CN109878556A - A kind of management method and device of rail traffic resource - Google Patents

A kind of management method and device of rail traffic resource Download PDF

Info

Publication number
CN109878556A
CN109878556A CN201910103988.7A CN201910103988A CN109878556A CN 109878556 A CN109878556 A CN 109878556A CN 201910103988 A CN201910103988 A CN 201910103988A CN 109878556 A CN109878556 A CN 109878556A
Authority
CN
China
Prior art keywords
resource
train
trackside
manager
application
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910103988.7A
Other languages
Chinese (zh)
Other versions
CN109878556B (en
Inventor
汪小勇
陈绍文
杨海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casco Signal Ltd
Original Assignee
Casco Signal Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casco Signal Ltd filed Critical Casco Signal Ltd
Priority to CN201910103988.7A priority Critical patent/CN109878556B/en
Publication of CN109878556A publication Critical patent/CN109878556A/en
Application granted granted Critical
Publication of CN109878556B publication Critical patent/CN109878556B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The present invention relates to the management methods and device of a kind of rail traffic resource, this method are as follows: train according to operation task, current location and plan operation curve determine train operation needed for resource, including track, track switch, side blow region and the zone of protection resource in setting range, and resource bid is actively initiated to trackside and adjacent train, trackside and adjacent train provide confirmation;After train obtains resource occupation authorization, allocated resource is used safely;And resource occupation authorization is once obtained, before by vehicle release, cannot reallocate this resource other trains, will be considered as limitation point by other trains by the resource that the vehicle occupies.Compared with prior art, the present invention has many advantages, such as the utilization efficiency for substantially increasing resource.

Description

A kind of management method and device of rail traffic resource
Technical field
The present invention relates to rail traffic signal systems, more particularly, to the management method and dress of a kind of rail traffic resource It sets.
Background technique
In current signal system, track resources needed for train operation are allocated simultaneously by interlocking or ATP system Guarantee.Using route or fixed area as basic unit when resource allocation, and route and fixed area are in Project design Aggregate, including section, track switch, zone of protection of a series of track resources of predefined etc..The management of this track resources There are two aspects in mode, first problem is that the granularity of resource management is too thick, leads to serious waste of resources, does not have Existing resource is made full use of to improve efficiency;It is Project design current events that Second Problem, which is such as route or other means resource collection, It first defines, when other trains enter or Train Parameters change, will lead to existing resource allocation and guarantee mode not It is able to satisfy this variation, can not achieve flexible operation.
The problem of signal system another aspect is a large amount of resource management using the central controlled mode of trackside at present, is needed Trackside and it is vehicle-mounted between have reliable train-ground communication means to realize reliable information exchange, simultaneously because information transmission via The mode of " vehicle-mounted-trackside-is vehicle-mounted ", the longer reaction speed for leading to system of information transmission path is slack-off, affects the effect of system Rate, and then capacity is caused to incur loss.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of rail traffic resources Management method and device.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of management method of rail traffic resource, this method are as follows:
Train train operation is determined according to operation task, current location and plan operation curve needed for resource, including set Determine track, track switch, side blow region and the zone of protection resource in range, and actively initiates resource Shen to trackside and adjacent train Please, trackside and adjacent train provide confirmation;
After train obtains resource occupation authorization, allocated resource is used safely;And resource occupation authorization is once obtained, this Before by vehicle release, cannot reallocate resource other trains, will be considered as limitation point by other trains by the resource that the vehicle occupies.
Preferably, track resources needed for train operation are with the track of the actually required range of train operation, within the scope of this Track switch and zone of protection are that minimum unit using instant application is finished the mode discharged, and wherein zone of protection includes side blow Zone of protection.
Preferably, for track resources needed for train operation by train active management, train is the manager of resource, trackside conduct The execution side and redundancy backup side of train resources management.
Preferably, the method specifically includes the following steps:
(01) train application resource: search front set distance range is interior between front truck in real time in the process of running for train Resource, if there is trackside resource, just to trackside resource manager send application occupy request;
(02) whether resource is occupied: whether trackside resource manager judges the applied resource of train by other vehicle applications It occupies, if occupied, (03) will be entered step;If (04) will be entered step without occupied;
(03) train waits resource release notice: if occupied, trackside resource manager is just to the train of application Notice train can be re-initiated application process, and return step (01) after resource is released by the Wait Orders such as transmission;
(04) whether resource can be used: if without occupied, resource manager judges whether resource can be used, if resource is not It can use, by return step (02);If resource is available, (05) will be entered step;
(05) track switch determines antiposition and zone of protection resource prepares: trackside resource manager is that train prepares resource, is judged Trouble is locked to defined position and zone of protection is available;
(06) resource lock and distribute resource to train: after resource is available, trackside resource manager by the resource lock, And resource is distributed to the train of application;
(07) train occupation resource confirms and feeds back: after train receives the distribution authorization of trackside resource manager, occupying money Source simultaneously feeds back to the occupancy confirmation of trackside resource manager;
(08) train uses resource: after train occupation resource, can safely use resource, indicate that train can safely lead to Cross the resource area of its occupancy;
(09) train is discharged to trackside resource manager application after use: after resource area of the train by occupancy, Release application can be sent, to trackside resource manager so that resource can be released to other trains;
(10) train receives release feedback: after trackside resource manager receives the release application of train transmission, sending out to train Send and whether discharge successful information, if train do not receive trackside resource manager successful release feedback, will enter step (09) after Continuous application;If train receives the successful release feedback of trackside resource manager, (11) will be entered step;
(11) stop sending release request: after train receives the successful release feedback of trackside resource manager, showing rail Other resource manager successfully discharges resource, which can will be stopped sending to discharge asking by its car team vehicle application, the train It asks, continue to run and carries out next resource bid process.
Preferably, the resource of the step (04) is unavailable are as follows: and track switch indicates without anti-/ position surely, though zone of protection is without Shen Please but it is occupied.
Preferably, the resource of the step (04) is available are as follows: track switch is unlatched and has fixed/antiposition to indicate, zone of protection It can use.
A kind of device of the management method of the rail traffic resource, including trackside resource manager and trackside train pipe Device is managed, trackside resource is managed by trackside resource manager, and trackside resource manager is communicated with track switch control device, To obtain the state of track switch;Trackside resource manager is communicated with all trains, to handle train application, and sends application As a result;
When the trackside resource manager of certain train breaks down or train-ground communication interrupts, by the redundancy of trackside synchronous operation Hot standby trackside Train Management device substitutes the trackside resource manager of cisco unity malfunction automatically.
Compared with prior art, the invention has the following advantages that
(1) resource management needed for train operation becomes track switch, side blow area as being similar to resource set zoarium as route The granularity of the elements such as domain, zone of protection, resource management becomes smaller, and manages finer.
(2) resource substantially increases the utilization efficiency of resource by the way of instant application, being finished and discharging.
It (3), can be according to the train and wheel rail adhesion of actual motion without the predefined resource set zoarium in Project design Equal current intelligences change the allocation strategy of resource in real time, and system is more flexible general.
(4) based on train autonomous control, execution side and redundancy backup side of the trackside as train autonomous control shorten money The reliability of time and resource allocation needed for the distribution of source, improve efficiency.
Detailed description of the invention
Fig. 1 is resource management flow chart of the invention;
Fig. 2 is the device of the invention structural schematic diagram;
Fig. 3 is example explanatory diagram of the invention;
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is a part of the embodiments of the present invention, rather than whole embodiments.Based on this hair Embodiment in bright, those of ordinary skill in the art's every other reality obtained without making creative work Example is applied, all should belong to the scope of protection of the invention.
A kind of management method of rail traffic resource, this method are as follows: train is transported according to operation task, current location and plan Resource needed for row curve determines train operation, including track, track switch, side blow region and the zone of protection money in setting range Source, and resource bid is actively initiated to trackside and adjacent train, trackside and adjacent train provide confirmation;
After train obtains resource occupation authorization, allocated resource is used safely;And resource occupation authorization is once obtained, this Before by vehicle release, cannot reallocate resource other trains, will be considered as limitation point by other trains by the resource that the vehicle occupies.
Track resources needed for train operation are with the track of the actually required range of train operation, the track switch within the scope of this and prevent Shield region is finished the mode discharged using instant application for minimum unit, and wherein zone of protection includes side blow guard plot Domain.Track resources needed for train operation are the manager of resource by train active management, train, and trackside is as train resources management Execution side and redundancy backup side.
As shown in Figure 1, the management method of rail traffic resource specifically includes the following steps:
(01) train application resource: search front set distance range is interior between front truck in real time in the process of running for train Resource, if there is trackside resource, just to trackside resource manager send application occupy request;
(02) whether resource is occupied: whether trackside resource manager judges the applied resource of train by other vehicle applications It occupies, if occupied, (03) will be entered step;If (04) will be entered step without occupied;
(03) train waits resource release notice: if occupied, trackside resource manager is just to the train of application Notice train can be re-initiated application process, and return step (01) after resource is released by the Wait Orders such as transmission;
(04) whether resource can be used: if without occupied, resource manager judges whether resource can be used, if resource is not It can use, by return step (02);If resource is available, (05) will be entered step;
(05) track switch determines antiposition and zone of protection resource prepares: trackside resource manager is that train prepares resource, is judged Trouble is locked to defined position and zone of protection is available;
(06) resource lock and distribute resource to train: after resource is available, trackside resource manager by the resource lock, And resource is distributed to the train of application;
(07) train occupation resource confirms and feeds back: after train receives the distribution authorization of trackside resource manager, occupying money Source simultaneously feeds back to the occupancy confirmation of trackside resource manager;
(08) train uses resource: after train occupation resource, can safely use resource, indicate that train can safely lead to Cross the resource area of its occupancy;
(09) train is discharged to trackside resource manager application after use: after resource area of the train by occupancy, Release application can be sent, to trackside resource manager so that resource can be released to other trains;
(10) train receives release feedback: after trackside resource manager receives the release application of train transmission, sending out to train Send and whether discharge successful information, if train do not receive trackside resource manager successful release feedback, will enter step (09) after Continuous application;If train receives the successful release feedback of trackside resource manager, (11) will be entered step;
(11) stop sending release request: after train receives the successful release feedback of trackside resource manager, showing rail Other resource manager successfully discharges resource, which can will be stopped sending to discharge asking by its car team vehicle application, the train It asks, continue to run and carries out next resource bid process.
The resource of the step (04) is unavailable are as follows: and track switch indicates without anti-/ position surely, though zone of protection is occupied without applying With.
The resource of the step (04) is available are as follows: track switch is unlatched and has fixed/antiposition to indicate, zone of protection is available.
As shown in Fig. 2, a kind of managing device of rail traffic resource, including trackside resource manager and trackside Train Management Device, trackside resource are managed by trackside resource manager, and trackside resource manager is communicated with track switch control device, with Obtain the state of track switch;Trackside resource manager is communicated with all trains, to handle train application, and sends application knot Fruit;When the trackside resource manager of certain train breaks down or train-ground communication interrupts, by the Redundant backup of trackside synchronous operation Trackside Train Management device substitutes the trackside resource manager of cisco unity malfunction automatically.
Below according to Fig. 3, illustrate a specific example of the invention in conjunction with the control process of Fig. 1.
(01) train A in the process of running in real time search front train B between resource, track switch P1 can be found, just to Resouce controller sends application and occupies P1 and zone of protection request.
(02) trackside resouce controller judges that the applied resource of train is not occupied by B vehicle application, enters step (04).
(04) resource manager judges that resource is available.(track switch is unlatched and has normal indication) can be used in P1 track switch resource, prevents Shield region is not also occupied without application.
(05) resouce controller is that train prepares resource, and track switch P1 is locked to positioning.
(06) resouce controller distributes resource by track switch P1 resource lock, and to train A.
(07) after train A receives the distribution authorization of resouce controller, occupy resource simultaneously feed back to resouce controller occupy it is true Recognize.
(08) after train A occupies resource, the ground region track switch P1 can be led to according to route speed limit, and traceable to B tailstock portion.
(09) train is by sending release application to resource manager behind the region P1.
(10) after resource manager receives the release application that train A is sent, whether successful information is discharged to train A transmission.
(11) after train A receives the successful release feedback of resource manager, show that resource manager successfully discharges Resource, train A will stop sending release request, continue to run and carry out next resource bid process.P1 resource can be arranged Vehicle C application.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace It changes, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right It is required that protection scope subject to.

Claims (7)

1. a kind of management method of rail traffic resource, which is characterized in that this method are as follows:
Train according to operation task, current location and plan operation curve determine train operation needed for resource, including setting model Interior track, track switch, side blow region and zone of protection resource are enclosed, and actively initiates resource bid, rail to trackside and adjacent train Take up adjacent train and provides confirmation;
After train obtains resource occupation authorization, allocated resource is used safely;And once obtain resource occupation authorization, this resource Before by vehicle release, cannot reallocate other trains, will be considered as limitation point by other trains by the resource that the vehicle occupies.
2. a kind of management method of rail traffic resource according to claim 1, which is characterized in that needed for train operation Track resources are used using the track of the actually required range of train operation, the track switch within the scope of this and zone of protection as minimum unit Instant application is finished the mode discharged, and wherein zone of protection includes side blow zone of protection.
3. a kind of management method of rail traffic resource according to claim 1, which is characterized in that rail needed for train operation Road resource is the manager of resource by train active management, train, and trackside is standby as the execution side of train resources management and redundancy Part side.
4. a kind of management method of rail traffic resource according to claim 1, which is characterized in that the method is specific The following steps are included:
(01) train application resource: train searches for the money in the set distance range of front between front truck in real time in the process of running Source just sends application to trackside resource manager and occupies request if there is trackside resource;
(02) whether resource is occupied: trackside resource manager judges whether the applied resource of train is accounted for by other vehicle applications With (03) will be entered step if occupied;If (04) will be entered step without occupied;
(03) train waits resource release notice: if occupied, trackside resource manager is just sent to the train of application Notice train can be re-initiated application process, and return step (01) after resource is released by equal Wait Orders;
(04) whether resource can be used: if without occupied, resource manager judges whether resource can be used, if resource can not With by return step (02);If resource is available, (05) will be entered step;
(05) track switch determines antiposition and zone of protection resource prepares: trackside resource manager is that train prepares resource, judges switch lock, point lock It closes available to defined position and zone of protection;
(06) resource lock and distribute resource to train: after resource is available, trackside resource manager by the resource lock, and to The train of application distributes resource;
(07) train occupation resource confirms and feeds back: after train receives the distribution authorization of trackside resource manager, occupying resource simultaneously It feeds back to trackside resource manager and occupies confirmation;
(08) train uses resource: after train occupation resource, can safely use resource, indicate that train can safely pass through it The resource area of occupancy;
(09) train is discharged to trackside resource manager application after use: after resource area of the train by occupancy, Release application is sent to trackside resource manager, so that resource can be released to other trains;
(10) train receives release feedback: after trackside resource manager receives the release application of train transmission, being to train transmission No release successful information will enter step (09) and continue Shen if train does not receive the successful release feedback of trackside resource manager Please;If train receives the successful release feedback of trackside resource manager, (11) will be entered step;
(11) stop sending release request: after train receives the successful release feedback of trackside resource manager, showing that trackside provides Source manager successfully discharges resource, which can will be stopped sending release request by its car team vehicle application, the train, after Reforwarding row simultaneously carries out next resource bid process.
5. a kind of management method of rail traffic resource according to claim 4, which is characterized in that the step (04) Resource it is unavailable are as follows: track switch indicates without surely anti-/ position, though zone of protection is occupied without applying.
6. a kind of management method of rail traffic resource according to claim 4, which is characterized in that the step (04) Resource it is available are as follows: track switch is unlatched and has fixed/antiposition to indicate, zone of protection is available.
7. a kind of device of the management method for rail traffic resource described in claim 1, which is characterized in that including trackside Resource manager and trackside Train Management device, trackside resource are managed by trackside resource manager, trackside resource manager It is communicated with track switch control device, to obtain the state of track switch;Trackside resource manager is communicated with all trains, with Train application is handled, and sends application result;
When the trackside resource manager of certain train breaks down or train-ground communication interrupts, by the Redundant backup of trackside synchronous operation Trackside Train Management device substitutes the trackside resource manager of cisco unity malfunction automatically.
CN201910103988.7A 2019-02-01 2019-02-01 Management method and device for rail transit resources Active CN109878556B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910103988.7A CN109878556B (en) 2019-02-01 2019-02-01 Management method and device for rail transit resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910103988.7A CN109878556B (en) 2019-02-01 2019-02-01 Management method and device for rail transit resources

Publications (2)

Publication Number Publication Date
CN109878556A true CN109878556A (en) 2019-06-14
CN109878556B CN109878556B (en) 2021-06-08

Family

ID=66927866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910103988.7A Active CN109878556B (en) 2019-02-01 2019-02-01 Management method and device for rail transit resources

Country Status (1)

Country Link
CN (1) CN109878556B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110696876A (en) * 2019-09-11 2020-01-17 浙江众合科技股份有限公司 Train operation safety protection system and method based on dynamic resource management
CN110696873A (en) * 2019-10-25 2020-01-17 新誉集团有限公司 Switch control system based on air-to-vehicle-ground integrated network
CN111204364A (en) * 2020-01-15 2020-05-29 卡斯柯信号有限公司 Trackside resource release method based on train actual positioning
CN111232022A (en) * 2020-01-15 2020-06-05 卡斯柯信号有限公司 Trackside resource management method combined with train identity information
CN111469891A (en) * 2020-04-03 2020-07-31 雷冰 Driving route planning processing method and device, computer device and storage medium
CN111497898A (en) * 2020-04-27 2020-08-07 卡斯柯信号有限公司 Device and method for autonomous access application and release of vehicle-mounted equipment
CN111497896A (en) * 2020-03-24 2020-08-07 卡斯柯信号有限公司 Management method of rail transit turnout resources
CN111605585A (en) * 2020-06-08 2020-09-01 中车青岛四方机车车辆股份有限公司 Train control method and device, rail train and train control system
CN111688765A (en) * 2020-06-04 2020-09-22 交控科技股份有限公司 Method and system for locking safety path for vehicle-to-vehicle communication and TMC
CN111731348A (en) * 2020-06-02 2020-10-02 通号城市轨道交通技术有限公司 Ground control method, device, equipment and storage medium based on resource management
CN112141176A (en) * 2020-09-30 2020-12-29 青岛海信微联信号有限公司 Mobile equipment searching method and equipment
CN112590866A (en) * 2020-12-28 2021-04-02 卡斯柯信号有限公司 Method and system for managing obstacle avoidance area of train line
CN112977554A (en) * 2021-03-11 2021-06-18 卡斯柯信号有限公司 Rail transit resource processing method and system based on portable safety terminal
CN113044082A (en) * 2021-04-16 2021-06-29 卡斯柯信号有限公司 Resource management method for TACS (terminal-to-terminal communication System)
CN113548096A (en) * 2021-07-28 2021-10-26 通号城市轨道交通技术有限公司 Turnout side-impact area protection method and system
CN114104042A (en) * 2020-08-31 2022-03-01 比亚迪股份有限公司 Train route management method, equipment and storage medium
CN114291140A (en) * 2021-12-27 2022-04-08 卡斯柯信号有限公司 Method, equipment and medium for processing turnout resource conflict of TACS (railway switching System)
CN114312932A (en) * 2021-12-13 2022-04-12 卡斯柯信号有限公司 Anti-deadlock method, device, equipment and medium for TACS system
CN114802365A (en) * 2022-04-02 2022-07-29 浙江众合科技股份有限公司 Train energy consumption control method based on multi-train cooperation
CN115257864A (en) * 2022-07-25 2022-11-01 卡斯柯信号有限公司 Train control system and method for vehicle-to-vehicle communication
CN115320681A (en) * 2022-09-19 2022-11-11 青岛地铁集团有限公司 Resource management method and device based on train
CN116946219A (en) * 2023-09-19 2023-10-27 湖南中车时代通信信号有限公司 Train driving path resource application method, allocation management method, device and medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19840715C1 (en) * 1998-08-26 2000-11-23 Abb Daimler Benz Transp Rail vehicle control device uses onboard processor for radio control of switching points via track atlas data updated to ensure train safety by preventing conflict situation
WO2016035390A1 (en) * 2014-09-01 2016-03-10 株式会社日立製作所 On-board device, train, and signaling safety system
CN106394611A (en) * 2016-08-31 2017-02-15 交控科技股份有限公司 Control method and device and controller of turnout
CN106494457A (en) * 2016-12-19 2017-03-15 兰州交通大学 CBTC and regional interlock integral system and method
CN107284471A (en) * 2017-05-18 2017-10-24 交控科技股份有限公司 A kind of CBTC systems based on truck traffic

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19840715C1 (en) * 1998-08-26 2000-11-23 Abb Daimler Benz Transp Rail vehicle control device uses onboard processor for radio control of switching points via track atlas data updated to ensure train safety by preventing conflict situation
WO2016035390A1 (en) * 2014-09-01 2016-03-10 株式会社日立製作所 On-board device, train, and signaling safety system
CN106394611A (en) * 2016-08-31 2017-02-15 交控科技股份有限公司 Control method and device and controller of turnout
CN106494457A (en) * 2016-12-19 2017-03-15 兰州交通大学 CBTC and regional interlock integral system and method
CN107284471A (en) * 2017-05-18 2017-10-24 交控科技股份有限公司 A kind of CBTC systems based on truck traffic

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐纪康等: ""基于车车通信的新型CBTC***中的道岔控制功能研究"", 《铁路通信信号工程技术(RSCE)》 *

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110696876A (en) * 2019-09-11 2020-01-17 浙江众合科技股份有限公司 Train operation safety protection system and method based on dynamic resource management
CN110696873B (en) * 2019-10-25 2021-09-03 新誉集团有限公司 Switch control system based on air-to-vehicle-ground integrated network
CN110696873A (en) * 2019-10-25 2020-01-17 新誉集团有限公司 Switch control system based on air-to-vehicle-ground integrated network
CN111204364A (en) * 2020-01-15 2020-05-29 卡斯柯信号有限公司 Trackside resource release method based on train actual positioning
CN111232022A (en) * 2020-01-15 2020-06-05 卡斯柯信号有限公司 Trackside resource management method combined with train identity information
CN111497896A (en) * 2020-03-24 2020-08-07 卡斯柯信号有限公司 Management method of rail transit turnout resources
CN111497896B (en) * 2020-03-24 2022-07-15 卡斯柯信号有限公司 Management method of rail transit turnout resources
CN111469891A (en) * 2020-04-03 2020-07-31 雷冰 Driving route planning processing method and device, computer device and storage medium
CN111497898A (en) * 2020-04-27 2020-08-07 卡斯柯信号有限公司 Device and method for autonomous access application and release of vehicle-mounted equipment
CN111731348A (en) * 2020-06-02 2020-10-02 通号城市轨道交通技术有限公司 Ground control method, device, equipment and storage medium based on resource management
CN111688765A (en) * 2020-06-04 2020-09-22 交控科技股份有限公司 Method and system for locking safety path for vehicle-to-vehicle communication and TMC
CN111605585A (en) * 2020-06-08 2020-09-01 中车青岛四方机车车辆股份有限公司 Train control method and device, rail train and train control system
CN114104042A (en) * 2020-08-31 2022-03-01 比亚迪股份有限公司 Train route management method, equipment and storage medium
CN114104042B (en) * 2020-08-31 2023-03-14 比亚迪股份有限公司 Train route management method, equipment and storage medium
CN112141176A (en) * 2020-09-30 2020-12-29 青岛海信微联信号有限公司 Mobile equipment searching method and equipment
CN112590866A (en) * 2020-12-28 2021-04-02 卡斯柯信号有限公司 Method and system for managing obstacle avoidance area of train line
CN112590866B (en) * 2020-12-28 2022-07-26 卡斯柯信号有限公司 Method and system for managing obstacle avoidance area of train line
CN112977554B (en) * 2021-03-11 2022-07-15 卡斯柯信号有限公司 Rail transit resource processing method and system based on portable safety terminal
CN112977554A (en) * 2021-03-11 2021-06-18 卡斯柯信号有限公司 Rail transit resource processing method and system based on portable safety terminal
CN113044082A (en) * 2021-04-16 2021-06-29 卡斯柯信号有限公司 Resource management method for TACS (terminal-to-terminal communication System)
CN113548096A (en) * 2021-07-28 2021-10-26 通号城市轨道交通技术有限公司 Turnout side-impact area protection method and system
CN114312932B (en) * 2021-12-13 2023-09-08 卡斯柯信号有限公司 Deadlock prevention method, device, equipment and medium of TACS system
CN114312932A (en) * 2021-12-13 2022-04-12 卡斯柯信号有限公司 Anti-deadlock method, device, equipment and medium for TACS system
WO2023109495A1 (en) * 2021-12-13 2023-06-22 卡斯柯信号有限公司 Anti-deadlock method and apparatus for tacs, and device and medium
CN114291140B (en) * 2021-12-27 2023-08-29 卡斯柯信号有限公司 Method, equipment and medium for processing turnout resource conflict of TACS (traffic control system)
CN114291140A (en) * 2021-12-27 2022-04-08 卡斯柯信号有限公司 Method, equipment and medium for processing turnout resource conflict of TACS (railway switching System)
CN114802365A (en) * 2022-04-02 2022-07-29 浙江众合科技股份有限公司 Train energy consumption control method based on multi-train cooperation
CN115257864A (en) * 2022-07-25 2022-11-01 卡斯柯信号有限公司 Train control system and method for vehicle-to-vehicle communication
CN115320681A (en) * 2022-09-19 2022-11-11 青岛地铁集团有限公司 Resource management method and device based on train
CN116946219A (en) * 2023-09-19 2023-10-27 湖南中车时代通信信号有限公司 Train driving path resource application method, allocation management method, device and medium
CN116946219B (en) * 2023-09-19 2024-01-30 湖南中车时代通信信号有限公司 Train driving path resource application method, allocation management method, device and medium

Also Published As

Publication number Publication date
CN109878556B (en) 2021-06-08

Similar Documents

Publication Publication Date Title
CN109878556A (en) A kind of management method and device of rail traffic resource
CN109080667B (en) Train moving authorization method based on vehicle-vehicle cooperation
US20210253150A1 (en) Method & apparatus for autonomous train control system
CN109664923B (en) Urban rail transit train control system based on vehicle-vehicle communication
CN110104031A (en) A kind of train control system degradation management system based on truck traffic
CN113320575B (en) TACS system supporting backup vehicle control mode and manual fault handling mode
CN111776013A (en) Train autonomous control system and method based on vehicle-to-vehicle communication
CN102225695B (en) Train class conversion method and related device
CN103764481A (en) Control of automatic guided vehicles without wayside interlocking
CN111497896B (en) Management method of rail transit turnout resources
CN114312932B (en) Deadlock prevention method, device, equipment and medium of TACS system
CN112960018A (en) Urban rail transit fusion signal system and use method
CN107571889A (en) A kind of line resource controller
CN111232022A (en) Trackside resource management method combined with train identity information
CN109625029A (en) A kind of Train Group control method out of the station and system
JP2019527886A (en) Vehicle external communication method and apparatus, and terminal
CN114194260A (en) TACS and TBTC fused signal system and switching method thereof
CN113479241A (en) Method for train side impact protection and train control system
CN115257864A (en) Train control system and method for vehicle-to-vehicle communication
US7578485B1 (en) Method for reducing data in railway operation
WO2024125212A1 (en) Protection method and apparatus for derailment between adjacent trackside resource managers, device and medium
CN104149821A (en) Method and device of active interval protection between trains for train operation control system
Chen et al. Architecture design of a novel train-centric CBTC system
CN114291140B (en) Method, equipment and medium for processing turnout resource conflict of TACS (traffic control system)
CN114524000B (en) Autonomous resource management method under virtual concatenation and decompression scene

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant