A kind of network slice management method and equipment Download PDFInfo
- Publication number
- CN109842507A CN109842507A CN201711208165.8A CN201711208165A CN109842507A CN 109842507 A CN109842507 A CN 109842507A CN 201711208165 A CN201711208165 A CN 201711208165A CN 109842507 A CN109842507 A CN 109842507A
- Authority
- CN
- China
- Prior art keywords
- network
- transmission
- demand
- information
- network slice
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
This application discloses a kind of network slice management method and equipment.In this method, network is sliced the determining transmission demand to transmission network of management equipment, and transmission demand comprises at least one of the following: network slice level transmission demand, network are sliced subnet class transport demand, and tie point is to class transport demand;Network is sliced management equipment and sends network slice transmission management request to transmission network management equipment, includes the information of the transmission demand in network slice transmission management request;Transmission network management equipment is managed transfer resource according to the transmission demand, and sends network slice transmission managing response to network slice management equipment.Pass through the above method, realize the communication between network slice management equipment and transmission network management equipment, so that transmission network management equipment can be managed transmission network according to hierarchical transmission demand, to meet the different demands of heterogeneous networks slice, heterogeneous networks slice subnet or different tie points pair.
Description
Technical field
This application involves field of communication technology more particularly to a kind of network slice management methods and equipment.
Background technique
Network slice (network is introduced in the 5th Generation Mobile Communication System (the fifth generation, 5G)
Slice, NS) concept, to cope with different communication business to the difference of network performance demand.Network slice be can provide it is specific
Network function, the logical network for meeting special services demand include network function mould needed for completing specific function or service
The set of block and resource.
It includes terminal, access net (access network, AN), transmission network that network slice, which can be one,
The complete end to end network of (transport network, TN), core net (core network, CN) and application server,
It is capable of providing complete communication service.Certainly, network slice is also possible to terminal, AN, TN, CN and the grouping of application server middle part
It closes.
One network slice can be divided into several networks slice subnets (network slice subnet instance,
NSSI).Network slice subnet can not need to provide complete network service end to end, and network slice subnet can be network
The network function of the same equipment vendor forms set in slice, is also possible to the set of the network function divided by domain, such as CN
Network is sliced subnet, AN network is sliced subnet, or forms set by other modes such as deployed positions.Network is sliced subnet may quilt
Multiple network slices are shared.
Fig. 1 illustratively provides a kind of slice of network end to end, wireless access network (the radio access in 5G
Network, RAN) network is sliced between subnet portion and CN network slice subnet portion and inside requires TN and provides connectivity
It supports, and transmission network management system (transport network management system, TNMS) is responsible for the net of management TN
Network function and with third generation partner program (3rd generation partnership project, 3GPP) manage be
System interacts.
However, in the prior art, not to network be sliced interface between management equipment and transmission network management equipment and
The information of transmitting is standardized, and therefore, how to be communicated between network slice management equipment and transmission network management equipment, into
And realize that the demand being sliced according to network is managed transmission network, it is current urgent problem to be solved.
Summary of the invention
The embodiment of the present application provides a kind of network slice management method and equipment, to solve network slice management equipment with
The problem of how being communicated between transmission network management equipment.
In a first aspect, the embodiment of the present application provides a kind of network slice management method, comprising:
Network slice management equipment determines network slice to the transmission demand of transmission network, wherein transmission demand includes following
At least one of transmission demand: the transmission demand of network slice level, network are sliced the other transmission demand of sub-network level, tie point
To the transmission demand of rank;Network is sliced management equipment and sends network slice transmission management request to transmission network management equipment, should
It include the information of the transmission demand in network slice transmission management request;Transmission network management equipment is according to the transmission demand pair
Transfer resource is managed, and sends network slice transmission managing response to network slice management equipment.
In the above-mentioned methods, network slice management equipment cuts network slice level, network slice subnet rank or network
Tie point in piece is sent to transmission network management equipment to the transmission demand of rank, so that transmission network management equipment can be according to layer
The transmission demand of gradeization is managed transmission network, to meet heterogeneous networks slice, heterogeneous networks slice subnet or different connections
The different demands of point pair.
In one possible implementation, the information of the transmission demand of the network slice level includes what network was sliced
Mark;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark pair
The topology information for the network slice answered, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes yet to be built between the information of the network element of connection to be established, the network element in network slice
Vertical connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice
Source, the second transmission performance demand information include that the network slice joins the performance requirement of the network slice level of transmission network
Number, the performance demand parameters of the network slice level are used to indicate the transmission performance of all tie points pair in the network slice
The value range or grade of the sum of demand, or the performance requirement ginseng of all tie points pair being used to indicate in network slice
Several unified value ranges or grade.
In the above-mentioned methods, the transmission demand of network slice level can be sent to transmission network by network slice management equipment
Management equipment, for example, total bandwidth, priority, the throughput etc. that network slice occupies are sent to transmission network, so that transmission network
Management equipment is managed corresponding network slice according to the transmission demand of network slice level.
In one possible implementation, the information of the network slice other transmission demand of sub-network level includes the first net
Network is sliced the mark of subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: described the
One network is sliced the topology information between subnet and second network slice subnet, first network slice subnet and described
Second network is sliced the other transmission performance demand information of sub-network level between subnet, first network slice subnet and described the
Two networks are sliced the slice mark of network belonging to subnet;
The topology information includes the network element and second net in the first network slice subnet of connection to be established
Connection relationship between the information of network element, the network element in network slice subnet wait establish and the connection formed after establishing connection
The mark of point pair;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand
Information and the second transmission performance demand information, the first transmission performance demand information indicate that the network slice transmission management is asked
It asks and is used to indicate the transmission network management equipment creation, modifies or discharge the first network slice subnet and second network
The transfer resource being sliced between subnet, the second transmission performance demand information include first network slice subnet and described second
Network is sliced the other transmission performance demand parameter of sub-network level between subnet, and the other transmission performance demand parameter of sub-network level is used
The sum of the transmission performance demand of all tie points pair between instruction first network slice subnet and the second network slice subnet
Value range or grade, or be used to indicate between first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of all tie points pair.
In the above-mentioned methods, network can be sliced the other transmission demand of sub-network level and be sent to biography by network slice management equipment
Defeated net management equipment is sliced corresponding network so that transmission network management equipment is sliced the other transmission demand of sub-network level according to network
Subnet is managed.
In one possible implementation, the tie point includes tie point pair to the information of the transmission demand of rank
Mark;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark pair
The topology information for the tie point pair answered, the transmission performance demand information for identifying corresponding tie point to rank, the connection
Mark of the point to affiliated network slice, mark of the tie point to belonging network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair
Source, the second transmission performance demand information include the tie point to the performance demand parameters to transmission network.
In the above-mentioned methods, transmission demand of the tie point to rank can be sent to transmission network by network slice management equipment
Management equipment, for example, total bandwidth, priority, throughput etc. of the tie point to occupancy are sent to transmission network, so that transmission network
Management equipment according to tie point to the transmission demand of rank to corresponding tie point to being managed.
In one possible implementation, the information of the transmission demand includes the priority of network slice level, net
The priority or tie point of tie point pair in network slice are to the priority of the type of data packet of upper transmission.
In one possible implementation, the network slice management equipment determines the transmission demand to transmission network, packet
It includes:
Network slice management equipment determine network slice to the transmission demand of transmission network, the transmission demand include with
Lower at least one: the transmission demand of network slice level, network are sliced the other transmission demand of sub-network level, biography of the tie point to rank
Defeated demand;Alternatively,
The network slice management equipment determines transmission demand of the network slice subnet to transmission network, the transmission demand packet
Include following at least one: network is sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
The network slice management equipment determines tie point to the transmission demand to transmission network, and the transmission demand includes connecting
Transmission demand of the contact to rank.
In the above-mentioned methods, network slice management equipment can determine the transmission demand of different stage according to different scenes.
For example, the transmission of the network slice level can be directly determined when determining the transmission demand of newly created network slice level
Demand, alternatively, can also determine that network is sliced respectively if network slice is made of multiple established network slice subnets
The other transmission demand of sub-network level.
In one possible implementation, the network slice management equipment determines that network is sliced the transmission to transmission network
Demand, comprising: the network slice management equipment is sliced supported demand for services and/or network according to the network and is sliced
In network slice subnet or network element transmission demand, determine network slice to the transmission demand of transmission network;The network
The transmission demand of slice subnet includes: in the network element that the network is sliced in subnet and network slice except the network is sliced
When the network element in transmission demand and/or network slice subnet when network element except subnet is transmitted is transmitted
Transmission demand.
In the above-mentioned methods, network slice management equipment can determine network according to the related needs that upper layer is sliced network
The transmission demand of slice can also determine the transmission demand of network slice according to the transmission demand that each network is sliced subnet, with
Adapt to various application scenarios.
In one possible implementation, this method further include: the transmission network management equipment is sliced to the network
The ability information of management equipment transmission transmission network;The network slice management equipment is determined according to the ability information of the transmission network
To the transmission demand of transmission network.
In the above-mentioned methods, transmission network management equipment can actively send the ability of transmission network to network slice management equipment
Information can also be sliced to network and manage when receiving the request for obtaining its ability information that network slice management equipment is sent
The ability information that equipment sends transmission network is managed, so that the transmission demand that network slice management equipment is determined is that transmission network can expire
The transmission demand of foot.
In one possible implementation, the ability information of the transmission network includes one of following information or any group
Close: the network of the transmission network service is sliced the transmission network type that can be used, the coverage area of the transmission network, the biography
The transmission performance parameter that defeated net can be supported, the information for the virtual LAN VLAN that the transmission network can be supported, the transmission
Net troubleshooting strategy, the transmission network failure report strategy, transmission performance of the transmission network to the network slice serviced
Whether monitoring capability information, the transmission network are supported to report the topology information of the transmission network.
In one possible implementation, network slice management equipment include network slice management function NSMF,
Network is sliced subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
In one possible implementation, network slice management equipment can also be to the network element or network in network slice
The network element being sliced in subnet sends instruction information, and the instruction information is used to indicate the network element when sending data packet in data
Network slice mark, the mark of network slice Subnet Identification or the tie point pair in network slice are added in packet.
In the above-mentioned methods, since the transmission demand that network slice management equipment is determined can be divided into network slice-level
Not, network slice subnet rank and tie point are to rank, therefore, can identify the letter that each network element is sent in order to facilitate transmission network
The corresponding transmission demand of breath, each network element can add network slice mark, network slice when sending information in the information
Network mark knows or the mark of tie point pair, enables transmission network management equipment according to the mark in information according to corresponding transmission need
It asks and transmits the information.
Second aspect, the embodiment of the present application provide a kind of network slice management equipment, comprising: processor, respectively with institute
State the memory and transceiver of processor connection;The processor, for calling pre-stored computer in the memory
Program executes:
Determine that the transmission demand includes at least one of following transmission demand: network to the transmission demand of transmission network
The transmission demand of slice level, network are sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;
Network slice transmission management request is sent to transmission network management equipment by the transceiver, the network slice passes
It include the information of the transmission demand in defeated management request;
The network slice transmission managing response that the transmission network management equipment is sent is received by the transceiver.
In one possible implementation, the information of the transmission demand of the network slice level includes what network was sliced
Mark;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark pair
The topology information for the network slice answered, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes yet to be built between the information of the network element of connection to be established, the network element in network slice
Vertical connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice
Source, the second transmission performance demand information include that the network slice joins the performance requirement of the network slice level of transmission network
Number, the performance demand parameters of the network slice level are used to indicate the transmission performance of all tie points pair in the network slice
The value range or grade of the sum of demand, or the performance requirement ginseng of all tie points pair being used to indicate in network slice
Several unified value ranges or grade.
In one possible implementation, the information of the network slice other transmission demand of sub-network level includes the first net
Network is sliced the mark of subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: described the
One network is sliced the topology information between subnet and second network slice subnet, first network slice subnet and described
Second network is sliced the other transmission performance demand information of sub-network level between subnet, first network slice subnet and described the
Two networks are sliced the slice mark of network belonging to subnet;
The topology information includes the network element and second net in the first network slice subnet of connection to be established
Connection relationship between the information of network element, the network element in network slice subnet wait establish and the connection formed after establishing connection
The mark of point pair;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand
Information and the second transmission performance demand information, the first transmission performance demand information indicate that the network slice transmission management is asked
It asks and is used to indicate the transmission network management equipment creation, modifies or discharge the first network slice subnet and second network
The transfer resource being sliced between subnet, the second transmission performance demand information include first network slice subnet and described second
Network is sliced the other transmission performance demand parameter of sub-network level between subnet, and the other transmission performance demand parameter of sub-network level is used
The sum of the transmission performance demand of all tie points pair between instruction first network slice subnet and the second network slice subnet
Value range or grade, or be used to indicate between first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of all tie points pair.
In one possible implementation, the tie point includes tie point pair to the information of the transmission demand of rank
Mark;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark pair
The topology information for the tie point pair answered, the transmission performance demand information for identifying corresponding tie point to rank, the connection
Mark of the point to affiliated network slice, mark of the tie point to belonging network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair
Source, the second transmission performance demand information include the tie point to the performance demand parameters to transmission network.
In one possible implementation, the information of the transmission demand includes the priority of network slice level, net
The priority or tie point of tie point pair in network slice are to the priority of the type of data packet of upper transmission.
In one possible implementation, the processor is specifically used for when determining the transmission demand to transmission network:
Network slice is determined to the transmission demand of transmission network, the transmission demand comprises at least one of the following: network slice
The transmission demand of rank, network are sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
Network slice subnet is determined to the transmission demand of transmission network, the transmission demand comprises at least one of the following: network
It is sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
Tie point is determined to the transmission demand to transmission network, the transmission demand includes that tie point needs the transmission of rank
It asks.
In one possible implementation, the processor is when determining network slice to the transmission demand of transmission network,
It is specifically used for:
The network slice subnet or network element being sliced according to the network in supported demand for services and/or network slice
Transmission demand, determine network slice to the transmission demand of transmission network;
The transmission demand of the network slice subnet includes: network element and network slice in the network slice subnet
In except the network be sliced subnet in addition to network element transmitted when transmission demand and/or the network slice subnet in
Transmission demand when network element is transmitted.
In one possible implementation, the processor is also used to:
The ability information for the transmission network that the transmission network management equipment is sent is received by the transceiver;
The processor is specifically used for when determining the transmission demand to transmission network:
The transmission demand to transmission network is determined according to the ability information of the transmission network.
In one possible implementation, the ability information of the transmission network includes one of following information or any group
Close: the network of the transmission network service is sliced the transmission network type that can be used, the coverage area of the transmission network, the biography
The transmission performance parameter that defeated net can be supported, the information for the virtual LAN VLAN that the transmission network can be supported, the transmission
Net troubleshooting strategy, the transmission network failure report strategy, transmission performance of the transmission network to the network slice serviced
Whether monitoring capability information, the transmission network are supported to report the topology information of the transmission network.
In one possible implementation, the network slice management equipment is that network is sliced management function NSMF, net
Network is sliced subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
In one possible implementation, the processor is also used to:
Instruction information, institute are sent by network element of the transceiver in the network element or network slice subnet into network slice
It states and indicates that information is used to indicate the network element and adds network slice mark, network slice in the packet when sending data packet
Network mark knows or the mark of the tie point pair in network slice.
The third aspect, the embodiment of the present application provide a kind of transmission network management equipment, comprising: processor, respectively with it is described
The memory and transceiver of processor connection;The processor, for calling pre-stored computer journey in the memory
Sequence executes:
Network, which is received, by the transceiver is sliced the network slice transmission management request that management equipment is sent, the network
Include at least one of following transmission demand in slice transmission management request: the transmission demand of network slice level, network are cut
The other transmission demand of piece sub-network level, transmission demand of the tie point to rank;
Transfer resource is managed according to the transmission demand;
Management equipment, which is sliced, to the network by the transceiver sends network slice transmission managing response.
In one possible implementation, the information of the transmission demand of the network slice level includes what network was sliced
Mark;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark pair
The topology information for the network slice answered, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes yet to be built between the information of the network element of connection to be established, the network element in network slice
Vertical connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice
Source, the second transmission performance demand information include that the network slice joins the performance requirement of the network slice level of transmission network
Number, the performance demand parameters of the network slice level are used to indicate the transmission performance of all tie points pair in the network slice
The value range or grade of the sum of demand, or the performance requirement ginseng of all tie points pair being used to indicate in network slice
Several unified value ranges or grade.
In one possible implementation, the information of the network slice other transmission demand of sub-network level includes the first net
Network is sliced the mark of subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: described the
One network is sliced the topology information between subnet and second network slice subnet, first network slice subnet and described
Second network is sliced the other transmission performance demand information of sub-network level between subnet, first network slice subnet and described the
Two networks are sliced the slice mark of network belonging to subnet;
The topology information includes the network element and second net in the first network slice subnet of connection to be established
Connection relationship between the information of network element, the network element in network slice subnet wait establish and the connection formed after establishing connection
The mark of point pair;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand
Information and the second transmission performance demand information, the first transmission performance demand information indicate that the network slice transmission management is asked
It asks and is used to indicate the transmission network management equipment creation, modifies or discharge the first network slice subnet and second network
The transfer resource being sliced between subnet, the second transmission performance demand information include first network slice subnet and described second
Network is sliced the other transmission performance demand parameter of sub-network level between subnet, and the other transmission performance demand parameter of sub-network level is used
The sum of the transmission performance demand of all tie points pair between instruction first network slice subnet and the second network slice subnet
Value range or grade, or be used to indicate between first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of all tie points pair.
In one possible implementation, the tie point includes tie point pair to the information of the transmission demand of rank
Mark;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark pair
The topology information for the tie point pair answered, the transmission performance demand information for identifying corresponding tie point to rank, the connection
Mark of the point to affiliated network slice, mark of the tie point to affiliated network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair
Source, the second transmission performance demand information include the tie point to the performance demand parameters to transmission network.
In one possible implementation, the information of the transmission demand includes the priority of network slice level, net
The priority or tie point of tie point pair in network slice are to the priority of the type of data packet of upper transmission.
In one possible implementation, the processor is also used to:
The ability information that management equipment sends the transmission network is sliced to the network by the transceiver.
In one possible implementation, the ability information of the transmission network includes one of following information or any group
Close: the network of the transmission network service is sliced the transmission network type that can be used, the coverage area of the transmission network, the biography
The transmission performance parameter that defeated net can be supported, the information for the virtual LAN VLAN that the transmission network can be supported, the transmission
Net troubleshooting strategy, the transmission network failure report strategy, transmission performance of the transmission network to the network slice serviced
Whether monitoring capability information, the transmission network are supported to report the topology information of the transmission network.
In one possible implementation, network slice management equipment include network slice management function NSMF,
Network is sliced subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
Fourth aspect, also provides a kind of computer readable storage medium in the embodiment of the present application, described computer-readable to deposit
Computer instruction is stored in storage media, when described instruction is run on computers, so that computer executes such as above-mentioned first
Method described in aspect.
Detailed description of the invention
Fig. 1 is that network provided by the embodiments of the present application is sliced one of schematic diagram;
Fig. 2 is the schematic diagram that network provided by the embodiments of the present application is sliced management system;
Fig. 3 is that network provided by the embodiments of the present application is sliced life cycle schematic diagram;
Fig. 4 is the flow diagram that network provided by the embodiments of the present application is sliced management method;
Fig. 5 is that network provided by the embodiments of the present application is sliced the two of schematic diagram;
Fig. 6 is that network provided by the embodiments of the present application is sliced the three of schematic diagram;
Fig. 7 is that network provided by the embodiments of the present application is sliced the four of schematic diagram;
Fig. 8 is the stream that network provided by the embodiments of the present application is sliced that management equipment determines the transmission demand of network slice level
Journey schematic diagram;
Fig. 9 is one of the structural schematic diagram of net slice network management equipment provided by the embodiments of the present application;
Figure 10 is the second structural representation that network provided by the embodiments of the present application is sliced management equipment;
Figure 11 is one of the structural schematic diagram of transmission network management equipment provided by the embodiments of the present application;
Figure 12 is the second structural representation of transmission network management equipment provided by the embodiments of the present application.
Specific embodiment
In order to keep the purposes, technical schemes and advantages of the application clearer, below in conjunction with attached drawing to the application make into
One step it is described in detail.
Network slice is the logical network that can be provided particular network functions, meet special services demand, includes completing
The set of network function module and resource needed for specific function or service.Operator can be different characteristic or service quality
The terminal device group of (quality of service, QoS) grade provides the multiple networks slice for being able to achieve identical network function.
Same terminal device can also access net by 5G while access multiple networks and be sliced, provided not using these networks slice
The service of same type.For example, can for reinforced type mobile broadband service (enhanced mobile broadband, eMBB),
High reliability low time delay communicates (ultra-reliable low latency communications, URLLC) and extensive
Network slice is respectively created in the service of Internet of Things (massive Internet of Things, MIoT) these three types, each
The service of service quality needed for network slice offer can satisfy its corresponding service type.
One network slice can be divided into several network slice subnets.Network slice subnet can not need offer end and arrive
The complete network service at end, network slice subnet can be the network function composition collection of the same equipment vendor in network slice
It closes, is also possible to the set of the network function divided by domain, such as core net network slice subnet, access net network slice
Net, or set is formed by other modes such as deployed positions.Network, which is sliced subnet and may be sliced by multiple networks, to be shared.
Network slice, network slice subnet are by the creation of network slice management system, management.One network is sliced management system
Multiple network slices, multiple networks slice subnet can be created, and they are managed simultaneously, such as network slice is being transported
Network performance during row monitored, fault management, modification configuration parameter etc..
Fig. 2 illustratively gives a kind of schematic diagram of network slice management system, as shown, network slice management system
System (network slice management system, NSMS) may include: communication service management function
(communication service management function, CSMF), network are sliced management function (network
Slice management function, NSMF) and network slice subnet management function (network slice subnet
Management function, NSSMF).
Wherein, CSMF is mainly used for converting the relevant requirement of network slice, such as net for the relevant requirement of communication service
Network type, capacity, qos requirement etc., and related service is required and managed request by the interface with NSMF and is sent to NSMF.
NSMF is mainly used for being sliced management requirement by network relevant to the interface communication service of CSMF, to network
Life cycle, performance, failure of slice etc. are managed, and can further require related service to be converted into network slice
Relevant management requirement is netted, is sliced subnet management demand by sending network with the interface of NSSMF.
NSSMF is mainly used for being sliced subnet to network by being sliced subnet management requirement with the interface network of NSMF
Life cycle, performance, failure etc. be managed.
The life cycle management that network slice management system is sliced network may include three phases as shown in Figure 3:
The instantiation of network slice, configuration, activation stage: all shared, non-shared network resources relevant to network slice
And network function is created, is configured, and network slice is allowed to operate normally supported every communication in the activation stage
Service.
Network is sliced the operation phase: to the supervision of network chip property, report and online modification.Wherein, modification operation packet
Online upgrading is included, reconfigured, the dilatation of network slice, capacity modification, topological structure modification, be associated with and conciliate related network function etc..
Network is sliced retirement phase: being sliced to network and carries out de-activated operation, to the shared resource or net in network slice
Network function is configured, and network slice is then terminated.
As shown in Figure 1, by transmission network establishing connection between each network element in network slice.Transmission network is based on each in network
Communication link is established in the address of network element, supports the information transmission between network element.Transmission network can be based on transmission control protocol/Yin Te
Net interconnection protocol (transmission control protocol/internet protocol, TCP/IP) is transmitted;Net
Network transmission device, such as interchanger, router, can based on media access control (media access control, MAC)
Location, IP address or TCP port realize addressing, transmission.
Heterogeneous networks slice may be different to the transmission demand between network element, and in consolidated network slice to different network elements it
Between transmission demand may also be different, in network slice different network slice subnets to the transmission demand between network element also not to the utmost
It is identical.For example, it is and to provide other no more than 0.5ms that the network for providing URLLC type of service, which is sliced requirement to propagation delay time,
The requirement that the network of type of service is sliced to propagation delay time is then relatively low.Therefore, transmission network management system (transport
Network management system, TNMS) transmission network should be managed according to the transmission demand that network is sliced, into
And meets the needs of network slice.But network is sliced the communication interface between management system and transmission network management system at present
It is not standardized.
The embodiment of the present application provides a kind of network slice management method, to solve network slice management equipment and transmission
The problem of how being communicated between net management equipment.
In the embodiment of the present application, network slice management equipment can be network slice management system in NSMF or
NSSMF;However, Fig. 2 is only an example of network slice management system, therefore the network in the embodiment of the present application is sliced management
Equipment, which is also possible to other, has the equipment for being managed function to network slice, such as network manager (network
Manager, NM), domain manager (domain manager, DM) or NE Explorer (element manager, EM).
Transmission network management equipment in the embodiment of the present application has the equipment for being managed function to transmission network, the application couple
This is not specifically limited.
Referring to fig. 4, the flow diagram of management method is sliced for network provided by the embodiments of the present application, as shown, should
Method may comprise steps of:
Step 401, network slice management equipment determine the transmission demand to transmission network.
Wherein, the transmission demand that network slice management equipment is determined can be the transmission demand of network slice level,
It can be sliced the other transmission demand of sub-network level for network, can also be the tie point in network slice to the transmission demand of rank.
In some embodiments, network slice management equipment can determine network slice to the transmission demand of transmission network.Phase
Ying Di, network slice management equipment can determine the transmission demand of network slice level for network slice.If the network
It include that several networks are sliced subnet in slice, network slice management equipment can also determine that the sub-network level of network slice is other
Transmission demand, embodying network slice by several networks slice other transmission demand of sub-network level needs the transmission of transmission network
It asks.Further, since including several tie points pair in network slice, network is sliced management equipment can also be for network slice
Each tie point is to determining tie point to the transmission demand of rank.
In other embodiments, network slice management equipment can determine transmission of the network slice subnet to transmission network
Demand.If the network is sliced the network in subnet including several nestings and is sliced subnet, network slice management equipment can be directed to should
Network slice subnet determines that network is sliced the other transmission demand of sub-network level.If it includes several tie points in subnet that the network, which is sliced,
It is right, network slice management equipment can also for each tie point to determine the network slice subnet tie point to rank
Transmission demand, and then embody the transmission demand of network slice subnet.
In further embodiments, network slice management equipment can also determine that tie point needs the transmission to transmission network
It asks.For example, network is sliced management equipment to improve the performance of network slice or subnet, can be determined as network slice or
Subnet creates a new tie point pair, and determines that tie point to be created needs corresponding tie point to the transmission of rank
It asks.
In one possible implementation, the transmission demand of various ranks that network slice management equipment is determined can be with
It including the first transmission performance demand, or may include the first transmission performance demand and the second transmission performance demand.
Wherein, the first transmission performance requirement representation needs the transfer resource of transmission network creation, modification or release appropriate level.
For example, network, which is sliced management equipment, can determine the transfer resource of creation network slice, or determine what needs modification had created
The transfer resource of network slice, or can also determine the transfer resource for discharging network slice.Certainly, the management of network slice is set
It is standby to determine the transmission demand for needing creation, modification or releasing network slice subnet, or can also determine and need to create, repair
Change or discharge the transfer resource of tie point pair.
Second transmission performance demand is the transmission performance demand parameter of appropriate level to be created or to be modified.In some fields
Jing Zhong, the first transmission performance demand that network slice management equipment is determined are to need to create network slice, and further determine that
Network to be created is sliced the slice level for needing to meet or subnet rank or tie point to the transmission performance parameter of rank, such as
Total bandwidth parameter of slice level, unified delay parameter, total throughput, slice level priority, isolation requirement etc..Also
Have in some scenes, the first transmission performance demand that network slice management equipment is determined is that the network that modification has created is sliced
Transmission performance demand, and further determine that network to be modified be sliced it is modified after the transmission performance parameter that needs to meet.?
In other scene, network slice management equipment can also be determined to need to create or modify network slice according to actual needs
The transmission demand of subnet or tie point pair, correspondingly, the second transmission performance demand then indicate after creating or modified network
Subnet rank or tie point are sliced to the transmission performance parameter of rank.
In some embodiments, the first transmission performance demand that network slice management equipment is determined is also likely to be release net
The demand of network slice, network slice subnet or tie point pair, network slice management equipment then can no longer determine the second biography at this time
Defeated performance requirement.
In one possible implementation, network slice management equipment determines the transmission demand of network slice level,
It also may include the first transmission performance demand, or including the first transmission performance demand and the second transmission performance demand.Wherein,
The transfer resource that one transmission performance demand can be sliced for creation, modification or releasing network, the second transmission performance demand can be
The transmission performance demand parameter of the slice level of network slice after to be created or to be modified.The performance demand parameters of slice level
Refer to that the value range of the sum of transmission performance demand of all tie points pair or grade or all tie points need performance in slice
Ask the unified value range or grade of parameter.For example, as shown in fig. 7, including k tie point pair, network in network slice
Slice management equipment can determine that the bandwidth summation of this k tie point pair is X million, the transmission time delay parameters of this k tie point pair
Unified maximum value is Y milliseconds, and correspondingly, it is every tie point pair that transmission network, which is bandwidth of this k tie point to configuration X million,
Configuring unified propagation delay time maximum value is Y milliseconds.Optionally, transmission network can be X in the total bandwidth for guaranteeing k tie point pair
While million, the bandwidth of every tie point pair is dynamically adjusted.Although including k tie point pair in network slice, it is not meant to
Include 2*k network element in network slice, for example, tie point in Fig. 5 to 1 and tie point in 2 comprising network element gNB1, or
Uplink and downlink between two network elements may also become two tie points pair.
Optionally, the transmission demand for the network slice level that network slice management equipment is determined, can also include the net
The topological demand of network slice.In a specific embodiment, if network slice management equipment determines one network of creation or modification
Slice, network slice management equipment may further determine that in network slice between each network element wait establish or connection to be modified
Relationship.For example, network slice management equipment request creates a network slice, it include network element 1,2 and of network element in network slice
Network element 3, network slice management equipment can also determine that network element 1 and network element 2 need to establish tie point pair, and network element 1 and network element 3 need
Establish tie point pair.
In alternatively possible implementation, network is sliced management equipment in the transmission demand for determining network slice level
When, it can first determine between transmission demand and/or the network slice subnet inside the network slice subnet in network slice
Transmission demand, then further determine that out the network slice slice level transmission demand.Due to being divided in network slice
The mode that network is sliced subnet is varied, and therefore, the network element inside network slice subnet marked off may be led to
Letter, it is also possible to the network element inside network slice subnet does not need to be communicated, and only carries out the communication between network slice subnet, therefore
And network is sliced management equipment when determining the transmission demand of network slice level, can comprehensively consider in network slice subnet
After transmission demand between portion or network slice subnet, the transmission demand of network slice level is determined.
For example, the network slice subnet A created, network slice is utilized in newly created network slice by taking Fig. 6 as an example
It nets B and network is sliced subnet C, wherein include gNB1 and gNB2 in network slice subnet A, it includes AMF in subnet B that network, which is sliced,
It includes UPF in subnet C that network, which is sliced,.Network slice management equipment can first determine network slice subnet A and network slice subnet B
Between transmission demand, network slice subnet A and network slice subnet C between transmission demand and network slice subnet B and
Network is sliced the transmission demand between subnet C, and the slice of network slice is determined according to the transmission demand between these subnets
The transmission demand of rank.Specifically, network slice management equipment gets network slice subnet A, network slice subnet B and net
Network be sliced subnet C between altogether include 5 tie points pair, i.e., gNB1 and AMF, gNB1 and UPF, gNB2 and AMF, gNB2 and UPF,
AMF and UPF.Network is sliced management equipment can be according to the information of the tie point pair got and/or the biography of each tie point pair
Defeated demand determines the transmission demand of network slice level.
There are also a kind of possible implementation, network is sliced management equipment and is sliced determining network slice level for network
When transmission demand, it can be sliced supported demand for services according to the network, determine the corresponding network of network network slice
The value range or grade of the transmission demand parameter of slice level.For example, if a network slice is for providing URLLC type
Service, network slice management equipment can determine the net according to the high reliability of the service of URLLC type, the demand of low time delay
Network is sliced the value ranges of parameters such as the unified throughput of corresponding network slice level, unified propagation delay time or waits
Grade.
Certainly, network slice management equipment can be combined with network and be sliced supported demand for services and network slice
The transmission demand of middle tie point pair, network are sliced the transmission demand between subnet, determine the corresponding network of network slice
The transmission demand of slice level.
In one possible implementation, network is sliced the other transmission demand of sub-network level, may include that first network is cut
The mark of piece subnet and the second network slice subnet, optionally, it can also include that network, which is sliced the other transmission demand of sub-network level,
One network is sliced the mark of network slice belonging to subnet and the second network slice subnet.Optionally, network is sliced subnet rank
Transmission demand can also include that transmission between first network slice subnet and the second network slice subnet when being communicated needs
It asks.The other transmission of sub-network level that network is sliced the first network slice subnet that management equipment determines and the second network slice subnet needs
It can also include the first transmission performance demand or the first transmission performance demand and the second transmission performance demand in asking.Wherein,
One transmission performance demand can be sliced the biography between subnet for creation, modification or release first network slice subnet and the second network
Defeated resource, the second transmission performance demand can be sliced the other biography of sub-network level between subnet for the network after to be created or to be modified
Defeated performance demand parameters.The other transmission performance demand parameter of sub-network level refers to first network slice subnet and the second network slice
Value range or grade or first network the slice subnet of the sum of the transmission performance demand of all tie points pair between net and institute
State the unified value range or grade of the performance demand parameters of all tie points pair between the second network slice subnet.
Optionally, the network that network slice management equipment is determined is sliced the other transmission demand of sub-network level, can also include
The two networks are sliced the topology information between subnet.The topology information includes the first network slice of connection to be established
Connection relationship to be established between the information of network element in subnet and the network element in second network slice subnet, the network element
And establish the mark of the tie point pair formed after connection.For example, network slice management equipment can determine that network is sliced subnet 1
In network element 1 and network slice subnet 2 in network element 2 connection relationship.
Specifically, network slice management equipment is determining between first network slice subnet and the second network slice subnet
When the other transmission demand of sub-network level, first network slice subnet external transmission demand and the second network can be first determined respectively
It is sliced the external transmission demand of subnet, the external transmission demand of subnet is then sliced according to first network and the second network is sliced son
External transmission demand is netted, determines that the transmission communicated between first network slice subnet and the second network slice subnet needs
It asks.
Wherein, the external transmission demand of first network slice subnet is for the network element in first network slice subnet and except first
Transmission demand when network element except network slice subnet is transmitted.For example, as shown in figure 5, including in network slice subnet A
GNB1 and gNB2, gNB1 can be connect by transmission network with AMF, can also be connect by transmission network with UPF.Network slice management
Equipment can determine the transmission when gNB1 in network slice subnet A is communicated with this network element of AMF to transmission network respectively
The transmission demand of transmission network, gNB2 are communicated with this network element of AMF when demand, gNB1 are communicated with this network element of UPF
When being communicated to the transmission demand and gNB2 of transmission network with this network element of UPF to the transmission demand of transmission network.
Similarly, the external transmission demand of the second network slice subnet be the network element that is sliced in subnet of the second network with except the
Transmission demand when network element except two networks slice subnet is transmitted.As shown in figure 5, including in network slice subnet B
AMF1 and UPF1, AMF1 can be connect by transmission network with gNB, and UPF1 can be connect by transmission network with gNB.Network slice pipe
Reason equipment can determine the biography when AMF1 in network slice subnet B is communicated with this network element of gNB to transmission network respectively
To the transmission demand of transmission network when defeated demand and UPF1 are communicated with this network element of gNB.
Network is sliced management equipment and is determining that first network slice subnet and the second network slice subnet are external respectively
After transmission demand, the transmission demand between first network slice subnet and the second network slice subnet is further determined that out.Still with
May include the tie point that constitutes of gNB1 and AMF1 for Fig. 5, between network slice subnet A and network slice subnet B to 1,
The tie point pair that the tie point that gNB1 and UPF1 is constituted constitutes the tie point that 2, gNB2 and AMF1 is constituted to 3, gNB2 and UPF1
4.If being demand when 20M, gNB2 are communicated with AMF to bandwidth to the demand of bandwidth when gNB1 is communicated with AMF is 10M, and AMF1
It is 10M to the demand of bandwidth when being communicated with gNB, it is determined that going out tie point is to 1 demand of (gNB1 and AMF1) to bandwidth
20M, demand of the tie point to 3 (gNB2 and AMF1) to bandwidth are 10M;If being to the demand of bandwidth when gNB1 is communicated with UPF
It is 5M to the demand of bandwidth when 10M, gNB2 are communicated with UPF, and demand when UPF1 is communicated with gNB to bandwidth is 5M, then
Determine that demand of the tie point to 2 (gNB1 and UPF1) to bandwidth is 10M, tie point is to 4 (gNB2 and UPF1) to the need of bandwidth
It asks as 5M.Then the other bandwidth demand of sub-network level between network slice subnet A and network slice subnet B is (20+10+10+5) M.
In some embodiments, network slice management equipment is sliced for network when determining the other transmission demand of sub-network level,
It can be sliced supported demand for services according to the network, determine the other transmission of sub-network level in network slice between each subnet
The value range or grade of demand parameter.For example, as shown in fig. 6, network slice subnet A includes gNB1 and gNB2, network slice
It include AMF in subnet B, it includes UPF in subnet C that network, which is sliced, is passed since network is sliced between subnet A and network slice subnet B
Defeated is control plane information, and transmitting between network slice subnet A and network slice subnet C is user plane information, therefore, net
The other transmission demand of sub-network level that network is sliced between subnet A and network slice subnet B can believe control plane according in demand for services
The transmission requirement of breath determines that if time delay is X millisecond, and network slice subnet A and network are sliced the subnet rank between subnet C
Transmission demand the transmission requirement of user plane information can be determined according in demand for services, as time delay be Y milliseconds.It can also incite somebody to action
The priority transmitted between network slice subnet A and network slice subnet B is set as high precedence, and network is sliced son
The priority transmitted is set as low precedence between net A and network slice subnet C, when gNB1 and gNB2 generate simultaneously with
When the demand that UPF is communicated in the AMF, network slice subnet C in network slice subnet B, if transfer resource is not able to satisfy together
When send information, then preferentially to network slice subnet B in AMF send information, then to network slice subnet C in UPF send letter
Breath.
Specifically, two can establish the network element that connection is communicated and may be constructed a tie point pair, tie point pair
Transmission demand is the transmission demand between two network elements.In order to accurately realize the demand for services of network slice, network slice
Management equipment can determine the transmission demand of some or certain tie points to corresponding tie point to rank, so that transmission network
Can according to tie point to the transmission demand of rank to corresponding tie point to the transfer resource between two network elements for being included
It is configured, to meet its corresponding transmission demand.
It in a specific embodiment, can be to different tie points to different priority is arranged.For example, due to control
The priority of face information is higher, and the priority of user plane information is lower, therefore, can be by next-generation base-station node (next
Generation node, gNB) with access and mobile management function to ps domain (access and mobility management,
AMF) priority of the tie point pair formed is set as high precedence, and by gNB and user plane functions (user plane
Function, UPF) priority of tie point pair that is formed is set as low precedence;When gNB simultaneously generate with AMF, UPF into
When the demand of row communication, if transfer resource is not able to satisfy while sending information, information preferentially is sent to AMF, then send to UPF
Information.
In another specific embodiment, data can also be set to the different types of data packet of the same tie point pair
The priority of package level.Such as the data packet transmitted between network element AMF and gNB may include the registration for management terminal, move
Dynamic property, establishing session etc., a variety of variety classes, each type of data packet may be because the difference of demand for services and have difference
Transmission demand, therefore when AMF to gNB simultaneously different types of data packet and transfer resource anxiety occurs when, can preferentially pass
The defeated data packet with more high-transmission demand.
From it is above-mentioned to different tie points to different priority class is arranged seemingly, can also be to different tie points to setting
Other the second transmission performance demands such as different time delay, bandwidth, details are not described herein again.
Further, since a tie point is shared to that can be sliced by multiple networks, therefore, tie point is in the different nets of transmission
When information in network slice, transmission network can transmit the information according to the transmission demand of the information corresponding network slice.For example,
Tie point is sliced A by network to 1 and network slice B shares, and network slice management equipment determines tie point to 1 in transmission network
Be sliced A in information when time delay be 0.5ms, and tie point to transmission network slice B in information when time delay be 1ms,
Then transmission network should be sliced in B by timing_delay estimation in 0.5ms in transmission network when transmission network is sliced the information in A
Information when should be by timing_delay estimation in 1ms.
In a specific embodiment, network slice A includes network element 1 and network element 2,1 He of network element when creating network slice A
Network element 2 is it has been established that form tie point to 1;And it is subsequent when creating network slice B, network slice B also contains network element 1
With network element 2, and network element 1 and network element 2 are also required to establish connection in network slice B.Transmission network then between network element 1 and network element 2,
A is sliced for network and network is sliced B and establishes a link in logic respectively.Optionally, transmission network network element 1 and network element 2 it
Between, a physical link can be only established, or may be that network slice A and network slice B establish a physics chain respectively
Road.
In some embodiments, the tie point pair constituted for two network elements, further can also carry out uplink to it
With the differentiation of downlink, using uplink and downlink as two tie points pair.It is known as example, network element 1 sends information to network element 2
Row, uplink are correspondingly connected with o'clock to 1;Network element 2 sends information to network element 1 and is known as downlink, and downlink is correspondingly connected with o'clock to 2.It is answered some
With in scene, the transmission demand of uplink and downlink be can also be different, and therefore, determine tie point to the transmission demand Shi Ruoneng of rank
It enough further determines that out the transmission demand of upstream or downstream and informs transmission network, transmission network is enabled to execute more accurately
Uplink and downlink transmission, further satisfaction user demand improve user experience.
As previously described, because the tie point that network slice management equipment is determined can be needle to the transmission demand of rank
To the transmission demand for the tie point pair that two network elements are constituted, it is also possible to the tie point of identical two network elements composition in different nets
Network slice or network slice subnet in transmission demand, can with the transmission demand of upstream or downstream between identical two network elements,
Therefore, the mark for the connection pair that network slice management equipment is determined, can only distinguish the tie point pair which two network element is constituted,
Identical two network elements tie point pair for constituting in heterogeneous networks slice or network slice subnet can also can be distinguished, it can be with
Distinguish the uplink or downlink between identical two network elements.
For example, tie point can only indicate mark 1 tie point pair that network element 1 and network element 2 are constituted, and it cannot distinguish between the company
Contact, if network slice management equipment is wanted to further discriminate between, can make in network slice 1 or in network slice 2
The mark of mark 1+ network slice 2 is distinguished with mark or tie point of the tie point to mark 1+ network slice 1.Again
For example, tie point can indicate the tie point pair of network element 1 and network element 2 in network slice 1 to mark A, tie point can to mark B
To indicate the tie point pair of network element 1 and network element 2 in network slice 2.For another example tie point indicates network element 1 to network element mark I
2 send transmission link when information, transmission link when tie point indicates that network element 2 sends information to network element 1 to mark II.
In one possible implementation, the transmission demand inside network slice subnet may include network slice subnet
The transmission demand of the transmission demand of rank and/or tie point to rank.Specifically, the transmission demand inside network slice subnet is
The transmission demand communicated between each network element in one network slice subnet.
Optionally, the network that network slice management equipment is determined is sliced the transmission demand inside subnet, can also include
The network is sliced the topological demand inside subnet.In a specific embodiment, if network slice management equipment determine creation or
A network slice subnet is modified, network slice management equipment may further determine that in network slice subnet between each network element
Wait establish or connection relationship to be modified.
Further, it can also be wrapped in the transmission demand inside network slice subnet that network slice management equipment is determined
The first transmission performance demand is included, or may include the first transmission performance demand and the second transmission performance demand.Wherein, it first passes
Defeated performance requirement can be sliced the transfer resource inside subnet for creation, modification or releasing network, and the second transmission performance demand can
Think it is to be created or to be modified after network slice subnet inside subnet rank and/or tie point the transmission performance of rank is needed
Seek parameter.
In a specific embodiment, network slice management equipment determines in network slice subnet for network slice subnet
When the transmission demand in portion, the demand for services that subnet is supported can be sliced according to the network, determined corresponding to network slice
The transmission demand of network slice level and/or tie point to rank.For example, if a network slice subnet is for providing terminal
Access service, network slice management equipment can determine the transmission inside network slice subnet according to the demand of access service
Demand;If a network slice subnet is for providing core net function, network is sliced management equipment can be according to core net function
Demand determine the network slice subnet inside transmission demand.
In another specific embodiment, network slice management equipment determines that network is sliced subnet for network slice subnet
When the transmission demand of inside, the transmission demand that can be sliced the tie point pair that each network element is formed in subnet to the network summarize, and obtain
Transmission demand to inside network slice subnet.For example, a network is sliced in subnet including gNB1, gNB2 and AMF,
GNB1 and AMF, which can establish connection and form tie point and can establish connection to 1, gNB2 and AMF, forms tie point to 2, then can be with
Using tie point to 1 transmission demand and tie point to 2 transmission demand as the network slice subnet inside transmission demand.If
Tie point is 10M to 1 and demand of the tie point to 2 pairs of bandwidth, it is believed that the network is sliced the demand inside subnet to bandwidth
For 20M;If tie point is 1ms to 1 and demand of the tie point to 2 pairs of bandwidth, it is believed that right inside network slice subnet
The demand of time delay is 1ms.
In addition, network slice management equipment can also be sliced the demand for services and the net that subnet is supported according to the network
Network is sliced the transmission demand of each tie point pair in subnet, determines the transmission demand inside network slice subnet.
In a specific embodiment, in network slice each network slice subnet external transmission demand or network element biography
Defeated demand can be determined that the external transmission demand of the network determined slice subnet is sent to NSMF by NSSMF by NSSMF,
Transmission demand NSMF external to each network slice subnet received is integrated, and determines network slice level or sub-network level
Not or tie point is to the transmission demand of rank, and the information for the transmission demand that the network determined is sliced is sent to transmission network by NSMF
Management equipment.Certainly, above-mentioned NSMF can also be sliced management equipment replacement by other networks.
Step 402, network are sliced management equipment and send network slice transmission management request to transmission network management equipment, this is asked
It include the information of above-mentioned transmission demand in asking.
As previously mentioned, network slice management equipment has confirmed network slice level, network slice subnet rank or company
Then the information for the transmission demand determined is carried in network slice transmission management request the transmission demand of rank by contact
It is sent to transmission network management equipment.
In one possible implementation, the information of the transmission demand of network slice level includes the mark of network slice
Know, i.e., the mark that the network to be created, to be modified or to be released that network slice management equipment is determined is sliced.Wherein, net
The mark of network slice can be the identity (identification, ID) of network slice, or being also possible to other can
For being sliced the mark that distinguishes to each network, if such as network slice management equipment be not desired to for the ID that network is sliced being exposed to
Other mapping marks can be used in transmission network.
Further, the information of the transmission demand of network slice level can also include corresponding with above-mentioned network slice mark
Network slice topology information and at least one of transmission performance demand information.
As previously mentioned, the transmission demand of network slice may include the first transmission performance demand or the first transmission performance
Demand and the second transmission performance demand, correspondingly, transmission performance information also may include the first transmission performance demand information, or
First transmission performance demand information and the second transmission performance demand information.
Specifically, the first transmission performance demand information indicates that network slice management request is used to indicate transmission network management and sets
Standby creation, modification or the transfer resource for discharging network slice corresponding with above-mentioned network slice mark, for example, the first transmission performance
Demand information can indicate that the value of this 2 bits can indicate to create when being " 00 ", and " 01 " can indicate to repair with 2 bits
Change, " 10 " can indicate to discharge.
Second transmission performance demand information is corresponding with the second transmission performance demand above-mentioned, and network is sliced management equipment will
The transmission performance demand determined is sent to transmission network management equipment by the second transmission performance demand information.As previously mentioned, the
Two transmission performance demand informations may include the parameters such as priority, bandwidth, time delay, throughput, isolation.
Specifically, each transmission performance demand parameter can serve to indicate that company each to be created or to be modified in network slice
The numerical value or grade of the sum of the transmission performance demand of contact pair, for example, can be indicated in network slice if bandwidth parameter is 100M
The sum of bandwidth of each tie point pair is 100M, but transmission network can dynamically adjust the bandwidth of each tie point pair;Alternatively, can also be with
Be used to indicate network slice in each tie point pair transmission performance demand parameter unified value range or grade, such as when
Prolonging parameter can indicate that the unified maximum delay of each tie point or time delay grade, priority parameters can indicate each tie point to biography
The grade of the priority of defeated information.The meaning of each transmission performance demand parameter, which can be, makes an appointment, so that transmission network management
Reason equipment correctly can create or modify the transfer resource of network slice according to parameters.
The topology information of network slice is corresponding with afore-mentioned topology demand, may include connection to be established in network slice
The mark of connection relationship wait establish between the information of network element, network element and the tie point pair formed after establishing connection.
For example, network slice management equipment request creates a network slice, transmission network is needed to establish the net to be created
Network element 1 and the connection of network element 2, the connection of network element 1 and network element 3 in network slice.Network slice management equipment can be by network element 1 at this time
The tie point pair that instruction information, network element 1 and the network element 2 that information, the information of network element 2, network element 1 and network element 2 establish connection are constituted
Mark is sent to transmission network management equipment;The information of network element 1, the information of network element 3, network element 1 and network element 3 can also be established connection
The mark for the tie point pair that instruction information, network element 1 and the network element 3 of relationship are constituted is sent to transmission network management equipment.
Optionally, the information of network element may include the title of network element, it is ID, IP address, MAC Address, port number information, virtual
The ID etc. of local area network (virtual local area network, VLAN), for identification network element of connection to be established.
As previously mentioned, the mark of tie point pair can be used for distinguishing the tie point pair formed between different network elements.Further
Ground, the mark of tie point pair can be also used for distinguishing the tie point pair that identical two network elements are formed in heterogeneous networks slice.This
Outside, tie point to mark can be also used for distinguish two network elements between uplink, downlink transfer link.
In one possible implementation, the information of the network slice other transmission demand of sub-network level may include that network is cut
The information of transmission demand between piece subnet.
Specifically, in the information of the transmission demand between network slice subnet, the mark including first network slice subnet
With the mark of the second network slice subnet, i.e., network slice management equipment determine to be created, to be modified or to be released the
One network is sliced the transfer resource between subnet and the second network slice subnet.The mark of network slice subnet can cut for network
The ID of piece subnet, or be also possible to other and can be used in being sliced the mark that subnet distinguishes to each network.
Further, network slice subnet between transmission demand information can also include first network slice subnet and
Second network is sliced the biography between the topology information between subnet and first network slice subnet and the second network slice subnet
At least one of defeated performance requirement information.
As previously mentioned, the transmission performance information between network slice subnet also may include the first transmission performance demand letter
Breath or the first transmission performance demand information and the second transmission performance demand information.Specifically, the first transmission performance demand information
Indicate the network slice management request be used to indicate transmission network management equipment creation, modification or release first network slice subnet and
Second network is sliced the transfer resource between subnet;Second transmission performance demand information indicates the transmission between network slice subnet
Required performance parameter.Specifically, each transmission performance demand parameter each of can serve to indicate that between two networks slice subnets
The value range or grade of the sum of the transmission performance demand of tie point pair to be created or to be modified can be used for instruction network
It is sliced the unified value range or grade of the transmission performance demand parameter of each tie point pair between subnet.
The topological demand that network is sliced between the topology information between subnet and aforementioned network slice subnet is corresponding, can wrap
Include connection relationship to be established between two networks slice subnets between the information of the network element of connection to be established, network element and
Establish the mark of the tie point pair formed after connection.Specifically, the information of network element and the mark of tie point pair may refer to above-mentioned
The topology information of network slice level.
In one possible implementation, the tie point in network slice can wrap the information of the transmission demand of rank
Include the mark of tie point pair, i.e., the mark of tie point pair to be created, to be modified or to be deleted.Specifically, the mark of tie point pair
Know for indicating connection relationship between two network elements, so as to subsequent modification or discharge the connection clock synchronization, network slice, which manages, to be set
It is standby not have to that the information of the network element of the tie point centering is sent to transmission network management equipment again, only send the mark of tie point pair
Knowing transmission network management equipment is that may know that the transfer resource between which two network element is modified or discharged.
Further, the information of the transmission demand of tie point pair can also include with above-mentioned tie point to the corresponding company of mark
The topology information of contact pair and with above-mentioned tie point to the corresponding tie point of mark in the transmission performance demand information of rank
It is at least one.
As previously mentioned, tie point also may include the first transmission performance demand information to the transmission performance information of rank, or
Person's the first transmission performance demand information and the second transmission performance demand information.Specifically, the first transmission performance demand information indicates
It is corresponding to mark with above-mentioned tie point that network slice management request is used to indicate the creation of transmission network management equipment, modification or release
Tie point pair transfer resource;Second transmission performance demand information indicates tie point to the transmission demand performance parameter of rank.
The topology information of tie point pair may include between the information of the network element of the tie point centering to be established, network element
Connection relationship to be established.Optionally, the information of network element may include title, ID, IP address, MAC Address, the port numbers of network element
Information, VLAN ID etc., for identification network element of connection to be established.
In one possible implementation, the information of the transmission demand inside network slice subnet may include that network is cut
The information of piece subnet rank or tie point to the transmission demand of rank.
Specifically, in the information of the transmission demand inside network slice subnet, the mark including network slice subnet, i.e. net
The mark for the network slice subnet to be created, to be modified or to be released that network slice management equipment is determined.Network slice
The mark of net can be sliced the ID of subnet for network, or be also possible to other and can be used in being sliced each network in subnet progress area
The mark divided.
Further, the information of the transmission demand inside network slice subnet can also include being sliced subnet with above-mentioned network
Identify the topology information inside corresponding network slice subnet and network slice corresponding with above-mentioned network slice Subnet Identification
Subnet rank or tie point inside net is at least one of the transmission performance demand information of rank.
As previously mentioned, the transmission performance information inside network slice subnet also may include the first transmission performance demand letter
Breath or the first transmission performance demand information and the second transmission performance demand information.Specifically, the first transmission performance demand information
Indicate that network slice management request is used to indicate the creation of transmission network management equipment, modification or release and is sliced subnet with above-mentioned network
Identify the transfer resource inside corresponding network slice subnet;Second transmission performance demand information indicates inside network slice subnet
Subnet rank or tie point to the transmission demand performance parameter of rank.Specifically, the other transmission performance demand parameter of sub-network level
It can serve to indicate that all tie points pair that network is sliced between the nested subnet that every two is to be created or to be modified in subnet
The value range or grade of the sum of transmission performance demand, can be used for instruction network slice subnet in every two nesting subnet it
Between all tie points pair transmission performance demand parameter unified value range or grade.
Tie point can be used for indicating respectively in network slice subnet each wait create to the transmission performance demand parameter of rank
It builds or the value range or grade of the transmission performance demand of tie point pair to be modified.
Topology information inside network slice subnet is corresponding with the topological demand inside aforementioned network slice subnet, can wrap
Include the connection relationship to be established in network slice subnet between the information of the network element of connection to be established, network element and the company of foundation
The mark of the tie point pair formed after connecing.Optionally, the information of network element may include the title of network element, ID, IP address, MAC
Location, port number information, VLAN ID etc., for identification network element of connection to be established.The mark of tie point pair and above-mentioned network are sliced
Topology information in tie point pair mark it is similar, details are not described herein again.
In a specific embodiment, the transmission demand inside network slice subnet can be is determined by NSSMF, can
To send network slice transmission management request from NSSMF to transmission network management equipment.Certainly, NSSMF can also will be determined
Transmission demand inside network slice subnet is sent to NSMF or other networks slice management equipment, then by NSMF or other networks
Slice management equipment is sent to transmission network management equipment.
Step 403, transmission network management equipment are managed transfer resource according to transmission demand.
Specifically, transmission network management equipment can be sliced the transmission for the network slice level that management equipment is sent according to network
Demand is managed the transfer resource of corresponding network slice;The network that management equipment is sent can also be sliced according to network
It is sliced the other transmission demand of sub-network level, to the transfer resource inside corresponding network slice or subnet or between network slice subnet
It is managed;Transmission demand of the tie point to rank of management equipment transmission can also be sliced according to network, to corresponding connection
The transfer resource of point pair is managed.
How transmission network management equipment is managed transfer resource, and the application is not construed as limiting this.
Step 404, transmission network management equipment send network slice transmission managing response to network slice management equipment.
It in one possible implementation, can be in the network slice transmission managing response that transmission network management equipment is sent
Result is managed including network slice transmission, wherein it may include to be used to indicate according to transmission that network slice transmission, which manages result,
Demand information is managed successfully instruction information to transmission network or is used to indicate according to the transmission demand information to transmission
Net is managed the instruction information of failure.
Further, if transmission network management equipment fails to the management of transmission network according to transmission demand, such as the company of creation is needed
Contact pair but success is not created, may further include the tie point of management failure in the instruction information of failure to, network slice
The information of subnet or network slice.In addition, the reason of can further include unsuccessfully in the instruction information of failure.
In one possible implementation, if network slice management equipment receives the net of transmission network management equipment transmission
Include the instruction information of management equipment in network slice transmission managing response, network slice can also be retransmitted over time
The transmission demand information carried in transfer management request, or modification request sends network slice transmission management request again.
For example, as shown in figure 8, network slice management equipment determines the transmission demand of network slice level, transmission demand packet
Including in creation network slice between network element 1 and network element 2 connection (tie point is to 1) and the company that creates NE between 1 and network element 3
Connect (tie point is to 2).Network is sliced management equipment and sends network slice transmission management request, the request to transmission network management equipment
In include network slice mark, the information of network element 1, network element 2, network element 3, the connection relationship to create NE between 1 and network element 2
Indicate information, tie point to 1 mark, the instruction information and tie point pair of the connection relationship to create NE between 1 and network element 3
2 mark.Transmission network management equipment sends network slice transmission managing response to network slice management equipment, and response instruction connects
Contact creates successfully to 1, and tie point fails to 2 creations.Network is sliced management equipment can be over time again to transmission
Net management equipment send the management of network slice transmission request, the request for request transmission network create NE again 1 and network element 3 it
Between connection relationship.Transmission network management equipment sends network slice transmission managing response, the response to network slice management equipment
Instruction tie point creates successfully to 2.
In one possible implementation, transmission network management equipment can also be sliced management equipment to network and send transmission
The ability information of net, so that network, which is sliced management equipment, determines that network slice, network are sliced son according to the ability information of transmission network
The transmission demand of net or tie point pair is sliced the energy that the transmission demand that management equipment is determined is more than transmission network to avoid network
Power range.
Optionally, network slice management equipment first can send acquisition capability information request to transmission network, so that transmission network
Management equipment reports the ability information of transmission network, alternatively, transmission network management equipment can also be believed with the ability of active reporting transmission network
Breath.
In some embodiments, transmission network management equipment send transmission network ability information include one of following information or
Any combination: the network of transmission network service is sliced the transmission network type (such as optical transport network etc.) and correlation that can be used
Transport Network Technique (such as software defined network SDN, VLAN etc.), the coverage area of transmission network, what transmission network can be supported
Transmission performance parameter, the information for the virtual LAN VLAN that transmission network can be supported, transmission network troubleshooting strategy, transmission network event
Barrier reports strategy, and to the transmission performance monitoring capability information of the network slice serviced, whether transmission network is supported reports transmission network
The topology information of transmission network service.
In one possible implementation, transmission network management equipment can also service it each network slice, net
The transmission performance of network slice subnet or tie point pair is monitored, and is sent to network slice management equipment.Optionally, transmission network
Management equipment can periodically be set to network slice management after receiving the instruction information that network slice management equipment is sent
Preparation send transmission performance monitoring information, or only sends after receiving instruction information every time;Alternatively, transmission network management equipment can
Sent to network slice management equipment according to the inquiry request in the inquiry request for receiving network slice management equipment transmission
Request the performance parameter of inquiry;Or transmission network management equipment actively can also send transmission performance to network slice management equipment
Monitoring information.The performance monitoring request or inquiry request that the network slice management equipment is sent may include needs and monitor or look into
Ask the network slice of transmission performance, the mark of subnet, tie point pair.
In one possible implementation, network slice management equipment can send instruction information to each network element, to refer to
Show network element added in the packet when sending data packet network slice mark, perhaps add network slice Subnet Identification or
Add the mark of tie point pair.For transmission network when transmitting data packet for each network element, the forwarding devices such as interchanger or router can
To parse the slice of network belonging to the data packet, affiliated network slice subnet or tie point pair from the data packet, and
Accordingly based upon network belonging to the data packet slice, network slice subnet or tie point pair transmission demand to the data packet into
Row transmission.
Based on the same technical idea, the embodiment of the present application provides a kind of network slice management equipment, for realizing upper
State network slice management method embodiment.
Referring to Fig. 9, being sliced management equipment for network provided by the embodiments of the present application can include determining that unit 901, transmission
Unit 902 and receiving unit 903.
Specifically, it is determined that unit 901 is for determining that the transmission demand includes following transmission to the transmission demand of transmission network
At least one of demand: the transmission demand of network slice level, network are sliced the other transmission demand of sub-network level, and tie point is to grade
Other transmission demand.
Transmission unit 902 is used to send network slice transmission management request, the network slice to transmission network management equipment
It include the information of the transmission demand in transfer management request.
Receiving unit 903 is used to receive the network slice transmission managing response that the transmission network management equipment is sent.
In one possible implementation, the information of the transmission demand of the network slice level includes what network was sliced
Mark;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark pair
The topology information for the network slice answered, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes yet to be built between the information of the network element of connection to be established, the network element in network slice
Vertical connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice
Source, the second transmission performance demand information include that the network slice joins the performance requirement of the network slice level of transmission network
Number, the performance demand parameters of the network slice level are used to indicate the transmission performance of all tie points pair in the network slice
The value range or grade of the sum of demand, or the performance requirement ginseng of all tie points pair being used to indicate in network slice
Several unified value ranges or grade.
In a kind of possible implementation, the information of the network slice other transmission demand of sub-network level includes first network
It is sliced the mark of subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: described the
One network is sliced the topology information between subnet and second network slice subnet, first network slice subnet and described
Second network is sliced the other transmission performance demand information of sub-network level between subnet, first network slice subnet and described the
Two networks are sliced the slice mark of network belonging to subnet;
The topology information includes the network element and second net in the first network slice subnet of connection to be established
Connection relationship between the information of network element, the network element in network slice subnet wait establish and the connection formed after establishing connection
The mark of point pair;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand
Information and the second transmission performance demand information, the first transmission performance demand information indicate that the network slice transmission management is asked
It asks and is used to indicate the transmission network management equipment creation, modifies or discharge the first network slice subnet and second network
The transfer resource being sliced between subnet, the second transmission performance demand information include first network slice subnet and described second
Network is sliced the other transmission performance demand parameter of sub-network level between subnet, and the other transmission performance demand parameter of sub-network level is used
The sum of the transmission performance demand of all tie points pair between instruction first network slice subnet and the second network slice subnet
Value range or grade, or be used to indicate between first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of all tie points pair.
In one possible implementation, the tie point includes tie point pair to the information of the transmission demand of rank
Mark;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark pair
The topology information for the tie point pair answered, the transmission performance demand information for identifying corresponding tie point to rank, the connection
Mark of the point to affiliated network slice, mark of the tie point to belonging network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair
Source, the second transmission performance demand information include the tie point to the performance demand parameters to transmission network.
In a kind of possible implementation, the information of the transmission demand includes the priority of network slice level, network
The priority of the priority of tie point pair in slice or tie point to the type of data packet of upper transmission.
In one possible implementation, the determination unit 901 is when determining the transmission demand to transmission network, specifically
For:
Standby to determine network slice to the transmission demand of transmission network, the transmission demand comprises at least one of the following: network is cut
The other transmission demand of chip level, network are sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
Network slice subnet is determined to the transmission demand of transmission network, the transmission demand comprises at least one of the following: network
It is sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
Tie point is determined to the transmission demand to transmission network, the transmission demand includes that tie point needs the transmission of rank
It asks.
In one possible implementation, the determination unit 901 is determining that network slice need to the transmission of transmission network
It asks, is specifically used for:
The network slice subnet or network element being sliced according to the network in supported demand for services and/or network slice
Transmission demand, determine network slice to the transmission demand of transmission network;The transmission demand of network slice subnet includes:
Network element in the network slice subnet is transmitted with the network element in network slice in addition to the network is sliced subnet
When transmission demand and/or network slice subnet in transmission demand of network element when being transmitted.
In one possible implementation, receiving unit 903 is also used to: receiving what the transmission network management equipment was sent
The ability information of transmission network.
Determination unit 901 is specifically used for: determining the transmission demand to transmission network according to the ability information of the transmission network.
In one possible implementation, the ability information of the transmission network includes one of following information or any group
Close: the network of the transmission network service is sliced the transmission network type that can be used, the coverage area of the transmission network, the biography
The transmission performance parameter that defeated net can be supported, the information for the virtual LAN VLAN that the transmission network can be supported, the transmission
Net troubleshooting strategy, the transmission network failure report strategy, transmission performance of the transmission network to the network slice serviced
Whether monitoring capability information, the transmission network are supported to report the topology information of the transmission network.
In one possible implementation, above-mentioned network slice management equipment include network slice management function NSMF,
Network is sliced subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
In one possible implementation, transmission unit 902 is also used to: network element or network slice into network slice
Network element in subnet sends instruction information, and the instruction information is used to indicate the network element when sending data packet in the packet
Add network slice mark, the mark of network slice Subnet Identification or the tie point pair in network slice.
Based on the same technical idea, the embodiment of the present application provides a kind of network slice management equipment, for realizing upper
State network slice management method embodiment.
Referring to Figure 10, it is sliced management equipment for network provided by the embodiments of the present application, may include processor 1001, respectively
The memory 1002 and transceiver 1003 being connect with the processor 1001;
The processor 1001, for calling pre-stored computer program in the memory 1002 to execute:
Determine that the transmission demand includes at least one of following transmission demand: network to the transmission demand of transmission network
The transmission demand of slice level, network are sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;
Network slice transmission management request is sent to transmission network management equipment by the transceiver 1003, the network is cut
It include the information of the transmission demand in the request of piece transfer management;
The network slice transmission managing response that the transmission network management equipment is sent is received by the transceiver 1003.
In one possible implementation, the information of the transmission demand of the network slice level includes what network was sliced
Mark;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark pair
The topology information for the network slice answered, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes yet to be built between the information of the network element of connection to be established, the network element in network slice
Vertical connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice
Source, the second transmission performance demand information include that the network slice joins the performance requirement of the network slice level of transmission network
Number, the performance demand parameters of the network slice level are used to indicate the transmission performance of all tie points pair in the network slice
The value range or grade of the sum of demand, or the performance requirement ginseng of all tie points pair being used to indicate in network slice
Several unified value ranges or grade.
In one possible implementation, the information of the network slice other transmission demand of sub-network level includes the first net
Network is sliced the mark of subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: described the
One network is sliced the topology information between subnet and second network slice subnet, first network slice subnet and described
Second network is sliced the other transmission performance demand information of sub-network level between subnet, first network slice subnet and described the
Two networks are sliced the slice mark of network belonging to subnet;
The topology information includes the network element and second net in the first network slice subnet of connection to be established
Connection relationship between the information of network element, the network element in network slice subnet wait establish and the connection formed after establishing connection
The mark of point pair;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand
Information and the second transmission performance demand information, the first transmission performance demand information indicate that the network slice transmission management is asked
It asks and is used to indicate the transmission network management equipment creation, modifies or discharge the first network slice subnet and second network
The transfer resource being sliced between subnet, the second transmission performance demand information include first network slice subnet and described second
Network is sliced the other transmission performance demand parameter of sub-network level between subnet, and the other transmission performance demand parameter of sub-network level is used
The sum of the transmission performance demand of all tie points pair between instruction first network slice subnet and the second network slice subnet
Value range or grade, or be used to indicate between first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of all tie points pair.
In one possible implementation, the tie point includes tie point pair to the information of the transmission demand of rank
Mark;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark pair
The topology information for the tie point pair answered, the transmission performance demand information for identifying corresponding tie point to rank, the connection
Mark of the point to affiliated network slice, mark of the tie point to belonging network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair
Source, the second transmission performance demand information include the tie point to the performance demand parameters to transmission network.
In one possible implementation, the information of the transmission demand includes the priority of network slice level, net
The priority or tie point of tie point pair in network slice are to the priority of the type of data packet of upper transmission.
In one possible implementation, the processor 1001 is when determining the transmission demand to transmission network, specifically
For:
Network slice is determined to the transmission demand of transmission network, the transmission demand comprises at least one of the following: network slice
The transmission demand of rank, network are sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
Network slice subnet is determined to the transmission demand of transmission network, the transmission demand comprises at least one of the following: network
It is sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
Tie point is determined to the transmission demand to transmission network, the transmission demand includes that tie point needs the transmission of rank
It asks.
In one possible implementation, the processor 1001 is determining network slice to the transmission demand of transmission network
When, it is specifically used for:
The network slice subnet or network element being sliced according to the network in supported demand for services and/or network slice
Transmission demand, determine network slice to the transmission demand of transmission network;
The transmission demand of the network slice subnet includes: network element and network slice in the network slice subnet
In except the network be sliced subnet in addition to network element transmitted when transmission demand and/or the network slice subnet in
Transmission demand when network element is transmitted.
In one possible implementation, the processor 1001 is also used to:
The ability information for the transmission network that the transmission network management equipment is sent is received by the transceiver 1003;
The processor 1001 is specifically used for when determining the transmission demand to transmission network:
The transmission demand to transmission network is determined according to the ability information of the transmission network.
In one possible implementation, the ability information of the transmission network includes one of following information or any group
Close: the network of the transmission network service is sliced the transmission network type that can be used, the coverage area of the transmission network, the biography
The transmission performance parameter that defeated net can be supported, the information for the virtual LAN VLAN that the transmission network can be supported, the transmission
Net troubleshooting strategy, the transmission network failure report strategy, transmission performance of the transmission network to the network slice serviced
Whether monitoring capability information, the transmission network are supported to report the topology information of the transmission network.
In one possible implementation, the network slice management equipment is that network is sliced management function NSMF, net
Network is sliced subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
In one possible implementation, the processor 1001 is also used to:
Instruction letter is sent by network element of the transceiver 1003 in the network element or network slice subnet into network slice
Breath, the instruction information are used to indicate the network element and add network slice mark, network in the packet when sending data packet
It is sliced the mark of Subnet Identification or the tie point pair in network slice.
Based on the same technical idea, the embodiment of the present application provides a kind of transmission network management equipment, for realizing above-mentioned
Network is sliced management method embodiment.
It may include receiving unit 1101, management for transmission network management equipment provided by the embodiments of the present application referring to Figure 11
Unit 1102 and transmission unit 1103.
Specifically, the network slice transmission management that receiving unit 1101 is used to receive that network slice management equipment to be sent is asked
It asks, includes at least one of following transmission demand: the transmission of network slice level in the network slice transmission management request
Demand, network are sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank.
Administrative unit 1102 is for being managed transfer resource according to the transmission demand;
Transmission unit 1103 is used to send network slice transmission managing response to network slice management equipment.
In one possible implementation, the information of the transmission demand of the network slice level includes what network was sliced
Mark;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark pair
The topology information for the network slice answered, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes yet to be built between the information of the network element of connection to be established, the network element in network slice
Vertical connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice
Source, the second transmission performance demand information include that the network slice joins the performance requirement of the network slice level of transmission network
Number, the performance demand parameters of the network slice level are used to indicate the transmission performance of all tie points pair in the network slice
The value range or grade of the sum of demand, or the performance requirement ginseng of all tie points pair being used to indicate in network slice
Several unified value ranges or grade.
In one possible implementation, the information of the network slice other transmission demand of sub-network level includes the first net
Network is sliced the mark of subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: described the
One network is sliced the topology information between subnet and second network slice subnet, first network slice subnet and described
Second network is sliced the other transmission performance demand information of sub-network level between subnet, first network slice subnet and described the
Two networks are sliced the slice mark of network belonging to subnet;
The topology information includes the network element and second net in the first network slice subnet of connection to be established
Connection relationship between the information of network element, the network element in network slice subnet wait establish and the connection formed after establishing connection
The mark of point pair;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand
Information and the second transmission performance demand information, the first transmission performance demand information indicate that the network slice transmission management is asked
It asks and is used to indicate the transmission network management equipment creation, modifies or discharge the first network slice subnet and second network
The transfer resource being sliced between subnet, the second transmission performance demand information include first network slice subnet and described second
Network is sliced the other transmission performance demand parameter of sub-network level between subnet, and the other transmission performance demand parameter of sub-network level is used
The sum of the transmission performance demand of all tie points pair between instruction first network slice subnet and the second network slice subnet
Value range or grade, or be used to indicate between first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of all tie points pair.
In one possible implementation, the tie point includes tie point pair to the information of the transmission demand of rank
Mark;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark pair
The topology information for the tie point pair answered, the transmission performance demand information for identifying corresponding tie point to rank, the connection
Mark of the point to affiliated network slice, mark of the tie point to affiliated network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair
Source, the second transmission performance demand information include the tie point to the performance demand parameters to transmission network.
In one possible implementation, the information of the transmission demand includes the priority of network slice level, net
The priority or tie point of tie point pair in network slice are to the priority of the type of data packet of upper transmission.
In one possible implementation, transmission unit 1103 is also used to: Xiang Suoshu network is sliced management equipment and sends
The ability information of the transmission network.
In one possible implementation, the ability information of the transmission network includes one of following information or any group
Close: the network of the transmission network service is sliced the transmission network type that can be used, the coverage area of the transmission network, the biography
The transmission performance parameter that defeated net can be supported, the information for the virtual LAN VLAN that the transmission network can be supported, the transmission
Net troubleshooting strategy, the transmission network failure report strategy, transmission performance of the transmission network to the network slice serviced
Whether monitoring capability information, the transmission network are supported to report the topology information of the transmission network.
In one possible implementation, network slice management equipment include network slice management function NSMF,
Network is sliced subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
Based on the same technical idea, the embodiment of the present application provides a kind of transmission network management equipment, for realizing above-mentioned
Network is sliced management method embodiment.
Referring to Figure 12, it is sliced management equipment for network provided by the embodiments of the present application, may include processor 1201, respectively
The memory 1202 and transceiver 1203 being connect with the processor 1201;
The processor 1201, for calling pre-stored computer program in the memory 1202 to execute:
Network, which is received, by the transceiver 1203 is sliced the network slice transmission management request that management equipment is sent, it is described
It include at least one of following transmission demand: the transmission demand of network slice level, net in network slice transmission management request
Network is sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;
Transfer resource is managed according to the transmission demand;
Management equipment, which is sliced, to the network by the transceiver 1203 sends network slice transmission managing response.
In one possible implementation, the information of the transmission demand of the network slice level includes what network was sliced
Mark;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark pair
The topology information for the network slice answered, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes yet to be built between the information of the network element of connection to be established, the network element in network slice
Vertical connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice
Source, the second transmission performance demand information include that the network slice joins the performance requirement of the network slice level of transmission network
Number, the performance demand parameters of the network slice level are used to indicate the transmission performance of all tie points pair in the network slice
The value range or grade of the sum of demand, or the performance requirement ginseng of all tie points pair being used to indicate in network slice
Several unified value ranges or grade.
In one possible implementation, the information of the network slice other transmission demand of sub-network level includes the first net
Network is sliced the mark of subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: described the
One network is sliced the topology information between subnet and second network slice subnet, first network slice subnet and described
Second network is sliced the other transmission performance demand information of sub-network level between subnet, first network slice subnet and described the
Two networks are sliced the slice mark of network belonging to subnet;
The topology information includes the network element and second net in the first network slice subnet of connection to be established
Connection relationship between the information of network element, the network element in network slice subnet wait establish and the connection formed after establishing connection
The mark of point pair;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand
Information and the second transmission performance demand information, the first transmission performance demand information indicate that the network slice transmission management is asked
It asks and is used to indicate the transmission network management equipment creation, modifies or discharge the first network slice subnet and second network
The transfer resource being sliced between subnet, the second transmission performance demand information include first network slice subnet and described second
Network is sliced the other transmission performance demand parameter of sub-network level between subnet, and the other transmission performance demand parameter of sub-network level is used
The sum of the transmission performance demand of all tie points pair between instruction first network slice subnet and the second network slice subnet
Value range or grade, or be used to indicate between first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of all tie points pair.
In one possible implementation, the tie point includes tie point pair to the information of the transmission demand of rank
Mark;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark pair
The topology information for the tie point pair answered, the transmission performance demand information for identifying corresponding tie point to rank, the connection
Mark of the point to affiliated network slice, mark of the tie point to affiliated network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or including the
One transmission performance demand information and the second transmission performance demand information, the first transmission performance demand information indicate the network
The transmission money that slice transmission management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair
Source, the second transmission performance demand information include the tie point to the performance demand parameters to transmission network.
In one possible implementation, the information of the transmission demand includes the priority of network slice level, net
The priority or tie point of tie point pair in network slice are to the priority of the type of data packet of upper transmission.
In one possible implementation, the processor 1201 is also used to:
The ability information that management equipment sends the transmission network is sliced to the network by the transceiver 1203.
In one possible implementation, the ability information of the transmission network includes one of following information or any group
Close: the network of the transmission network service is sliced the transmission network type that can be used, the coverage area of the transmission network, the biography
The transmission performance parameter that defeated net can be supported, the information for the virtual LAN VLAN that the transmission network can be supported, the transmission
Net troubleshooting strategy, the transmission network failure report strategy, transmission performance of the transmission network to the network slice serviced
Whether monitoring capability information, the transmission network are supported to report the topology information of the transmission network.
In one possible implementation, network slice management equipment include network slice management function NSMF,
Network is sliced subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
Based on the same technical idea, the embodiment of the present application also provides a kind of computer readable storage medium, the meters
Calculation machine readable storage medium storing program for executing is stored with computer instruction, when described instruction is run on computers, so that computer executes such as
The preceding network is sliced management method.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
The application be referring to according to the present processes, equipment (system) and computer program product flow chart and/or
Block diagram describes.It should be understood that each process that can be realized by computer program instructions in flowchart and/or the block diagram and/or
The combination of process and/or box in box and flowchart and/or the block diagram.It can provide these computer program instructions to arrive
General purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices processor to generate one
Machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for realizing flowing
The device for the function of being specified in journey figure one process or multiple processes and/or block diagrams one box or multiple boxes.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
Obviously, those skilled in the art can carry out various modification and variations without departing from the essence of the application to the application
Mind and range.In this way, if these modifications and variations of the application belong to the range of the claim of this application and its equivalent technologies
Within, then the application is also intended to include these modifications and variations.
Claims (39)
1. a kind of network is sliced management method characterized by comprising
Network is sliced management equipment and determines to the transmission demand of transmission network, the transmission demand include in following transmission demand extremely
Few one kind: the transmission demand of network slice level, network are sliced the other transmission demand of sub-network level, and tie point needs the transmission of rank
It asks;
The network is sliced management equipment and sends network slice transmission management request, the network slice to transmission network management equipment
It include the information of the transmission demand in transfer management request;
The network slice management equipment receives the network slice transmission managing response that the transmission network management equipment is sent.
2. the method as described in claim 1, which is characterized in that the information of the transmission demand of the network slice level includes net
The mark of network slice;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark is corresponding
The topology information of network slice, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes to be established between the information of the network element of connection to be established, the network element in network slice
Connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or passes including first
Defeated performance requirement information and the second transmission performance demand information, the first transmission performance demand information indicate the network slice
The transfer resource that transfer management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice,
The second transmission performance demand information includes performance demand parameters of the network slice to the network slice level of transmission network,
The transmission performance that the performance demand parameters of the network slice level are used to indicate all tie points pair in the network slice needs
The value range or grade the sum of asked, or the performance demand parameters of all tie points pair being used to indicate in the network slice
Unified value range or grade.
3. the method as described in claim 1, which is characterized in that the packet of the network slice other transmission demand of sub-network level
Include the mark of first network slice subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: first net
Network is sliced the topology information between subnet and second network slice subnet, and the first network is sliced subnet and described second
Network is sliced the other transmission performance demand information of sub-network level between subnet, the first network slice subnet and second net
Network is sliced the slice mark of network belonging to subnet;
The topology information includes that the network element that the first network of connection to be established is sliced in subnet and second network are cut
Connection relationship between the information of network element in piece subnet, the network element wait establish and the tie point pair formed after establishing connection
Mark;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand information
With the second transmission performance demand information, the first transmission performance demand information indicates that the network slice transmission management request is used
Subnet and second network slice are sliced in indicating the transmission network management equipment creation, modifying or discharging the first network
Transfer resource between subnet, the second transmission performance demand information include first network slice subnet and second network
The other transmission performance demand parameter of sub-network level being sliced between subnet, the other transmission performance demand parameter of sub-network level is for referring to
Show taking for the sum of transmission performance demand of all tie points pair between first network slice subnet and the second network slice subnet
It is worth range or grade, or is used to indicate all between the first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of tie point pair.
4. the method as described in claim 1, which is characterized in that the tie point includes connecting to the information of the transmission demand of rank
The mark of contact pair;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark is corresponding
The topology information of tie point pair, the transmission performance demand information for identifying corresponding tie point to rank, the tie point pair
The mark of affiliated network slice, mark of the tie point to belonging network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or passes including first
Defeated performance requirement information and the second transmission performance demand information, the first transmission performance demand information indicate the network slice
The transfer resource that transfer management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair,
The second transmission performance demand information includes the tie point to the performance demand parameters to transmission network.
5. the method as described in claim 1, which is characterized in that the information of the transmission demand includes the excellent of network slice level
First grade, the priority of tie point pair in network slice or tie point are to the priority of the type of data packet of upper transmission.
6. the method as described in claim 1, which is characterized in that the network slice management equipment determines the transmission to transmission network
Demand, comprising:
Network slice management equipment determine network slice to the transmission demand of transmission network, the transmission demand include with down toward
Few one kind: the transmission demand of network slice level, network are sliced the other transmission demand of sub-network level, and tie point needs the transmission of rank
It asks;Alternatively,
Network slice management equipment determine network slice subnet to the transmission demand of transmission network, the transmission demand include with
Lower at least one: network is sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
The network slice management equipment determines tie point to the transmission demand to transmission network, and the transmission demand includes tie point
To the transmission demand of rank.
7. method as claimed in claim 6, which is characterized in that the network slice management equipment determines network slice to transmission
The transmission demand of net, comprising:
The network slice management equipment is sliced the net in supported demand for services and/or network slice according to the network
Network is sliced the transmission demand of subnet or network element, determines the network slice to the transmission demand of transmission network;
The transmission demand of network slice subnet includes: network element in the network slice subnet and the network be sliced in remove
The network element in transmission demand and/or network slice subnet when network element except the network slice subnet is transmitted
Transmission demand when being transmitted.
8. the method as described in claim 1, which is characterized in that further include:
The network slice management equipment receives the ability information for the transmission network that the transmission network management equipment is sent;
The network slice management equipment determines the transmission demand to transmission network, comprising:
The network slice management equipment determines the transmission demand to transmission network according to the ability information of the transmission network.
9. method according to claim 8, which is characterized in that the ability information of the transmission network include one of following information or
Any combination: the transmission network type that the network slice of the transmission network service can use, the coverage area of the transmission network,
The transmission performance parameter that the transmission network can be supported, the information for the virtual LAN VLAN that the transmission network can be supported, institute
Transmission network troubleshooting strategy is stated, the transmission network failure reports strategy, biography of the transmission network to the network slice serviced
Whether defeated performance monitoring ability information, the transmission network are supported to report the topology information of the transmission network.
10. the method as described in claim 1, which is characterized in that the network slice management equipment includes network slice management
Function NSMF, network slice subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
11. the method as described in claim 1, which is characterized in that further include:
The network is sliced network element of the management equipment in the network element or network slice subnet into network slice and sends instruction information,
The instruction information is used to indicate the network element and adds network slice mark, network slice in the packet when sending data packet
The mark of Subnet Identification or the tie point pair in network slice.
12. a kind of network is sliced management method characterized by comprising
Transmission network management equipment receives the network slice transmission management request that network slice management equipment is sent, the network slice
It include at least one of following transmission demand: the transmission demand of network slice level, network slice in transfer management request
The transmission demand of net rank, transmission demand of the tie point to rank;
The transmission network management equipment is managed transfer resource according to the transmission demand;
The transmission network management equipment sends network slice transmission managing response to network slice management equipment.
13. method as claimed in claim 12, which is characterized in that the information of the transmission demand of the network slice level includes
The mark of network slice;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark is corresponding
The topology information of network slice, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes to be established between the information of the network element of connection to be established, the network element in network slice
Connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or passes including first
Defeated performance requirement information and the second transmission performance demand information, the first transmission performance demand information indicate the network slice
The transfer resource that transfer management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice,
The second transmission performance demand information includes performance demand parameters of the network slice to the network slice level of transmission network,
The transmission performance that the performance demand parameters of the network slice level are used to indicate all tie points pair in the network slice needs
The value range or grade the sum of asked, or the performance demand parameters of all tie points pair being used to indicate in the network slice
Unified value range or grade.
14. method as claimed in claim 12, which is characterized in that the information of the network slice other transmission demand of sub-network level
The mark of mark and the second network slice subnet including first network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: first net
Network is sliced the topology information between subnet and second network slice subnet, and the first network is sliced subnet and described second
Network is sliced the other transmission performance demand information of sub-network level between subnet, the first network slice subnet and second net
Network is sliced the slice mark of network belonging to subnet;
The topology information includes that the network element that the first network of connection to be established is sliced in subnet and second network are cut
Connection relationship between the information of network element in piece subnet, the network element wait establish and the tie point pair formed after establishing connection
Mark;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand information
With the second transmission performance demand information, the first transmission performance demand information indicates that the network slice transmission management request is used
Subnet and second network slice are sliced in indicating the transmission network management equipment creation, modifying or discharging the first network
Transfer resource between subnet, the second transmission performance demand information include first network slice subnet and second network
The other transmission performance demand parameter of sub-network level being sliced between subnet, the other transmission performance demand parameter of sub-network level is for referring to
Show taking for the sum of transmission performance demand of all tie points pair between first network slice subnet and the second network slice subnet
It is worth range or grade, or is used to indicate all between the first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of tie point pair.
15. method as claimed in claim 12, which is characterized in that the tie point includes to the information of the transmission demand of rank
The mark of tie point pair;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark is corresponding
The topology information of tie point pair, the transmission performance demand information for identifying corresponding tie point to rank, the tie point pair
The mark of affiliated network slice, mark of the tie point to affiliated network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or passes including first
Defeated performance requirement information and the second transmission performance demand information, the first transmission performance demand information indicate the network slice
The transfer resource that transfer management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair,
The second transmission performance demand information includes the tie point to the performance demand parameters to transmission network.
16. method as claimed in claim 12, which is characterized in that the information of the transmission demand includes network slice level
Priority, the priority of tie point pair in network slice or tie point are to the priority of the type of data packet of upper transmission.
17. method as claimed in claim 12, which is characterized in that further include:
The transmission network management equipment sends the ability information of the transmission network to network slice management equipment.
18. method as claimed in claim 17, which is characterized in that the ability information of the transmission network includes one of following information
Or any combination: the network of the transmission network service is sliced the transmission network type that can be used, the covering model of the transmission network
It encloses, the transmission performance parameter that the transmission network can be supported, the information for the virtual LAN VLAN that the transmission network can be supported,
The transmission network troubleshooting strategy, the transmission network failure report strategy, and the transmission network is to the network slice serviced
Whether transmission performance monitoring capability information, the transmission network are supported to report the topology information of the transmission network.
19. method as claimed in claim 12, which is characterized in that the network slice management equipment includes network slice management
Function NSMF, network slice subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
20. a kind of network is sliced management equipment characterized by comprising processor, the storage being connected to the processor respectively
Device and transceiver;
The processor, for calling pre-stored computer program in the memory to execute:
Determine that the transmission demand includes at least one of following transmission demand to the transmission demand of transmission network: network slice
The transmission demand of rank, network are sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;
Network slice transmission management request, the network slice transmission pipe are sent to transmission network management equipment by the transceiver
It include the information of the transmission demand in reason request;
The network slice transmission managing response that the transmission network management equipment is sent is received by the transceiver.
21. network as claimed in claim 20 is sliced management equipment, which is characterized in that the transmission of the network slice level needs
The information asked includes the mark of network slice;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark is corresponding
The topology information of network slice, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes to be established between the information of the network element of connection to be established, the network element in network slice
Connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or passes including first
Defeated performance requirement information and the second transmission performance demand information, the first transmission performance demand information indicate the network slice
The transfer resource that transfer management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice,
The second transmission performance demand information includes performance demand parameters of the network slice to the network slice level of transmission network,
The transmission performance that the performance demand parameters of the network slice level are used to indicate all tie points pair in the network slice needs
The value range or grade the sum of asked, or the performance demand parameters of all tie points pair being used to indicate in the network slice
Unified value range or grade.
22. network as claimed in claim 20 is sliced management equipment, which is characterized in that the network is sliced the other biography of sub-network level
The information of defeated demand includes the mark of first network slice subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: first net
Network is sliced the topology information between subnet and second network slice subnet, and the first network is sliced subnet and described second
Network is sliced the other transmission performance demand information of sub-network level between subnet, the first network slice subnet and second net
Network is sliced the slice mark of network belonging to subnet;
The topology information includes that the network element that the first network of connection to be established is sliced in subnet and second network are cut
Connection relationship between the information of network element in piece subnet, the network element wait establish and the tie point pair formed after establishing connection
Mark;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand information
With the second transmission performance demand information, the first transmission performance demand information indicates that the network slice transmission management request is used
Subnet and second network slice are sliced in indicating the transmission network management equipment creation, modifying or discharging the first network
Transfer resource between subnet, the second transmission performance demand information include first network slice subnet and second network
The other transmission performance demand parameter of sub-network level being sliced between subnet, the other transmission performance demand parameter of sub-network level is for referring to
Show taking for the sum of transmission performance demand of all tie points pair between first network slice subnet and the second network slice subnet
It is worth range or grade, or is used to indicate all between the first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of tie point pair.
23. network as claimed in claim 20 is sliced management equipment, which is characterized in that the tie point needs the transmission of rank
The information asked includes the mark of tie point pair;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark is corresponding
The topology information of tie point pair, the transmission performance demand information for identifying corresponding tie point to rank, the tie point pair
The mark of affiliated network slice, mark of the tie point to belonging network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or passes including first
Defeated performance requirement information and the second transmission performance demand information, the first transmission performance demand information indicate the network slice
The transfer resource that transfer management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair,
The second transmission performance demand information includes the tie point to the performance demand parameters to transmission network.
24. network as claimed in claim 20 is sliced management equipment, which is characterized in that the information of the transmission demand includes net
The type of data packet of the priority of network slice level, the priority of tie point pair in network slice or tie point to upper transmission
Priority.
25. network as claimed in claim 20 is sliced management equipment, which is characterized in that the processor is being determined to transmission network
Transmission demand when, be specifically used for:
Network slice is determined to the transmission demand of transmission network, the transmission demand comprises at least one of the following: network slice level
Transmission demand, network be sliced the other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
Network slice subnet is determined to the transmission demand of transmission network, the transmission demand comprises at least one of the following: network slice
The other transmission demand of sub-network level, transmission demand of the tie point to rank;Alternatively,
Tie point is determined to the transmission demand to transmission network, the transmission demand includes transmission demand of the tie point to rank.
26. network as claimed in claim 25 is sliced management equipment, which is characterized in that the processor is determining network slice
When to the transmission demand of transmission network, it is specifically used for:
The biography of the network slice subnet or network element that are sliced according to the network in supported demand for services and/or network slice
Defeated demand determines the network slice to the transmission demand of transmission network;
The transmission demand of network slice subnet includes: network element in the network slice subnet and the network be sliced in remove
The network element in transmission demand and/or network slice subnet when network element except the network slice subnet is transmitted
Transmission demand when being transmitted.
27. network as claimed in claim 20 is sliced management equipment, which is characterized in that the processor is also used to:
The ability information for the transmission network that the transmission network management equipment is sent is received by the transceiver;
The processor is specifically used for when determining the transmission demand to transmission network:
The transmission demand to transmission network is determined according to the ability information of the transmission network.
28. network as claimed in claim 27 is sliced management equipment, which is characterized in that the ability information of the transmission network includes
One of following information or any combination: the network of the transmission network service is sliced the transmission network type that can be used, the biography
The coverage area of defeated net, the transmission performance parameter that the transmission network can be supported, the virtual local area that the transmission network can be supported
Net the information of VLAN, the transmission network troubleshooting strategy, the transmission network failure reports strategy, and the transmission network is to being serviced
Network slice transmission performance monitoring capability information, whether the transmission network support to report the topology information of the transmission network.
29. method as claimed in claim 20, which is characterized in that the network slice management equipment is network slice management function
It can NSMF, network slice subnet management function NSSMF, network manager NM, domain manager DM or NE Explorer EM.
30. network as claimed in claim 20 is sliced management equipment, which is characterized in that the processor is also used to:
Instruction information, the finger are sent by network element of the transceiver in the network element or network slice subnet into network slice
Show that information is used to indicate the network element and adds network slice mark, network slice subnet mark in the packet when sending data packet
The mark of knowledge or the tie point pair in network slice.
31. a kind of transmission network management equipment characterized by comprising processor, the memory being connected to the processor respectively
And transceiver;
The processor, for calling pre-stored computer program in the memory to execute:
Network, which is received, by the transceiver is sliced the network slice transmission management request that management equipment is sent, the network slice
It include at least one of following transmission demand: the transmission demand of network slice level, network slice in transfer management request
The transmission demand of net rank, transmission demand of the tie point to rank;
Transfer resource is managed according to the transmission demand;
Management equipment, which is sliced, to the network by the transceiver sends network slice transmission managing response.
32. transmission network management equipment as claimed in claim 31, which is characterized in that the transmission demand of the network slice level
Information include network slice mark;
The information of the transmission demand of the network slice level further includes at least one of following information: the mark is corresponding
The topology information of network slice, the transmission performance demand information for identifying corresponding network slice level;
The topology information includes to be established between the information of the network element of connection to be established, the network element in network slice
Connection relationship and the mark for establishing the tie point pair formed after connection;
The transmission performance demand information of the network slice level includes the first transmission performance demand information, or passes including first
Defeated performance requirement information and the second transmission performance demand information, the first transmission performance demand information indicate the network slice
The transfer resource that transfer management request is used to indicate the transmission network management equipment creation, modifies or discharge the network slice,
The second transmission performance demand information includes performance demand parameters of the network slice to the network slice level of transmission network,
The transmission performance that the performance demand parameters of the network slice level are used to indicate all tie points pair in the network slice needs
The value range or grade the sum of asked, or the performance demand parameters of all tie points pair being used to indicate in the network slice
Unified value range or grade.
33. transmission network management equipment as claimed in claim 31, which is characterized in that the network is sliced the other transmission of sub-network level
The information of demand includes the mark of first network slice subnet and the mark of the second network slice subnet;
The information of the network slice other transmission demand of sub-network level further includes at least one of following information: first net
Network is sliced the topology information between subnet and second network slice subnet, and the first network is sliced subnet and described second
Network is sliced the other transmission performance demand information of sub-network level between subnet, the first network slice subnet and second net
Network is sliced the slice mark of network belonging to subnet;
The topology information includes that the network element that the first network of connection to be established is sliced in subnet and second network are cut
Connection relationship between the information of network element in piece subnet, the network element wait establish and the tie point pair formed after establishing connection
Mark;
The transmission performance demand information includes the first transmission performance demand information, or including the first transmission performance demand information
With the second transmission performance demand information, the first transmission performance demand information indicates that the network slice transmission management request is used
Subnet and second network slice are sliced in indicating the transmission network management equipment creation, modifying or discharging the first network
Transfer resource between subnet, the second transmission performance demand information include first network slice subnet and second network
The other transmission performance demand parameter of sub-network level being sliced between subnet, the other transmission performance demand parameter of sub-network level is for referring to
Show taking for the sum of transmission performance demand of all tie points pair between first network slice subnet and the second network slice subnet
It is worth range or grade, or is used to indicate all between the first network slice subnet and second network slice subnet
The unified value range or grade of the performance demand parameters of tie point pair.
34. transmission network management equipment as claimed in claim 31, which is characterized in that transmission demand of the tie point to rank
Information include tie point pair mark;
The tie point further includes at least one of following information to the information of the transmission demand of rank: the mark is corresponding
The topology information of tie point pair, the transmission performance demand information for identifying corresponding tie point to rank, the tie point pair
The mark of affiliated network slice, mark of the tie point to affiliated network slice subnet;
The topology information of the tie point pair include the tie point to comprising network element information;
The tie point includes the first transmission performance demand information to the transmission performance demand information of rank, or passes including first
Defeated performance requirement information and the second transmission performance demand information, the first transmission performance demand information indicate the network slice
The transfer resource that transfer management request is used to indicate the transmission network management equipment creation, modifies or discharge the tie point pair,
The second transmission performance demand information includes the tie point to the performance demand parameters to transmission network.
35. transmission network management equipment as claimed in claim 31, which is characterized in that the information of the transmission demand includes network
The priority of slice level, the priority of tie point pair in network slice or tie point are to the type of data packet of upper transmission
Priority.
36. transmission network management equipment as claimed in claim 31, which is characterized in that the processor is also used to:
The ability information that management equipment sends the transmission network is sliced to the network by the transceiver.
37. transmission network management equipment as claimed in claim 36, which is characterized in that the ability information of the transmission network include with
One of lower information or any combination: the network of the transmission network service is sliced the transmission network type that can be used, the transmission
The coverage area of net, the transmission performance parameter that the transmission network can be supported, the virtual LAN that the transmission network can be supported
The information of VLAN, the transmission network troubleshooting strategy, the transmission network failure report strategy, and the transmission network is to being serviced
Whether the transmission performance monitoring capability information of network slice, the transmission network are supported to report the topology information of the transmission network.
38. transmission network management equipment as claimed in claim 31, which is characterized in that the network slice management equipment includes net
Network is sliced management function NSMF, network slice subnet management function NSSMF, network manager NM, domain manager DM or network element
Manager EM.
39. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer to refer to
It enables, when described instruction is run on computers, so that computer executes such as the described in any item methods of claim 1-20.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711208165.8A CN109842507B (en) | 2017-11-27 | 2017-11-27 | Network slice management method and equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711208165.8A CN109842507B (en) | 2017-11-27 | 2017-11-27 | Network slice management method and equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109842507A true CN109842507A (en) | 2019-06-04 |
CN109842507B CN109842507B (en) | 2020-11-06 |
Family
ID=66880536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711208165.8A Active CN109842507B (en) | 2017-11-27 | 2017-11-27 | Network slice management method and equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109842507B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110266594A (en) * | 2019-06-28 | 2019-09-20 | Ut斯达康通讯有限公司 | The Segment routing retransmission method and device of across a network slice |
CN110708708A (en) * | 2019-09-03 | 2020-01-17 | 中国联合网络通信集团有限公司 | Wireless resource optimization method and device |
CN110730478A (en) * | 2019-10-18 | 2020-01-24 | 腾讯科技(深圳)有限公司 | Slice association method, device, end-to-end slice organizer and storage medium |
WO2021077995A1 (en) * | 2019-10-21 | 2021-04-29 | 中兴通讯股份有限公司 | Method for network slices to share uplink port, apparatus, and storage medium |
CN113259961A (en) * | 2020-02-13 | 2021-08-13 | 华为技术有限公司 | Network management method and device |
CN113517995A (en) * | 2021-03-05 | 2021-10-19 | 深圳艾灵网络有限公司 | Network slice establishing method and equipment |
CN113905448A (en) * | 2020-07-06 | 2022-01-07 | ***通信集团重庆有限公司 | Wireless network resource scheduling method, device and equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106060900A (en) * | 2016-05-13 | 2016-10-26 | 宇龙计算机通信科技(深圳)有限公司 | Method and apparatus for controlling access to network slicing, terminal small cell and SDN controller |
WO2017086847A1 (en) * | 2015-11-18 | 2017-05-26 | Telefonaktiebolaget Lm Ericsson (Publ) | First network node, receiving network node and methods performed therein |
CN106792739A (en) * | 2016-11-17 | 2017-05-31 | 北京邮电大学 | Network dicing method, device and equipment |
CN106954267A (en) * | 2017-04-14 | 2017-07-14 | 北京邮电大学 | A kind of method for managing resource cut into slices based on wireless network |
WO2017167247A1 (en) * | 2016-03-31 | 2017-10-05 | Huawei Technologies Co., Ltd. | Systems and methods for service and session continuity in software defined topology management |
-
2017
- 2017-11-27 CN CN201711208165.8A patent/CN109842507B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017086847A1 (en) * | 2015-11-18 | 2017-05-26 | Telefonaktiebolaget Lm Ericsson (Publ) | First network node, receiving network node and methods performed therein |
WO2017167247A1 (en) * | 2016-03-31 | 2017-10-05 | Huawei Technologies Co., Ltd. | Systems and methods for service and session continuity in software defined topology management |
CN106060900A (en) * | 2016-05-13 | 2016-10-26 | 宇龙计算机通信科技(深圳)有限公司 | Method and apparatus for controlling access to network slicing, terminal small cell and SDN controller |
CN106792739A (en) * | 2016-11-17 | 2017-05-31 | 北京邮电大学 | Network dicing method, device and equipment |
CN106954267A (en) * | 2017-04-14 | 2017-07-14 | 北京邮电大学 | A kind of method for managing resource cut into slices based on wireless network |
Non-Patent Citations (1)
Title |
---|
侯建星等: "网络切片在5G中应用分析", 《中国通信学会信息通信网络技术委员会2015年年会论文集》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110266594A (en) * | 2019-06-28 | 2019-09-20 | Ut斯达康通讯有限公司 | The Segment routing retransmission method and device of across a network slice |
CN110266594B (en) * | 2019-06-28 | 2021-07-30 | Ut斯达康通讯有限公司 | Cross-network-slice segmented routing forwarding method and device |
CN110708708A (en) * | 2019-09-03 | 2020-01-17 | 中国联合网络通信集团有限公司 | Wireless resource optimization method and device |
CN110708708B (en) * | 2019-09-03 | 2022-10-25 | 中国联合网络通信集团有限公司 | Wireless resource optimization method and device |
CN110730478A (en) * | 2019-10-18 | 2020-01-24 | 腾讯科技(深圳)有限公司 | Slice association method, device, end-to-end slice organizer and storage medium |
CN110730478B (en) * | 2019-10-18 | 2021-12-21 | 腾讯科技(深圳)有限公司 | Slice association method, device, end-to-end slice organizer and storage medium |
WO2021077995A1 (en) * | 2019-10-21 | 2021-04-29 | 中兴通讯股份有限公司 | Method for network slices to share uplink port, apparatus, and storage medium |
CN113259961A (en) * | 2020-02-13 | 2021-08-13 | 华为技术有限公司 | Network management method and device |
CN113905448A (en) * | 2020-07-06 | 2022-01-07 | ***通信集团重庆有限公司 | Wireless network resource scheduling method, device and equipment |
CN113905448B (en) * | 2020-07-06 | 2023-09-08 | ***通信集团重庆有限公司 | Wireless network resource scheduling method, device and equipment |
CN113517995A (en) * | 2021-03-05 | 2021-10-19 | 深圳艾灵网络有限公司 | Network slice establishing method and equipment |
CN113517995B (en) * | 2021-03-05 | 2024-03-12 | 深圳艾灵网络有限公司 | Network slice establishment method and device |
Also Published As
Publication number | Publication date |
---|---|
CN109842507B (en) | 2020-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109842507A (en) | A kind of network slice management method and equipment | |
CN108282352B (en) | Method, device and system for managing network slice instances | |
AU2020437137B2 (en) | Application workload routing and interworking for network defined edge routing | |
CN111200878B (en) | Information transmission method and device | |
CN102857416B (en) | A kind of realize the method for virtual network, controller and virtual network | |
CN104982006B (en) | For providing the system and method for software definition protocol stack | |
CN105210337B (en) | A kind of service implementation method and communication unit of NFV system | |
CN107770794A (en) | A kind of network section collocation method and device | |
CN108270823A (en) | A kind of service providing method, device and system | |
CN110326345B (en) | Method, device and system for configuring network slice | |
CN107708109A (en) | Method for processing business, device, system, base station, terminal and core network element | |
CN109218046A (en) | The management method and system and storage medium of network slice | |
EP4005171B1 (en) | Integration of communication network in time sensitive networking system | |
CN109391498A (en) | The management method and the network equipment of networking component | |
CN108777883A (en) | A kind of construction method and device of Radio Access Network slice | |
CN107770826A (en) | A kind of network section system of selection and relevant device | |
CN110235510A (en) | Enhance the system and method for session management in NextGen mobile core network | |
CN113676924A (en) | Communication method, device and system | |
CN104735101A (en) | Network resource sharing processing method and device and network resource sharing method and system | |
CN106533937B (en) | A kind of distributed message forwarding method of multipath and base station | |
CN117061432A (en) | Multiple network transmission method and related equipment thereof | |
CN109302504A (en) | The method for building up in control signaling channel, PTN network element and storage medium in PTN | |
CN109391545A (en) | The discovery system and discovery method of domain-to-domain link | |
CN110999371B (en) | Virtual anchor in anchorless mobile network | |
Messaoudi et al. | SDN Framework for QoS provisioning and latency guarantee in 5G and beyond |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211222 Address after: 450046 Floor 9, building 1, Zhengshang Boya Plaza, Longzihu wisdom Island, Zhengdong New Area, Zhengzhou City, Henan Province Patentee after: Super fusion Digital Technology Co.,Ltd. Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd. |
|
TR01 | Transfer of patent right |