel or buckles with rail, rail had not only played the role of carried and transported vehicle, but also played and prevent transport vehicle The effect turned on one's side and jolted, does not generate impact to finished product material, and transport vehicle load is transmitted in ground by reinforced concrete foundation. Buffer unit 7 is arranged in loading area, for limiting the parking position of transport vehicle, and buffers the extra kinetic energy of transport vehicle.Charging hopper Transport vehicle is arranged in above the parking stall of loading area, is charged by it into transport vehicle, is trickled down outside vehicle to avoid finished product material.
The present invention controls trolley even running using hoisting equipment and track, therefore does not specially require to slope, only The slope of the suitable gradient is selected, the gradient of ramp can be 25 ° ~ 45 °.Route short (expropriation of land range is small), small investment And low energy consumption.
The arrangement and operation of a kind of ramp finished product material transportation system, comprising the following steps:
Step 1 suitably corrects the natural hillside slope of arrangement transportation system, and armored concrete is built on slope Basis and steel rail laying track;The bolster stake of fixed pulley is built, and fixed pulley is installed;The basis of hoisting equipment is built, and is installed Hoisting equipment;The top ground setting support pulley on slope installs buffer unit in loading area, in charging area edge installation limit Device;Entire transportation system is debugged, trial operation.
Step 2, installation hawser, the first transport vehicle and the second transport vehicle;Hawser bypasses fixed pulley and hoisting equipment, the first fortune Defeated vehicle and the second transport vehicle are connected by hawser;First transport vehicle is arranged in charging area edge, by second by spacing unit in unlocking Transport vehicle is arranged in loading dock, installs charging hopper above the first transport vehicle parking stall;
Step 3 charges to the first transport vehicle, after the first transport vehicle charges, closes limiting device, the first transport of starting Second transport vehicle is transported supreme elevation during transporting from elevation to low elevation by vehicle glide downwards, the first transport vehicle;It is logical Cross the speed of service that hoisting equipment controls the first transport vehicle;
When step 4, the second transport vehicle touching buffer unit, the second transport vehicle is limited in the side of loading area by spacing unit in unlocking Edge;When first transport vehicle is out of service, unload the first transport vehicle;
Step 5 charges to the second transport vehicle, after the second transport vehicle charges, closes limiting device, the second transport of starting First transport vehicle is transported supreme elevation during transporting from elevation to low elevation by vehicle glide downwards, the second transport vehicle;It is logical Cross the speed of service that hoisting equipment controls the second transport vehicle;
When step 6, the first transport vehicle touching buffer unit, the first transport vehicle is limited in the side of loading area by spacing unit in unlocking Edge;When second transport vehicle is out of service, unload the second transport vehicle;
Step 7 repeats step 3 ~ 6, until transport terminates.
It is small that the present invention by suitable clinoform, by the position that be fully loaded with trolley at the top of slope can be converted into the zero load of slope bottom The promotion kinetic energy of vehicle, so that empty wagons is transported supreme height during the trolley of fully loaded finished product material is transported from elevation to low elevation Journey, and by the travelling speed of the equipment such as hoist engine control finished product material, so that cargo is not hit.By two trolleies, hawser, The equipment such as fixed pulley and hoist engine form a set of slope transportation system from elevation to low elevation, by being fully loaded with trolley from dress Area's descending is expected to discharge zone, and the unloaded trolley after driving unloading goes upward to loading area from discharge zone, and the potential energy of fully loaded trolley is turned The kinetic energy that unloaded trolley rises is turned to, and controls trolley even running by equipment such as track, hoist engines.It loops back and forth like this, The cargo of elevation loading area can be transported to low elevation discharge zone by slope.
As described above, only presently preferred embodiments of the present invention, practical range not for the purpose of limiting the invention, i.e., It is all according to equivalent changes and modifications made by the present invention, be all that scope of the invention as claimed is covered, no longer illustrate one by one here.

Claims (7)

1. a kind of ramp finished product material transportation system, including, the first transport vehicle, the second transport vehicle, hawser, track and charging hopper, It is characterized in that, the system also includes fixed pulley, hoisting equipment, buffer unit and limiting devices;
First transport vehicle and the second transport vehicle are arranged on different tracks and are connected by the hawser;The fixed pulley It is installed on fixed cylinder, the hawser is around the fixed pulley and the fixed pulley is driven to rotate;
The hoisting equipment is arranged in along the hawser, and on hoisting equipment, the hoisting equipment is used for the cable takeup Control the operation of first transport vehicle and the second transport vehicle;The buffer unit is arranged in loading area, for limiting described The parking position of one transport vehicle or the second transport vehicle;
The limiting device is arranged in the edge of loading area, and the buffer unit is connect with the limiting device, when described first When transport vehicle or the second transport vehicle touch the buffer unit, the limiting device is opened, by first transport vehicle or second Transport vehicle is limited in the edge of loading area.
2. a kind of ramp finished product material transportation system according to claim 1, which is characterized in that in slope section top arc Section arrangement support pulley, is used to support the hawser.
3. a kind of ramp finished product material transportation system according to claim 1, which is characterized in that first transport vehicle and Second transport vehicle is connect by position-limited wheel or buckle with the track.
4. a kind of ramp finished product material transportation system according to claim 1, which is characterized in that the charging hopper is arranged in Above the parking stall of the loading area.
5. a kind of ramp finished product material transportation system according to claim 1, which is characterized in that the gradient of the ramp It is 25 ° ~ 45 °.
6. a kind of ramp finished product material transportation system according to claim 1, which is characterized in that the hoisting equipment is volume Raise machine.
7. a kind of ramp finished product material arrangement of conveying system method, which comprises the following steps:
Step 1 suitably corrects the natural hillside slope of arrangement transportation system, and armored concrete is built on slope Basis and steel rail laying track;The bolster stake of fixed pulley is built, and fixed pulley is installed;The basis of hoisting equipment is built, and is installed Hoisting equipment;The top ground setting support pulley on slope installs buffer unit in loading area, in charging area edge installation limit Device;
Step 2, installation hawser, the first transport vehicle and the second transport vehicle;The hawser sets around the fixed pulley and the elevator Standby, first transport vehicle and the second transport vehicle are connected by the hawser;The limiting device is opened, described first is transported Vehicle is arranged in charging area edge, and second transport vehicle is arranged in loading dock, is pacified above first transport vehicle parking stall Fill charging hopper;
Step 3 charges to first transport vehicle, after the first transport vehicle charging, closes the limiting device, Start the first transport vehicle glide downwards, first transport vehicle transport from elevation to low elevation during by described Two transport vehicles transport supreme elevation;The speed of service of first transport vehicle is controlled by hoisting equipment;
When step 4, second transport vehicle touch the buffer unit, the limiting device is opened, by second transport vehicle It is limited in the edge of loading area;When first transport vehicle is out of service, unload first transport vehicle;
Step 5 charges to second transport vehicle, after the second transport vehicle charging, closes the limiting device, Start the second transport vehicle glide downwards, second transport vehicle transport from elevation to low elevation during by described One transport vehicle transports supreme elevation;The speed of service of second transport vehicle is controlled by hoisting equipment;
When step 6, first transport vehicle touch the buffer unit, the limiting device is opened, by first transport vehicle It is limited in the edge of loading area;When second transport vehicle is out of service, unload second transport vehicle;
Step 7 repeats the above steps, until transport terminates.
CN201910184702.2A 2019-03-12 2019-03-12 A kind of ramp finished product material transportation system and its method for arranging Pending CN109878996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910184702.2A CN109878996A (en) 2019-03-12 2019-03-12 A kind of ramp finished product material transportation system and its method for arranging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910184702.2A CN109878996A (en) 2019-03-12 2019-03-12 A kind of ramp finished product material transportation system and its method for arranging

Publications (1)

Publication Number Publication Date
CN109878996A true CN109878996A (en) 2019-06-14

Family

ID=66931857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910184702.2A Pending CN109878996A (en) 2019-03-12 2019-03-12 A kind of ramp finished product material transportation system and its method for arranging

Country Status (1)

Country Link
CN (1) CN109878996A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112849976A (en) * 2020-12-31 2021-05-28 新兴铸管股份有限公司 Cast tube conveying system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4286911A (en) * 1978-02-28 1981-09-01 Litton Systems, Inc. Semi-automated warehousing system
JP2005212945A (en) * 2004-01-28 2005-08-11 Mitsubishi Electric Corp Elevator device
CN101734539A (en) * 2008-11-17 2010-06-16 吕安文 Potential energy lifting gear
KR101034774B1 (en) * 2010-07-30 2011-05-17 (주)챔피온코리아 Lift device using the wire rope
CN105041019A (en) * 2015-06-27 2015-11-11 胡向赤 Roadside three-dimensional single-row car garage
CN205061252U (en) * 2015-09-01 2016-03-02 中国建筑第八工程局有限公司 Lower string in a perpendicular conveyor system of material of mould platform
CN105858408A (en) * 2016-05-13 2016-08-17 中国矿业大学 Large slope lifting device for strip mine dump truck
CN105946877A (en) * 2016-06-02 2016-09-21 华南农业大学 Double-rail transporting machine utilizing gravitational potential energy for hillside orchard
CN106429267A (en) * 2016-11-11 2017-02-22 中国人民解放军63926部队 Rail-mounted material lifting device
CN207483250U (en) * 2017-09-22 2018-06-12 宁夏贺兰山东麓庄园酒业有限公司 A kind of material elevator

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4286911A (en) * 1978-02-28 1981-09-01 Litton Systems, Inc. Semi-automated warehousing system
JP2005212945A (en) * 2004-01-28 2005-08-11 Mitsubishi Electric Corp Elevator device
CN101734539A (en) * 2008-11-17 2010-06-16 吕安文 Potential energy lifting gear
KR101034774B1 (en) * 2010-07-30 2011-05-17 (주)챔피온코리아 Lift device using the wire rope
CN105041019A (en) * 2015-06-27 2015-11-11 胡向赤 Roadside three-dimensional single-row car garage
CN205061252U (en) * 2015-09-01 2016-03-02 中国建筑第八工程局有限公司 Lower string in a perpendicular conveyor system of material of mould platform
CN105858408A (en) * 2016-05-13 2016-08-17 中国矿业大学 Large slope lifting device for strip mine dump truck
CN105946877A (en) * 2016-06-02 2016-09-21 华南农业大学 Double-rail transporting machine utilizing gravitational potential energy for hillside orchard
CN106429267A (en) * 2016-11-11 2017-02-22 中国人民解放军63926部队 Rail-mounted material lifting device
CN207483250U (en) * 2017-09-22 2018-06-12 宁夏贺兰山东麓庄园酒业有限公司 A kind of material elevator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112849976A (en) * 2020-12-31 2021-05-28 新兴铸管股份有限公司 Cast tube conveying system
CN112849976B (en) * 2020-12-31 2022-06-03 新兴铸管股份有限公司 Cast tube conveying system

Similar Documents

Publication Publication Date Title
CN105800327A (en) Crawler travelling stacker
CN107089528A (en) A kind of side formula cantilever tire mobile ship loader
CN107237649A (en) The long steep inclined shaft transportation system of light section and construction method
JP2005023692A (en) Conveyance facilities for concrete
CN113620018A (en) Empty rail conveying device for bulk materials
CN103334755B (en) Slope hoisting and crushing system for deep open-pit mine
CN109878996A (en) A kind of ramp finished product material transportation system and its method for arranging
CN107278197B (en) Conveying system for open-pit mining
US20070295581A1 (en) Transport discharge material flow regulation device and method
US10647521B2 (en) Transfer bridge for coarse bulk materials
US20070297883A1 (en) Bulk material unloading system and method
CN210001055U (en) slope way finished product material transportation system
CN102689801A (en) Novel tire type movable feeding device
Wolpers Thyssenkrupp's Skip Way System offers an alternative
CN202208295U (en) Underground mine transportation pool and mine slant well elevating system
CN105173673A (en) Soil dumping process for multi-directional transferring and machine head dead zone eliminating by waste soil field rubber belt machines
RU2136883C1 (en) Method for transporting rock mass from quarries and mines
CN211812431U (en) Direct-unloading direct-loading bulk cargo ship loading device
US20220162941A1 (en) Vehicle and Process for Moving Coarse Ore
CN103332503B (en) Large-scale over-long single armed row material distributing machine
Matsui Underground mining transportation systems
Wolpers Cost-efficient transport for open-pit mines
CN116119378A (en) Bridge crane type ore transportation system and ore transportation method
CN216188575U (en) Empty rail conveying device for bulk materials
CN204727245U (en) Side dump tipper

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination