CN109827007A - Fixed equipment is used in a kind of laying of heating and ventilating pipeline - Google Patents

Fixed equipment is used in a kind of laying of heating and ventilating pipeline Download PDF

Info

Publication number
CN109827007A
CN109827007A CN201910078018.6A CN201910078018A CN109827007A CN 109827007 A CN109827007 A CN 109827007A CN 201910078018 A CN201910078018 A CN 201910078018A CN 109827007 A CN109827007 A CN 109827007A
Authority
CN
China
Prior art keywords
fixed
connecting rod
mounting plate
heating
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910078018.6A
Other languages
Chinese (zh)
Inventor
邓建红
李文彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi University of Science and Technology
Original Assignee
Jiangxi University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi University of Science and Technology filed Critical Jiangxi University of Science and Technology
Priority to CN201910078018.6A priority Critical patent/CN109827007A/en
Publication of CN109827007A publication Critical patent/CN109827007A/en
Pending legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The present invention relates to belonging to, HVAC is laid with field more particularly to fixed equipment is used in a kind of laying of heating and ventilating pipeline.The technical problem to be solved in the present invention is to provide a kind of heating and ventilating pipeline laying fixed equipments for capableing of convenient adjusting HVAC pipe position.A kind of heating and ventilating pipeline laying fixed equipment, includes mounting plate, the first bolt, height adjustment mechanism, fixed mechanism, the second bolt and circular slab;First threaded hole etc. is offered at the top of mounting plate;First threaded hole is with third threaded hole about the vertical central axes of mounting plate at axial symmetry, first bolt and the first screw hole, second bolt and third screw hole, height adjustment mechanism is installed at the top of mounting plate, circular slab is fixed in height adjustment mechanism output end, and fixed mechanism is installed on circular slab.The present invention can easily adjust the position of HVAC pipe, to achieve the effect that quickly to connect HVAC pipe.

Description

Fixed equipment is used in a kind of laying of heating and ventilating pipeline
Technical field
The present invention relates to belonging to, HVAC is laid with field more particularly to fixed equipment is used in a kind of laying of heating and ventilating pipeline.
Background technique
HVAC is the title of a classification of work post in architectural design.HVAC include: heating, ventilation, air conditioning this three A aspect, these three aspect abbreviation Heating,Ventilating and Air Conditioning.Heating --- it also known as heats, gives building heat supply as needed, guarantee room Interior temperature is persistently higher than external environment by people's requirement.Logical common heat sink etc..Ventilation: it is sent into room, or be discharged by room The process of air.The air in building (claiming room air) is replaced using outdoor air (claiming fresh air or fresh air), is led to Often divide gravity-flow ventilation and force ventilation.Air conditioning --- abbreviation air-conditioning, for the temperature, humidity, clean in room or space Cleanliness and reciprocal of duty cycle flowing velocity are adjusted, and provide the architectural environment control system of the fresh air of sufficient amount.
HVAC pipe is fixedly mounted in ground machine room lower by fixed frame in the prior art, can not be adjusted so that HVAC Connection between pipe impacts, therefore needs to research and develop and a kind of be capable of the convenient heating and ventilating pipeline for adjusting HVAC pipe position and be laid with solid Locking equipment.
Summary of the invention
The present invention in order to overcome in the prior art HVAC pipe be all be fixedly mounted on by fixed frame ground machine room lower in, cannot It is enough to adjust so that the shortcomings that connection between HVAC pipe impacts, the technical problem to be solved in the present invention is to provide one kind Fixed equipment is used in the convenient heating and ventilating pipeline laying for adjusting HVAC pipe position.
The present invention is reached by technological means in detail below:
A kind of heating and ventilating pipeline laying fixed equipment includes mounting plate, the first bolt, height adjustment mechanism, fixed machine Structure, the second bolt and circular slab;The first threaded hole, third threaded hole, the first threaded hole and third spiral shell are offered at the top of mounting plate Pit about the vertical central axes of mounting plate at axial symmetry, the first bolt and the first screw hole, the second bolt and third screw thread Hole is spirally connected, and height adjustment mechanism is installed at the top of mounting plate, and circular slab is fixed in height adjustment mechanism output end, fixed mechanism peace Loaded on circular slab.
Further, height adjustment mechanism include screw rod, connecting tube, the first sliding rail, the first sliding block, first connecting rod, Bearing block, shaft, turn-button, the second connecting rod, the second sliding block and the second sliding rail;Bearing block is at the top of mounting plate;Shaft one end It is pivotally connected with bearing block, the other end is fixed in turn-button bottom;Screw rod is attributed to along the vertical direction at the top of turn-button;Connecting tube is fixed in circle Board bottom portion, and connecting tube inner sidewall offers internal screw thread;Screw rod is spirally connected with internal screw thread, and the first sliding rail is fixed in peace along the vertical direction At the top of loading board, the second sliding rail is fixed in along the vertical direction at the top of mounting plate, and the first sliding block is slidably connected with the first sliding rail, and second is sliding Block is slidably connected with the second sliding rail;First connecting rod one end is fixed in connection tube side part, and the other end is fixed in the first slider end; Second connecting rod one end is fixed in connection tube side part, and the other end is fixed in the second slider end.
Further, fixed mechanism includes stay bolt, the first elastic component, arc fixed plate and the second elastic component;It is round Plate is equidistantly opened up there are four the second threaded hole, each second threaded hole has the stay bolt being spirally connected therewith, arc fixed plate It is fixed in circular slab inner sidewall by the first elastic component, the second elastic component, stay bolt and arc fixed plate connect.
Further, the heating and ventilating pipeline laying fixed equipment further include have the first inserted link, installing frame, third connecting rod and Second inserted link;First inserted link is fixed in installation frame bottom, and the second inserted link is fixed in installation frame bottom, begins with confession at the top of mounting plate First slot of the first inserted link insertion, mounting plate top offer the second slot for the insertion of the second inserted link, open at the top of installing frame Equipped with groove, third connecting rod is fixed in groove inner sidewall.
Further, which further includes having the 4th connecting rod, the 5th connecting rod, third bullet Property part, the 6th connecting rod, the 7th connecting rod, the 8th connecting rod, the 9th connecting rod, the 4th elastic component, the tenth connecting rod and the tenth One connecting rod;4th connecting rod is fixed in along the vertical direction at the top of mounting plate, and the 11st connecting rod is fixed in peace along the vertical direction At the top of loading board, the 4th connecting rod and the 11st connecting rod about the vertical central axes of mounting plate at axial symmetry, the 5th connecting rod and the Four connecting rods are hinged, and the 7th connecting rod is fixed in circular slab side, and the 6th connecting rod and the 7th connecting rod are hinged;Third elastic component It is affixed that one end with the 5th connect boom end, and it is affixed that the other end with the 6th connect boom end;Tenth connecting rod and the 11st connecting rod Hingedly, the 8th connecting rod is fixed in circular slab side, and the 9th connecting rod and the 8th connecting rod are hinged;4th elastic component one end and the Nine connection boom ends are affixed, and the other end and the tenth connecting rod are affixed.
Further, which further includes having the first non-slip mat;First non-slip mat is fixed in Arc fixed plate inner sidewall.
Further, which further includes having the second non-slip mat;Second non-slip mat is fixed in Mounting plate bottom, the second non-slip mat bottom offer the first through hole passed through for the first bolt, and the second non-slip mat bottom offers The second through-hole passed through for the second bolt.
Further, turn-button side offers lines.
Compared with prior art, the invention has the following beneficial effects:
The present invention by stay bolt, arc fixed plate, the first elastic component, the second elastic component mutual cooperation under can be convenient HVAC pipe is fixed on ground, and can finely tune the position of HVAC pipe simultaneously;Pass through turn-button, screw rod, the first sliding block, the second sliding block, One sliding rail, the second sliding rail, first connecting rod, the second connecting rod mutual cooperation under, can easily adjust the height of circular slab, In order to adjust the height of HVAC pipe;The present invention can easily adjust the position of HVAC pipe, to reach quickly connection HVAC The effect of pipe.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
The label in accompanying drawing is: 1- mounting plate, the first threaded hole of 2-, the first bolt of 3-, 4- height adjustment mechanism, in 41- Screw thread, 42- screw rod, 43- connecting tube, the first sliding rail of 44-, the first sliding block of 45-, 46- first connecting rod, 47- bearing block, 48- turn Axis, 49- turn-button, the second connecting rod of 410-, the second sliding block of 411-, the second sliding rail of 412-, 5- fixed mechanism, 51- stay bolt, 52- Second threaded hole, the first elastic component of 53-, 54- arc fixed plate, the second elastic component of 55-, the second bolt of 6-, 7- third threaded hole, 8- circular slab, the first slot of 9-, the first inserted link of 10-, 11- installing frame, 12- groove, 13- third connecting rod, the second inserted link of 14-, The second slot of 15-, the 4th connecting rod of 16-, the 5th connecting rod of 17-, 18- third elastic component, the 6th connecting rod of 19-, 20- the 7th connect Extension bar, the 8th connecting rod of 21-, the 9th connecting rod of 22-, the 4th elastic component of 23-, the tenth connecting rod of 24-, the 11st connecting rod of 25-, The first non-slip mat of 26-, the second non-slip mat of 27-, 28- first through hole, the second through-hole of 29-.
Specific embodiment
The present invention is described further below in conjunction with attached drawing:
Embodiment
A kind of heating and ventilating pipeline laying fixed equipment, as shown in Figure 1-3, include mounting plate 1, the first bolt 3, height tune Save mechanism 4, fixed mechanism 5, the second bolt 6 and circular slab 8;The first threaded hole 2, third threaded hole are offered at the top of mounting plate 1 7, the first threaded hole 2 is with third threaded hole 7 about the vertical central axes of mounting plate 1 at axial symmetry, the first bolt 3 and the first threaded hole 2 are spirally connected, and the second bolt 6 is spirally connected with third threaded hole 7, and height adjustment mechanism 4 is installed on 1 top of mounting plate, and circular slab 8 is fixed in 4 output end of height adjustment mechanism, fixed mechanism 5 are installed on circular slab 8.
The present apparatus is fixed to designated position by the first bolt 3, the second bolt 6, then HVAC pipe from circular slab 8 Between pass through, then control fixed mechanism 5 and fix HVAC pipe, the control operating of height adjustment mechanism 4 adjusts the height of circular slab 8, And then the height of HVAC pipe is adjusted, and at the same time fixed mechanism 5 can finely tune the position of HVAC pipe, in order between HVAC pipe It is connected with each other.
Wherein, height adjustment mechanism 4 includes screw rod 42, connecting tube 43, the first sliding rail 44, the first sliding block 45, first company Extension bar 46, bearing block 47, shaft 48, turn-button 49, the second connecting rod 410, the second sliding block 411 and the second sliding rail 412;Bearing block 47 Embedded in 1 top of mounting plate;48 one end of shaft and bearing block 47 are pivotally connected, and the other end is fixed in 49 bottom of turn-button;Screw rod 42 is along vertical Direction is attributed to 49 top of turn-button;Connecting tube 43 is fixed in 8 bottom of circular slab, and 43 inner sidewall of connecting tube offers internal screw thread 41; Screw rod 42 is spirally connected with internal screw thread 41, and the first sliding rail 44 is fixed in 1 top of mounting plate along the vertical direction, and the second sliding rail 412 is along vertical Direction is fixed in 1 top of mounting plate, and the first sliding block 45 is slidably connected with the first sliding rail 44, the second sliding block 411 and the second sliding rail 412 It is slidably connected;46 one end of first connecting rod is fixed in 43 side of connecting tube, and the other end is fixed in 45 end of the first sliding block;Second connects 410 one end of extension bar is fixed in 43 side of connecting tube, and the other end is fixed in 411 end of the second sliding block.
Turn-button 49 is rotated, the rotation of turn-button 49 drives screw rod 42 to rotate, because the first sliding rail 44, the second sliding rail 412, first are sliding The restriction effect of block 45, the second sliding block 411, the rotation of screw rod 42 drives connecting tube 43 up to move, and then drives circular slab 8 up It is mobile, turn-button 49 is rotated backward, turn-button 49, which rotates backward, drives screw rod 42 to rotate backward, because of the first sliding rail 44, the second sliding rail 412, the restriction effect of the first sliding block 45, the second sliding block 411, the rotation of screw rod 42 drives connecting tube 43 to move down, and then drives Circular slab 8 moves down, and can easily adjust the height of HVAC pipe repeatedly, in order to be able to which convenient floor heating connection is logical Pipe.
Wherein, fixed mechanism 5 includes stay bolt 51, the first elastic component 53, arc fixed plate 54 and the second elastic component 55; Circular slab 8 is equidistantly opened up there are four the second threaded hole 52, each second threaded hole 52 has the stay bolt 51 being spirally connected therewith, Arc fixed plate 54 is fixed in 8 inner sidewall of circular slab by the first elastic component 53, the second elastic component 55, and stay bolt 51 and arc are solid Fixed board 54 connects.
Stay bolt 51 is rotated, and then arc fixed plate 54 is driven mutually to draw close, arc fixed plate 54, which is mutually drawn close, to be fixed HVAC pipe rotates backward stay bolt 51, acts in the elastic force of the first elastic component 53, the second elastic component 55,54 phase of arc fixed plate Mutually separate, arc fixed plate 54, which is located remotely from each other, unclamps HVAC pipe, can easily fix or unclamp HVAC pipe repeatedly.
Wherein, as shown in Fig. 2, the heating and ventilating pipeline laying fixed equipment, which further includes, the first inserted link 10, installing frame 11, Three connecting rods 13 and the second inserted link 14;First inserted link 10 is fixed in 11 bottom of installing frame, and the second inserted link 14 is fixed in installing frame 11 Bottom begins with the first slot 9 for the insertion of the first inserted link 10 at the top of mounting plate 1, offers at the top of mounting plate 1 for the second inserted link Second slots 15 of 14 insertions, open up fluted 12 at the top of installing frame 11, third connecting rod 13 is fixed in 12 inner sidewall of groove.
Just installing frame 11 can be fixed on mounting plate 1 by the first inserted link 10, the second inserted link 14, pass through installing frame 11 can prevent someone from going to twist the first bolt 3, the second bolt 6, can easily be taken installing frame 11 by third connecting rod 13.
Wherein, as shown in figure 3, the heating and ventilating pipeline laying fixed equipment, which further includes, the connection of the 4th connecting rod the 16, the 5th Bar 17, third elastic component 18, the 6th connecting rod 19, the 7th connecting rod 20, the 8th connecting rod 21, the 9th connecting rod 22, the 4th bullet Property part 23, the tenth connecting rod 24 and the 11st connecting rod 25;4th connecting rod 16 is fixed in 1 top of mounting plate along the vertical direction, 11st connecting rod 25 is fixed in 1 top of mounting plate along the vertical direction, and the 4th connecting rod 16 and the 11st connecting rod 25 are about peace The vertical central axes of loading board 1 are at axial symmetry, and the 5th connecting rod 17 and the 4th connecting rod 16 are hinged, and the 7th connecting rod 20 is fixed in circle 8 side of plate, the 6th connecting rod 19 and the 7th connecting rod 20 are hinged;18 one end of third elastic component and 17 end of the 5th connecting rod are solid It connects, the other end and 19 end of the 6th connecting rod are affixed;Tenth connecting rod 24 and the 11st connecting rod 25 are hinged, the 8th connecting rod 21 It is fixed in 8 side of circular slab, the 9th connecting rod 22 and the 8th connecting rod 21 are hinged;4th elastic component, 23 one end and the 9th connecting rod 22 ends are affixed, and the other end and the tenth connecting rod 24 are affixed.
By under the effect of the elastic force of third elastic component 18, the 4th elastic component 23, shake that can easily to being generated in work It is dynamic to be buffered, it prevents that the first bolt 3, the second bolt 6 is caused to loosen because of vibration.
Wherein, as shown in figure 3, the heating and ventilating pipeline laying fixed equipment further includes having the first non-slip mat 26;First is anti-skidding Pad 26 is fixed in 54 inner sidewall of arc fixed plate.
First non-slip mat 26 can increase the frictional force between HVAC pipe, in order to be able to more firmly fix HVAC Pipe.
Wherein, as shown in figure 3, the heating and ventilating pipeline laying fixed equipment further includes having the second non-slip mat 27;
Second non-slip mat 27 is fixed in 1 bottom of mounting plate, and 27 bottom of the second non-slip mat is offered to be passed through for the first bolt 3 First through hole 28,27 bottom of the second non-slip mat offer the second through-hole 29 passed through for the second bolt 6.
Second non-slip mat 27 can increase the frictional force with metope, in order to which the present apparatus can be more solidly fixed to wall On.
Wherein, 49 side of turn-button offers lines.
Lines can increase the frictional force with finger, in order to the operation to turn-button 49.
Using technical solution of the present invention or those skilled in the art under the inspiration of technical solution of the present invention, if Similar technical solution is counted out, and reaches above-mentioned technical effect, is to fall into protection scope of the present invention.

Claims (8)

1. a kind of heating and ventilating pipeline, which is laid with, uses fixed equipment, which is characterized in that include mounting plate (1), the first bolt (3), height Regulating mechanism (4), fixed mechanism (5), the second bolt (6) and circular slab (8);The first threaded hole is offered at the top of mounting plate (1) (2), third threaded hole (7), the first threaded hole (2) and third threaded hole (7) are about the vertical central axes of mounting plate (1) at axis pair Claim, the first bolt (3) is spirally connected with the first threaded hole (2), and the second bolt (6) is spirally connected with third threaded hole (7), height adjustment mechanism (4) it is installed at the top of mounting plate (1), circular slab (8) is fixed in height adjustment mechanism (4) output end, and fixed mechanism (5) is installed on On circular slab (8).
2. a kind of heating and ventilating pipeline according to claim 1, which is laid with, uses fixed equipment, which is characterized in that height adjustment mechanism It (4) include screw rod (42), connecting tube (43), the first sliding rail (44), the first sliding block (45), first connecting rod (46), bearing block (47), shaft (48), turn-button (49), the second connecting rod (410), the second sliding block (411) and the second sliding rail (412);Bearing block (47) at the top of mounting plate (1);Shaft (48) one end and bearing block (47) are pivotally connected, and the other end is fixed in turn-button (49) bottom; Screw rod (42) is attributed to along the vertical direction at the top of turn-button (49);Connecting tube (43) is fixed in circular slab (8) bottom, and connecting tube (43) Inner sidewall offers internal screw thread (41);Screw rod (42) is spirally connected with internal screw thread (41), and the first sliding rail (44) is fixed in along the vertical direction At the top of mounting plate (1), the second sliding rail (412) is fixed in along the vertical direction at the top of mounting plate (1), and the first sliding block (45) is sliding with first Rail (44) is slidably connected, and the second sliding block (411) is slidably connected with the second sliding rail (412);First connecting rod (46) one end is fixed in Connecting tube (43) side, the other end are fixed in the first sliding block (45) end;Second connecting rod (410) one end is fixed in connecting tube (43) side, the other end are fixed in the second sliding block (411) end.
3. a kind of heating and ventilating pipeline according to claim 2, which is laid with, uses fixed equipment, which is characterized in that fixed mechanism (5) packet Stay bolt (51), the first elastic component (53), arc fixed plate (54) and the second elastic component (55) are included;Circular slab (8) is equidistant It opens up there are four the second threaded hole (52), each second threaded hole (52) has the stay bolt (51) being spirally connected therewith, and arc is solid Fixed board (54) is fixed in circular slab (8) inner sidewall, stay bolt (51) and arc by the first elastic component (53), the second elastic component (55) Shape fixed plate (54) connects.
4. a kind of heating and ventilating pipeline according to claim 3, which is laid with, uses fixed equipment, which is characterized in that the heating and ventilating pipeline is laid with It further include having the first inserted link (10), installing frame (11), third connecting rod (13) and the second inserted link (14) with fixed equipment;First inserts Bar (10) is fixed in installing frame (11) bottom, and the second inserted link (14) is fixed in installing frame (11) bottom, starts at the top of mounting plate (1) There is the first slot (9) for the first inserted link (10) insertion, second for the second inserted link (14) insertion is offered at the top of mounting plate (1) Slot (15), installing frame (11) top open up fluted (12), and third connecting rod (13) is fixed in groove (12) inner sidewall.
5. a kind of heating and ventilating pipeline according to claim 4, which is laid with, uses fixed equipment, which is characterized in that the heating and ventilating pipeline is laid with It further include having the 4th connecting rod (16), the 5th connecting rod (17), third elastic component (18), the 6th connecting rod with fixed equipment (19), the 7th connecting rod (20), the 8th connecting rod (21), the 9th connecting rod (22), the 4th elastic component (23), the tenth connecting rod (24) and the 11st connecting rod (25);4th connecting rod (16) is fixed in along the vertical direction at the top of mounting plate (1), the 11st connection Bar (25) is fixed in along the vertical direction at the top of mounting plate (1), and the 4th connecting rod (16) and the 11st connecting rod (25) are about installation The vertical central axes of plate (1) are at axial symmetry, and hingedly, the 7th connecting rod (20) is affixed for the 5th connecting rod (17) and the 4th connecting rod (16) In circular slab (8) side, the 6th connecting rod (19) and the 7th connecting rod (20) are hinged;Third elastic component (18) one end connects with the 5th Extension bar (17) end is affixed, and the other end and the 6th connecting rod (19) end are affixed;Tenth connecting rod (24) and the 11st connecting rod (25) hingedly, the 8th connecting rod (21) is fixed in circular slab (8) side, and the 9th connecting rod (22) and the 8th connecting rod (21) are cut with scissors It connects;4th elastic component (23) one end and the 9th connecting rod (22) end are affixed, and the other end and the tenth connecting rod (24) are affixed.
6. a kind of heating and ventilating pipeline according to claim 5, which is laid with, uses fixed equipment, which is characterized in that the heating and ventilating pipeline is laid with It further include having the first non-slip mat (26) with fixed equipment;First non-slip mat (26) is fixed in arc fixed plate (54) inner sidewall.
7. a kind of heating and ventilating pipeline according to claim 6, which is laid with, uses fixed equipment, which is characterized in that the heating and ventilating pipeline is laid with It further include having the second non-slip mat (27) with fixed equipment;Second non-slip mat (27) is fixed in mounting plate (1) bottom, the second non-slip mat (27) bottom offers the first through hole (28) passed through for the first bolt (3), and the second non-slip mat (27) bottom is offered for second The second through-hole (29) that bolt (6) passes through.
8. a kind of heating and ventilating pipeline according to claim 7, which is laid with, uses fixed equipment, which is characterized in that open turn-button (49) side Equipped with lines.
CN201910078018.6A 2019-01-28 2019-01-28 Fixed equipment is used in a kind of laying of heating and ventilating pipeline Pending CN109827007A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910078018.6A CN109827007A (en) 2019-01-28 2019-01-28 Fixed equipment is used in a kind of laying of heating and ventilating pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910078018.6A CN109827007A (en) 2019-01-28 2019-01-28 Fixed equipment is used in a kind of laying of heating and ventilating pipeline

Publications (1)

Publication Number Publication Date
CN109827007A true CN109827007A (en) 2019-05-31

Family

ID=66862584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910078018.6A Pending CN109827007A (en) 2019-01-28 2019-01-28 Fixed equipment is used in a kind of laying of heating and ventilating pipeline

Country Status (1)

Country Link
CN (1) CN109827007A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111839287A (en) * 2020-07-31 2020-10-30 杭州揽廉科技有限公司 Automatic rice washing anti-spilling device and using method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4295766A (en) * 1978-07-27 1981-10-20 Francis Shaw Self-aligning dome nut
CN202833532U (en) * 2012-07-26 2013-03-27 东风汽车有限公司 Novel wheel nut assembly with protective cover
CN205078918U (en) * 2015-10-28 2016-03-09 国网山东巨野县供电公司 Power cable unwrapping wire auxiliary device
CN205689905U (en) * 2016-06-13 2016-11-16 张炜 A kind of single-layer type petroleum pipeline lifting support
CN107401634A (en) * 2017-08-03 2017-11-28 过蕊 A kind of portable sewage treatment pipeline support frame
CN206860646U (en) * 2016-11-01 2018-01-09 新昌县城关双雄五金厂 A kind of anti-theft screw cap set easy to install
CN207005463U (en) * 2017-07-18 2018-02-13 张宁 A kind of water conservancy and hydropower Pipe installing locating support
CN208058127U (en) * 2018-03-27 2018-11-06 孙洁 A kind of water conservancy construction pipeline fixer
CN108825878A (en) * 2018-08-07 2018-11-16 江苏宇恒电气有限公司 A kind of adjustable pipe-hanger support
CN208107305U (en) * 2018-04-27 2018-11-16 郑昌业 A kind of water conservancy construction pipeline protection device
CN108869876A (en) * 2018-07-02 2018-11-23 江苏嘉胜石油科技有限公司 A kind of fixed structure of petroleum pipeline

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4295766A (en) * 1978-07-27 1981-10-20 Francis Shaw Self-aligning dome nut
CN202833532U (en) * 2012-07-26 2013-03-27 东风汽车有限公司 Novel wheel nut assembly with protective cover
CN205078918U (en) * 2015-10-28 2016-03-09 国网山东巨野县供电公司 Power cable unwrapping wire auxiliary device
CN205689905U (en) * 2016-06-13 2016-11-16 张炜 A kind of single-layer type petroleum pipeline lifting support
CN206860646U (en) * 2016-11-01 2018-01-09 新昌县城关双雄五金厂 A kind of anti-theft screw cap set easy to install
CN207005463U (en) * 2017-07-18 2018-02-13 张宁 A kind of water conservancy and hydropower Pipe installing locating support
CN107401634A (en) * 2017-08-03 2017-11-28 过蕊 A kind of portable sewage treatment pipeline support frame
CN208058127U (en) * 2018-03-27 2018-11-06 孙洁 A kind of water conservancy construction pipeline fixer
CN208107305U (en) * 2018-04-27 2018-11-16 郑昌业 A kind of water conservancy construction pipeline protection device
CN108869876A (en) * 2018-07-02 2018-11-23 江苏嘉胜石油科技有限公司 A kind of fixed structure of petroleum pipeline
CN108825878A (en) * 2018-08-07 2018-11-16 江苏宇恒电气有限公司 A kind of adjustable pipe-hanger support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111839287A (en) * 2020-07-31 2020-10-30 杭州揽廉科技有限公司 Automatic rice washing anti-spilling device and using method thereof

Similar Documents

Publication Publication Date Title
CN209542384U (en) A kind of dust on the roads on-Line Monitor Device
CN109827007A (en) Fixed equipment is used in a kind of laying of heating and ventilating pipeline
CN106568128A (en) Air conditioner air outlet panel structure, air conditioner and control method thereof
CN2886408Y (en) Ventilation system for room ventilation
US2286115A (en) Air tempering apparatus
CN209116510U (en) Surface frame component and the apparatus of air conditioning
CN208138582U (en) A kind of pipe clamp of fixed Heating,Ventilating and Air Conditioning pipeline
CN110374255A (en) Sound insulation wallboard and preparation device thereof
CN208169211U (en) It is a kind of to be easily installed fixed intelligent axial flow blower
CN209431472U (en) A kind of air compensation device for gas-cooker
CN207584922U (en) A kind of energy-saving type frequency conversion fan coil
CN211275584U (en) Cleaning device of heating ventilation air conditioner
CN218409276U (en) Air volume testing device for air conditioner ventilation
CN207299474U (en) It is capable of the mounting bracket of the indoor apparatus of air conditioner of Fast Installation
CN2470726Y (en) Wind-guiding mechanism of indoor machine of air-conditioner
CN207960993U (en) A kind of axial flow blower convenient for cleaning
JP3228282B2 (en) Fan coil unit
CN108397895A (en) Air conditioner connection structure and air conditioner with it
JPS59109743A (en) Supply opening for air conditioning capable of varying quantity of airflow
CN218096248U (en) Split type all-fresh air conditioner
CN217441825U (en) Easy-to-install heating ventilation air conditioner heat dissipation device
CN217464816U (en) Air pipe air quantity balance damping plate for air conditioner
CN219346766U (en) Heating ventilation air conditioner installing support
CN217763889U (en) Device for fixing central air-conditioning unit
CN105202733B (en) A kind of wind deflector structure, sliding door cabinet-type air conditioner and air conditioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190531

WD01 Invention patent application deemed withdrawn after publication