CN109827007A - Fixed equipment is used in a kind of laying of heating and ventilating pipeline - Google Patents
Fixed equipment is used in a kind of laying of heating and ventilating pipeline Download PDFInfo
- Publication number
- CN109827007A CN109827007A CN201910078018.6A CN201910078018A CN109827007A CN 109827007 A CN109827007 A CN 109827007A CN 201910078018 A CN201910078018 A CN 201910078018A CN 109827007 A CN109827007 A CN 109827007A
- Authority
- CN
- China
- Prior art keywords
- fixed
- connecting rod
- mounting plate
- heating
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Floor Finish (AREA)
Abstract
The present invention relates to belonging to, HVAC is laid with field more particularly to fixed equipment is used in a kind of laying of heating and ventilating pipeline.The technical problem to be solved in the present invention is to provide a kind of heating and ventilating pipeline laying fixed equipments for capableing of convenient adjusting HVAC pipe position.A kind of heating and ventilating pipeline laying fixed equipment, includes mounting plate, the first bolt, height adjustment mechanism, fixed mechanism, the second bolt and circular slab;First threaded hole etc. is offered at the top of mounting plate;First threaded hole is with third threaded hole about the vertical central axes of mounting plate at axial symmetry, first bolt and the first screw hole, second bolt and third screw hole, height adjustment mechanism is installed at the top of mounting plate, circular slab is fixed in height adjustment mechanism output end, and fixed mechanism is installed on circular slab.The present invention can easily adjust the position of HVAC pipe, to achieve the effect that quickly to connect HVAC pipe.
Description
Technical field
The present invention relates to belonging to, HVAC is laid with field more particularly to fixed equipment is used in a kind of laying of heating and ventilating pipeline.
Background technique
HVAC is the title of a classification of work post in architectural design.HVAC include: heating, ventilation, air conditioning this three
A aspect, these three aspect abbreviation Heating,Ventilating and Air Conditioning.Heating --- it also known as heats, gives building heat supply as needed, guarantee room
Interior temperature is persistently higher than external environment by people's requirement.Logical common heat sink etc..Ventilation: it is sent into room, or be discharged by room
The process of air.The air in building (claiming room air) is replaced using outdoor air (claiming fresh air or fresh air), is led to
Often divide gravity-flow ventilation and force ventilation.Air conditioning --- abbreviation air-conditioning, for the temperature, humidity, clean in room or space
Cleanliness and reciprocal of duty cycle flowing velocity are adjusted, and provide the architectural environment control system of the fresh air of sufficient amount.
HVAC pipe is fixedly mounted in ground machine room lower by fixed frame in the prior art, can not be adjusted so that HVAC
Connection between pipe impacts, therefore needs to research and develop and a kind of be capable of the convenient heating and ventilating pipeline for adjusting HVAC pipe position and be laid with solid
Locking equipment.
Summary of the invention
The present invention in order to overcome in the prior art HVAC pipe be all be fixedly mounted on by fixed frame ground machine room lower in, cannot
It is enough to adjust so that the shortcomings that connection between HVAC pipe impacts, the technical problem to be solved in the present invention is to provide one kind
Fixed equipment is used in the convenient heating and ventilating pipeline laying for adjusting HVAC pipe position.
The present invention is reached by technological means in detail below:
A kind of heating and ventilating pipeline laying fixed equipment includes mounting plate, the first bolt, height adjustment mechanism, fixed machine
Structure, the second bolt and circular slab;The first threaded hole, third threaded hole, the first threaded hole and third spiral shell are offered at the top of mounting plate
Pit about the vertical central axes of mounting plate at axial symmetry, the first bolt and the first screw hole, the second bolt and third screw thread
Hole is spirally connected, and height adjustment mechanism is installed at the top of mounting plate, and circular slab is fixed in height adjustment mechanism output end, fixed mechanism peace
Loaded on circular slab.
Further, height adjustment mechanism include screw rod, connecting tube, the first sliding rail, the first sliding block, first connecting rod,
Bearing block, shaft, turn-button, the second connecting rod, the second sliding block and the second sliding rail;Bearing block is at the top of mounting plate;Shaft one end
It is pivotally connected with bearing block, the other end is fixed in turn-button bottom;Screw rod is attributed to along the vertical direction at the top of turn-button;Connecting tube is fixed in circle
Board bottom portion, and connecting tube inner sidewall offers internal screw thread;Screw rod is spirally connected with internal screw thread, and the first sliding rail is fixed in peace along the vertical direction
At the top of loading board, the second sliding rail is fixed in along the vertical direction at the top of mounting plate, and the first sliding block is slidably connected with the first sliding rail, and second is sliding
Block is slidably connected with the second sliding rail;First connecting rod one end is fixed in connection tube side part, and the other end is fixed in the first slider end;
Second connecting rod one end is fixed in connection tube side part, and the other end is fixed in the second slider end.
Further, fixed mechanism includes stay bolt, the first elastic component, arc fixed plate and the second elastic component;It is round
Plate is equidistantly opened up there are four the second threaded hole, each second threaded hole has the stay bolt being spirally connected therewith, arc fixed plate
It is fixed in circular slab inner sidewall by the first elastic component, the second elastic component, stay bolt and arc fixed plate connect.
Further, the heating and ventilating pipeline laying fixed equipment further include have the first inserted link, installing frame, third connecting rod and
Second inserted link;First inserted link is fixed in installation frame bottom, and the second inserted link is fixed in installation frame bottom, begins with confession at the top of mounting plate
First slot of the first inserted link insertion, mounting plate top offer the second slot for the insertion of the second inserted link, open at the top of installing frame
Equipped with groove, third connecting rod is fixed in groove inner sidewall.
Further, which further includes having the 4th connecting rod, the 5th connecting rod, third bullet
Property part, the 6th connecting rod, the 7th connecting rod, the 8th connecting rod, the 9th connecting rod, the 4th elastic component, the tenth connecting rod and the tenth
One connecting rod;4th connecting rod is fixed in along the vertical direction at the top of mounting plate, and the 11st connecting rod is fixed in peace along the vertical direction
At the top of loading board, the 4th connecting rod and the 11st connecting rod about the vertical central axes of mounting plate at axial symmetry, the 5th connecting rod and the
Four connecting rods are hinged, and the 7th connecting rod is fixed in circular slab side, and the 6th connecting rod and the 7th connecting rod are hinged;Third elastic component
It is affixed that one end with the 5th connect boom end, and it is affixed that the other end with the 6th connect boom end;Tenth connecting rod and the 11st connecting rod
Hingedly, the 8th connecting rod is fixed in circular slab side, and the 9th connecting rod and the 8th connecting rod are hinged;4th elastic component one end and the
Nine connection boom ends are affixed, and the other end and the tenth connecting rod are affixed.
Further, which further includes having the first non-slip mat;First non-slip mat is fixed in
Arc fixed plate inner sidewall.
Further, which further includes having the second non-slip mat;Second non-slip mat is fixed in
Mounting plate bottom, the second non-slip mat bottom offer the first through hole passed through for the first bolt, and the second non-slip mat bottom offers
The second through-hole passed through for the second bolt.
Further, turn-button side offers lines.
Compared with prior art, the invention has the following beneficial effects:
The present invention by stay bolt, arc fixed plate, the first elastic component, the second elastic component mutual cooperation under can be convenient
HVAC pipe is fixed on ground, and can finely tune the position of HVAC pipe simultaneously;Pass through turn-button, screw rod, the first sliding block, the second sliding block,
One sliding rail, the second sliding rail, first connecting rod, the second connecting rod mutual cooperation under, can easily adjust the height of circular slab,
In order to adjust the height of HVAC pipe;The present invention can easily adjust the position of HVAC pipe, to reach quickly connection HVAC
The effect of pipe.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
The label in accompanying drawing is: 1- mounting plate, the first threaded hole of 2-, the first bolt of 3-, 4- height adjustment mechanism, in 41-
Screw thread, 42- screw rod, 43- connecting tube, the first sliding rail of 44-, the first sliding block of 45-, 46- first connecting rod, 47- bearing block, 48- turn
Axis, 49- turn-button, the second connecting rod of 410-, the second sliding block of 411-, the second sliding rail of 412-, 5- fixed mechanism, 51- stay bolt, 52-
Second threaded hole, the first elastic component of 53-, 54- arc fixed plate, the second elastic component of 55-, the second bolt of 6-, 7- third threaded hole,
8- circular slab, the first slot of 9-, the first inserted link of 10-, 11- installing frame, 12- groove, 13- third connecting rod, the second inserted link of 14-,
The second slot of 15-, the 4th connecting rod of 16-, the 5th connecting rod of 17-, 18- third elastic component, the 6th connecting rod of 19-, 20- the 7th connect
Extension bar, the 8th connecting rod of 21-, the 9th connecting rod of 22-, the 4th elastic component of 23-, the tenth connecting rod of 24-, the 11st connecting rod of 25-,
The first non-slip mat of 26-, the second non-slip mat of 27-, 28- first through hole, the second through-hole of 29-.
Specific embodiment
The present invention is described further below in conjunction with attached drawing:
Embodiment
A kind of heating and ventilating pipeline laying fixed equipment, as shown in Figure 1-3, include mounting plate 1, the first bolt 3, height tune
Save mechanism 4, fixed mechanism 5, the second bolt 6 and circular slab 8;The first threaded hole 2, third threaded hole are offered at the top of mounting plate 1
7, the first threaded hole 2 is with third threaded hole 7 about the vertical central axes of mounting plate 1 at axial symmetry, the first bolt 3 and the first threaded hole
2 are spirally connected, and the second bolt 6 is spirally connected with third threaded hole 7, and height adjustment mechanism 4 is installed on 1 top of mounting plate, and circular slab 8 is fixed in
4 output end of height adjustment mechanism, fixed mechanism 5 are installed on circular slab 8.
The present apparatus is fixed to designated position by the first bolt 3, the second bolt 6, then HVAC pipe from circular slab 8
Between pass through, then control fixed mechanism 5 and fix HVAC pipe, the control operating of height adjustment mechanism 4 adjusts the height of circular slab 8,
And then the height of HVAC pipe is adjusted, and at the same time fixed mechanism 5 can finely tune the position of HVAC pipe, in order between HVAC pipe
It is connected with each other.
Wherein, height adjustment mechanism 4 includes screw rod 42, connecting tube 43, the first sliding rail 44, the first sliding block 45, first company
Extension bar 46, bearing block 47, shaft 48, turn-button 49, the second connecting rod 410, the second sliding block 411 and the second sliding rail 412;Bearing block 47
Embedded in 1 top of mounting plate;48 one end of shaft and bearing block 47 are pivotally connected, and the other end is fixed in 49 bottom of turn-button;Screw rod 42 is along vertical
Direction is attributed to 49 top of turn-button;Connecting tube 43 is fixed in 8 bottom of circular slab, and 43 inner sidewall of connecting tube offers internal screw thread 41;
Screw rod 42 is spirally connected with internal screw thread 41, and the first sliding rail 44 is fixed in 1 top of mounting plate along the vertical direction, and the second sliding rail 412 is along vertical
Direction is fixed in 1 top of mounting plate, and the first sliding block 45 is slidably connected with the first sliding rail 44, the second sliding block 411 and the second sliding rail 412
It is slidably connected;46 one end of first connecting rod is fixed in 43 side of connecting tube, and the other end is fixed in 45 end of the first sliding block;Second connects
410 one end of extension bar is fixed in 43 side of connecting tube, and the other end is fixed in 411 end of the second sliding block.
Turn-button 49 is rotated, the rotation of turn-button 49 drives screw rod 42 to rotate, because the first sliding rail 44, the second sliding rail 412, first are sliding
The restriction effect of block 45, the second sliding block 411, the rotation of screw rod 42 drives connecting tube 43 up to move, and then drives circular slab 8 up
It is mobile, turn-button 49 is rotated backward, turn-button 49, which rotates backward, drives screw rod 42 to rotate backward, because of the first sliding rail 44, the second sliding rail
412, the restriction effect of the first sliding block 45, the second sliding block 411, the rotation of screw rod 42 drives connecting tube 43 to move down, and then drives
Circular slab 8 moves down, and can easily adjust the height of HVAC pipe repeatedly, in order to be able to which convenient floor heating connection is logical
Pipe.
Wherein, fixed mechanism 5 includes stay bolt 51, the first elastic component 53, arc fixed plate 54 and the second elastic component 55;
Circular slab 8 is equidistantly opened up there are four the second threaded hole 52, each second threaded hole 52 has the stay bolt 51 being spirally connected therewith,
Arc fixed plate 54 is fixed in 8 inner sidewall of circular slab by the first elastic component 53, the second elastic component 55, and stay bolt 51 and arc are solid
Fixed board 54 connects.
Stay bolt 51 is rotated, and then arc fixed plate 54 is driven mutually to draw close, arc fixed plate 54, which is mutually drawn close, to be fixed
HVAC pipe rotates backward stay bolt 51, acts in the elastic force of the first elastic component 53, the second elastic component 55,54 phase of arc fixed plate
Mutually separate, arc fixed plate 54, which is located remotely from each other, unclamps HVAC pipe, can easily fix or unclamp HVAC pipe repeatedly.
Wherein, as shown in Fig. 2, the heating and ventilating pipeline laying fixed equipment, which further includes, the first inserted link 10, installing frame 11,
Three connecting rods 13 and the second inserted link 14;First inserted link 10 is fixed in 11 bottom of installing frame, and the second inserted link 14 is fixed in installing frame 11
Bottom begins with the first slot 9 for the insertion of the first inserted link 10 at the top of mounting plate 1, offers at the top of mounting plate 1 for the second inserted link
Second slots 15 of 14 insertions, open up fluted 12 at the top of installing frame 11, third connecting rod 13 is fixed in 12 inner sidewall of groove.
Just installing frame 11 can be fixed on mounting plate 1 by the first inserted link 10, the second inserted link 14, pass through installing frame
11 can prevent someone from going to twist the first bolt 3, the second bolt 6, can easily be taken installing frame 11 by third connecting rod 13.
Wherein, as shown in figure 3, the heating and ventilating pipeline laying fixed equipment, which further includes, the connection of the 4th connecting rod the 16, the 5th
Bar 17, third elastic component 18, the 6th connecting rod 19, the 7th connecting rod 20, the 8th connecting rod 21, the 9th connecting rod 22, the 4th bullet
Property part 23, the tenth connecting rod 24 and the 11st connecting rod 25;4th connecting rod 16 is fixed in 1 top of mounting plate along the vertical direction,
11st connecting rod 25 is fixed in 1 top of mounting plate along the vertical direction, and the 4th connecting rod 16 and the 11st connecting rod 25 are about peace
The vertical central axes of loading board 1 are at axial symmetry, and the 5th connecting rod 17 and the 4th connecting rod 16 are hinged, and the 7th connecting rod 20 is fixed in circle
8 side of plate, the 6th connecting rod 19 and the 7th connecting rod 20 are hinged;18 one end of third elastic component and 17 end of the 5th connecting rod are solid
It connects, the other end and 19 end of the 6th connecting rod are affixed;Tenth connecting rod 24 and the 11st connecting rod 25 are hinged, the 8th connecting rod 21
It is fixed in 8 side of circular slab, the 9th connecting rod 22 and the 8th connecting rod 21 are hinged;4th elastic component, 23 one end and the 9th connecting rod
22 ends are affixed, and the other end and the tenth connecting rod 24 are affixed.
By under the effect of the elastic force of third elastic component 18, the 4th elastic component 23, shake that can easily to being generated in work
It is dynamic to be buffered, it prevents that the first bolt 3, the second bolt 6 is caused to loosen because of vibration.
Wherein, as shown in figure 3, the heating and ventilating pipeline laying fixed equipment further includes having the first non-slip mat 26;First is anti-skidding
Pad 26 is fixed in 54 inner sidewall of arc fixed plate.
First non-slip mat 26 can increase the frictional force between HVAC pipe, in order to be able to more firmly fix HVAC
Pipe.
Wherein, as shown in figure 3, the heating and ventilating pipeline laying fixed equipment further includes having the second non-slip mat 27;
Second non-slip mat 27 is fixed in 1 bottom of mounting plate, and 27 bottom of the second non-slip mat is offered to be passed through for the first bolt 3
First through hole 28,27 bottom of the second non-slip mat offer the second through-hole 29 passed through for the second bolt 6.
Second non-slip mat 27 can increase the frictional force with metope, in order to which the present apparatus can be more solidly fixed to wall
On.
Wherein, 49 side of turn-button offers lines.
Lines can increase the frictional force with finger, in order to the operation to turn-button 49.
Using technical solution of the present invention or those skilled in the art under the inspiration of technical solution of the present invention, if
Similar technical solution is counted out, and reaches above-mentioned technical effect, is to fall into protection scope of the present invention.
Claims (8)
1. a kind of heating and ventilating pipeline, which is laid with, uses fixed equipment, which is characterized in that include mounting plate (1), the first bolt (3), height
Regulating mechanism (4), fixed mechanism (5), the second bolt (6) and circular slab (8);The first threaded hole is offered at the top of mounting plate (1)
(2), third threaded hole (7), the first threaded hole (2) and third threaded hole (7) are about the vertical central axes of mounting plate (1) at axis pair
Claim, the first bolt (3) is spirally connected with the first threaded hole (2), and the second bolt (6) is spirally connected with third threaded hole (7), height adjustment mechanism
(4) it is installed at the top of mounting plate (1), circular slab (8) is fixed in height adjustment mechanism (4) output end, and fixed mechanism (5) is installed on
On circular slab (8).
2. a kind of heating and ventilating pipeline according to claim 1, which is laid with, uses fixed equipment, which is characterized in that height adjustment mechanism
It (4) include screw rod (42), connecting tube (43), the first sliding rail (44), the first sliding block (45), first connecting rod (46), bearing block
(47), shaft (48), turn-button (49), the second connecting rod (410), the second sliding block (411) and the second sliding rail (412);Bearing block
(47) at the top of mounting plate (1);Shaft (48) one end and bearing block (47) are pivotally connected, and the other end is fixed in turn-button (49) bottom;
Screw rod (42) is attributed to along the vertical direction at the top of turn-button (49);Connecting tube (43) is fixed in circular slab (8) bottom, and connecting tube (43)
Inner sidewall offers internal screw thread (41);Screw rod (42) is spirally connected with internal screw thread (41), and the first sliding rail (44) is fixed in along the vertical direction
At the top of mounting plate (1), the second sliding rail (412) is fixed in along the vertical direction at the top of mounting plate (1), and the first sliding block (45) is sliding with first
Rail (44) is slidably connected, and the second sliding block (411) is slidably connected with the second sliding rail (412);First connecting rod (46) one end is fixed in
Connecting tube (43) side, the other end are fixed in the first sliding block (45) end;Second connecting rod (410) one end is fixed in connecting tube
(43) side, the other end are fixed in the second sliding block (411) end.
3. a kind of heating and ventilating pipeline according to claim 2, which is laid with, uses fixed equipment, which is characterized in that fixed mechanism (5) packet
Stay bolt (51), the first elastic component (53), arc fixed plate (54) and the second elastic component (55) are included;Circular slab (8) is equidistant
It opens up there are four the second threaded hole (52), each second threaded hole (52) has the stay bolt (51) being spirally connected therewith, and arc is solid
Fixed board (54) is fixed in circular slab (8) inner sidewall, stay bolt (51) and arc by the first elastic component (53), the second elastic component (55)
Shape fixed plate (54) connects.
4. a kind of heating and ventilating pipeline according to claim 3, which is laid with, uses fixed equipment, which is characterized in that the heating and ventilating pipeline is laid with
It further include having the first inserted link (10), installing frame (11), third connecting rod (13) and the second inserted link (14) with fixed equipment;First inserts
Bar (10) is fixed in installing frame (11) bottom, and the second inserted link (14) is fixed in installing frame (11) bottom, starts at the top of mounting plate (1)
There is the first slot (9) for the first inserted link (10) insertion, second for the second inserted link (14) insertion is offered at the top of mounting plate (1)
Slot (15), installing frame (11) top open up fluted (12), and third connecting rod (13) is fixed in groove (12) inner sidewall.
5. a kind of heating and ventilating pipeline according to claim 4, which is laid with, uses fixed equipment, which is characterized in that the heating and ventilating pipeline is laid with
It further include having the 4th connecting rod (16), the 5th connecting rod (17), third elastic component (18), the 6th connecting rod with fixed equipment
(19), the 7th connecting rod (20), the 8th connecting rod (21), the 9th connecting rod (22), the 4th elastic component (23), the tenth connecting rod
(24) and the 11st connecting rod (25);4th connecting rod (16) is fixed in along the vertical direction at the top of mounting plate (1), the 11st connection
Bar (25) is fixed in along the vertical direction at the top of mounting plate (1), and the 4th connecting rod (16) and the 11st connecting rod (25) are about installation
The vertical central axes of plate (1) are at axial symmetry, and hingedly, the 7th connecting rod (20) is affixed for the 5th connecting rod (17) and the 4th connecting rod (16)
In circular slab (8) side, the 6th connecting rod (19) and the 7th connecting rod (20) are hinged;Third elastic component (18) one end connects with the 5th
Extension bar (17) end is affixed, and the other end and the 6th connecting rod (19) end are affixed;Tenth connecting rod (24) and the 11st connecting rod
(25) hingedly, the 8th connecting rod (21) is fixed in circular slab (8) side, and the 9th connecting rod (22) and the 8th connecting rod (21) are cut with scissors
It connects;4th elastic component (23) one end and the 9th connecting rod (22) end are affixed, and the other end and the tenth connecting rod (24) are affixed.
6. a kind of heating and ventilating pipeline according to claim 5, which is laid with, uses fixed equipment, which is characterized in that the heating and ventilating pipeline is laid with
It further include having the first non-slip mat (26) with fixed equipment;First non-slip mat (26) is fixed in arc fixed plate (54) inner sidewall.
7. a kind of heating and ventilating pipeline according to claim 6, which is laid with, uses fixed equipment, which is characterized in that the heating and ventilating pipeline is laid with
It further include having the second non-slip mat (27) with fixed equipment;Second non-slip mat (27) is fixed in mounting plate (1) bottom, the second non-slip mat
(27) bottom offers the first through hole (28) passed through for the first bolt (3), and the second non-slip mat (27) bottom is offered for second
The second through-hole (29) that bolt (6) passes through.
8. a kind of heating and ventilating pipeline according to claim 7, which is laid with, uses fixed equipment, which is characterized in that open turn-button (49) side
Equipped with lines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910078018.6A CN109827007A (en) | 2019-01-28 | 2019-01-28 | Fixed equipment is used in a kind of laying of heating and ventilating pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910078018.6A CN109827007A (en) | 2019-01-28 | 2019-01-28 | Fixed equipment is used in a kind of laying of heating and ventilating pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109827007A true CN109827007A (en) | 2019-05-31 |
Family
ID=66862584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910078018.6A Pending CN109827007A (en) | 2019-01-28 | 2019-01-28 | Fixed equipment is used in a kind of laying of heating and ventilating pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109827007A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111839287A (en) * | 2020-07-31 | 2020-10-30 | 杭州揽廉科技有限公司 | Automatic rice washing anti-spilling device and using method thereof |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4295766A (en) * | 1978-07-27 | 1981-10-20 | Francis Shaw | Self-aligning dome nut |
CN202833532U (en) * | 2012-07-26 | 2013-03-27 | 东风汽车有限公司 | Novel wheel nut assembly with protective cover |
CN205078918U (en) * | 2015-10-28 | 2016-03-09 | 国网山东巨野县供电公司 | Power cable unwrapping wire auxiliary device |
CN205689905U (en) * | 2016-06-13 | 2016-11-16 | 张炜 | A kind of single-layer type petroleum pipeline lifting support |
CN107401634A (en) * | 2017-08-03 | 2017-11-28 | 过蕊 | A kind of portable sewage treatment pipeline support frame |
CN206860646U (en) * | 2016-11-01 | 2018-01-09 | 新昌县城关双雄五金厂 | A kind of anti-theft screw cap set easy to install |
CN207005463U (en) * | 2017-07-18 | 2018-02-13 | 张宁 | A kind of water conservancy and hydropower Pipe installing locating support |
CN208058127U (en) * | 2018-03-27 | 2018-11-06 | 孙洁 | A kind of water conservancy construction pipeline fixer |
CN108825878A (en) * | 2018-08-07 | 2018-11-16 | 江苏宇恒电气有限公司 | A kind of adjustable pipe-hanger support |
CN208107305U (en) * | 2018-04-27 | 2018-11-16 | 郑昌业 | A kind of water conservancy construction pipeline protection device |
CN108869876A (en) * | 2018-07-02 | 2018-11-23 | 江苏嘉胜石油科技有限公司 | A kind of fixed structure of petroleum pipeline |
-
2019
- 2019-01-28 CN CN201910078018.6A patent/CN109827007A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4295766A (en) * | 1978-07-27 | 1981-10-20 | Francis Shaw | Self-aligning dome nut |
CN202833532U (en) * | 2012-07-26 | 2013-03-27 | 东风汽车有限公司 | Novel wheel nut assembly with protective cover |
CN205078918U (en) * | 2015-10-28 | 2016-03-09 | 国网山东巨野县供电公司 | Power cable unwrapping wire auxiliary device |
CN205689905U (en) * | 2016-06-13 | 2016-11-16 | 张炜 | A kind of single-layer type petroleum pipeline lifting support |
CN206860646U (en) * | 2016-11-01 | 2018-01-09 | 新昌县城关双雄五金厂 | A kind of anti-theft screw cap set easy to install |
CN207005463U (en) * | 2017-07-18 | 2018-02-13 | 张宁 | A kind of water conservancy and hydropower Pipe installing locating support |
CN107401634A (en) * | 2017-08-03 | 2017-11-28 | 过蕊 | A kind of portable sewage treatment pipeline support frame |
CN208058127U (en) * | 2018-03-27 | 2018-11-06 | 孙洁 | A kind of water conservancy construction pipeline fixer |
CN208107305U (en) * | 2018-04-27 | 2018-11-16 | 郑昌业 | A kind of water conservancy construction pipeline protection device |
CN108869876A (en) * | 2018-07-02 | 2018-11-23 | 江苏嘉胜石油科技有限公司 | A kind of fixed structure of petroleum pipeline |
CN108825878A (en) * | 2018-08-07 | 2018-11-16 | 江苏宇恒电气有限公司 | A kind of adjustable pipe-hanger support |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111839287A (en) * | 2020-07-31 | 2020-10-30 | 杭州揽廉科技有限公司 | Automatic rice washing anti-spilling device and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209542384U (en) | A kind of dust on the roads on-Line Monitor Device | |
CN109827007A (en) | Fixed equipment is used in a kind of laying of heating and ventilating pipeline | |
CN106568128A (en) | Air conditioner air outlet panel structure, air conditioner and control method thereof | |
CN2886408Y (en) | Ventilation system for room ventilation | |
US2286115A (en) | Air tempering apparatus | |
CN209116510U (en) | Surface frame component and the apparatus of air conditioning | |
CN208138582U (en) | A kind of pipe clamp of fixed Heating,Ventilating and Air Conditioning pipeline | |
CN110374255A (en) | Sound insulation wallboard and preparation device thereof | |
CN208169211U (en) | It is a kind of to be easily installed fixed intelligent axial flow blower | |
CN209431472U (en) | A kind of air compensation device for gas-cooker | |
CN207584922U (en) | A kind of energy-saving type frequency conversion fan coil | |
CN211275584U (en) | Cleaning device of heating ventilation air conditioner | |
CN218409276U (en) | Air volume testing device for air conditioner ventilation | |
CN207299474U (en) | It is capable of the mounting bracket of the indoor apparatus of air conditioner of Fast Installation | |
CN2470726Y (en) | Wind-guiding mechanism of indoor machine of air-conditioner | |
CN207960993U (en) | A kind of axial flow blower convenient for cleaning | |
JP3228282B2 (en) | Fan coil unit | |
CN108397895A (en) | Air conditioner connection structure and air conditioner with it | |
JPS59109743A (en) | Supply opening for air conditioning capable of varying quantity of airflow | |
CN218096248U (en) | Split type all-fresh air conditioner | |
CN217441825U (en) | Easy-to-install heating ventilation air conditioner heat dissipation device | |
CN217464816U (en) | Air pipe air quantity balance damping plate for air conditioner | |
CN219346766U (en) | Heating ventilation air conditioner installing support | |
CN217763889U (en) | Device for fixing central air-conditioning unit | |
CN105202733B (en) | A kind of wind deflector structure, sliding door cabinet-type air conditioner and air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190531 |
|