CN109823418A - The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure - Google Patents

The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure Download PDF

Info

Publication number
CN109823418A
CN109823418A CN201711183541.2A CN201711183541A CN109823418A CN 109823418 A CN109823418 A CN 109823418A CN 201711183541 A CN201711183541 A CN 201711183541A CN 109823418 A CN109823418 A CN 109823418A
Authority
CN
China
Prior art keywords
plate unit
aluminium alloy
herbaceous peony
chinese herbaceous
top beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711183541.2A
Other languages
Chinese (zh)
Inventor
熊卫卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suntown Technology Group Co Ltd
Original Assignee
HUNAN SNTO TIANLI AUTOMOBILE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN SNTO TIANLI AUTOMOBILE Co Ltd filed Critical HUNAN SNTO TIANLI AUTOMOBILE Co Ltd
Priority to CN201711183541.2A priority Critical patent/CN109823418A/en
Publication of CN109823418A publication Critical patent/CN109823418A/en
Pending legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of aluminium alloy compartment Chinese herbaceous peony walls of horizontal paving structure, it include: two columns being oppositely arranged, it is separately connected the preceding top beam and preceding bottom beam of two columns, it is characterized in that, the aluminium alloy compartment Chinese herbaceous peony wall of the horizontal paving structure further includes several preceding plate units, and both ends are welded on two columns after the preceding horizontal paving splicing of plate unit.There is the top beam of rectangle to be recessed at both ends on the preceding top beam, and the top of two columns is equipped with column top bump corresponding with top beam recess.Compared with the relevant technologies, the present invention uses the front wall of profile lateral arrangement, rationally utilizes cavity of sectional material structure, increases the overall stiffness of front wallboard, and then improve front wall stress, to be effectively improved preceding wall construction.In the case where guaranteeing that towing plate height constantly reduces, it can effectively ensure that swollen compartment ability and intensity requirement while can further lightweight structure design.

Description

The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure
[technical field]
The invention belongs to compartment vehicle manufacturing technology fields, and in particular to a kind of aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure.
[background technique]
For aluminium alloy compartment vehicle because its light-weighted advantage is widely popularized, the carriage body of compartment vehicle includes front wall, the manufacture of vehicle in compartment In the process, in the related technology, the front wall profile plate of full aluminium compartment vehicle or cabinet is vertical direction arragement construction.Due to being vertically arranged When, stress maximum point appears in lower-edge beam position, and big by stress, maximum deformation quantity appears in foreboard center, deflection Greatly;And during the vehicle-mounted shipping row in compartment, front wall is hit by cargo when bringing to a halt, before carriage body, and front wall stress is big.When leading Draw height it is lower and lower in the case where, front wallboard height is constantly got higher, and the rigidity on vertical direction is gradually deteriorated, and is unable to satisfy swollen Compartment intensity requirement.Therefore, the deficiency of the relevant technologies is, cannot further light-weight design, be unable to satisfy traction hight reduction Swollen compartment afterwards requires.
Therefore, it is really necessary to provide a kind of aluminium alloy compartment Chinese herbaceous peony wall of new horizontal paving structure to overcome above-mentioned technical problem.
[summary of the invention]
Rise the horizontal paving structure of compartment requirement the technical problem to be solved by the invention is to provide a kind of lightweight and being able to satisfy Aluminium alloy compartment Chinese herbaceous peony wall.
A kind of aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure of the present invention, comprising: two columns being oppositely arranged are separately connected two The preceding top beam and preceding bottom beam of a column, wherein the aluminium alloy compartment Chinese herbaceous peony wall of the horizontal paving structure further includes several foreboard lists Member, both ends are welded on two columns after the preceding horizontal paving splicing of plate unit.
Preferably, there is at the both ends on the preceding top beam top beam of rectangle to be recessed, and the top of two columns is equipped with Column top bump corresponding with top beam recess, the preceding top beam, preceding bottom beam and two columns collectively form square The foreboard accommodating space of shape, the foreboard are placed in the foreboard accommodating space.
Preferably, the preceding bottom beam further includes the kidney slot through thereon.
Preferably, the front wallboard is made of aluminum alloy materials.
Preferably, the column is one piece of solid arc panel.
Preferably, the preceding top beam includes that the top beam segmental arc of cavity body structure and mutually cutting with the top beam segmental arc is connect Cavity body structure top beam straightway.
Preferably, several stiffener plates are equipped in the cavity of the top beam straightway.
Preferably, the preceding plate unit is cavity body structure.
Preferably, the quantity of the preceding plate unit is 8 pieces, plate unit before being followed successively by first by bottom to top, the second foreboard list Member, plate unit before third, plate unit before the 4th, plate unit before the 5th, plate unit before the 6th, plate unit before the 7th, the 8th foreboard Unit, plate unit is strong before the intensity that the intensity of plate unit is greater than plate unit before the third before the described 4th is greater than the described 5th Plate unit before the intensity of plate unit is greater than the described 7th before the intensity of plate unit is greater than the described 6th before degree is greater than described second The intensity of plate unit before intensity is greater than the described 8th.
Preferably, be equipped with reinforcing rib in the preceding plate unit, described in the quantity and size adjusting by adjusting reinforcing rib before The intensity of plate unit.
Compared with the relevant technologies, the present invention uses the front wall of profile lateral arrangement, rationally utilizes cavity of sectional material structure, increases The overall stiffness of front wallboard, and then front wall stress is improved, to be effectively improved preceding wall construction.Guaranteeing towing plate height not In the case where disconnected reduction, it can effectively ensure that swollen compartment ability and intensity requirement while can further lightweight structure design.
[Detailed description of the invention]
Fig. 1 is a kind of overall structure schematic front view of the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure of the present invention;
Fig. 2 is that a kind of overall structure solid of the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure of the present invention is intended to.
In figure: column 1, preceding top beam 2, preceding bottom beam 3, front wall 4, kidney slot 31, plate unit 48 before first, plate unit before second 47, plate unit 46 before third, plate unit 45 before the 4th, plate unit 44 before the 5th, plate unit 43 before the 6th, plate unit before the 7th 42, plate unit 41 before the 8th.
[specific embodiment]
It to facilitate the understanding of the present invention, below will be to invention is more fully described.But the present invention can be to be permitted Mostly different form is realized, however it is not limited to embodiment described herein.On the contrary, purpose of providing these embodiments is makes It is more thorough and comprehensive to the understanding of the disclosure.
Referring to Fig. 1-2, a kind of aluminium alloy compartment Chinese herbaceous peony wall 4 of horizontal paving structure, comprising: two columns 1 being oppositely arranged, respectively Connect the preceding top beam 2 and preceding bottom beam 3 of two columns 1, wherein the aluminium alloy compartment Chinese herbaceous peony wall 4 of horizontal paving structure further includes several foreboards Unit, both ends are welded on two columns 1 after the preceding horizontal paving splicing of plate unit.
There is the top beam of rectangle to be recessed at both ends on preceding top beam 2, and the top of two columns 1 is equipped with opposite with top beam recess 1 top bump of column answered, preceding top beam 2, preceding bottom beam 3 and two columns 1 collectively form the foreboard accommodating space of rectangle, and foreboard is set In in foreboard accommodating space.
Preceding bottom beam 3 further includes the kidney slot 31 through thereon.
4 plate of front wall is made of aluminum alloy materials.
Column 1 is one piece of solid arc panel.
The top beam segmental arc of preceding top beam 2 including cavity body structure and mutually cut with top beam segmental arc connection cavity body structure top Beam straightway.
Several stiffener plates are equipped in the cavity of top beam straightway.
Preceding plate unit is cavity body structure.
The quantity of preceding plate unit is 8 pieces, plate unit 48 before being followed successively by first by bottom to top, plate unit 47 before second, third Preceding plate unit 46, plate unit 45 before the 4th, plate unit 44 before the 5th, plate unit 43 before the 6th, plate unit 42 before the 7th, before the 8th Plate unit 41, the intensity of plate unit 44 before the intensity that the intensity of plate unit 45 is greater than plate unit 46 before third before the 4th is greater than the 5th The intensity of plate unit 42 is greater than before the intensity of plate unit 43 is greater than the 7th before the intensity of plate unit 47 is greater than the 6th before greater than second The intensity of plate unit 41 before 8th.The design considerations force analysis of each foreboard element thickness obtains.Pass through Mechanics Simulation software mould The quasi- compartment state that rises, to obtain the best force structure of each part.It is equipped with and reinforces in preceding plate unit.
Compared with the relevant technologies, the present invention uses the front wall of profile lateral arrangement, rationally utilizes cavity of sectional material structure, increases The overall stiffness of front wallboard, and then front wall stress is improved, to be effectively improved preceding wall construction.Guaranteeing towing plate height not In the case where disconnected reduction, it can effectively ensure that swollen compartment ability and intensity requirement while can further lightweight structure design.More than Described is only embodiments of the present invention, it should be noted here that for those of ordinary skill in the art, not departing from Under the premise of the invention is conceived, improvement can also be made, but these are all belonged to the scope of protection of the present invention.

Claims (10)

1. a kind of aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure, comprising: two columns being oppositely arranged, be separately connected two it is described vertical The preceding top beam and preceding bottom beam of column, which is characterized in that the aluminium alloy compartment Chinese herbaceous peony wall of the horizontal paving structure further includes several preceding plate units, Both ends are welded on two columns after the horizontal paving splicing of preceding plate unit.
2. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 1, which is characterized in that two on the preceding top beam There is the top beam of rectangle to be recessed for end, and the top of two columns is equipped with convex at the top of column corresponding with top beam recess It rises, the preceding top beam, preceding bottom beam and two columns collectively form the foreboard accommodating space of rectangle, and the foreboard is placed in described In foreboard accommodating space.
3. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 2, which is characterized in that the preceding bottom beam further includes Through kidney slot thereon.
4. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 3, which is characterized in that the front wallboard is closed by aluminium Golden material is made.
5. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 4, which is characterized in that the column is one piece of reality The arc panel of the heart.
6. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 5, which is characterized in that the preceding top beam includes chamber The top beam segmental arc of body structure and mutually cut with the top beam segmental arc connection cavity body structure top beam straightway.
7. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 6, which is characterized in that the top beam straightway Several stiffener plates are equipped in cavity.
8. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 7, which is characterized in that the preceding plate unit is chamber Body structure.
9. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 8, which is characterized in that the number of the preceding plate unit Amount is 8 pieces, plate unit before being followed successively by first by bottom to top, plate unit before second, plate unit before third, plate unit before the 4th, the Plate unit before five, plate unit before the 6th, plate unit before the 7th, plate unit before the 8th, the intensity of plate unit is greater than before the described 4th The intensity of plate unit is big before the intensity of plate unit is greater than described second before the intensity of plate unit is greater than the described 5th before the third The intensity of plate unit before the intensity of plate unit is greater than the described 8th before the intensity of plate unit is greater than the described 7th before the described 6th.
10. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 9, which is characterized in that in the preceding plate unit Equipped with reinforcing rib, the intensity of preceding plate unit described in the quantity and size adjusting by adjusting reinforcing rib.
CN201711183541.2A 2017-11-23 2017-11-23 The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure Pending CN109823418A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711183541.2A CN109823418A (en) 2017-11-23 2017-11-23 The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711183541.2A CN109823418A (en) 2017-11-23 2017-11-23 The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure

Publications (1)

Publication Number Publication Date
CN109823418A true CN109823418A (en) 2019-05-31

Family

ID=66859580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711183541.2A Pending CN109823418A (en) 2017-11-23 2017-11-23 The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure

Country Status (1)

Country Link
CN (1) CN109823418A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112158265A (en) * 2020-09-30 2021-01-01 福建省闽铝轻量化汽车制造有限公司 Carriage front wall structure of energy-conserving increase-volume

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060065152A1 (en) * 2004-09-27 2006-03-30 Gunderson, Inc. Insulative panels for a railway boxcar
CN201512007U (en) * 2009-08-31 2010-06-23 中集车辆(集团)有限公司 Front wall structure for semi-hanging side curtain car
CN203804165U (en) * 2014-04-28 2014-09-03 上海机床铸造一厂(苏州)有限公司 Cross-arm pull-column structure of sand box
CN105083306A (en) * 2015-08-11 2015-11-25 南车眉山车辆有限公司 High-capacity pallet transport boxcar
CN205098319U (en) * 2015-11-18 2016-03-23 辽宁忠旺特种车辆制造有限公司 Full load bearing structure railway carriage or compartment of aluminum alloy car
US20170144579A1 (en) * 2015-11-25 2017-05-25 Pegasus Vans and Trailers, Inc. Belt Discharge Body
US9701350B2 (en) * 2013-09-18 2017-07-11 Titan Trailers Inc. Trailer sidewall construction
CN107200029A (en) * 2017-07-19 2017-09-26 中车眉山车辆有限公司 A kind of high temperature is heat-fed steel billet transportation special-purpose vehicle headwall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060065152A1 (en) * 2004-09-27 2006-03-30 Gunderson, Inc. Insulative panels for a railway boxcar
CN201512007U (en) * 2009-08-31 2010-06-23 中集车辆(集团)有限公司 Front wall structure for semi-hanging side curtain car
US9701350B2 (en) * 2013-09-18 2017-07-11 Titan Trailers Inc. Trailer sidewall construction
CN203804165U (en) * 2014-04-28 2014-09-03 上海机床铸造一厂(苏州)有限公司 Cross-arm pull-column structure of sand box
CN105083306A (en) * 2015-08-11 2015-11-25 南车眉山车辆有限公司 High-capacity pallet transport boxcar
CN205098319U (en) * 2015-11-18 2016-03-23 辽宁忠旺特种车辆制造有限公司 Full load bearing structure railway carriage or compartment of aluminum alloy car
US20170144579A1 (en) * 2015-11-25 2017-05-25 Pegasus Vans and Trailers, Inc. Belt Discharge Body
CN107200029A (en) * 2017-07-19 2017-09-26 中车眉山车辆有限公司 A kind of high temperature is heat-fed steel billet transportation special-purpose vehicle headwall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112158265A (en) * 2020-09-30 2021-01-01 福建省闽铝轻量化汽车制造有限公司 Carriage front wall structure of energy-conserving increase-volume

Similar Documents

Publication Publication Date Title
CN108116205B (en) Reinforcement for vehicle back door inner plate
TWI652192B (en) Car exterior panel
CN104334442B (en) The frame for cycle piece construction of impact resistant excellent performance
CN105722746A (en) Beam for producing a metal framework
US20080250732A1 (en) Shock-absorbing tie brace
US11208150B2 (en) Automotive frame member and electric vehicle
CN109823418A (en) The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure
CN209467202U (en) A kind of front longitudinal beam and the vehicle with the front longitudinal beam
CN107221840A (en) A kind of combination side crossbeam for power distributing cabinet
CN105460083A (en) Front floor center channel
CN203666793U (en) Doorsill reinforcing structure and automobile
CN103213548B (en) Front anti-collision beam, vehicle frame and there is its automobile
CN203580856U (en) Automobile front bumper
CN204956648U (en) Hinge vehicle reinforcing plate, column assembly and car
CN109383542A (en) A kind of compartment side wall skeleton unit, side wall and compartment
CN207683612U (en) A kind of support plate of car side sill outside plate
CN206947736U (en) A kind of combination side crossbeam for power distributing cabinet
CN202541658U (en) Vehicle compartment side board assembly
CN214093959U (en) Composite material transition section structure
CN110525762B (en) All-aluminum box
CN202987285U (en) Middle cross beam of automobile top cover
CN208036438U (en) Anti- latent holder, rear floor panel assembly and vehicle
CN103600710A (en) Aluminium-alloy front impact crossbeam
CN204124211U (en) A kind of front floor centre gangway
CN207683610U (en) A kind of support construction of front panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211011

Address after: 410200 Shengtong Industrial Park, No. 109, Section 2, Tengfei Road, Wangcheng economic and Technological Development Zone, Changsha City, Hunan Province

Applicant after: Shengtong Science and Technology Group Co.,Ltd.

Address before: 410200 No. 109, Jinxing Road, Wangcheng District, Changsha City, Hunan Province

Applicant before: HUNAN SNTO TIANLI AUTOMOBILE Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190531