CN109870363A - A kind of pressure-measuring method and pressure testing system - Google Patents

A kind of pressure-measuring method and pressure testing system Download PDF

Info

Publication number
CN109870363A
CN109870363A CN201910101651.2A CN201910101651A CN109870363A CN 109870363 A CN109870363 A CN 109870363A CN 201910101651 A CN201910101651 A CN 201910101651A CN 109870363 A CN109870363 A CN 109870363A
Authority
CN
China
Prior art keywords
pressure
pressure testing
valve
testing system
defeated pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910101651.2A
Other languages
Chinese (zh)
Other versions
CN109870363B (en
Inventor
张贤秋
荣德夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING RUILIBI GAS EQUIPMENT Co Ltd
Original Assignee
CHONGQING RUILIBI GAS EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING RUILIBI GAS EQUIPMENT Co Ltd filed Critical CHONGQING RUILIBI GAS EQUIPMENT Co Ltd
Priority to CN201910101651.2A priority Critical patent/CN109870363B/en
Publication of CN109870363A publication Critical patent/CN109870363A/en
Application granted granted Critical
Publication of CN109870363B publication Critical patent/CN109870363B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Measuring Fluid Pressure (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a kind of pressure-measuring method and pressure testing systems, it is characterized by: at least 2 groups of testboards are arranged in pressure testing system, the testboard is connected with the defeated pipeline of at least two point, the valve of described point of defeated pipeline setting regulating gas admission pressure, to realize the pressure testing simultaneously under the conditions of different pressure values of at least two pressure testing part.The present invention improves testing efficiency, and previous single test pattern has been become composite mode, the service life of test macro components has further been extended, while reducing labour expenditure, reduces costs, also have better economic benefit.

Description

A kind of pressure-measuring method and pressure testing system
Technical field
The present invention relates to machinery fields, specifically, being related to a kind of pressure-measuring method and pressure testing system.
Background technique
As the improvement of people's living standards, pipe gas is more more and more universal in urban life, since combustion gas is conveying Pressure in pipeline is larger, and only needs the combustion gas of lower pressure when use in daily life, production, in conveyance conduit and user Between need to carry out combustion gas pressure regulation, meanwhile, in order to ensure user's gas safety, also need the cutting gas of results of regular determination pressure regulating box Pressure.Since the test of pressure regulating box cut-out pressure needs to close pressure regulating box exits and entrances valve, the testing time is too long to will affect downstream user Just common gas.
Conventional test device can only measure the cut-out pressure or outlet pressure of a device each time, in batch metaplasia Today of production, it is clear that it is comparatively laborious in this test mode, and the failure for easily causing equipment part is frequently changed, therefore Need to provide a kind of method and pressure testing system for improving testing efficiency.
Summary of the invention
In view of this, an object of the present invention is to provide a kind of pressure-measuring method, have improve test outlet pressure or The advantages of efficiency of person's cut-out pressure, the second purpose provide a kind of pressure testing to work using pressure-measuring method proposed by the present invention System.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of pressure-measuring method, is arranged at least 2 groups of testboards in pressure testing system, and the testboard is connected at least two point Defeated pipeline, the valve of described point of defeated pipeline setting regulating gas admission pressure, to realize at least two pressure testing part in different pressure Pressure testing simultaneously under the conditions of value.
A kind of pressure testing system, including main pipeline and with the concatenated admission line group of the main pipeline, further include with it is described into The concatenated at least 2 groups of testboards of feed channel group, the testboard are connected with pressure testing device I and pressure testing device II, the pressure testing dress It sets I and is connected to by point defeated pipeline group with the admission line, described point of defeated pipeline group includes at least two point defeated pipeline in parallel, Described point of defeated pipeline setting has the valve group for adjusting admission pressure function, and the pressure testing device II and the admission line group connect It is logical;
Further, the testboard includes the clamping device that vertical direction is sequentially arranged and the undertaking for placing test block Platform, the adapting table setting are connected to the channel that the test block is connected to pressure testing device I and pressure testing device II;
Further, the pressure testing device I includes device for pressure measurement I, flowmeter and the filter being sequentially communicated;
Further, the pressure testing device II includes the regulating valve being sequentially communicated, pressure release portion and device for pressure measurement II;
Further, the clamping device includes the hydraulic cylinder and support parts being fixedly connected, and the support parts are in top end opening Construction, and limiting section is arranged in open end;
Further, the pressure release portion includes the pressure release mouth and blow valve being connected in series;
Further, the both ends setting valve body I of the regulating valve and valve body I, the device for pressure measurement I are spring-tube pressure Measuring device, the device for pressure measurement II are U-tube manometer, and the flow is calculated as ultrasonic flowmeter or turbine flow Meter;
Further, valve body III is arranged in the admission line end, and the adapting table is filled by connecting pipe and the pressure testing Set II connection;
Further, the valve body I, valve body II and valve body III are ball valve.
The beneficial effects of the present invention are:
Testing efficiency is improved, previous single test pattern has been become into composite mode, further extends test system The service life of system components, while reducing labour expenditure, it reduces costs, also has better economic benefit.
Other advantages, target and feature of the invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.Target and other advantages of the invention can be wanted by following specification and right Book is sought to be achieved and obtained.
Detailed description of the invention
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention make into The detailed description of one step, in which:
Attached drawing 1 is structural schematic diagram of the embodiment of the present invention;
Attached drawing 2 is pressure testing device I structural schematic diagram;
Attached drawing 3 is pressure testing device II structural schematic diagram;
Attached drawing 4 is the defeated pipeline I of the present embodiment point and point defeated II schematic diagram of pipeline;
Attached drawing 5 is the present embodiment clamping device structural schematic diagram;
Attached drawing 6 is the present embodiment main pipeline and admission line group schematic diagram.
Specific embodiment
Hereinafter reference will be made to the drawings, and a preferred embodiment of the present invention will be described in detail.It should be appreciated that preferred embodiment Only for illustrating the present invention, rather than limiting the scope of protection of the present invention.
The present invention provides a kind of pressure-measuring methods, specifically, at least 2 groups of testboards, the survey are arranged in pressure testing system Test stand is connected with the defeated pipeline of at least two point, the valve of described point of defeated pipeline setting regulating gas admission pressure, to realize at least 2 The pressure testing simultaneously under the conditions of different pressure values of a pressure testing part.This method, which has, improves testing efficiency, by previous single survey The advantages of die trial formula has become composite mode, further extends the service life of test macro components.
The present invention provides a kind of pressure testing system as shown in figs. 1 and 6, including main pipeline 8 and with main pipeline 8 it is concatenated into Feed channel group 1, further include with 1 concatenated 3 group of testboard 5 of admission line group, admission line group 1 includes in parallel in the present embodiment Admission line I 11 and admission line II 12, testboard 5 are connected with pressure testing device I3 and pressure testing device II4, and pressure testing device I3 is logical Excessively defeated pipeline group I2 is connected to admission line I 11, and point defeated pipeline group I2 includes 2 point defeated pipelines in parallel, and a point defeated pipeline is set The valve group with adjusting admission pressure is set, pressure testing device II4 is connected to the admission line I 1.As shown in figure 4, this implementation The admission pressure set in example with point defeated pipeline I21 plug valve I23 connecting is 0.2MPa, with the rotation for dividing defeated pipeline II22 to connect The admission pressure that plug valve II24 is set is 0.45MPa, the air inlet pressure for the plug valve III26 setting connecting with admission line II 12 Power is 0.05MPa.
As a further improvement, testboard 5 includes the clamping device 51 that vertical direction is sequentially arranged and tests for placing The adapting table of part, adapting table setting are connected to the channel that the test block is connected to pressure testing device I3 and pressure testing device II4.Such as Fig. 5 Shown, clamping device 51 includes the hydraulic cylinder 511 and support parts 512 being fixedly connected, and support parts 512 are constructed in top end opening, and Limiting section is arranged in open end.Pressure testing part is placed on adapting table, start clamping device 51, then hydraulic cylinder 511 with adapting table to Upper propulsion abuts pressure testing part with the limiting section of support parts 521, plays fixed effect, and adapting table passes through connecting pipe 6 and examination Pressure device II4 connection.
As a further improvement, as shown in Fig. 2, pressure testing device I3 includes device for pressure measurement I31, the flow being sequentially communicated Meter 32, filter 33 and device for pressure measurement II41.
As a further improvement, as shown in figure 3, pressure testing device II4 includes the regulating valve 43 being sequentially communicated, pressure release portion and pressure Force measuring device II41.
As a further improvement, pressure release portion includes the pressure release mouth 46 and blow valve 42 being connected in series, pressure release mouth 46 is for delaying Slow pressure release, and can control pressure release speed, the effect of blow valve 42 is to beat blow valve 42 manually when gas pressure is excessively high It opens, plays the role of safeguard protection.
As a further improvement, the both ends setting valve body I44 and valve body II 45 of regulating valve, device for pressure measurement I31 are bullet Reed pipe pressure gauge, device for pressure measurement II41 are U-tube manometer, and flowmeter 32 is ultrasonic flowmeter or turbine flowmeter. Valve body I44, valve body II 45 and valve body III 7 are ball valve, and ball valve is preferable for standard-sized sheet or the state closed entirely, leakproofness.
As a further improvement, valve body III 7 is arranged in 1 end of admission line.
Test the process of the outlet pressure of pressure testing part are as follows:
Plug valve I23, cut-out tap valve II24 and plug valve III26 are opened, device for pressure measurement II41 (U-shaped pressure is read Power meter) degree.
Test the process of the cut-out pressure of pressure testing part are as follows:
Cut-out tap valve I23, plug valve II24 and plug valve III26, valve body II 45 are normally open, slowly open valve body I44 after valve body I44 standard-sized sheet, slowly opens regulating valve 43, until the stop valve of pressure testing part is opened, reads device for pressure measurement II41 reading.
Flow closes pressure test process are as follows:
Plug valve I23 is opened, cut-out tap valve II24, plug valve III26 and blow valve 42 record measuring device II41 Readings, readings at this time are that test block closes pressure, gradually open blow valve 42, observe the variation of flow, and record every group of stream Outlet pressure under amount, until maximum stream flow of the test block under this group of inlet pressure.Switch admission pressure value, that is, closes rotation Plug valve I23 and plug valve III26 opens plug valve II24 or cut-out tap valve I23 and plug valve II24, opens plug valve III26, process are same as above.
The cut-out pressure, outlet pressure and flow that pressure testing part is tested in the present embodiment, which close pressure, to carry out simultaneously.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of the technical program, should all be covered in the present invention Scope of the claims in.

Claims (10)

1. a kind of pressure-measuring method, it is characterised in that: at least 2 groups of testboards, the testboard are arranged in pressure testing system and is connected with The defeated pipeline of at least two point, the valve of described point of defeated pipeline setting regulating gas admission pressure, to realize that at least two pressure testing part exists Pressure testing simultaneously under the conditions of different pressure values.
2. a kind of pressure testing system, including main pipeline and with the concatenated admission line group of the main pipeline, it is characterised in that: further include With the concatenated at least 2 groups of testboards of the admission line group, the testboard is connected with pressure testing device I and pressure testing device II, institute It states pressure testing device I and is connected to by point defeated pipeline group I with the admission line group, described point of defeated pipeline group I includes at least two parallel connection Point defeated pipeline, described point of defeated pipeline setting have a valve group for adjusting admission pressure function, the pressure testing device II with it is described The connection of admission line group.
3. according to right want 2 described in a kind of pressure testing system, it is characterised in that: the testboard includes that vertical direction is sequentially arranged Clamping device and adapting table for placing test block, the adapting table setting be connected to the test block and the pressure testing device The channel of I and pressure testing device II.
4. according to right want 2 described in a kind of pressure testing system, it is characterised in that: the pressure testing device I includes the pressure being sequentially communicated Force measuring device I, flowmeter, filter and device for pressure measurement II.
5. according to right want 2 described in a kind of pressure testing system, it is characterised in that: the pressure testing device II includes the tune being sequentially communicated Save valve, pressure release portion and device for pressure measurement II.
6. a kind of pressure testing system according to claim 3, it is characterised in that: the clamping device includes the liquid being fixedly connected Cylinder pressure and support parts, the support parts are constructed in top end opening, and limiting section is arranged in open end.
7. a kind of pressure testing system according to claim 5, it is characterised in that: the pressure release portion includes the pressure release being connected in series Mouth and blow valve.
8. a kind of pressure testing system according to claim 5, it is characterised in that: the both ends of regulating valve setting valve body I and Valve body I, the device for pressure measurement I are bourdon gauges, and the device for pressure measurement II is U-tube manometer, the flow It is calculated as ultrasonic flowmeter or turbine flowmeter.
9. according to a kind of any pressure testing system of claim 2 and 3, it is characterised in that: valve is arranged in the main pipeline end Body III, the adapting table are connect by connecting pipe with the pressure testing device II.
10. according to a kind of any pressure testing system of claim 8 and 9, it is characterised in that: the valve body I, valve body II and valve Body III is ball valve.
CN201910101651.2A 2019-01-30 2019-01-30 Pressure testing method and system Active CN109870363B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910101651.2A CN109870363B (en) 2019-01-30 2019-01-30 Pressure testing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910101651.2A CN109870363B (en) 2019-01-30 2019-01-30 Pressure testing method and system

Publications (2)

Publication Number Publication Date
CN109870363A true CN109870363A (en) 2019-06-11
CN109870363B CN109870363B (en) 2021-10-29

Family

ID=66918510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910101651.2A Active CN109870363B (en) 2019-01-30 2019-01-30 Pressure testing method and system

Country Status (1)

Country Link
CN (1) CN109870363B (en)

Citations (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004360714A (en) * 2003-06-02 2004-12-24 Tatsuno Corp Gas filling device
CN101086466A (en) * 2007-06-13 2007-12-12 袁玉英 Static characteristic detection system of voltage regulator
CN101266187A (en) * 2008-05-07 2008-09-17 常州市科信燃气设备有限公司 Gas pressure regulator test device
CN201173841Y (en) * 2008-03-28 2008-12-31 博益(天津)气动技术研究所有限公司 Liquid petroleum gas regulator automatic test equipment
CN102155621A (en) * 2011-01-14 2011-08-17 上海万事红燃气技术发展有限公司 Medium pressure regulating box in compressed natural gas supplying station and pressure regulating and gas supplying method thereof
CN202442114U (en) * 2012-02-21 2012-09-19 郑州郑燃调压控制技术有限公司 Pressure regulating box detection device
CN102706726A (en) * 2012-04-24 2012-10-03 清华大学 Force-electricity coupling dynamic fracture experimental system
CN103091160A (en) * 2013-02-27 2013-05-08 辽宁省水利水电勘测设计研究院 Geotechnical compression test hydraulic system and testing method
CN203037477U (en) * 2012-12-29 2013-07-03 成都伦慈仪表有限公司 Static characteristic detection system of gas pressure regulator
CN203037428U (en) * 2012-12-29 2013-07-03 成都伦慈仪表有限公司 Auxiliary tooling used for realizing integration of pressure regulator assembling, debugging and detection
CN203404475U (en) * 2013-08-01 2014-01-22 郑州郑燃调压控制技术有限公司 Stop valve and reversing device and pressure adjusting system which use stop valve
CN203549406U (en) * 2013-11-20 2014-04-16 重庆市正华钻采设备有限公司 Fuel gas pressure regulating metering skid-mounted device for petroleum and gas
CN103776640A (en) * 2012-10-26 2014-05-07 西安信唯信息科技有限公司 Combination property test system of fuel gas pressure regulating device
CN204328479U (en) * 2014-11-20 2015-05-13 天津华迈燃气装备股份有限公司 A kind of Gas Pressure Regulating Equipment adopting the uninterrupted air feed of monitoring guarantee in parallel
CN204328486U (en) * 2014-09-28 2015-05-13 中国海洋石油总公司 The pressure testing device of LNG pipeline
CN104865983A (en) * 2015-03-19 2015-08-26 上海航天能源股份有限公司 Fuel gas transmission and distribution intelligent pressure regulating station and control method thereof
CN205175682U (en) * 2015-12-07 2016-04-20 成都伦慈仪表有限公司 Gas cut -off valve debugs frock
US20160153371A1 (en) * 2016-02-09 2016-06-02 Caterpillar Inc. Gas regulator for a multi-fuel engine and method of operating same
CN205483784U (en) * 2016-02-18 2016-08-17 武汉地长能源装备有限公司 Low pressure is diffused and is cut off pressure boost detector
CN105910842A (en) * 2016-06-30 2016-08-31 重庆市山城燃气设备有限公司 Whole-performance detection system of gas pressure regulator
CN205785283U (en) * 2016-06-30 2016-12-07 重庆市山城燃气设备有限公司 There is the gas pressure regulator, governor detecting system of multiple pressure stage
CN206054752U (en) * 2016-09-23 2017-03-29 嘉兴依相动力科技有限公司 A kind of natural gas used for automobile decompressor
CN106594341A (en) * 2017-01-23 2017-04-26 森格斯输配设备(宁波)有限公司 Pressure regulator of structure with adjustable lever ratio
CN206192642U (en) * 2016-10-31 2017-05-24 广州新奥燃气有限公司 Pressure regulating box is with cutting off pressure test device
CN206478446U (en) * 2016-08-04 2017-09-08 沈阳洪生气体有限公司 Pressure device of air in oxygen nitrogen and argon gas
CN206530812U (en) * 2017-03-02 2017-09-29 广州从化中燃城市燃气发展有限公司 A kind of gas pipe pressure end pressure regulation pressure tester
CN206990146U (en) * 2017-07-14 2018-02-09 中国葛洲坝集团电力有限责任公司 A kind of fuel gas pressure-regulating box pressure tester of portable multi-function
CN107782400A (en) * 2016-08-31 2018-03-09 重庆瑞力比燃气设备有限责任公司 Gas pressure adjusting metering cabinet
CN107782393A (en) * 2016-08-29 2018-03-09 重庆瑞力比燃气设备有限责任公司 A kind of gas meter, flow meter that can be remotely controlled monitoring gas flow
CN107957376A (en) * 2017-12-20 2018-04-24 长江水利委员会长江科学院 A kind of microcomputer electric gas/liquid pressure servo joint control field rock-soil mechanics experimental rig and method
CN108119757A (en) * 2017-11-30 2018-06-05 北京市燃气集团有限责任公司 A kind of implementation method being monitored to gas pressure regulator, governor state
CN108333050A (en) * 2017-12-29 2018-07-27 中国海洋石油集团有限公司 The secondary hydraulic fracturing test method of coal petrography under a kind of true triaxial state
CN207796560U (en) * 2017-12-20 2018-08-31 北京市燃气集团有限责任公司 Gas pressure regulator, governor diagnoses case
CN207865034U (en) * 2018-01-22 2018-09-14 北京东方通捷燃气有限责任公司 A kind of gas pressure regulating system
CN208026562U (en) * 2018-02-07 2018-10-30 常州进出口工业及消费品安全检测中心 A kind of high-accuracy hydraulic dynamometer
CN108801773A (en) * 2018-04-29 2018-11-13 长庆石油勘探局技术监测中心 The online pilot system of special-shaped valve pressure and test method
CN108869263A (en) * 2018-05-09 2018-11-23 中国人民解放军空军工程大学 Aircraft fuel pump comprehensive performance degradation experiment platform
CN108980624A (en) * 2018-08-10 2018-12-11 王巨锋 A kind of fuel gas pressure-regulating box cut-out pressure measuring device
US10180119B2 (en) * 2015-07-31 2019-01-15 The Hydrogen Group, Inc. System and method of improving fuel efficiency in vehicles using HHO
CN109253395A (en) * 2018-11-15 2019-01-22 特瑞斯能源装备股份有限公司 A kind of high leakproofness underground voltage regulating station

Patent Citations (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004360714A (en) * 2003-06-02 2004-12-24 Tatsuno Corp Gas filling device
CN101086466A (en) * 2007-06-13 2007-12-12 袁玉英 Static characteristic detection system of voltage regulator
CN201173841Y (en) * 2008-03-28 2008-12-31 博益(天津)气动技术研究所有限公司 Liquid petroleum gas regulator automatic test equipment
CN101266187A (en) * 2008-05-07 2008-09-17 常州市科信燃气设备有限公司 Gas pressure regulator test device
CN102155621A (en) * 2011-01-14 2011-08-17 上海万事红燃气技术发展有限公司 Medium pressure regulating box in compressed natural gas supplying station and pressure regulating and gas supplying method thereof
CN202442114U (en) * 2012-02-21 2012-09-19 郑州郑燃调压控制技术有限公司 Pressure regulating box detection device
CN102706726A (en) * 2012-04-24 2012-10-03 清华大学 Force-electricity coupling dynamic fracture experimental system
CN103776640A (en) * 2012-10-26 2014-05-07 西安信唯信息科技有限公司 Combination property test system of fuel gas pressure regulating device
CN203037477U (en) * 2012-12-29 2013-07-03 成都伦慈仪表有限公司 Static characteristic detection system of gas pressure regulator
CN203037428U (en) * 2012-12-29 2013-07-03 成都伦慈仪表有限公司 Auxiliary tooling used for realizing integration of pressure regulator assembling, debugging and detection
CN103091160A (en) * 2013-02-27 2013-05-08 辽宁省水利水电勘测设计研究院 Geotechnical compression test hydraulic system and testing method
CN203404475U (en) * 2013-08-01 2014-01-22 郑州郑燃调压控制技术有限公司 Stop valve and reversing device and pressure adjusting system which use stop valve
CN203549406U (en) * 2013-11-20 2014-04-16 重庆市正华钻采设备有限公司 Fuel gas pressure regulating metering skid-mounted device for petroleum and gas
CN204328486U (en) * 2014-09-28 2015-05-13 中国海洋石油总公司 The pressure testing device of LNG pipeline
CN204328479U (en) * 2014-11-20 2015-05-13 天津华迈燃气装备股份有限公司 A kind of Gas Pressure Regulating Equipment adopting the uninterrupted air feed of monitoring guarantee in parallel
CN104865983A (en) * 2015-03-19 2015-08-26 上海航天能源股份有限公司 Fuel gas transmission and distribution intelligent pressure regulating station and control method thereof
US10180119B2 (en) * 2015-07-31 2019-01-15 The Hydrogen Group, Inc. System and method of improving fuel efficiency in vehicles using HHO
CN205175682U (en) * 2015-12-07 2016-04-20 成都伦慈仪表有限公司 Gas cut -off valve debugs frock
US20160153371A1 (en) * 2016-02-09 2016-06-02 Caterpillar Inc. Gas regulator for a multi-fuel engine and method of operating same
CN205483784U (en) * 2016-02-18 2016-08-17 武汉地长能源装备有限公司 Low pressure is diffused and is cut off pressure boost detector
CN205785283U (en) * 2016-06-30 2016-12-07 重庆市山城燃气设备有限公司 There is the gas pressure regulator, governor detecting system of multiple pressure stage
CN105910842A (en) * 2016-06-30 2016-08-31 重庆市山城燃气设备有限公司 Whole-performance detection system of gas pressure regulator
CN206478446U (en) * 2016-08-04 2017-09-08 沈阳洪生气体有限公司 Pressure device of air in oxygen nitrogen and argon gas
CN107782393A (en) * 2016-08-29 2018-03-09 重庆瑞力比燃气设备有限责任公司 A kind of gas meter, flow meter that can be remotely controlled monitoring gas flow
CN107782400A (en) * 2016-08-31 2018-03-09 重庆瑞力比燃气设备有限责任公司 Gas pressure adjusting metering cabinet
CN206054752U (en) * 2016-09-23 2017-03-29 嘉兴依相动力科技有限公司 A kind of natural gas used for automobile decompressor
CN206192642U (en) * 2016-10-31 2017-05-24 广州新奥燃气有限公司 Pressure regulating box is with cutting off pressure test device
CN106594341A (en) * 2017-01-23 2017-04-26 森格斯输配设备(宁波)有限公司 Pressure regulator of structure with adjustable lever ratio
CN206530812U (en) * 2017-03-02 2017-09-29 广州从化中燃城市燃气发展有限公司 A kind of gas pipe pressure end pressure regulation pressure tester
CN206990146U (en) * 2017-07-14 2018-02-09 中国葛洲坝集团电力有限责任公司 A kind of fuel gas pressure-regulating box pressure tester of portable multi-function
CN108119757A (en) * 2017-11-30 2018-06-05 北京市燃气集团有限责任公司 A kind of implementation method being monitored to gas pressure regulator, governor state
CN107957376A (en) * 2017-12-20 2018-04-24 长江水利委员会长江科学院 A kind of microcomputer electric gas/liquid pressure servo joint control field rock-soil mechanics experimental rig and method
CN207796560U (en) * 2017-12-20 2018-08-31 北京市燃气集团有限责任公司 Gas pressure regulator, governor diagnoses case
CN108333050A (en) * 2017-12-29 2018-07-27 中国海洋石油集团有限公司 The secondary hydraulic fracturing test method of coal petrography under a kind of true triaxial state
CN207865034U (en) * 2018-01-22 2018-09-14 北京东方通捷燃气有限责任公司 A kind of gas pressure regulating system
CN208026562U (en) * 2018-02-07 2018-10-30 常州进出口工业及消费品安全检测中心 A kind of high-accuracy hydraulic dynamometer
CN108801773A (en) * 2018-04-29 2018-11-13 长庆石油勘探局技术监测中心 The online pilot system of special-shaped valve pressure and test method
CN108869263A (en) * 2018-05-09 2018-11-23 中国人民解放军空军工程大学 Aircraft fuel pump comprehensive performance degradation experiment platform
CN108980624A (en) * 2018-08-10 2018-12-11 王巨锋 A kind of fuel gas pressure-regulating box cut-out pressure measuring device
CN109253395A (en) * 2018-11-15 2019-01-22 特瑞斯能源装备股份有限公司 A kind of high leakproofness underground voltage regulating station

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吕佐周: "《燃气工程》", 30 September 1999 *
宋辉 等: "天然气站场中的压力流量控制", 《山西建筑》 *
纪颖 等: "燃气调压器的应用研究", 《齐齐哈尔大学学报》 *

Also Published As

Publication number Publication date
CN109870363B (en) 2021-10-29

Similar Documents

Publication Publication Date Title
CN204085645U (en) With the gas flow standard device of self calibration structure
CN206440441U (en) A kind of differential pressure type air leakage tester
CN105445007B (en) A kind of gas turbine gaseous fuel control valve Flow characteristic test system and method
CN106872155B (en) exhaust valve performance test system and test method
CN102494841A (en) Pressure sensor calibration system
CN106643942A (en) Aero-engine turbine blade air mass flow testing device
CN106935125A (en) Fluid flow resistance and flow measurement self assembly experimental provision and its application method
CN209069746U (en) A kind of high precision low pressure hydraulic pressure test platform
CN111595574A (en) Efficient pressure regulating box test board and test method thereof
CN109870363A (en) A kind of pressure-measuring method and pressure testing system
CN208239024U (en) A kind of airtight detecting apparatus
CN213363969U (en) Two-temperature-state composite critical flow gas flow detection device
CN109975500A (en) Recirculated water on-line detecting system
CN116104750B (en) Method and device for testing flow lift of water pump
CN1188671C (en) Gas flow standardizing devices
CN110567674A (en) device and method for testing flow resistance characteristics of fins of plate-fin heat exchanger
CN208816306U (en) TVC sprays pump test device
CN205719551U (en) A kind of big flux gas sources system
CN108953204A (en) Pipeline compressor performance test method and system
CN208950840U (en) A kind of medium volume flow regulator pumped at class products export
RU2571303C1 (en) Test plant for flow meters-gas counters
CN208043404U (en) A kind of gas pipeline is by external pressure flow tester
CN207675754U (en) Recirculated water on-line detecting system
CN209181885U (en) A kind of calibration equipment based on nuclear power plant's penetration piece test flow
CN208579154U (en) Experimental device for measuring leakage characteristics of gas pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 402460 No.1 Avenue, Guangfu Industrial Park, Rongchang District, Chongqing

Applicant after: Chongqing ruilibi Gas Equipment Co.,Ltd.

Address before: 402460 No.1 Avenue, Guangfu Industrial Park, Rongchang District, Chongqing

Applicant before: CHONGQING RUILIBI GAS EQUIPMENT Co.,Ltd.

GR01 Patent grant