CN109850094A - A kind of cruise tooling occasional passage - Google Patents

A kind of cruise tooling occasional passage Download PDF

Info

Publication number
CN109850094A
CN109850094A CN201910251693.4A CN201910251693A CN109850094A CN 109850094 A CN109850094 A CN 109850094A CN 201910251693 A CN201910251693 A CN 201910251693A CN 109850094 A CN109850094 A CN 109850094A
Authority
CN
China
Prior art keywords
cruise
rectangular steel
tooling
basic framework
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910251693.4A
Other languages
Chinese (zh)
Inventor
曾骥
袁博
游云辉
周瑞佳
麦松彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Maritime University
Original Assignee
Shanghai Maritime University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Maritime University filed Critical Shanghai Maritime University
Priority to CN201910251693.4A priority Critical patent/CN109850094A/en
Publication of CN109850094A publication Critical patent/CN109850094A/en
Pending legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Abstract

It include basic framework, standing platform, air hose, ladder and channel support plate the invention discloses a kind of cruise tooling occasional passage.The present invention uses modularized design, and construction cost is low, and structure is simple, is readily transported and dismounts, and flexibility is good.

Description

A kind of cruise tooling occasional passage
Technical field
The present invention relates to field of shipbuilding, and in particular to a kind of cruise tooling occasional passage.
Background technique
Luxury liner has the characteristics that above to build high, is related to staff during tooling and needs to pass in and out different height Deck is constructed, and the stair freight volume of hull interior is small, is not able to satisfy construction demand.In order to meet construction demand, in cruise work Gangway ladder auxiliary of going on board accordingly is had during dress, but the land occupation range for gangway ladder of going on board is big, construction cost is high, in tooling mistake Gangway ladder of going on board can not be largely built in journey.For it is some in the upper worker for building construction for, their boundary of works area can Can be only several layers of, it builds large size gangway ladder of going on board and is undoubtedly a kind of waste of resource.The enclosed environment on every layer of deck can make air simultaneously Second-rate, the work of the equipment such as welding machine is discharge harmful dust etc..
Summary of the invention
The purpose of the present invention is to solve the above-mentioned problems and provides a kind of cruise tooling occasional passage, using mould Blockization design, construction cost is low, and structure is simple, is readily transported and dismounts, and flexibility is good.
A kind of cruise tooling occasional passage of the invention includes basic framework, standing platform, air hose, ladder and channel Support plate;
Basic framework is the rectangle space frame structure up and down that rectangular steel tube is constituted;
Standing platform is the plate for being parallel to ground in basic framework;
Air pipeline includes the air supervisor for being equipped with right side in basic framework perpendicular to the ground, is installed on air supervisor upper end Air outlet, be installed on the air supervisor lower end air inlet and vertical direction between two adjacent standing platforms simultaneously The air branch pipe being installed on air supervisor;
Ladder is set to left side in basic framework perpendicular to the ground;
Channel support plate is installed on basic framework top left side and docks with the deck of cruise.
Basic framework is by including on top module and several construction modules in a kind of cruise tooling occasional passage of appeal Under be spliced;
Construction module includes the rectangle space frame structure that several rectangular steel tubes are constituted and a wherein vertical square bar Pipe upper end is equipped with locating piece, lower end is equipped with the location hole to match with the locating piece, a knot in two adjacent construction modules The locating piece of structure module can be set in the location hole of another construction module, in the middle part of the vertical rectangular steel tube for constituting construction module Equipped with the lifting lug mounting hole for lifting operation;The vertical rectangular steel tube upper and lower side side for constituting construction module is equipped with fixation Plate, two neighbouring construction modules are fixedly connected by fixed plate;
Top module includes standing platform, four rectangular steel tubes for being installed vertically on the standing platform four corners, is installed on Lifting lug at the top of four rectangular steel tubes is installed on the fixed plate of four rectangular steel tube lower ends side and is installed on two, left side Channel support plate on rectangular steel tube, the bottom of a rectangular steel tube is equipped with and the positioning on construction module in four rectangular steel tubes The compatible location hole of block, top module and construction module are fixedly mounted by fixed plate.
Above-mentioned cruise tooling is rectangular opening with lifting lug mounting hole in occasional passage.
If air hose and ladder are according to the top module of basic framework and dry and hard in above-mentioned cruise tooling occasional passage The height of structure module is cut accordingly.
The center of gravity of the center of lifting lug mounting hole and construction module is in same in a kind of above-mentioned cruise tooling occasional passage One horizontal plane.
A kind of above-mentioned cruise tooling is welded with I-steel, the bottom of I-steel with the two sides of channel support plate in occasional passage Face and cruise deck are welded and the I-steel and cruise deck weld are equipped with welding groove.
Detailed description of the invention
Fig. 1 is the perspective view of cruise tooling occasional passage of the present invention;
Fig. 2 is the left view of cruise tooling occasional passage of the present invention;
Fig. 3 is the main view of cruise tooling occasional passage of the present invention;
Fig. 4 is Fig. 2 top view;
Fig. 5 is the perspective view of construction module of the invention;
Fig. 6 is the left view of construction module of the invention;
Fig. 7 is the main view of construction module of the invention;
Fig. 8 is Fig. 6 top view;
Fig. 9 is Fig. 6 bottom view;
Figure 10 is the perspective view of top module of the invention;
Figure 11 is the left view of top module of the invention;
Figure 12 is the top view of Figure 11;
Figure 13 is air hose structural schematic diagram of the invention.
Specific embodiment
Below in conjunction with attached drawing, the invention will be further described.
Referring to Fig. 1~Figure 13, a kind of cruise tooling occasional passage of the invention include basic framework 1, standing platform 2, Air hose 3, ladder 4 and channel support plate 5;Occasional passage of the invention is designed using external hanging type, is connected to first by connecting plate Plate topside.
Basic framework 1 includes that top module 11 and about 12 three-decker module are spliced;
Construction module 12 include the rectangle space frame structure that several rectangular steel tubes are constituted and wherein one it is vertical rectangular Steel pipe upper end is equipped with locating piece 12a, lower end is equipped with the location hole 12b to match with locating piece 12a, two adjacent structure moulds The locating piece 12a of a construction module 12 can be set in the location hole 12b of another construction module 12 in block 12, constitute structure The rectangle lifting lug mounting hole 12c, rectangle lifting lug mounting hole 12c for lifting operation are equipped in the middle part of the vertical rectangular steel tube of module 12 Center and the center of gravity of construction module 12 be in same level;Constitute the vertical rectangular steel tube upper and lower side side of construction module 12 Fixed plate 12d is installed, two neighbouring construction modules 12 are fixedly connected by fixed plate 12d;
Top module 11 includes standing platform 11a, four rectangular steel tubes for being installed vertically on standing platform 11a four corners 11b, the lifting lug 11c being installed at the top of four rectangular steel tube 11b, the fixed plate for being installed on four sides rectangular steel tube 11b 11d and the channel support plate 5 being installed on the two rectangular steel tube 11b in left side, in four rectangular steel tube 11b a root bottom part be equipped with The compatible location hole 11e of 12 top locating piece of construction module;
Standing platform 2 is three layers and is respectively parallel to plate of the ground in three-decker module 12;
Air pipeline 3 includes the air supervisor 3a for being equipped with right side in basic framework perpendicular to the ground, is installed on air supervisor Positioned at two adjacent stations in the air outlet 3b of the upper end 3a, the air inlet 3c for being installed on the air supervisor lower end 3a and vertical direction Between vertical platform 2 and it is installed on the air branch pipe 3d that air is responsible on 3a;
Ladder 4 is set to left side in basic framework 1 perpendicular to the ground;
Channel support plate 5 is installed on 1 top left side of basic framework and docks with the deck of cruise, the two of channel support plate 5 Side is welded with I-steel 51, and the bottom surface of I-steel 51 and cruise deck weld are equipped with welding groove 51a;
Air hose 3 and ladder 4 carry out corresponding according to the top module 11 of basic framework 1 and the height of three-decker module 12 Cutting.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or modification, therefore all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a kind of cruise tooling occasional passage, which is characterized in that including basic framework, standing platform, air hose, ladder and lead to Road support plate;
The basic framework is the rectangle space frame structure up and down that rectangular steel tube is constituted;
The standing platform is the plate for being parallel to ground in the basic framework;
The air pipeline includes the air supervisor for being equipped with right side in the basic framework perpendicular to the ground, is installed on air supervisor The air outlet of upper end, be installed on the air supervisor lower end air inlet and vertical direction on be located at two adjacent standing platforms it Between and the air branch pipe that is installed on air supervisor;
The ladder is set to left side in the basic framework perpendicular to the ground;
The channel support plate is installed on the basic framework top left side and docks with the deck of cruise.
2. cruise tooling occasional passage as described in claim 1, which is characterized in that the basic framework is by including top die Block and several construction modules are spliced up and down;
The construction module includes the rectangle space frame structure that several rectangular steel tubes are constituted and a wherein vertical square bar Pipe upper end is equipped with locating piece, lower end is equipped with the location hole to match with the locating piece, a knot in two adjacent construction modules The locating piece of structure module can be set in the location hole of another construction module, constitute the vertical rectangular steel tube of the construction module Middle part is equipped with the lifting lug mounting hole for lifting operation;Constitute the vertical rectangular steel tube upper and lower side side installation of the construction module There is fixed plate, two neighbouring construction modules are fixedly connected by fixed plate;
The top module includes standing platform, four rectangular steel tubes for being installed vertically on the standing platform four corners, is installed on Lifting lug at the top of four rectangular steel tubes is installed on the fixed plate of four rectangular steel tube lower ends side and is installed on two, left side Channel support plate on rectangular steel tube, the bottom of a rectangular steel tube is equipped with and the positioning on construction module in four rectangular steel tubes The compatible location hole of block, the top module and the construction module are fixedly mounted by fixed plate.
3. cruise tooling occasional passage as claimed in claim 2, which is characterized in that the lifting lug mounting hole is rectangular opening.
4. cruise tooling occasional passage as claimed in claim 2, which is characterized in that the air hose and the ladder according to The height of the top module of the basic framework and several construction modules is cut accordingly.
5. cruise tooling occasional passage as claimed in claim 2, which is characterized in that the center of the lifting lug mounting hole and institute The center of gravity for stating construction module is in same level.
6. cruise tooling occasional passage as described in claim 1, which is characterized in that weld the two sides of the channel support plate There is I-steel, the bottom surface and cruise deck of the I-steel are welded and the I-steel and cruise deck weld are equipped with welding slope Mouthful.
CN201910251693.4A 2019-03-29 2019-03-29 A kind of cruise tooling occasional passage Pending CN109850094A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910251693.4A CN109850094A (en) 2019-03-29 2019-03-29 A kind of cruise tooling occasional passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910251693.4A CN109850094A (en) 2019-03-29 2019-03-29 A kind of cruise tooling occasional passage

Publications (1)

Publication Number Publication Date
CN109850094A true CN109850094A (en) 2019-06-07

Family

ID=66902643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910251693.4A Pending CN109850094A (en) 2019-03-29 2019-03-29 A kind of cruise tooling occasional passage

Country Status (1)

Country Link
CN (1) CN109850094A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112193372A (en) * 2020-10-14 2021-01-08 上海外高桥造船有限公司 Superelevation type passenger liner is with tower device of going on board

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2766220A1 (en) * 1997-07-16 1999-01-22 Auxiliaire Soc Building construction with tower-like structure containing all services for building
BRMU8501414U (en) * 2005-07-15 2007-02-27 Sebastiao Ferreira Dias connection for mounting modular structures
CN1965136A (en) * 2004-05-27 2007-05-16 老理查德·海斯 Modular multilevel access platform and method for erecting the same
CN103029817A (en) * 2012-12-12 2013-04-10 渤海装备辽河重工有限公司 Lift cage for folding ships and offshore engineering structures
AU2013101343A4 (en) * 2012-10-18 2013-11-07 Merhi, Khalil Nasser Methods, systems and components for multi-storey building construction
CN105292526A (en) * 2015-07-22 2016-02-03 上海卫星装备研究所 Platform module, novel vacuum tank internal adjustable satellite multi-layer operation platform and method
CN106592946A (en) * 2016-12-23 2017-04-26 苏州飞华铝制工业有限公司 Combined modularization scaffold for large building
CN108699846A (en) * 2016-02-24 2018-10-23 斯阿赫托公司 Modularization scaffold
CN209634697U (en) * 2019-03-29 2019-11-15 上海海事大学 A kind of cruise tooling occasional passage

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2766220A1 (en) * 1997-07-16 1999-01-22 Auxiliaire Soc Building construction with tower-like structure containing all services for building
CN1965136A (en) * 2004-05-27 2007-05-16 老理查德·海斯 Modular multilevel access platform and method for erecting the same
BRMU8501414U (en) * 2005-07-15 2007-02-27 Sebastiao Ferreira Dias connection for mounting modular structures
AU2013101343A4 (en) * 2012-10-18 2013-11-07 Merhi, Khalil Nasser Methods, systems and components for multi-storey building construction
CN103029817A (en) * 2012-12-12 2013-04-10 渤海装备辽河重工有限公司 Lift cage for folding ships and offshore engineering structures
CN105292526A (en) * 2015-07-22 2016-02-03 上海卫星装备研究所 Platform module, novel vacuum tank internal adjustable satellite multi-layer operation platform and method
CN108699846A (en) * 2016-02-24 2018-10-23 斯阿赫托公司 Modularization scaffold
CN106592946A (en) * 2016-12-23 2017-04-26 苏州飞华铝制工业有限公司 Combined modularization scaffold for large building
CN209634697U (en) * 2019-03-29 2019-11-15 上海海事大学 A kind of cruise tooling occasional passage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112193372A (en) * 2020-10-14 2021-01-08 上海外高桥造船有限公司 Superelevation type passenger liner is with tower device of going on board

Similar Documents

Publication Publication Date Title
CN100371211C (en) Unitary pre-assembling method for cross piece, anti-twist deck, hatching coaming and railing frame
CN107416130A (en) Whole Transporting device is built on a kind of ship
CN209634697U (en) A kind of cruise tooling occasional passage
CN108177735B (en) Binding device integrated on container ship breakwater and mounting method thereof
CN105905461B (en) detachable multifunctional special container
CN109850094A (en) A kind of cruise tooling occasional passage
CN107521630B (en) Semi-submersible support platform
CN111017145A (en) Method for carrying transverse bulkhead of ultra-large container ship
CN205206284U (en) But detachably assembled formula elevartor shaft operation platform
CN108177731B (en) Method for building main pipe platform of liquid cargo ship
CN111017146A (en) Auxiliary carrying structure for transverse bulkhead of ultra-large container ship
CN209757430U (en) Cruise ship is built with frock of facing
RU2096243C1 (en) Ship
CN212771937U (en) Steel trestle assembled tube bank combined bridge floor
CN209396010U (en) The new type scaffold that full angle uses during a kind of shipbuilding
CN218908012U (en) Frock is transported in antiskid of steel sheet loading and unloading car
CN110013932B (en) Flat-bottom segmented sand blasting coating support arrangement method
CN112158306A (en) Floating type heavy-load platform
CN209992003U (en) Novel multi-functional hardware is at ring frock platform
CN219325911U (en) Vehicle operation auxiliary platform for container ship construction
CN111236662A (en) Rapid assembly unloading platform capable of protecting head
CN111438455B (en) Car body spot welding production line layout structure and automatic production line system
CN217100376U (en) Chemical tanker cargo tank channel
CN212580559U (en) Temporary curtain wall glass storage device for construction site
CN213323595U (en) Floating type heavy-load platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination