CN109842942A - The method, apparatus and communication equipment of blind examination down physical layer control signaling - Google Patents
The method, apparatus and communication equipment of blind examination down physical layer control signaling Download PDFInfo
- Publication number
- CN109842942A CN109842942A CN201711211762.6A CN201711211762A CN109842942A CN 109842942 A CN109842942 A CN 109842942A CN 201711211762 A CN201711211762 A CN 201711211762A CN 109842942 A CN109842942 A CN 109842942A
- Authority
- CN
- China
- Prior art keywords
- physical layer
- layer control
- control signaling
- blind examination
- down physical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention proposes method, apparatus, communication equipment and the computer readable storage mediums of a kind of blind examination down physical layer control signaling, wherein the method for blind examination down physical layer control signaling includes: the down physical layer control signaling that blind examination is sent by base station since first time node, obtains the information of one or more running time-frequency resource position in down physical layer control signaling;Wherein, first time node is the OFDM symbol that the OFDM symbol terminated with the last one running time-frequency resource position of semi-static scheduling cycle has default lead.By beginning to blind examination DCI before semi-persistent scheduling terminates, the time delay of terminal data transmission can be reduced.
Description
Technical field
The present invention relates to field of communication technology, in particular to a kind of blind examination down physical layer control signaling method,
Device, communication equipment and computer readable storage medium.
Background technique
5th third-generation mobile communication technology contain enhanced mobile broadband (Enhance Mobile Broadband, eMBB),
Highly reliable low time delay (Ultra-reliable and Low Latency Communications, URLLC) and magnanimity machine
Type communication (mMTC).The job of 5G NR (New Radio) has passed through in RAN#75 meeting at present, the project
Need to standardize the technology of eating dishes without rice or wine of eMBB and URLLC.EMBB business demand is high-speed, is not wanted strictly to reliability and time delay
It asks;For URLLC business, needing to meet 3GPP, (3rd Generation Partnership Project, the third generation are closed
Make Partnership Program) propose reliability and delay requirement.In order to meet the requirement of high reliability and low time delay, URLLC business is needed
It to dispatch, i.e., can also be dispatched at once in the intermediate time that an eMBB sends interval in time.It is different from general eMBB data
, URLLC data can generally select to occupy biggish bandwidth on frequency domain due to needing ultralow time delay, to reduce in time domain
On resource occupation, such receiving end can be received within the period short as far as possible reconciliation adjusting data.In the case where resource-constrained,
URLLC data may occupy the running time-frequency resource of scheduled eMBB data, also punch eMBB data, with higher prior
Grade occupies resource and carries out data transmission.
In order to adapt to the requirement of URLLC low time delay, and reduction URLLC terminal blind examination down physical layer control information
The power consumption of (Downlink Control Information, DCI), a kind of feasible scheme are to carry out half for URLLC business
Static scheduling, i.e. base station carry out first resource scheduling by sending a down physical layer control signaling, are designated as terminal point
The multiple running time-frequency resource positions in time domain period profile matched, terminal can be in multiple running time-frequency resources after DCI of blind examination
Data are received or sent at position.As shown in Figure 1, be designated as in DCI terminal distribution frequency resource position be resource block 8 to
Resource block 15, and the transmitting continuous OFDM of a data (Orthogonal Frequency Division Multiplexing, just
Hand over frequency division multiplexing symbol) symbol data is 2 OFDM symbols, the time interval of the adjacent transmission of data twice is 5 OFDM symbols,
The quantity of the distributed running time-frequency resource position of primary scheduling is 5.
But when a semi-persistent scheduling terminates, when terminal should start blind examination DCI, if in semi-static knot
First after beam can carry URLLC control information OFDM symbol at start blind examination DCI, then need terminal semi-static
Just start blind examination DCI after finishing scheduling, if the data of terminal available for transmission, needs after DCI is demodulated successfully
Upstream data or demodulation downlink data can be sent, this can generate biggish time delay.
Summary of the invention
The present invention is directed to solve at least one of the technical problems existing in the prior art or related technologies.
For this purpose, one aspect of the present invention is to propose a kind of method of blind examination down physical layer control signaling.
Another aspect of the present invention is to propose a kind of device of blind examination down physical layer control signaling.
Another aspect of the invention is to propose a kind of communication equipment.
An additional aspect of the present invention is to propose a kind of computer readable storage medium.
In view of this, according to an aspect of the present invention, it proposes a kind of method of blind examination down physical layer control signaling,
Include: the down physical layer control signaling that blind examination is sent by base station since first time node, obtains down physical layer control
The information of one or more running time-frequency resource position in signaling;Wherein, first time node is and semi-static scheduling cycle
The OFDM symbol that the last one running time-frequency resource position terminates has the OFDM symbol of default lead.
The method of blind examination down physical layer control signaling provided by the invention, terminal this semi-persistent scheduling last
It can start DCI blind detection in some also unclosed OFDM symbol of a running time-frequency resource.Because in semi-persistent scheduling knot before
After beam, if it also to carry out semi-persistent scheduling and not know, it may be comprising indicating multiple running time-frequency resources in the DCI that base station is sent
It is not used in semi-persistent scheduling comprising a running time-frequency resource position for semi-persistent scheduling, or only, so terminal blind examination DCI can
Obtain the information of one or more running time-frequency resource position.It, can be with by beginning to blind examination DCI before semi-persistent scheduling terminates
Reduce the time delay of terminal data transmission.
The method of above-mentioned blind examination down physical layer control signaling according to the present invention, can also have following technical characteristic:
In the above-mentioned technical solutions, it is preferable that further include: in the last one running time-frequency resource position of semi-static scheduling cycle
Start data transmission at the OFDM symbol of preset quantity after the OFDM symbol of end or data connect
It receives.
In the technical scheme, terminal is after the blind examination DCI, so that it may refer to after waiting semi-persistent schedulings to terminate in the DCI
After the OFDM symbol that the last one the running time-frequency resource position on one or more running time-frequency resource position shown terminates
Some OFDM symbol at directly start data and send or receive, so there is no need to equal semi-persistent schedulings knots
Just start blind examination DCI after beam, avoids the time overhead of blind examination.
In any of the above-described technical solution, it is preferable that default lead is the fixation lead by standard convention;Or by
The lead relevant to the lasting OFDM symbol quantity in a running time-frequency resource position of standard convention.
In any of the above-described technical solution, it is preferable that default lead be by base station radio resource control layer signaling or
The lead of person's physical layer control signaling configuration.
In the technical scheme, the OFDM that the OFDM symbol that DCI blind detection starts terminates relative to the last one running time-frequency resource
The default lead of symbol can be for by the fixation lead of standard convention, or by one of standard convention and semi-persistent scheduling
The relevant lead of number of the lasting OFDM symbol in running time-frequency resource position, RRC can also be used by base station by presetting lead
(this time can be used for example in (Radio Resource Control, wireless heterogeneous networks) signaling or physical layer control signaling
The DCI that semi-persistent scheduling uses) configuration.Lead realization is preset according to this, and blind examination is begun to before semi-persistent scheduling terminates
DCI can reduce the time delay of terminal data transmission.
According to another aspect of the present invention, a kind of device of blind examination down physical layer control signaling is proposed, comprising: blind
Module is examined, for the down physical layer control signaling that blind examination is sent by base station since first time node, obtains downlink physical
The information of one or more running time-frequency resource position in layer control signaling;Wherein, first time node is and semi-persistent scheduling
The OFDM symbol that the last one running time-frequency resource position in period terminates has the orthogonal frequency division multiplexing of default lead
Symbol.
The device of blind examination down physical layer control signaling provided by the invention, terminal this semi-persistent scheduling last
It can start DCI blind detection in some also unclosed OFDM symbol of a running time-frequency resource.Because in semi-persistent scheduling knot before
After beam, if it also to carry out semi-persistent scheduling and not know, it may be comprising indicating multiple running time-frequency resources in the DCI that base station is sent
It is not used in semi-persistent scheduling comprising a running time-frequency resource position for semi-persistent scheduling, or only, so terminal blind examination DCI can
Obtain the information of one or more running time-frequency resource position.It, can be with by beginning to blind examination DCI before semi-persistent scheduling terminates
Reduce the time delay of terminal data transmission.
The device of above-mentioned blind examination down physical layer control signaling according to the present invention, can also have following technical characteristic:
In the above-mentioned technical solutions, it is preferable that further include: data processing module, in the semi-static scheduling cycle
The OFDM symbol that terminates of the last one running time-frequency resource position after preset quantity OFDM symbol at
Start data transmission or data receiver.
In the technical scheme, terminal is after the blind examination DCI, so that it may refer to after waiting semi-persistent schedulings to terminate in the DCI
After the OFDM symbol that the last one the running time-frequency resource position on one or more running time-frequency resource position shown terminates
Some OFDM symbol at directly start data and send or receive, so there is no need to equal semi-persistent schedulings knots
Just start blind examination DCI after beam, avoids the time overhead of blind examination.
In any of the above-described technical solution, it is preferable that default lead is the fixation lead by standard convention;Or by
The lead relevant to the lasting OFDM symbol quantity in a running time-frequency resource position of standard convention.
In any of the above-described technical solution, it is preferable that default lead be by base station radio resource control layer signaling or
The lead of person's physical layer control signaling configuration.
In the technical scheme, the OFDM that the OFDM symbol that DCI blind detection starts terminates relative to the last one running time-frequency resource
The default lead of symbol can be for by the fixation lead of standard convention, or by one of standard convention and semi-persistent scheduling
The relevant lead of number of the lasting OFDM symbol in running time-frequency resource position, RRC can also be used by base station by presetting lead
Signaling or physical layer control signaling (DCI that the secondary semi-persistent scheduling uses can be used for example) configuration.It is preset and is mentioned according to this
Preceding amount realization begins to blind examination DCI before semi-persistent scheduling terminates, and can reduce the time delay of terminal data transmission.
According to a further aspect of the invention, it proposes a kind of communication equipment, including memory, processor and is stored in
On reservoir and the computer program that can run on a processor, processor are realized when executing computer program such as any of the above-described
The step of method of blind examination down physical layer control signaling.
Communication equipment provided by the invention, processor are realized when executing computer program in the last of this semi-persistent scheduling
It can start DCI blind detection in some also unclosed OFDM symbol of one running time-frequency resource.Because in semi-persistent scheduling before
After end, if it also to carry out semi-persistent scheduling and not know, it may be comprising indicating multiple time-frequency moneys in the DCI that base station is sent
Source is used for semi-persistent scheduling, or is only not used in semi-persistent scheduling comprising a running time-frequency resource position, so terminal blind examination DCI energy
Enough obtain the information of one or more running time-frequency resource position.It, can by beginning to blind examination DCI before semi-persistent scheduling terminates
To reduce the time delay of terminal data transmission.
According to a further aspect of the invention, a kind of computer readable storage medium is proposed, computer is stored thereon with
Program is realized when computer program is executed by processor such as the method for the blind examination down physical layer control signaling of any of the above-described
Step.
Computer readable storage medium provided by the invention is realized half quiet at this when computer program is executed by processor
It can start DCI blind detection in some also unclosed OFDM symbol of the last one running time-frequency resource of state scheduling.Because before
Semi-persistent scheduling terminate after, if also to carry out semi-persistent scheduling and not know, base station send DCI in may comprising refer to
Show that multiple running time-frequency resources are not used in semi-persistent scheduling comprising a running time-frequency resource position for semi-persistent scheduling, or only, so
Terminal blind examination DCI can obtain the information of one or more running time-frequency resource position.By before semi-persistent scheduling terminates just
Start blind examination DCI, the time delay of terminal data transmission can be reduced.
Additional aspect and advantage of the invention will become obviously in following description section, or practice through the invention
Recognize.
Detailed description of the invention
Above-mentioned and/or additional aspect of the invention and advantage will become from the description of the embodiment in conjunction with the following figures
Obviously and it is readily appreciated that, in which:
Fig. 1 shows the schematic diagram of scheduling of resource in the related technology;
Fig. 2 shows the signals of the process of the method for the blind examination down physical layer control signaling of one embodiment of the present of invention
Figure;
Fig. 3 shows the process signal of the method for the blind examination down physical layer control signaling of another embodiment of the invention
Figure;
Fig. 4 shows the schematic diagram of the scheduling of resource of one embodiment of the present of invention;
Fig. 5 shows the schematic block diagram of the device of the blind examination down physical layer control signaling of one embodiment of the present of invention;
Fig. 6 shows the schematic block of the device of the blind examination down physical layer control signaling of another embodiment of the invention
Figure.
Specific embodiment
To better understand the objects, features and advantages of the present invention, with reference to the accompanying drawing and specific real
Applying mode, the present invention is further described in detail.It should be noted that in the absence of conflict, the implementation of the application
Feature in example and embodiment can be combined with each other.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, still, the present invention may be used also
To be implemented using other than the one described here other modes, therefore, protection scope of the present invention is not limited to following public affairs
The limitation for the specific embodiment opened.
The embodiment of first aspect present invention, a kind of method for proposing blind examination down physical layer control signaling, Fig. 2 shows
The flow diagram of the method for the blind examination down physical layer control signaling of one embodiment of the present of invention.Wherein, this method comprises:
Step 202, the down physical layer control signaling that blind examination is sent by base station since first time node obtains downlink
The information of one or more running time-frequency resource position in physical layer control signaling;Wherein, first time node be with it is semi-static
The OFDM symbol that the last one running time-frequency resource position of dispatching cycle terminates has the orthogonal frequency of default lead
Multiplexed symbols.
The method of blind examination down physical layer control signaling provided by the invention, terminal this semi-persistent scheduling last
It can start DCI blind detection in some also unclosed OFDM symbol of a running time-frequency resource.Because in semi-persistent scheduling knot before
After beam, if it also to carry out semi-persistent scheduling and not know, it may be comprising indicating multiple running time-frequency resources in the DCI that base station is sent
It is not used in semi-persistent scheduling comprising a running time-frequency resource position for semi-persistent scheduling, or only, so terminal blind examination DCI can
Obtain the information of one or more running time-frequency resource position.It, can be with by beginning to blind examination DCI before semi-persistent scheduling terminates
Reduce the time delay of terminal data transmission.
Fig. 3 shows the process signal of the method for the blind examination down physical layer control signaling of another embodiment of the invention
Figure.Wherein, this method comprises:
Step 302, the down physical layer control signaling that blind examination is sent by base station since first time node obtains downlink
The information of one or more running time-frequency resource position in physical layer control signaling;Wherein, first time node be with it is semi-static
The OFDM symbol that the last one running time-frequency resource position of dispatching cycle terminates has the orthogonal frequency of default lead
Multiplexed symbols;
Step 304, the OFDM symbol terminated in the last one running time-frequency resource position of semi-static scheduling cycle
Start data transmission or data receiver at the OFDM symbol of preset quantity afterwards.
In this embodiment, terminal is after the blind examination DCI, so that it may indicate after waiting semi-persistent schedulings to terminate in the DCI
One or more running time-frequency resource position on the OFDM symbol that terminates of the last one running time-frequency resource position after
Directly start data at some OFDM symbol to send or receive, so there is no need to wait semi-persistent schedulings to terminate
Just start blind examination DCI later, avoids the time overhead of blind examination.
In one embodiment of the invention, it is preferable that default lead is the fixation lead by standard convention;Or
By the lead relevant to the lasting OFDM symbol quantity in a running time-frequency resource position of standard convention.
In one embodiment of the present of invention case, it is preferable that default lead is to be believed by the radio resource control layer of base station
The lead of order or physical layer control signaling configuration.
In this embodiment, the OFDM symbol that the OFDM symbol that DCI blind detection starts terminates relative to the last one running time-frequency resource
Number default lead can be for by the fixation lead of standard convention, or when by one of standard convention and semi-persistent scheduling
The relevant lead of number of the lasting OFDM symbol of frequency resource location, default lead can also be believed by base station using RRC
It enables or physical layer control signaling (DCI that the secondary semi-persistent scheduling uses can be used for example) configures.It is default in advance according to this
Amount is realized begins to blind examination DCI before semi-persistent scheduling terminates, and can reduce the time delay of terminal data transmission.
In specific embodiment, terminal, which shifts to an earlier date blind examination, can enable base station send DCI in advance, and terminal can also be known in advance
DCI information sends or receives to get started data next time after the secondary semi-persistent scheduling.It is assumed that half quiet by this
The OFDM symbol that the OFDM symbol that instruction terminal D CI blind examination starts in the DCI of state scheduling terminates relative to the last one running time-frequency resource
Number lead be 1 OFDM symbol, as shown in figure 4, then terminal will symbol 9 i.e. start DCI blind detection.If terminal has data
It needs to transmit, then base station can send DCI information in the position of symbol 9, and the DCI information instruction terminal is in this semi-persistent scheduling knot
First OFDM symbol after beam starts data transmission (DCI is also required to the necessary informations such as instruction frequency domain resource information).Terminal
In 9 blind examination DCI of symbol, the content of DCI is correctly demodulated in symbol 10, then after semi-persistent scheduling terminates, terminal can be with
The frequency domain position specified on symbol 11 at once transmits data.
The embodiment of second aspect of the present invention proposes that a kind of device of blind examination down physical layer control signaling, Fig. 5 are shown
The schematic block diagram of the device 500 of the blind examination down physical layer control signaling of one embodiment of the present of invention.Wherein, the device 500
Include:
Blind examination module 502, for the down physical layer control signaling that blind examination is sent by base station since first time node,
Obtain the information of one or more running time-frequency resource position in down physical layer control signaling;Wherein, first time node is
The OFDM symbol terminated with the last one running time-frequency resource position of semi-static scheduling cycle has default lead
OFDM symbol.
The device 500 of blind examination down physical layer control signaling provided by the invention, terminal this semi-persistent scheduling most
It can start DCI blind detection in some also unclosed OFDM symbol of the latter running time-frequency resource.Because in semi-static tune before
After degree terminates, if it also to carry out semi-persistent scheduling and not know, it may be comprising indicating multiple time-frequencies in the DCI that base station is sent
Resource is used for semi-persistent scheduling, or is only not used in semi-persistent scheduling comprising a running time-frequency resource position, so terminal blind examination DCI
The information of one or more running time-frequency resource position can be obtained.By beginning to blind examination DCI before semi-persistent scheduling terminates,
The time delay of terminal data transmission can be reduced.
Fig. 6 shows the signal of the device 600 of the blind examination down physical layer control signaling of another embodiment of the invention
Block diagram.Wherein, which includes:
Blind examination module 602, for the down physical layer control signaling that blind examination is sent by base station since first time node,
Obtain the information of one or more running time-frequency resource position in down physical layer control signaling;Wherein, first time node is
The OFDM symbol terminated with the last one running time-frequency resource position of semi-static scheduling cycle has default lead
OFDM symbol;
Data processing module 604 terminates for the last one running time-frequency resource position in the semi-static scheduling cycle
Start data transmission or data receiver at the OFDM symbol of preset quantity after OFDM symbol.
In this embodiment, terminal is after the blind examination DCI, so that it may indicate after waiting semi-persistent schedulings to terminate in the DCI
One or more running time-frequency resource position on the OFDM symbol that terminates of the last one running time-frequency resource position after
Directly start data at some OFDM symbol to send or receive, so there is no need to wait semi-persistent schedulings to terminate
Just start blind examination DCI later, avoids the time overhead of blind examination.
In one embodiment of the invention, it is preferable that default lead is the fixation lead by standard convention;Or
By the lead relevant to the lasting OFDM symbol quantity in a running time-frequency resource position of standard convention.
In one embodiment of the invention, it is preferable that default lead is the radio resource control layer signaling by base station
Or the lead of physical layer control signaling configuration.
In this embodiment, the OFDM symbol that the OFDM symbol that DCI blind detection starts terminates relative to the last one running time-frequency resource
Number default lead can be for by the fixation lead of standard convention, or when by one of standard convention and semi-persistent scheduling
The relevant lead of number of the lasting OFDM symbol of frequency resource location, default lead can also be believed by base station using RRC
It enables or physical layer control signaling (DCI that the secondary semi-persistent scheduling uses can be used for example) configures.It is default in advance according to this
Amount is realized begins to blind examination DCI before semi-persistent scheduling terminates, and can reduce the time delay of terminal data transmission.
The embodiment of third aspect present invention, proposes a kind of communication equipment, including memory, processor and is stored in
On reservoir and the computer program that can run on a processor, processor are realized when executing computer program such as any of the above-described
The step of method of blind examination down physical layer control signaling.
Communication equipment provided by the invention, processor are realized when executing computer program in the last of this semi-persistent scheduling
It can start DCI blind detection in some also unclosed OFDM symbol of one running time-frequency resource.Because in semi-persistent scheduling before
After end, if it also to carry out semi-persistent scheduling and not know, it may be comprising indicating multiple time-frequency moneys in the DCI that base station is sent
Source is used for semi-persistent scheduling, or is only not used in semi-persistent scheduling comprising a running time-frequency resource position, so terminal blind examination DCI energy
Enough obtain the information of one or more running time-frequency resource position.It, can by beginning to blind examination DCI before semi-persistent scheduling terminates
To reduce the time delay of terminal data transmission.
The embodiment of fourth aspect present invention proposes a kind of computer readable storage medium, is stored thereon with computer
Program is realized when computer program is executed by processor such as the method for the blind examination down physical layer control signaling of any of the above-described
Step.
Computer readable storage medium provided by the invention is realized half quiet at this when computer program is executed by processor
It can start DCI blind detection in some also unclosed OFDM symbol of the last one running time-frequency resource of state scheduling.Because before
Semi-persistent scheduling terminate after, if also to carry out semi-persistent scheduling and not know, base station send DCI in may comprising refer to
Show that multiple running time-frequency resources are not used in semi-persistent scheduling comprising a running time-frequency resource position for semi-persistent scheduling, or only, so
Terminal blind examination DCI can obtain the information of one or more running time-frequency resource position.By before semi-persistent scheduling terminates just
Start blind examination DCI, the time delay of terminal data transmission can be reduced.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc.
Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the invention
It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or reality
Example.Moreover, description particular features, structures, materials, or characteristics can in any one or more of the embodiments or examples with
Suitable mode combines.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of method of blind examination down physical layer control signaling characterized by comprising
The down physical layer control signaling that blind examination is sent by base station since first time node obtains the down physical layer control
The information of one or more running time-frequency resource position in signaling processed;
Wherein, the first time node is the orthogonal frequency terminated with the last one running time-frequency resource position of semi-static scheduling cycle
The OFDM symbol for dividing multiplexed symbols that there is default lead.
2. the method for blind examination down physical layer control signaling according to claim 1, which is characterized in that further include:
It is default after the OFDM symbol that the last one running time-frequency resource position of the semi-static scheduling cycle terminates
Start data transmission or data receiver at the OFDM symbol of quantity.
3. the method for blind examination down physical layer control signaling according to claim 1 or 2, which is characterized in that
The default lead is the fixation lead by standard convention;Or by the standard convention and time-frequency
The lasting relevant lead of OFDM symbol quantity of resource location.
4. the method for blind examination down physical layer control signaling according to claim 1 or 2, which is characterized in that
The default lead is to be mentioned by what the radio resource control layer signaling or physical layer control signaling of the base station configured
Preceding amount.
5. a kind of device of blind examination down physical layer control signaling characterized by comprising
Blind examination module obtains institute for the down physical layer control signaling that blind examination is sent by base station since first time node
State the information of one or more running time-frequency resource position in down physical layer control signaling;
Wherein, the first time node is the orthogonal frequency terminated with the last one running time-frequency resource position of semi-static scheduling cycle
The OFDM symbol for dividing multiplexed symbols that there is default lead.
6. the device of blind examination down physical layer control signaling according to claim 5, which is characterized in that further include:
Data processing module, the orthogonal frequency terminated for the last one running time-frequency resource position in the semi-static scheduling cycle
Start data transmission or data receiver at the OFDM symbol of preset quantity after multiplexed symbols.
7. the device of blind examination down physical layer control signaling according to claim 5 or 6, which is characterized in that
The default lead is the fixation lead by standard convention;Or by the standard convention and time-frequency
The lasting relevant lead of OFDM symbol quantity of resource location.
8. the device of blind examination down physical layer control signaling according to claim 5 or 6, which is characterized in that
The default lead is to be mentioned by what the radio resource control layer signaling or physical layer control signaling of the base station configured
Preceding amount.
9. a kind of communication equipment, including memory, processor and it is stored on the memory and can transports on the processor
Capable computer program, which is characterized in that the processor is realized when executing the computer program as in Claims 1-4
The step of method of described in any item blind examination down physical layer control signalings.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The method of blind examination down physical layer control signaling according to any one of claims 1 to 4 is realized when being executed by processor
Step.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711211762.6A CN109842942B (en) | 2017-11-28 | 2017-11-28 | Method, device and communication equipment for blind detection of downlink physical layer control signaling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711211762.6A CN109842942B (en) | 2017-11-28 | 2017-11-28 | Method, device and communication equipment for blind detection of downlink physical layer control signaling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109842942A true CN109842942A (en) | 2019-06-04 |
CN109842942B CN109842942B (en) | 2022-11-04 |
Family
ID=66879423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711211762.6A Active CN109842942B (en) | 2017-11-28 | 2017-11-28 | Method, device and communication equipment for blind detection of downlink physical layer control signaling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109842942B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111065162A (en) * | 2019-12-24 | 2020-04-24 | 展讯通信(上海)有限公司 | PDSCH (physical Downlink shared channel) semi-persistent scheduling method and device and computer readable storage medium |
CN111294134A (en) * | 2020-02-04 | 2020-06-16 | 北京邮电大学 | Time service method and device and electronic equipment |
CN112436931A (en) * | 2020-11-24 | 2021-03-02 | 北京中航通用科技有限公司 | Data communication method and device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102014508A (en) * | 2009-09-04 | 2011-04-13 | 中兴通讯股份有限公司 | Method for reactivation of semi-static scheduling, and base station thereof |
CN103687039A (en) * | 2012-09-26 | 2014-03-26 | 普天信息技术研究院有限公司 | Method for confirming PDCCH authorization of semi-static scheduling identifier scrambling |
CN106455103A (en) * | 2016-11-30 | 2017-02-22 | 宇龙计算机通信科技(深圳)有限公司 | Resource allocation method and resource allocation device |
GB201712939D0 (en) * | 2017-08-11 | 2017-09-27 | Tcl Communication Ltd | Multiplexing data over control resources in new radio |
-
2017
- 2017-11-28 CN CN201711211762.6A patent/CN109842942B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102014508A (en) * | 2009-09-04 | 2011-04-13 | 中兴通讯股份有限公司 | Method for reactivation of semi-static scheduling, and base station thereof |
CN103687039A (en) * | 2012-09-26 | 2014-03-26 | 普天信息技术研究院有限公司 | Method for confirming PDCCH authorization of semi-static scheduling identifier scrambling |
CN106455103A (en) * | 2016-11-30 | 2017-02-22 | 宇龙计算机通信科技(深圳)有限公司 | Resource allocation method and resource allocation device |
GB201712939D0 (en) * | 2017-08-11 | 2017-09-27 | Tcl Communication Ltd | Multiplexing data over control resources in new radio |
Non-Patent Citations (5)
Title |
---|
""R1-1717890"", 《3GPP TSG_RAN\WG1_RL1》 * |
""R2-1705118 Grant-free resource configuration"", 《3GPP TSG_RAN\WG2_RL2》 * |
HUAWEI等: "R1-1704291 "On support of semi-persistent scheduling"", 《3GPP TSG_RAN\WG1_RL1》 * |
LG ELECTRONICS: ""R1-166882 Overall discussion on URLLC"", 《3GPP TSG_RAN\WG1_RL1》 * |
NOKIA等: "R1-1701027 "Flexible semi-persistent scheduling for UL URLLC"", 《3GPP TSG_RAN\WG1_RL1》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111065162A (en) * | 2019-12-24 | 2020-04-24 | 展讯通信(上海)有限公司 | PDSCH (physical Downlink shared channel) semi-persistent scheduling method and device and computer readable storage medium |
CN111065162B (en) * | 2019-12-24 | 2022-06-24 | 展讯通信(上海)有限公司 | PDSCH (physical Downlink shared channel) semi-persistent scheduling method and device and computer readable storage medium |
CN111294134A (en) * | 2020-02-04 | 2020-06-16 | 北京邮电大学 | Time service method and device and electronic equipment |
CN112436931A (en) * | 2020-11-24 | 2021-03-02 | 北京中航通用科技有限公司 | Data communication method and device |
CN112436931B (en) * | 2020-11-24 | 2023-11-21 | 北京中航通用科技有限公司 | Data communication method and device |
Also Published As
Publication number | Publication date |
---|---|
CN109842942B (en) | 2022-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105025574B (en) | A kind of data transmission method and device | |
CN105634666B (en) | A kind of data transmission method and device in unauthorized frequency range | |
CN109890083A (en) | Carry out data transmission in the random access procedure and received method | |
CN102282881B (en) | Method, access network device and terminal for communicating using convergence carrier wave | |
CN109152052A (en) | Determine the method and device of transport block size | |
CN106793101B (en) | The control method of user equipment, network side equipment and user equipment | |
JP5366962B2 (en) | Method and apparatus for scheduling resources between different TDD systems | |
CN110431826A (en) | Method and apparatus for configuring control resource set in a wireless communication system | |
CN109923825B (en) | Apparatus and method for subframe arrangement | |
CN105612714A (en) | Virtual carriers for LTE/LTE-A communications in shared spectrum | |
CN108023665A (en) | A kind of data transmission method and device, electronic equipment | |
JP2013527714A (en) | UPLINK RESOURCE ALLOCATION INSTRUCTION APPARATUS AND METHOD IN WIDE BAND RADIO COMMUNICATION SYSTEM | |
CN106954277A (en) | A kind of dispatch request treating method and apparatus | |
CN108282880B (en) | A kind of method and device of the initial position of determining downstream data channel | |
CN109842942A (en) | The method, apparatus and communication equipment of blind examination down physical layer control signaling | |
CN104471998B (en) | For distributing the method and network node of the resource of uplink subframe | |
CN109495966A (en) | It is used for transmission determination and configuration method, the terminal and base station of the resource of downlink data | |
CN109803422A (en) | A kind of method and relevant device of resource active | |
CN108934068A (en) | A kind of method of resource distribution instruction, terminal and base station | |
US10939425B2 (en) | Configuring wireless communications resources | |
CN109392118A (en) | It is a kind of send scheduling request and scheduling request failure after configuration method and device | |
CN108260221A (en) | A kind of transmission method of wireless communication system, base station and terminal | |
CN109842950B (en) | Resource scheduling method and device for base station or terminal | |
CN107295660A (en) | A kind of scheduling of resource and data detection method, device, relevant device and system | |
CN109874176A (en) | A kind of indicating means of resource occupation, instruction device and communication equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |