CN109853820A - A kind of furred ceiling and its installation method based on BIM - Google Patents

A kind of furred ceiling and its installation method based on BIM Download PDF

Info

Publication number
CN109853820A
CN109853820A CN201910059316.0A CN201910059316A CN109853820A CN 109853820 A CN109853820 A CN 109853820A CN 201910059316 A CN201910059316 A CN 201910059316A CN 109853820 A CN109853820 A CN 109853820A
Authority
CN
China
Prior art keywords
mounting rod
installing pipe
ceiling board
furred ceiling
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910059316.0A
Other languages
Chinese (zh)
Inventor
郭江波
李煜
谢建琳
邹琼仪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen City Architectural Design Co Cooper
Original Assignee
Shenzhen City Architectural Design Co Cooper
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen City Architectural Design Co Cooper filed Critical Shenzhen City Architectural Design Co Cooper
Priority to CN201910059316.0A priority Critical patent/CN109853820A/en
Publication of CN109853820A publication Critical patent/CN109853820A/en
Pending legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses a kind of furred ceiling and its installation method based on BIM, is related to field of house buildings.The furred ceiling includes keel and ceiling board, and the surrounding of the upper surface of ceiling board is vertically arranged with mounting rod, and the lower end of keel is provided with the installing pipe for mounting rod grafting, and sticking department is provided on mounting rod, and sticking department is used to mounting rod being fixed on installing pipe.The present invention has the following advantages and effects: by utilizing the mounting means being plugged and fixed, instead of traditional glue bonding or rivet, so that the installation process of ceiling board is more easy and convenient, ceiling board is lifted always without worker, to significantly reduce the labor intensity of worker, achieve the effect that convenience is installed and used.

Description

A kind of furred ceiling and its installation method based on BIM
Technical field
The present invention relates to field of house buildings, in particular to a kind of furred ceiling and its installation method based on BIM.
Background technique
Furred ceiling refers to that a kind of decoration of the top finishing of house living environment briefly just refers to the decoration of ceiling, It is one of the pith of interior decoration.
Traditional furred ceiling needs first to install keel on roof when installing and using, and then needs manually to lift always and hang Top plate recycles glue or rivet that ceiling board is fixed on keel.It is very inconvenient so as to cause the installation process of furred ceiling, need It improves.
Summary of the invention
The object of the present invention is to provide a kind of furred ceiling and its installation method based on BIM has the effect conveniently installed and used Fruit.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of furred ceiling based on BIM, packet Keel and ceiling board are included, the surrounding of the upper surface of the ceiling board is vertically arranged with mounting rod, and the lower end of the keel is set It is equipped with the installing pipe for the mounting rod grafting, sticking department is provided on the mounting rod, the sticking department is used for the peace Dress bar is fixed on the installing pipe.
By using above-mentioned technical proposal, when installing above-mentioned furred ceiling, keel are fixed on roof first with bolt, and So that one end with installing pipe is downward.Then ceiling board is held up, after so that the mounting rod on ceiling board is directed at installing pipe, is pushed Ceiling board moves upwards, while mounting rod grafting installing pipe.Until the complete grafting installing pipe of mounting rod, and the lower end surface of installing pipe Behind the upper surface for contradicting ceiling board, mounting rod is fixed in installing pipe using sticking department, to realize the installation of ceiling board.Most After all ceiling boards are installed again afterwards, the installation of entire furred ceiling is completed.To utilize the mounting means being plugged and fixed, instead of Traditional glue bonding or rivet are lifted always without worker and are hung so that the installation process of ceiling board is more easy and convenient Top plate has achieved the effect that convenience is installed and used to significantly reduce the labor intensity of worker.
The further setting of the present invention are as follows: the sticking department includes a pair of elastic fastening hook being set on the mounting rod, The inner wall of the installing pipe is provided with the card slot for elastic fastening hook upper end insertion.
By using above-mentioned technical proposal, when mounting rod grafting installing pipe, and when along the inner wall upward sliding of installing pipe, Mounting rod drives elastic fastening hook to move synchronously, and when the complete grafting installing pipe of mounting rod, the upper end of elastic fastening hook is just right Quasi- card slot, elastic fastening hook is automatically springed open and is embedded in card slot at this time, to realize the locking of sticking department.The structure letter of sticking department It is clean, and can automatically spring open, the fixation of mounting rod and installing pipe is realized, so that the installation process of ceiling board is lighter It is convenient.
The further setting of the present invention are as follows: the roof of the installing pipe is vertically arranged with wedge block, and the wedge block is by upper Setting is in gradually-reducing shape under, and for being embedded between a pair of of elastic fastening hook.
By using above-mentioned technical proposal, when a pair of of elastic fastening hook moves upwards, wedge block is gradually embedded a pair of of elasticity In gap between grab.And with the gradually movement of elastic fastening hook, under the action of wedge block, so that the two of elastic fastening hook End is gradually flared out, and compresses installation inside pipe wall.Until when in elastic fastening hook insertion card slot, using wedge block by elastic fastening hook Upper end be pressed in card slot, to increase the stability and firmness of elastic fastening hook, increase the stabilization of ceiling board Property.
The further setting of the present invention are as follows: the sticking department includes the first card for being set to the elasticity of the mounting rod side wall Tooth, the installation inside pipe wall are provided with the second latch, and the first latching tooth is mutually twisted with second latch;First card The mounting rod side wall is fixed in the side of tooth, and the other side is tilted down setting, and the inclined direction of second latch It is opposite with the inclined direction of the first latching tooth.
By using above-mentioned technical proposal, when mounting rod grafting installing pipe, and when along the inner wall upward sliding of installing pipe, Mounting rod drives first latching tooth to move synchronously, and the second latch presses first latching tooth and elastic deformation occurs.When mounting rod is complete When grafting installing pipe, first latching tooth is flicked and is mutually twisted with the second latch.Due to the inclination side of first latching tooth and the second latch To on the contrary, and first latching tooth be tilted down shape setting so that mounting rod can only upward sliding and be unable to slide downward, Ceiling board is contradicted further through installing pipe, limitation mounting rod continues up, and being locked for mounting rod is realized, to realize lock Determine the locking in portion.Sticking department it is simple for structure, and can lock automatically, so that the installation process of ceiling board is lighter It is convenient.
The further setting of the present invention are as follows: the bottom wall of the installing pipe is provided with the compression bullet contradicted for the mounting rod Spring.
By using above-mentioned technical proposal, when mounting rod is along installation inside pipe wall upward sliding, mounting rod presses compression Spring-compressed, when the complete grafting installing pipe of mounting rod, first latching tooth is mutually twisted with the second latch, at this time holddown spring itself Screen resilience apply downward active force to first latching tooth so that first latching tooth can be stronger is snapped at the second card Tooth.To increase the connective stability and firmness of mounting rod and installing pipe, the stabilization of ceiling board is further increased Property.
The further setting of the present invention are as follows: the holddown spring is taper, and is in gradually-reducing shape setting from top to bottom.
By using above-mentioned technical proposal, because volute spring can reduce compressing area, and volute spring is each The diameter of a pitch is all different, therefore can provide certain space for the flexible of itself, is prolonged its service life.
The further setting of the present invention are as follows: the surrounding outer wall of the ceiling board is provided with interconnected dovetail groove, and And the dovetail groove on the inconsistent side wall of the two neighboring ceiling board collectively forms limiting slot, sliding in the limiting slot It is plugged with positive stop strip.
By using above-mentioned technical proposal, when adjacent two pieces of ceiling boards after the installation is completed, the dovetail of two ceiling board side walls The notch position of slot aligns, and constitutes the limiting slot that a both ends are big, centre is small.Positive stop strip is taken out at this time and is embedded limited Position slot, two ceiling boards are linked together using positive stop strip, thus increase the connective stability between two ceiling boards with And firmness, extend the tightness and service life of entire furred ceiling.
It is a further object of the present invention to provide a kind of installation methods of furred ceiling based on BIM, with what is conveniently installed and used Effect.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of furred ceiling based on BIM Installation method has used above-mentioned furred ceiling, has included the following steps:
S1 installs keel, using bolt by keel installation on roof, and guarantees that the lower end of keel is in horizontality;
S2 installs ceiling board, the mounting rod on ceiling board is inserted into the installing pipe of keel lower end, and will be installed by sticking department Bar is fixed on installing pipe;
S3, ceiling board are fixed, and positive stop strip is inserted into limiting slot, realizes the fixation of ceiling board.
By using above-mentioned technical proposal, which is succinctly used, and work progress is convenient and efficient, so that The installation process of ceiling board is more easy and convenient, has achieved the effect that convenience is installed and used.
The further setting of the present invention are as follows: further include following steps:
S4, jointing inject gap filler in the gap between two neighboring ceiling board, then will with flexible cloth
The gap filler of gap and ceiling surface is cleaned.
By using above-mentioned technical proposal, after jointing is handled, the cohesive force between ceiling board can be improved and prevent Anti-cracking function is seeped, and influences the service life of ceiling board after can preventing hydrone from penetrating into furred ceiling back.And gap filler With certain flexibility, and then the slight shift of ceiling board can be resisted, prevent ceiling board from deforming or falling off, further extend The service life of ceiling board.
In conclusion the invention has the following advantages:
1. by using the mounting means being plugged and fixed, instead of traditional glue bonding or rivet, so that the peace of ceiling board Dress process is more easy and convenient, lifts ceiling board always without worker, to significantly reduce the labor intensity of worker, reaches The effect that convenience is installed and used is arrived;
2. it is succinct by setting structure, and sticking department that can be self-locking, realize the fixation of mounting rod and installing pipe, so that The installation process of ceiling board is more easy and convenient;
3. two ceiling boards are linked together, by the cooperation of setting positive stop strip and limiting slot to increase two furred ceilings Connective stability and firmness between plate extend the tightness and service life of entire furred ceiling;
4. realizing the installation of ceiling board by the way that succinct installation method is arranged, having achieved the effect that convenience is installed and used.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment 1;
Fig. 2 is the keel of embodiment 1 and the connection relationship diagram of ceiling board;
Fig. 3 is the connection relationship diagram of the ceiling board of embodiment 1;
Fig. 4 is the partial enlarged view at the A in Fig. 2 of embodiment 1;
Fig. 5 is the mounting rod of embodiment 2 and the connection relationship diagram of installing pipe.
Appended drawing reference: 1, keel;2, ceiling board;21, dovetail groove;22, limiting slot;23, positive stop strip;3, mounting rod;4, pacify Tubulature;41, card slot;42, wedge block;43, the second latch;44, holddown spring;5, sticking department;51, elastic fastening hook;52, the first card Tooth.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1: as shown in Figure 1 and Figure 2, a kind of furred ceiling based on BIM, including keel 1 and ceiling board 2.Ceiling board 2 Upper surface be provided with multiple mounting rods 3, multiple mounting rods 3 are distributed in the surrounding of ceiling board 2, and the lower end setting of keel 1 There is the installing pipe 4 for 3 grafting of mounting rod.Sticking department 5 is additionally provided on mounting rod 3, sticking department 5 is for mounting rod 3 to be fixed on Installing pipe 4.
When installing above-mentioned furred ceiling, keel 1 downward, and are fixed on by one end by keel 1 with installing pipe 4 using bolt On roof, while the lower end surface of keel 1 is smoothed, and using the lower end of horizontal ruler measurement keel 1, so that under keel 1 End is in horizontality.
Then ceiling board 2 is held up again, after so that the mounting rod 3 on ceiling board 2 is directed at installing pipe 4, pushes ceiling board 2 upward It moves, at this time 3 grafting installing pipe 4 of mounting rod, and along the inner wall upward sliding of installing pipe 4.
Until the complete grafting installing pipe 4 of mounting rod 3, and behind the upper surface of the lower end surface conflict ceiling board 2 of installing pipe 4, then Mounting rod 3 is fixed in installing pipe 4 using sticking department 5, realization mounting rod 3 is locked with installing pipe 4, hangs to realize The installation of top plate 2.
Finally other ceiling board 2 is taken out again, and after all ceiling boards 2 are installed one by one, be can be completed entire The installation of furred ceiling.And when all ceiling boards 2 install, the surrounding outer wall of ceiling board 2 is mutually contradicted.
As shown in figure 3, the surrounding outer wall of ceiling board 2 is provided with interconnected dovetail groove 21, and two neighboring hang Dovetail groove 21 on the inconsistent side wall of top plate 2 collectively forms limiting slot 22.The both ends of limiting slot 22 are big and intermediate small, and limit Sliding is plugged with positive stop strip 23 in the slot 22 of position, and the outer wall of positive stop strip 23 is pressed in the inner wall of limiting slot 22.
When installing two adjacent ceiling boards 2, the notch position of the dovetail groove 21 of two 2 side walls of ceiling board is opposite Standard, and constitute the limiting slot 22 that a both ends are big, centre is small.Positive stop strip 23 is inserted into limiting slot 22 at this time, and pushes limit Item 23 is along 22 inner wall slid inward of limiting slot, until realizing two neighboring hang after positive stop strip 23 is completely embedded into limiting slot 22 Top plate 2 is connected and fixed.
As shown in figure 4, sticking department 5 includes a pair of of elastic fastening hook 51, a pair of of elastic fastening hook 51 is set to 3 upper surface of mounting rod Two sides.The inner wall of installing pipe 4 is provided with the card slot 41 for the insertion of 51 upper end of elastic fastening hook, and roof is provided with wedge block 42.Wedge block 42 is in gradually-reducing shape setting from top to bottom, and for being embedded between a pair of of elastic fastening hook 51.
When 3 grafting installing pipe 4 of mounting rod, and when along the inner wall upward sliding of installing pipe 4, mounting rod 3 drives elastic card Hook 51 moves synchronously, while wedge block 42 is gradually embedded in the gap between a pair of of elastic fastening hook 51, and with elastic fastening hook The both ends of 51 gradually movement, the two sidewalls driving elastic fastening hook 51 of wedge block 42 are gradually flared out, and are compressed in installing pipe 4 Wall.
When 3 complete grafting installing pipe 4 of mounting rod, the upper end of elastic fastening hook 51 is narrowly focused towards card slot 41, at this time elastic card Hook 51 is automatically springed open and is embedded in card slot 41.Simultaneously under the action of wedge block 42, the upper end of elastic fastening hook 51 is pressed in card In slot 41, to realize the locking of sticking department 5, i.e. completion mounting rod 3 and installing pipe 4 is locked.
Embodiment 2: as shown in figure 5, a kind of furred ceiling based on BIM, the difference with embodiment are: sticking department 5 includes setting It is placed in the first latching tooth 52 of the elasticity of 3 side wall of mounting rod, 4 inner wall of installing pipe is provided with the second latch 43.The bottom wall of installing pipe 4 is also It is provided with the holddown spring 44 of taper, and holddown spring 44 is in gradually-reducing shape setting from top to bottom.
As shown in figure 5, in the present embodiment, 3 side wall of mounting rod is fixed in the side of first latching tooth 52, the other side it is inclined to Lower setting.4 inner wall of installing pipe is fixed in the side of second latch 43, and the other side is inclined to be set up, and first latching tooth 52 It is mutually twisted with the second latch 43.
When 3 grafting installing pipe 4 of mounting rod, and when along the inner wall upward sliding of installing pipe 4, the upper end of mounting rod 3 is pressed Holddown spring 44 compresses.At the same time, mounting rod 3 drives first latching tooth 52 to move synchronously, and the second latch 43 presses first Elastic deformation occurs for latch 52.
When 3 complete grafting installing pipe 4 of mounting rod, first latching tooth 52 is flicked and is mutually twisted with the second latch 43.At this time Ceiling board 2 is contradicted by installing pipe 4, limitation mounting rod 3 continues up, while utilizing the screen resilience of holddown spring 44 itself Apply downward active force to first latching tooth 52 so that first latching tooth 52 it is stronger be snapped at the second latch 43.To real The locking of existing sticking department 5, i.e. completion mounting rod 3 are locked with installing pipe 4.
Embodiment 3: a kind of installation method of the furred ceiling based on BIM has used above-mentioned furred ceiling, has included the following steps:
S1 is installed keel 1, keel 1 is installed on roof using bolt, and guarantee that the lower end of keel 1 is in horizontality;
S2 installs ceiling board 2, the mounting rod 3 on ceiling board 2 is inserted into the installing pipe 4 of 1 lower end of keel, and passes through sticking department 5 Mounting rod 3 is fixed on installing pipe 4;
S3, ceiling board 2 is fixed, and positive stop strip 23 is inserted into limiting slot 22, realizes the fixation of ceiling board 2;
S4, jointing inject gap filler in the gap between two neighboring ceiling board 2, then with flexible cloth by gap and furred ceiling The gap filler on 2 surface of plate is wiped.
Specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art It can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as in this hair All by the protection of Patent Law in bright scope of the claims.

Claims (9)

1. a kind of furred ceiling based on BIM, including keel (1) and ceiling board (2), it is characterised in that: the ceiling board (2) it is upper The surrounding of end face is vertically arranged with mounting rod (3), and the lower end of the keel (1) is provided with for the mounting rod (3) grafting Installing pipe (4) is provided with sticking department (5) on the mounting rod (3), and the sticking department (5) is used for the mounting rod (3) are fixed In the installing pipe (4).
2. a kind of furred ceiling based on BIM according to claim 1, it is characterised in that: the sticking department (5) sets including a pair The elastic fastening hook (51) being placed on the mounting rod (3), the inner wall of the installing pipe (4) are provided with for the elastic fastening hook (51) The card slot (41) of upper end insertion.
3. a kind of furred ceiling based on BIM according to claim 2, it is characterised in that: the roof of the installing pipe (4) is vertical It is provided with wedge block (42), the wedge block (42) is in gradually-reducing shape setting from top to bottom, and for being embedded at a pair of of elastic fastening hook (51) between.
4. a kind of furred ceiling based on BIM according to claim 1, it is characterised in that: the sticking department (5) includes being set to The first latching tooth (52) of the elasticity of mounting rod (3) side wall, installing pipe (4) inner wall are provided with the second latch (43), institute First latching tooth (52) is stated to be mutually twisted with second latch (43);
The mounting rod (3) side wall is fixed in the side of the first latching tooth (52), and the other side is tilted down setting, and institute The inclined direction for stating the second latch (43) is opposite with the inclined direction of the first latching tooth (52).
5. a kind of furred ceiling based on BIM according to claim 4, it is characterised in that: the bottom wall of the installing pipe (4) is arranged There is the holddown spring (44) contradicted for the mounting rod (3).
6. a kind of furred ceiling based on BIM according to claim 5, it is characterised in that: the holddown spring (44) is taper, And it is in gradually-reducing shape setting from top to bottom.
7. a kind of furred ceiling based on BIM according to claim 1, it is characterised in that: the surrounding outer wall of the ceiling board (2) It is provided with interconnected dovetail groove (21), and the swallow on the inconsistent side wall of the two neighboring ceiling board (2) Stern notch (21) collectively forms limiting slot (22), and sliding is plugged with positive stop strip (23) in the limiting slot (22).
8. a kind of installation method of the furred ceiling based on BIM, has used above-mentioned furred ceiling, characterized by the following steps:
S1 is installed keel (1), keel (1) is installed on roof using bolt, and guarantees that the lower end of keel (1) is in level State;
S2 is installed ceiling board (2), and the installing pipe (4) of mounting rod (3) insertion keel (1) lower end on ceiling board (2) is interior, and Mounting rod (3) is fixed on installing pipe (4) by sticking department (5);
S3, ceiling board (2) is fixed, by positive stop strip (23) insertion limiting slot (22), realizes the fixation of ceiling board (2).
9. a kind of installation method of furred ceiling based on BIM according to claim 8, it is characterised in that: further include walking as follows It is rapid:
Gap filler is injected in the gap between two neighboring ceiling board (2), then by gap and is hung with flexible cloth by S4, jointing The gap filler on top plate (2) surface is cleaned.
CN201910059316.0A 2019-01-22 2019-01-22 A kind of furred ceiling and its installation method based on BIM Pending CN109853820A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910059316.0A CN109853820A (en) 2019-01-22 2019-01-22 A kind of furred ceiling and its installation method based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910059316.0A CN109853820A (en) 2019-01-22 2019-01-22 A kind of furred ceiling and its installation method based on BIM

Publications (1)

Publication Number Publication Date
CN109853820A true CN109853820A (en) 2019-06-07

Family

ID=66895647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910059316.0A Pending CN109853820A (en) 2019-01-22 2019-01-22 A kind of furred ceiling and its installation method based on BIM

Country Status (1)

Country Link
CN (1) CN109853820A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211339A (en) * 2020-10-20 2021-01-12 福建中设工程咨询有限公司 Prefabricated assembly type suspended ceiling structure and construction method
CN112459338A (en) * 2020-12-02 2021-03-09 天津阳光力天装饰科技集团有限公司 Suspended ceiling structure of light steel keel and mounting method
CN113152860A (en) * 2021-04-13 2021-07-23 中建一局集团第二建筑有限公司 Ceiling installation method based on bim

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB894082A (en) * 1957-05-04 1962-04-18 Matthew Forkin Improvements in the construction of wall, ceiling and like surfaces
WO2001090586A2 (en) * 2000-05-25 2001-11-29 Chui King Wah Front access strip for holding boards
CN103790286A (en) * 2012-10-30 2014-05-14 林恕如 Connector
CN105822036A (en) * 2016-04-07 2016-08-03 嘉兴美斯克电气科技有限公司 Simple plug-in type suspended ceiling structure
CN205444631U (en) * 2016-04-07 2016-08-10 嘉兴美斯克电气科技有限公司 Suspended ceiling structure
CN206467851U (en) * 2017-01-25 2017-09-05 山西凯得森建筑科技有限公司 A kind of wooden aluminium composite curtain wall of fast disassembly type
CN108331234A (en) * 2018-01-24 2018-07-27 江苏南通三建建筑装饰有限公司 A kind of modularization assembled ceiling structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB894082A (en) * 1957-05-04 1962-04-18 Matthew Forkin Improvements in the construction of wall, ceiling and like surfaces
WO2001090586A2 (en) * 2000-05-25 2001-11-29 Chui King Wah Front access strip for holding boards
CN103790286A (en) * 2012-10-30 2014-05-14 林恕如 Connector
CN105822036A (en) * 2016-04-07 2016-08-03 嘉兴美斯克电气科技有限公司 Simple plug-in type suspended ceiling structure
CN205444631U (en) * 2016-04-07 2016-08-10 嘉兴美斯克电气科技有限公司 Suspended ceiling structure
CN206467851U (en) * 2017-01-25 2017-09-05 山西凯得森建筑科技有限公司 A kind of wooden aluminium composite curtain wall of fast disassembly type
CN108331234A (en) * 2018-01-24 2018-07-27 江苏南通三建建筑装饰有限公司 A kind of modularization assembled ceiling structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211339A (en) * 2020-10-20 2021-01-12 福建中设工程咨询有限公司 Prefabricated assembly type suspended ceiling structure and construction method
CN112211339B (en) * 2020-10-20 2021-11-09 福建中设工程咨询有限公司 Prefabricated assembly type suspended ceiling structure and construction method
CN112459338A (en) * 2020-12-02 2021-03-09 天津阳光力天装饰科技集团有限公司 Suspended ceiling structure of light steel keel and mounting method
CN113152860A (en) * 2021-04-13 2021-07-23 中建一局集团第二建筑有限公司 Ceiling installation method based on bim

Similar Documents

Publication Publication Date Title
CN109853820A (en) A kind of furred ceiling and its installation method based on BIM
CN210597835U (en) Vertical installation component of furred ceiling decorative board
CN111576712B (en) Ceiling board mounting structure and ceiling board paving method with same
CN208168003U (en) Deformation joint decoration installing structure in large public building room
CN207211609U (en) A kind of impact resistance composite stone material mounting structure
CN113530071B (en) Assembled simple suspended ceiling mounting structure
CN211286483U (en) Fixed buckle of multiple spot, decoration material and fixed subassembly of decoration material
KR101324770B1 (en) panel assembly for ceiling and wall
CN214614968U (en) Quick installation interlude fossil fragments formula pendant
CN214272772U (en) Practice thrift novel dry-hanging frame in space
JP7355329B2 (en) Dry tile construction method, dry tile wall structure, and tile mounting hardware
CN210947535U (en) Indoor wallboard supporting structure
CN207228536U (en) A kind of dry-hanging installation structure for vertical faces of stone materials
KR200491195Y1 (en) Mounting device assembly for lighting
CN208363401U (en) Ceiling board mounting structure and horizontal support profile
JP2021127593A (en) Bracket for rear groove of tile
CN216920949U (en) A coupling assembling for connecting main joist and decorative board
CN206636029U (en) A kind of horizontal card plug-in unit
KR20210073136A (en) A coupling device for race way
CN215398103U (en) Mounting fastener and guide rail assembly for vehicle curtain
CN204781542U (en) Smallpox keel structure
CN210563165U (en) Dry-hanging wall brick connecting sleeve
CN216007621U (en) Wall block material assembled decoration installation structure
CN209415369U (en) A kind of installation structure of track of track lamp
CN213741782U (en) Porcelain plate dry-hanging structure and dry-hanging porcelain plate curtain wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190607