CN109838238A - Forced thaw device and method for subway frozen construction - Google Patents

Forced thaw device and method for subway frozen construction Download PDF

Info

Publication number
CN109838238A
CN109838238A CN201910122941.5A CN201910122941A CN109838238A CN 109838238 A CN109838238 A CN 109838238A CN 201910122941 A CN201910122941 A CN 201910122941A CN 109838238 A CN109838238 A CN 109838238A
Authority
CN
China
Prior art keywords
heating tube
freezing pipe
subway
gap
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910122941.5A
Other languages
Chinese (zh)
Inventor
张颖君
沈翔
朱槐柏
姚新春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201910122941.5A priority Critical patent/CN109838238A/en
Publication of CN109838238A publication Critical patent/CN109838238A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present embodiments relate to subway work technical fields, provide a kind of forced thaw device and method for subway frozen construction, which includes: freezing pipe, heating tube, filler material and sealed piece;The heating tube is sleeved in the freezing pipe along the length direction of the freezing pipe, gap between the freezing pipe and the heating tube is filled with the filler material, the sealed piece is mounted on one end of the freezing pipe, and the sealed piece is equipped with the through-hole passed through for the conducting wire of heating tube power supply.It is big that the forced thaw device for being used for subway frozen construction solves thaw collapse amount in traditional construction freezing method, the defect of thaw collapse period length, high construction efficiency is convenient, ground adaptability is strong, and forced thaw construction is not take up space in tunnel, it can be carried out simultaneously with other constructions, shorten the subway work period, especially there are certain economic results in society to Subway Tunnel construction.

Description

Forced thaw device and method for subway frozen construction
Technical field
The present embodiments relate to subway work technical field more particularly to a kind of pressure solutions for subway frozen construction Freeze device and method.
Background technique
Subway Tunnel service channel is at present frequently with construction freezing method, due to the phase transformation of water and water in the soil body in work progress Migrating for dividing causes the soil body that certain frost heaving amount occurs.After the completion of Freezing Method for Cross-passage Construction, need to thaw to frozen soil body, mesh Preceding Normal practice is natural thaw.
Since the subway duration is more nervous, after the completion of Freezing Method for Cross-passage Construction, enters lay a railway track the stage quickly.And use nature The method thawing rate of defrosting is slow, and not in time, effect is difficult to ensure tracking grouting, so as to cause the generation of two siding track of service channel Biggish thaw collapse amount, influences rail smooth degree, is unfavorable for the operation of later period subway.
Summary of the invention
The embodiment of the present invention provides the forced thaw device and method for being used for subway frozen construction, uses at present to solve The problem that the method for natural thaw causes thawing rate slow, solves in conventional construction method that thaw collapse amount is big, and the thaw collapse period is long Defect.
The embodiment of the present invention provides a kind of forced thaw device for subway frozen construction, comprising: freezing pipe, heating Pipe, filler material and sealed piece;
The heating tube is sleeved in the freezing pipe along the length direction of the freezing pipe, the freezing pipe and described Gap between heating tube is filled with the filler material, and the sealed piece is mounted on one end of the freezing pipe, the sealed piece It is equipped with the through-hole passed through for the conducting wire of heating tube power supply.
Wherein, the filler material includes pea gravel concreten and grouting material;
Hole of bowing in the gap is filled using the pea gravel concreten, uphole and the gap in the gap In lateral aperture filled using the grouting material.
Wherein, the length direction along the heating tube is provided with multiple positioning wings, and the spacing of the adjacent positioning wing is 1500~2500mm.
Wherein, multiple lantern rings are equipped with along the length direction of the heating tube, the spacing of the adjacent lantern ring is 1500~ 2500mm。
Wherein, the lantern ring with the heating tube mechanically or chemical mode connects.
Wherein, the center line of the center line of the heating tube and the freezing pipe is overlapped.
Wherein, the length of the heating tube is less than the length of the freezing pipe.
Wherein, the sealed piece is prepared using steel plate.
The embodiment of the present invention provides a kind of forced thaw method for subway frozen construction, comprising: heating tube along The length direction of freezing pipe is sleeved in the freezing pipe;
Gap between the freezing pipe and the heating tube fills filler material;
Sealed piece is mounted on one end of the freezing pipe, the conducting wire for heating tube power supply passes through on the sealed piece Through-hole after be connected to power supply, by heat that the heating tube generates to complete forced thaw.
Wherein, the gap filling filler material between the freezing pipe and the heating tube includes:
Hole of bowing in the gap is filled using pea gravel concreten, in the uphole and the gap in the gap Lateral aperture is filled using grouting material.
Forced thaw device and method provided in an embodiment of the present invention for subway frozen construction, using built in freezing pipe Heating tube replaces hot salt brine, and orifice tube is completed before frozen soil body thaws and cuts off and sealed piece sealing of hole is used to construct, prevents sealing of hole mistake Sand risk occurs in journey, stratum is adaptable;It can be by cable by the heating in all freezing pipes in course of defrosting Pipe is in parallel, thaws simultaneously, accelerates defrosting progress, without hot salt brine circulation, is not take up space in tunnel, can be with other constructions It carries out simultaneously, saves construction space and time.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the structural schematic diagram that the present invention is applied to steel pipe sheet for the forced thaw device of subway frozen construction;
Fig. 2 is the structural representation that the present invention is applied to concrete pipe sheet for the forced thaw device of subway frozen construction Figure;
Fig. 3 is flow chart of the present invention for the forced thaw method of subway frozen construction.
Description of symbols:
1- freezing pipe;2- heating tube;3- conducting wire;4- sealed piece;5- steel pipe sheet;6- filler material;7- aluminium sulfate microdilatancy Cement;8- concrete pipe sheet;9- orifice tube;10- expansion bolt;11- built-in slip casting pipe;12-C30 aluminium sulfate microdilatancy water Mud.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
The method of forced thaw is carried out frequently with the mode that hot salt brine recycles at present, inefficiency.In Metro Connection Passage Frozen construction is frequently with horizontal frozen hole, using gap is easily seeped between orifice tube and freezing pipe after conventional method forced thaw Leakage, sealing pores are more difficult, and water burst easily occurs in aquifer water-bearing stratum and gushes husky risk, forced thaw is caused to be difficult to promote.
As depicted in figs. 1 and 2, the forced thaw device provided in an embodiment of the present invention for subway frozen construction, comprising: Freezing pipe 1, heating tube 2, filler material 6 and sealed piece 4;
Heating tube 2 is sleeved in freezing pipe 1 along the length direction of freezing pipe 1, the sky between freezing pipe 1 and heating tube 2 Gap is filled with filler material 6, and sealed piece 4 is mounted on one end of freezing pipe 1, and sealed piece 4 is equipped with the conducting wire powered for heating tube 2 and wears The through-hole crossed.
After frozen construction, using residual brine in pressure-air drying freezing pipe, then places and add in freezing pipe 1 Heat pipe 2, heating tube 2 can use temperature control electric heating tube, which includes electric heating tube, and electric heating tube one end is peace End is filled, the other end is fixing end, and installation end is equipped with installation nut and locking screw, plug is equipped in installation end, in fixing end Equipped with temperature controller, heating pipe unit is equipped in electric heating tube, heating pipe unit one end is connected with plug, and the other end is equipped with wiring Column, binding post are equipped with electric wire, and electric wire is connected with temperature controller, and the length of fixing end is 3-6cm, and the length of installation end is 5-8cm, Installation nut is positive hexagonal structure, and the height R1 for installing nut is greater than the height R2 of locking screw.Temperature controller can be according to scene It needs to be adjusted, generally no more than 80 DEG C, after temperature is more than this temperature, automatic temp limit, it is more than specified for avoiding temperature Value plays the role of protection heating pipe unit, saves electric power, extend the service life of product.After the completion of heating tube 2 is placed, freeze It ties the gap between pipe 1 and heating tube 2 and fills filler material 6, orifice tube 9 can be cut off after filling is closely knit, and using envelope Mouth part 4 blocks one end of freezing pipe 1, and the other end of freezing pipe 1 is located at the inside of frozen soil.After all freezing pipes 1 are disposed The conducting wire of heating tube can be drawn by the through-hole on sealed piece 4, and be connected to power supply system, carry out forced thaw.
Can be thawed by the temperature probe monitoring reserved in the thermometer hole that is arranged in frozen construction during forced thaw into Degree, at the same by service channel built-in slip casting pipe 11 to surrounding formations carry out thaw collapse compensation and grouting, reach the short time defrosting The purpose of Frozen Soil Cylinder.Reserved heating pipe fitting is cut off after the completion of thawing, and reinforcement is carried out to sealed piece 4, to guarantee to seal The intensity of mouth part 4.
In embodiments of the present invention, hot salt brine is replaced using freezing pipe heating pipe built-in, completes hole before frozen soil body thaws Mouth pipe cuts off and sealed piece sealing of hole is used to construct, and prevents that Sand risk occurs during sealing of hole, stratum is adaptable;Solution Can be in parallel by the heating tube in all freezing pipes by cable during jelly, it thaws simultaneously, accelerates defrosting progress, without heat Brine recycling is not take up space in tunnel, can carry out simultaneously with other constructions, saves the construction time.
In a specific embodiment, filler material 6 includes pea gravel concreten and grouting material;
Hole of bowing in gap is filled using pea gravel concreten, and the lateral aperture in uphole and gap in gap uses institute Grouting material is stated to be filled.
Pea gravel concreten refers to that maximum size of coarse aggregate is not more than the concrete of 15mm.Pea gravel concreten must not use volcano Grey matter cement;Sand uses the medium coarse sand of 0.3~0.5mm of partial size, and coarse aggregate clay content should not exceed 1%;Fine aggregate clay content is not It should be greater than 2%;Water uses tap water or drinkable natural water;Concrete strength is not lower than C20, every cubic meter of concrete water Mud dosage is no less than 330kg, and the ratio of mud should not exceed 0.55;Sand factor is preferably 35%~40%;Cement-sand ratio is preferably 1: 2~1: 2.5。
Grouting material be using high-strength material as aggregate, using cement as bonding agent, be aided with upper flow regime, microdilatancy, prevent from The substances such as analysis are formulated.A certain amount of water is added in it at the construction field (site), can be used after mixing evenly.Grouting material has gravity flow Property good, fast hard, early strong, high-strength, ungauged regions, microdilatancy;It is nontoxic, harmless, not aging, pollution-free to water quality and ambient enviroment, from The features such as close property is good, antirust.There is reliable in quality in construction party face, the advantages that reducing cost, shorten the construction period and is easy to use.
In a specific embodiment, the length direction along heating tube 2 is provided with multiple positioning wings, between adjacent positioned wing Away from for 1500~2500mm.
In embodiments of the present invention, when the length of freezing pipe 1 is too long, the length of heating tube 2 also can be with the length of freezing pipe 1 Degree is adapted, and is positioned by setting positioning wing to the position of heating tube 2, so that the heat transfer of heating tube 2 is more uniform, is mentioned The efficiency of high defrosting frozen soil.
In a specific embodiment, multiple lantern rings are equipped with along the length direction of heating tube 1, the spacing of adjacent lantern ring is 1500~2500mm.
In embodiments of the present invention, when the length of freezing pipe 1 is too long, the length of heating tube 2 also can be with the length of freezing pipe 1 Degree is adapted, and can prevent the deformation as caused by its gravity factor of heating tube 2 by the way that lantern ring is arranged, so that influencing it generates heat The effect of amount.
In a specific embodiment, lantern ring with heating tube 2 mechanically or chemical mode connects.
In embodiments of the present invention, it can be bonded, can be kept between the two by encapsulating between lantern ring and heating tube 2 Connective stability, it is also ensured that will not influence the effect that heating tube 2 generates heat.
In a specific embodiment, the center line of the center line and freezing pipe 1 of heating tube 2 is overlapped.
In embodiments of the present invention, the center line of the center line and freezing pipe 1 of heating tube 2 is overlapped, and can make heating tube 2 Heat transfer it is more uniform, prevent the thawing degree of the frozen soil around freezing pipe 1 inconsistent.
In a specific embodiment, the length of heating tube 2 is less than the length of freezing pipe 1.
In embodiments of the present invention, the length of heating tube 2 is chosen according to the length of freezing pipe 1, by heating tube 2 Length be set as the similar length with freezing pipe 1, i.e. the length of heating tube 2 is slightly less than the length of freezing pipe 1, being capable of maximum journey The big thawing degree improved to the frozen soil around freezing pipe 1 of degree.
In a specific embodiment, sealed piece 4 is prepared using steel plate.
In embodiments of the present invention, the size of steel plate used by sealed piece 4 according to actual needs and freezing pipe it is straight Diameter is selected, and carrying out sealing of hole using steel plate can prevent that Sand risk occurs during sealing of hole.
As shown in figure 3, the forced thaw method provided in an embodiment of the present invention for subway frozen construction, comprising:
S1 is sleeved on heating tube in the freezing pipe along the length direction of freezing pipe;
When the length of freezing pipe 1 is too long, the length of heating tube 2 can be also adapted with the length of freezing pipe 1, pass through setting Positioning wing positions the position of heating tube 2, so that heating tube 2 is located at the center of freezing pipe, makes the heat transfer of heating tube 2 more Add uniformly, improves the efficiency of defrosting frozen soil;When the length of freezing pipe 1 is too long, the length of heating tube 2 also can be with freezing pipe 1 Length is adapted, and the deformation as caused by its gravity factor of heating tube 2 can be prevented by the way that lantern ring is arranged, to influence its generation The effect of heat;It is bonded between lantern ring and heating tube 2 by encapsulating, connective stability between the two can be kept, it can also be with Guarantee to will not influence the effect that heating tube 2 generates heat.
S2, the gap between the freezing pipe and the heating tube fill filler material;
Hole of bowing in gap is filled using pea gravel concreten, and the lateral aperture in uphole and the gap in gap is adopted It is filled with grouting material.
S3 is mounted on sealed piece one end of the freezing pipe, and the conducting wire for heating tube power supply passes through the sealing It is connected to power supply after through-hole on part, by heat that the heating tube generates to complete forced thaw.
Sealed piece 4 is prepared using steel plate, and the size of steel plate used by sealed piece 4 is according to actual needs and freezing pipe Diameter is selected, and carrying out sealing of hole using steel plate can prevent that Sand risk occurs during sealing of hole.
As shown in Figure 1, being located at using pressure-air drying residual in the freezing pipe 1 inside steel pipe sheet 5 after frozen construction Remaining salt water then places heating tube 2 in freezing pipe 1, and heating tube 2 can use temperature control electric heating tube, and heating tube 2, which is placed, to be completed Afterwards, the gap between freezing pipe 1 and heating tube 2 fills filler material 6, can be cut off completely to orifice tube 9 after filling is closely knit, And one end of freezing pipe 1 is blocked using sealed piece 4, sulphoaluminate micro-expansive cement 7 is filled in the compartment of steel pipe sheet 5, when all Freezing pipe 1 can draw the conducting wire 3 of heating tube by the through-hole on sealed piece 4 after being disposed, and be connected to power supply system, into Row forced thaw.It can be thawed by the temperature probe monitoring reserved in the thermometer hole that is arranged in frozen construction during forced thaw Progress, at the same by service channel built-in slip casting pipe 11 to surrounding formations carry out thaw collapse compensation and grouting, reach the short time solution Freeze the purpose of Frozen Soil Cylinder.Reserved heating pipe fitting is cut off after the completion of thawing, and reinforcement is carried out to sealed piece 4, to guarantee The intensity of sealed piece 4.
Aluminium sulfate expanding cement is mainly used for the concreter for pouring component node and shrinking applied to impervious and compensation Cheng Zhong, expanding cement refer to the cement that volume expansion is generated in aquation and hardening process, and general portland cement is in air When hardening, volume can be shunk.Contraction can make water mudrock structure generate microcrack, reduce the density of water mudrock structure, shadow Ring the impervious, freeze proof, anticorrosive etc. of structure.Expanding cement volume in hardening process will not be shunk, and also slightly be expanded, can To solve due to shrinking bring negative consequence.
As shown in Fig. 2, after frozen construction, using freezing pipe 1 of the pressure-air drying inside concrete pipe sheet 8 Interior residual brine then places heating tube 2 in freezing pipe 1, and heating tube 2 can use temperature control electric heating tube, and heating tube 2 is placed After the completion, the gap between freezing pipe 1 and heating tube 2 fills filler material 6, can cut off to orifice tube 9 after filling is closely knit, And one end of freezing pipe 1 is blocked using sealed piece 4, the both ends of sealed piece 4 pass through an expansion bolt 10 respectively and are fixed on aperture Guan Shang can be drawn the conducting wire 3 of heating tube by the through-hole on sealed piece 4 after all freezing pipes 1 are disposed, and is connected to Power supply system carries out forced thaw.It can be by the thermometric reserved in the thermometer hole that is arranged in frozen construction during forced thaw Probe monitors defrosting progress, at the same by service channel built-in slip casting pipe 11 to surrounding formations carry out thaw collapse compensation injection C30 sulphoaluminate micro-expansive cement 12 achievees the purpose that short time defrosting Frozen Soil Cylinder.Reserved heating is cut off after the completion of thawing Pipe fitting, and reinforcement is carried out to sealed piece 4, to guarantee the intensity of sealed piece 4.
In embodiments of the present invention, hot salt brine is replaced using freezing pipe heating pipe built-in, completes hole before frozen soil body thaws Mouth pipe cuts off and sealed piece sealing of hole is used to construct, and prevents that Sand risk occurs during sealing of hole, stratum is adaptable;Solution Can be in parallel by the heating tube in all freezing pipes by cable during jelly, it thaws simultaneously, accelerates defrosting progress, without heat Brine recycling is not take up space in tunnel, can carry out simultaneously with other constructions, saves the construction time.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (10)

1. a kind of forced thaw device for subway frozen construction characterized by comprising freezing pipe, heating tube, filler material And sealed piece;
The heating tube is sleeved in the freezing pipe along the length direction of the freezing pipe, the freezing pipe and the heating Gap between pipe is filled with the filler material, and the sealed piece is mounted on one end of the freezing pipe, sets on the sealed piece The through-hole that the conducting wire of the promising heating tube power supply passes through.
2. the forced thaw device according to claim 1 for subway frozen construction, which is characterized in that the filler material Including pea gravel concreten and grouting material;
Hole of bowing in the gap is filled using the pea gravel concreten, in the uphole and the gap in the gap Lateral aperture is filled using the grouting material.
3. the forced thaw device according to claim 1 for subway frozen construction, which is characterized in that along the heating The length direction of pipe is provided with multiple positioning wings, and the spacing of the adjacent positioning wing is 1500~2500mm.
4. the forced thaw device according to claim 1 for subway frozen construction, which is characterized in that along the heating The length direction of pipe is equipped with multiple lantern rings, and the spacing of the adjacent lantern ring is 1500~2500mm.
5. the forced thaw device according to claim 4 for subway frozen construction, which is characterized in that the lantern ring and The heating tube is mechanically or chemical mode connects.
6. the forced thaw device according to claim 1 for subway frozen construction, which is characterized in that the heating tube Center line and the freezing pipe center line be overlapped.
7. the forced thaw device according to claim 1 for subway frozen construction, which is characterized in that the heating tube Length be less than the freezing pipe length.
8. the forced thaw device according to claim 1 for subway frozen construction, which is characterized in that the sealed piece It is prepared using steel plate.
9. a kind of forced thaw method for subway frozen construction characterized by comprising
Heating tube is sleeved in the freezing pipe along the length direction of freezing pipe;
Gap between the freezing pipe and the heating tube fills filler material;
Sealed piece is mounted on one end of the freezing pipe, passes through leading on the sealed piece for the conducting wire of heating tube power supply Power supply is connected to behind hole, by heat that the heating tube generates to complete forced thaw.
10. the forced thaw method according to claim 9 for subway frozen construction, which is characterized in that described in institute State between freezing pipe and the heating tube gap filling filler material include:
Hole of bowing in the gap is filled using pea gravel concreten, the level in uphole and the gap in the gap Hole is filled using grouting material.
CN201910122941.5A 2019-02-18 2019-02-18 Forced thaw device and method for subway frozen construction Pending CN109838238A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910122941.5A CN109838238A (en) 2019-02-18 2019-02-18 Forced thaw device and method for subway frozen construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910122941.5A CN109838238A (en) 2019-02-18 2019-02-18 Forced thaw device and method for subway frozen construction

Publications (1)

Publication Number Publication Date
CN109838238A true CN109838238A (en) 2019-06-04

Family

ID=66884709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910122941.5A Pending CN109838238A (en) 2019-02-18 2019-02-18 Forced thaw device and method for subway frozen construction

Country Status (1)

Country Link
CN (1) CN109838238A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296390A (en) * 1995-04-27 1996-11-12 Kajima Corp Method of forcedly thawing soil in freezing shield excavation
CN102720465A (en) * 2012-06-29 2012-10-10 中煤第五建设有限公司 Method for forcibly unfreezing frozen hole
CN102864793A (en) * 2012-06-15 2013-01-09 中国科学院寒区旱区环境与工程研究所 Test device for simulating permafrost region well heat insulation or heating
CN206636586U (en) * 2017-02-10 2017-11-14 建基建设集团有限公司 A kind of high security service channel freezing pipe cuts off rear port closing leakage-resistant device
CN107420130A (en) * 2017-08-10 2017-12-01 沈阳铁道勘察设计院有限公司 Method is melted in a kind of permanent frost zone electrical heating in huge talus bottom
CN209654039U (en) * 2019-02-18 2019-11-19 中铁第四勘察设计院集团有限公司 Forced thaw device for subway frozen construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296390A (en) * 1995-04-27 1996-11-12 Kajima Corp Method of forcedly thawing soil in freezing shield excavation
CN102864793A (en) * 2012-06-15 2013-01-09 中国科学院寒区旱区环境与工程研究所 Test device for simulating permafrost region well heat insulation or heating
CN102720465A (en) * 2012-06-29 2012-10-10 中煤第五建设有限公司 Method for forcibly unfreezing frozen hole
CN206636586U (en) * 2017-02-10 2017-11-14 建基建设集团有限公司 A kind of high security service channel freezing pipe cuts off rear port closing leakage-resistant device
CN107420130A (en) * 2017-08-10 2017-12-01 沈阳铁道勘察设计院有限公司 Method is melted in a kind of permanent frost zone electrical heating in huge talus bottom
CN209654039U (en) * 2019-02-18 2019-11-19 中铁第四勘察设计院集团有限公司 Forced thaw device for subway frozen construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
上海市建设和交通委员会科学技术委员会: "复兴东路双层越江隧道工程", 31 August 2006, 上海科学技术出版社, pages: 203 - 205 *
化工部设备设计技术中心站: "换热器设计", 30 April 1988, 上海科学技术出版社, pages: 192 - 193 *

Similar Documents

Publication Publication Date Title
CN105257297B (en) The construction method of Frozen Soil Cylinder is precisely controlled between a kind of pipe
CN106013259B (en) Shake the underground engineering concrete structure deformation joint blocking method under bumpy weather
CN105062442B (en) A kind of heavy oil thermal recovery fleeing proof agent, envelope alter agent slurries and preparation method thereof, and heavy crude heat extraction profile control envelope alters method
CN205856960U (en) A kind of based on phase-changing energy storage material and can the airfield pavement structure of snow melt deicing
WO2017049783A1 (en) Silica sol slow infiltration reinforcing method for argillaceous soft rock
CN104675408A (en) Liquid nitrogen freezing system of high water pressure super-long-distance large-sectional tunnel and method of quickly changing shield tail brushes
CN202745404U (en) External repairing and reinforcing device of reinforced concrete chimney cylinder wall after tapping and sampling
CN104895581A (en) Tunnel lining rapid repair structure based on carbon fiber woven mesh and repair method thereof
CN113718777A (en) Mass concrete crack prevention construction method
CN111022059A (en) Freezing hole construction process
CN204783046U (en) Tunnel lining restores structure fast based on carbon fiber mesh grid
CN104074434A (en) Structure and construction method of aluminum alloy window
CN106930330A (en) A kind of blocking method for shaking disturbance crack in underground engineering
CN206636586U (en) A kind of high security service channel freezing pipe cuts off rear port closing leakage-resistant device
CN209654039U (en) Forced thaw device for subway frozen construction
US9435092B2 (en) Dam construction method utilizing refrigeration technique
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
Ji et al. Classification, causes of tunnel frost damages in cold region and several new technologies to prevent them
CN109838238A (en) Forced thaw device and method for subway frozen construction
CN105927271A (en) Grouting backfilling system and grouting backfilling method for vertical shafts in vertical heat exchangers
CN101696572B (en) Freezer with gas guide structure
CN104533462A (en) Tunnel lining concrete thermal insulation system
CN219119320U (en) Spatial structure based on asphalt concrete and corrugated steel combined support
CN204627614U (en) A kind of high hydraulic pressure extra long distance large cross-section tunnel liquid nitrogen freezing system
CN107100197A (en) A kind of detachable water-stop opposite-pulling screw rod erecting device of large steel moulding plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination