CN109853748A - The connecting node of steel plate combined shear wall and not equal higher baselines - Google Patents

The connecting node of steel plate combined shear wall and not equal higher baselines Download PDF

Info

Publication number
CN109853748A
CN109853748A CN201910131381.XA CN201910131381A CN109853748A CN 109853748 A CN109853748 A CN 109853748A CN 201910131381 A CN201910131381 A CN 201910131381A CN 109853748 A CN109853748 A CN 109853748A
Authority
CN
China
Prior art keywords
steel plate
shear wall
combined shear
plate combined
baselines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910131381.XA
Other languages
Chinese (zh)
Other versions
CN109853748B (en
Inventor
余周
薛尚铃
罗福盛
陶修
程振宇
沈琪雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CISDI Engineering Co Ltd
Original Assignee
CISDI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CISDI Engineering Co Ltd filed Critical CISDI Engineering Co Ltd
Priority to CN201910131381.XA priority Critical patent/CN109853748B/en
Publication of CN109853748A publication Critical patent/CN109853748A/en
Application granted granted Critical
Publication of CN109853748B publication Critical patent/CN109853748B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The connecting node of higher baselines is not waited the invention discloses a kind of steel plate combined shear wall and, higher baselines are not waited including steel plate combined shear wall and, the second basis that there is the not equal higher baselines first foundation and absolute altitude to be higher than first foundation, elevation location corresponding with second basis is connected with connecting plate on the steel plate combined shear wall, and the connecting plate passes through the first anchor bolts with the second basis of higher baselines is not waited;Elevation location corresponding with the first foundation is connected with end plate on the steel plate combined shear wall, and the first foundation of the end plate and not grade higher baselines passes through the second anchor bolts.The present invention, by end plate and connecting plate and not, equal higher baselines pass through anchor bolts to steel plate combined shear wall, realize the connection between steel plate combined shear wall and not equal higher baselines, base top mark height is reduced without whole, reduce foundation depth and excavated volume, anti-floating head and precipitation difficulty are reduced, project cost has been saved.

Description

The connecting node of steel plate combined shear wall and not equal higher baselines
Technical field
The invention belongs to structural engineering fields, and in particular to a kind of company of steel plate combined shear wall and not equal higher baselines Connect node.
Background technique
Shear wall is widely used in skyscraper as effective lateral resistant member, especially by peripheral steel plate and Nei Bao The double steel plate combined concrete shear wall that concrete efficient combination is formed together is currently to greatly develop assembled architecture research Hot spot.The connecting node on steel plate combined shear wall used at present and basis mainly has exposed, outer-enwraped type and flush type, but For basic top surface the same absolute altitude the case where.
Often arrange that raft foundation or pile-raft foundation, steel plate combined shear wall are often arranged in core in skyscraper under Core Walls Structure Cylinder elevator foundation pit periphery forms steel plate combination and cuts so that the basic top surface absolute altitude of steel plate combined shear wall two sides is inconsistent The connectivity problem of power wall and not equal higher baselines.General processing mode is that raft foundation top surface absolute altitude is down to elevator foundation pit bottom, complete At terrace absolute altitude is backfilled to plain concrete again after steel plate combined shear wall and the connection construction on basis, which leads to raft Plate board bottom absolute altitude increases according to the high corresponding reduction of base top mark, i.e. foundation depth, increases deep excavation project amount, increase anti-floating water Head and precipitation difficulty, while bottom shear wall computed altitude is also increased, cause project cost to increase.
Summary of the invention
In view of the foregoing deficiencies of prior art, the purpose of the present invention is to provide a kind of steel plate combined shear wall and not Connecting node between equal higher baselines, in the case where not reducing raft foundation base top mark height integrally, it can be achieved that steel plate combination is cut Connection between power wall and not equal higher baselines.
A kind of connecting node of steel plate combined shear wall and not equal higher baselines, including steel plate combined shear wall and not contour base Plinth, the second basis that there is the not equal higher baselines first foundation and absolute altitude to be higher than first foundation, in the steel plate combined shear Elevation location corresponding with second basis is connected with connecting plate, the connecting plate and the second basis for not waiting higher baselines on wall Pass through the first anchor bolts;Elevation location corresponding with the first foundation is connected with end plate on the steel plate combined shear wall, The first foundation of the end plate and not equal higher baselines passes through the second anchor bolts.
Using the above structure, steel plate combined shear wall is by end plate and connecting plate and not equal higher baselines pass through anchor bolts, The connection between steel plate combined shear wall and not equal higher baselines is realized, it is high without the whole base top mark that reduces, reduce foundation pit depth Degree and excavated volume, reduce anti-floating head and precipitation difficulty, have saved project cost.
Optionally, the connecting plate and end plate are welded with the steel plate of the steel plate combined shear wall respectively.
Optionally, the steel plate combined shear wall lower end is supported on the first foundation, and the end plate passes through described the Two anchor bolts are fixed on first foundation top surface, and the connecting plate is fixed on the second basic top surface by first anchor bolt.
Optionally, stiffener is connected on the outside of the connecting plate and steel plate combined shear wall.
Optionally, the steel plate combined shear wall includes the steel plate of periphery and the concrete of Nei Bao, and the steel plate inside is right The high cursor position of connecting plate described in Ying Yu is welded with dowel, and the dowel protrudes into the concrete.
The globality for enhancing connecting plate and steel plate combined shear wall in the present invention, in the steel plate for being correspondingly connected with Board position It is provided with dowel on the inside of compound shear wall, the horizontal force of connecting plate can be effectively applied on steel plate combined shear wall, Er Qiemao The setting of muscle will not influence steel plate combined shear wall inner concrete pour it is closely knit.
Optionally, there is gap between the steel plate combined shear wall and not equal higher baselines, the gap uses microlith The closely knit formation pouring layer of concreting.
Optionally, the side of close not equal higher baselines is provided with peg on the steel plate combined shear wall, and the peg buries Enter in the pouring layer.
Optionally, the peg in the position on steel plate combined shear wall between connecting plate and end plate, the peg It is welded with the steel plate of steel plate combined shear wall.
Optionally, pouring hole is offered on the connecting plate.
Optionally, the end plate connection is connected to steel plate combination and cuts in steel plate combined shear wall lower end surface, the connecting plate The side of the close not equal higher baselines of power wall.
The beneficial effects of the present invention are: it is of the invention, the connection between steel plate combined shear wall and not equal higher baselines is realized, It is high without the whole base top mark that reduces, foundation depth and excavated volume are reduced, anti-floating head and precipitation difficulty is reduced, has saved work Journey cost.
Detailed description of the invention
Fig. 1 is the connecting node sectional view of steel plate combined shear wall and not equal higher baselines of the invention;
Fig. 2 and Fig. 3 is the perspective view of steel plate combined shear wall different directions of the present invention.
Piece mark explanation
1- steel plate combined shear wall;2- connecting plate;3- end plate;The not equal higher baselines of 4-;41- first foundation;The second base of 42- Plinth;The first anchor bolt of 5a-;The second anchor bolt of 5b-;6- stiffener;7- dowel;8- pouring layer;9- peg;10- pouring hole.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily.
It should be clear that the term of such as "upper", "lower", "left", "right", " centre " and " one " cited in this specification, also Only being illustrated convenient for narration, rather than to limit the scope of the invention, relativeness is altered or modified, in nothing Under essence change technology contents, when being also considered as the enforceable scope of the present invention.
As shown in Figure 1 to Figure 3, the present invention provides the connecting node of a kind of steel plate combined shear wall and not equal higher baselines, packet Include steel plate combined shear wall 1 and not equal higher baselines 4, wherein do not wait higher baselines 4 that there is relatively low first foundation 41 and absolute altitude Higher than the second basis of first foundation 41, that is, the basis for having height different;It is connected on the steel plate combined shear wall 1 Fishplate bar 2, the connecting plate 2 is corresponding with the elevation location on second basis 42, and the second base of connecting plate 2 and not equal higher baselines 4 Plinth 42 passes through multiple first anchor bolt 5a connections;1 lower end of steel plate combined shear wall is connected with end plate 3, end plate 3 and described first The elevation location on basis 41 corresponds to, and end plate 3 is connect with the first foundation 41 of not equal higher baselines 4 by multiple second anchor bolt 5b.
By end plate 3 and connecting plate 2 and not, equal higher baselines 4 realize steel plate by anchor bolts to steel plate combined shear wall 1 Connection between compound shear wall 1 and not equal higher baselines 4, it is high without the whole base top mark that reduces, reduce foundation depth and excavation Amount, reduces anti-floating head and precipitation difficulty, has saved project cost.
Wherein, the steel plate combined shear wall 1 includes the steel plate of periphery and the concrete of Nei Bao, in an embodiment In, the connecting plate 2 and end plate 3 are connect with the steel plate of the steel plate combined shear wall 1 by welding respectively.The steel 1 lower end of board group combination shearing wall is supported on the first foundation 41, the steel plate lower end of the end plate 3 and steel plate combined shear wall 1 Outer wall welding, and end plate 3 is fixed on 41 top surface of first foundation by multiple second anchor bolt 5b;The outer wall of connecting plate 2 and steel plate welds It connects, and is fixed on the second basic 42 top surfaces by multiple first anchor bolt 5a.
In one embodiment, multiple stiffeners 6 are connected on the outside of the connecting plate 2 and steel plate combined shear wall 1.It should Stiffener 6 is connected with connecting plate 2 and steel plate outer wall simultaneously, such as is connected by the way of welding.Reinforced by stiffener 6 Processing, improves the intensity and stability of structure.
In one embodiment, the high cursor position for connecting plate 2 being corresponded on the inside of the steel plate is welded with dowel 7, described Dowel 7 protrudes into the concrete.It is provided with dowel 7 on the inside of the steel plate combined shear wall 1 for being correspondingly connected with 2 position of plate, can incite somebody to action The horizontal force of connecting plate 2 is effectively applied on steel plate combined shear wall 1, and the setting of dowel 7 will not influence steel plate combination and cut 1 inner concrete of power wall pours closely knit.And enhance the globality of connecting plate 2 Yu steel plate combined shear wall 1, prevent steel plate because It is separated by lateral force with the concrete of interior packet.
In one embodiment, the side of the close not equal higher baselines 4 of the steel plate combined shear wall 1 and not contour base There is gap, gap pours closely knit formation pouring layer 8 using pea gravel concreten between plinth 4.It is mixed that microlith is poured in the gap Solidifying soil, is filled closely knit.Enhance anchoring ability of the steel plate combined shear wall 1 in basis.
In one embodiment, it is provided on the steel plate combined shear wall 1 close to the side of grade higher baselines 4 multiple Peg 9, for peg 9 in the position on steel plate combined shear wall 1 between connecting plate 2 and end plate 3, peg 9 is embedded to described pour In layer 8, enhance the globality that steel plate combined shear wall 1 is connect with pouring layer 8.Wherein, the peg 9 and steel plate combined shear wall Welding on the outside of 1 steel plate.
In one embodiment, multiple pouring holes 10 to be offered on the connecting plate 2 convenient for pouring.
In one embodiment, the anchoring stability between higher baselines 4 is waited for enhancing steel plate combined shear wall 1 and not, The end plate 3 is connect with 1 lower end surface of steel plate combined shear wall, i.e., the steel plate lower end surface of end plate 3 and steel plate combined shear wall 1 is welded It connects, and end plate 3 is a monolith, the integrated support of steel plate combined shear wall 1 improves stability of strutting system on end plate 3;Wherein, it connects Plate 2 is connected to the side of the close not equal higher baselines 4 of steel plate combined shear wall 1.
The present invention realizes that process is as follows, in corresponding second basic (i.e. the eminence position) for not waiting higher baselines 4, in steel plate combination Connecting plate 2 with stiffener 6 and pouring hole 10 is set on the outside of shear wall 1, and dowel 7 is arranged in inside;Higher baselines 4 are not waited corresponding End plate 3 is arranged in first foundation (i.e. lower position) on steel plate combined shear wall 1, and by anchor bolt respectively by connecting plate 2 and end Plate 3 is anchored on not equal higher baselines 4, finally again by steel plate combined shear wall 1 and the gap pea gravel concreten for not waiting higher baselines 4 Pour it is closely knit, at this time peg 9 be embedded to the pea gravel concreten in.
The beneficial effects of the present invention are: it is of the invention, realize the company between steel plate combined shear wall 1 and not equal higher baselines 4 It connects, it is high without the whole base top mark that reduces, foundation depth and excavated volume are reduced, anti-floating head and precipitation difficulty are reduced, is saved Project cost.
Dowel 7 is provided in the present invention on the inside of the steel plate combined shear wall 1 for being correspondingly connected with 2 position of plate, it can be by connecting plate 2 Horizontal force be effectively applied on steel plate combined shear wall 1, and the setting of dowel 7 will not influence in steel plate combined shear wall 1 Portion's concreting is closely knit.Enhance the globality of connecting plate 2 Yu steel plate combined shear wall 1.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as At all equivalent modifications or change, should be covered by the claims of the present invention.

Claims (10)

1. the connecting node of a kind of steel plate combined shear wall and not equal higher baselines, including steel plate combined shear wall and not contour base Plinth, the second basis that there is the not equal higher baselines first foundation and absolute altitude to be higher than first foundation, it is characterised in that: in the steel Elevation location corresponding with second basis is connected with connecting plate, the connecting plate and not equal higher baselines on board group combination shearing wall Second basis pass through the first anchor bolts;Elevation location corresponding with the first foundation connects on the steel plate combined shear wall It is connected to end plate, the first foundation of the end plate and not grade higher baselines passes through the second anchor bolts.
2. the connecting node of steel plate combined shear wall according to claim 1 and not equal higher baselines, it is characterised in that: described Connecting plate and end plate are welded with the steel plate of the steel plate combined shear wall respectively.
3. the connecting node of steel plate combined shear wall according to claim 1 and not equal higher baselines, it is characterised in that: described Steel plate combined shear wall lower end is supported on the first foundation, and the end plate is fixed on first foundation by second anchor bolt Top surface, the connecting plate are fixed on the second basic top surface by first anchor bolt.
4. the connecting node of steel plate combined shear wall according to claim 1 and not equal higher baselines, it is characterised in that: described Stiffener is connected on the outside of connecting plate and steel plate combined shear wall.
5. the connecting node of steel plate combined shear wall according to claim 1 and not equal higher baselines, it is characterised in that: described Steel plate combined shear wall includes the steel plate of periphery and the concrete of Nei Bao, and the high standard of the connecting plate is corresponded on the inside of the steel plate Position is welded with dowel, and the dowel protrudes into the concrete.
6. steel plate combined shear wall described in -5 any one and the connecting node for not waiting higher baselines according to claim 1, special Sign is: having gap between the steel plate combined shear wall and not equal higher baselines, the gap is poured using pea gravel concreten Build closely knit formation pouring layer.
7. the connecting node of steel plate combined shear wall according to claim 6 and not equal higher baselines, it is characterised in that: described Close to not waiting side of higher baselines to be provided with peg on steel plate combined shear wall, the peg is embedded in the pouring layer.
8. the connecting node of steel plate combined shear wall according to claim 7 and not equal higher baselines, it is characterised in that: described Peg in the position on steel plate combined shear wall between connecting plate and end plate, the steel of the peg and steel plate combined shear wall Plate welding.
9. the connecting node of steel plate combined shear wall according to claim 6 and not equal higher baselines, it is characterised in that: described Pouring hole is offered on connecting plate.
10. the connecting node of steel plate combined shear wall according to claim 1 and not equal higher baselines, it is characterised in that: institute End plate connection is stated in steel plate combined shear wall lower end surface, the connecting plate is connected to the close not equal higher baselines of steel plate combined shear wall Side.
CN201910131381.XA 2019-02-22 2019-02-22 Connecting node of steel plate combined shear wall and unequal-height foundation Active CN109853748B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910131381.XA CN109853748B (en) 2019-02-22 2019-02-22 Connecting node of steel plate combined shear wall and unequal-height foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910131381.XA CN109853748B (en) 2019-02-22 2019-02-22 Connecting node of steel plate combined shear wall and unequal-height foundation

Publications (2)

Publication Number Publication Date
CN109853748A true CN109853748A (en) 2019-06-07
CN109853748B CN109853748B (en) 2024-02-06

Family

ID=66898556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910131381.XA Active CN109853748B (en) 2019-02-22 2019-02-22 Connecting node of steel plate combined shear wall and unequal-height foundation

Country Status (1)

Country Link
CN (1) CN109853748B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011028958A2 (en) * 2009-09-02 2011-03-10 Virginia Tech Intellectual Properties, Inc. Connector devices and assemblies for construction and support of buildings and structures, and methods of making and using them
KR20110034716A (en) * 2009-09-29 2011-04-06 동아에스텍 주식회사 Road for bicycle and walker constructing on the slope of road
CN208039480U (en) * 2018-04-11 2018-11-02 湖北沛函建设有限公司 The connection structure of assembling type outer wall and ground base
CN208056126U (en) * 2018-04-03 2018-11-06 保定市建筑设计院有限公司 A kind of connecting node construction of steel pipe bundle concrete walls and Base isolation system
CN209723230U (en) * 2019-02-22 2019-12-03 中冶赛迪工程技术股份有限公司 The connecting node of steel plate combined shear wall and not equal higher baselines

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011028958A2 (en) * 2009-09-02 2011-03-10 Virginia Tech Intellectual Properties, Inc. Connector devices and assemblies for construction and support of buildings and structures, and methods of making and using them
KR20110034716A (en) * 2009-09-29 2011-04-06 동아에스텍 주식회사 Road for bicycle and walker constructing on the slope of road
CN208056126U (en) * 2018-04-03 2018-11-06 保定市建筑设计院有限公司 A kind of connecting node construction of steel pipe bundle concrete walls and Base isolation system
CN208039480U (en) * 2018-04-11 2018-11-02 湖北沛函建设有限公司 The connection structure of assembling type outer wall and ground base
CN209723230U (en) * 2019-02-22 2019-12-03 中冶赛迪工程技术股份有限公司 The connecting node of steel plate combined shear wall and not equal higher baselines

Also Published As

Publication number Publication date
CN109853748B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN205604473U (en) Assembled shear force wall tooth's socket formula connection structure who combines coincide floor
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN105756202A (en) Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab
CN106869321A (en) The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN109356173A (en) A kind of pin-connected panel anchor bolt frame girder construction and its construction method
CN206376287U (en) Subway station main body and the float Structure of accessory structure interface
CN206737118U (en) A kind of prefabricated regeneration concrete bean column node of reinforcement
CN106978909A (en) A kind of method that beams of concrete is connected with profile steel concrete column joint reinforcing bar
CN205935195U (en) Prefabricated building concrete beam column shaped steel built -up connection node construction
CN203334270U (en) Mountable buried type prefabricated hollow underground diaphragm wall
CN207878458U (en) Interim steel trestle with resistance to plucking auxiliary pile
CN209723230U (en) The connecting node of steel plate combined shear wall and not equal higher baselines
CN210117712U (en) Stirring grooving insertion type prefabricated combined box foundation structure
CN207331394U (en) Embedded prefabricated road plate of corner protection assembled
CN109853748A (en) The connecting node of steel plate combined shear wall and not equal higher baselines
CN206503160U (en) A kind of continuous underground wall structure with measure of anti float
CN109695249A (en) A kind of herringbone foundation pit supporting construction
CN107916798A (en) The building structure of skyscraper is built suitable for tier building set
CN209620049U (en) A kind of pin-connected panel anchor bolt frame girder construction
CN209619998U (en) A kind of superposed type continuous underground wall structure
CN205529847U (en) Landing stage structure that combination smw worker method was gone along with sb. to guard him
CN206376251U (en) Steel plate concrete prefabricated parts and face forever and descend retaining design in combination
CN208088311U (en) Back-pressure de-bowed type pile slab supporting structure after stake
CN106120853A (en) A kind of inverted construction method of frame bridge
CN205475300U (en) Utilize foundation pit retaining structure's tower crane foundation cushion cap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant