CN109823418A - The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure - Google Patents
The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure Download PDFInfo
- Publication number
- CN109823418A CN109823418A CN201711183541.2A CN201711183541A CN109823418A CN 109823418 A CN109823418 A CN 109823418A CN 201711183541 A CN201711183541 A CN 201711183541A CN 109823418 A CN109823418 A CN 109823418A
- Authority
- CN
- China
- Prior art keywords
- plate unit
- aluminium alloy
- herbaceous peony
- chinese herbaceous
- top beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The invention discloses a kind of aluminium alloy compartment Chinese herbaceous peony walls of horizontal paving structure, it include: two columns being oppositely arranged, it is separately connected the preceding top beam and preceding bottom beam of two columns, it is characterized in that, the aluminium alloy compartment Chinese herbaceous peony wall of the horizontal paving structure further includes several preceding plate units, and both ends are welded on two columns after the preceding horizontal paving splicing of plate unit.There is the top beam of rectangle to be recessed at both ends on the preceding top beam, and the top of two columns is equipped with column top bump corresponding with top beam recess.Compared with the relevant technologies, the present invention uses the front wall of profile lateral arrangement, rationally utilizes cavity of sectional material structure, increases the overall stiffness of front wallboard, and then improve front wall stress, to be effectively improved preceding wall construction.In the case where guaranteeing that towing plate height constantly reduces, it can effectively ensure that swollen compartment ability and intensity requirement while can further lightweight structure design.
Description
[technical field]
The invention belongs to compartment vehicle manufacturing technology fields, and in particular to a kind of aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure.
[background technique]
For aluminium alloy compartment vehicle because its light-weighted advantage is widely popularized, the carriage body of compartment vehicle includes front wall, the manufacture of vehicle in compartment
In the process, in the related technology, the front wall profile plate of full aluminium compartment vehicle or cabinet is vertical direction arragement construction.Due to being vertically arranged
When, stress maximum point appears in lower-edge beam position, and big by stress, maximum deformation quantity appears in foreboard center, deflection
Greatly;And during the vehicle-mounted shipping row in compartment, front wall is hit by cargo when bringing to a halt, before carriage body, and front wall stress is big.When leading
Draw height it is lower and lower in the case where, front wallboard height is constantly got higher, and the rigidity on vertical direction is gradually deteriorated, and is unable to satisfy swollen
Compartment intensity requirement.Therefore, the deficiency of the relevant technologies is, cannot further light-weight design, be unable to satisfy traction hight reduction
Swollen compartment afterwards requires.
Therefore, it is really necessary to provide a kind of aluminium alloy compartment Chinese herbaceous peony wall of new horizontal paving structure to overcome above-mentioned technical problem.
[summary of the invention]
Rise the horizontal paving structure of compartment requirement the technical problem to be solved by the invention is to provide a kind of lightweight and being able to satisfy
Aluminium alloy compartment Chinese herbaceous peony wall.
A kind of aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure of the present invention, comprising: two columns being oppositely arranged are separately connected two
The preceding top beam and preceding bottom beam of a column, wherein the aluminium alloy compartment Chinese herbaceous peony wall of the horizontal paving structure further includes several foreboard lists
Member, both ends are welded on two columns after the preceding horizontal paving splicing of plate unit.
Preferably, there is at the both ends on the preceding top beam top beam of rectangle to be recessed, and the top of two columns is equipped with
Column top bump corresponding with top beam recess, the preceding top beam, preceding bottom beam and two columns collectively form square
The foreboard accommodating space of shape, the foreboard are placed in the foreboard accommodating space.
Preferably, the preceding bottom beam further includes the kidney slot through thereon.
Preferably, the front wallboard is made of aluminum alloy materials.
Preferably, the column is one piece of solid arc panel.
Preferably, the preceding top beam includes that the top beam segmental arc of cavity body structure and mutually cutting with the top beam segmental arc is connect
Cavity body structure top beam straightway.
Preferably, several stiffener plates are equipped in the cavity of the top beam straightway.
Preferably, the preceding plate unit is cavity body structure.
Preferably, the quantity of the preceding plate unit is 8 pieces, plate unit before being followed successively by first by bottom to top, the second foreboard list
Member, plate unit before third, plate unit before the 4th, plate unit before the 5th, plate unit before the 6th, plate unit before the 7th, the 8th foreboard
Unit, plate unit is strong before the intensity that the intensity of plate unit is greater than plate unit before the third before the described 4th is greater than the described 5th
Plate unit before the intensity of plate unit is greater than the described 7th before the intensity of plate unit is greater than the described 6th before degree is greater than described second
The intensity of plate unit before intensity is greater than the described 8th.
Preferably, be equipped with reinforcing rib in the preceding plate unit, described in the quantity and size adjusting by adjusting reinforcing rib before
The intensity of plate unit.
Compared with the relevant technologies, the present invention uses the front wall of profile lateral arrangement, rationally utilizes cavity of sectional material structure, increases
The overall stiffness of front wallboard, and then front wall stress is improved, to be effectively improved preceding wall construction.Guaranteeing towing plate height not
In the case where disconnected reduction, it can effectively ensure that swollen compartment ability and intensity requirement while can further lightweight structure design.
[Detailed description of the invention]
Fig. 1 is a kind of overall structure schematic front view of the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure of the present invention;
Fig. 2 is that a kind of overall structure solid of the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure of the present invention is intended to.
In figure: column 1, preceding top beam 2, preceding bottom beam 3, front wall 4, kidney slot 31, plate unit 48 before first, plate unit before second
47, plate unit 46 before third, plate unit 45 before the 4th, plate unit 44 before the 5th, plate unit 43 before the 6th, plate unit before the 7th
42, plate unit 41 before the 8th.
[specific embodiment]
It to facilitate the understanding of the present invention, below will be to invention is more fully described.But the present invention can be to be permitted
Mostly different form is realized, however it is not limited to embodiment described herein.On the contrary, purpose of providing these embodiments is makes
It is more thorough and comprehensive to the understanding of the disclosure.
Referring to Fig. 1-2, a kind of aluminium alloy compartment Chinese herbaceous peony wall 4 of horizontal paving structure, comprising: two columns 1 being oppositely arranged, respectively
Connect the preceding top beam 2 and preceding bottom beam 3 of two columns 1, wherein the aluminium alloy compartment Chinese herbaceous peony wall 4 of horizontal paving structure further includes several foreboards
Unit, both ends are welded on two columns 1 after the preceding horizontal paving splicing of plate unit.
There is the top beam of rectangle to be recessed at both ends on preceding top beam 2, and the top of two columns 1 is equipped with opposite with top beam recess
1 top bump of column answered, preceding top beam 2, preceding bottom beam 3 and two columns 1 collectively form the foreboard accommodating space of rectangle, and foreboard is set
In in foreboard accommodating space.
Preceding bottom beam 3 further includes the kidney slot 31 through thereon.
4 plate of front wall is made of aluminum alloy materials.
Column 1 is one piece of solid arc panel.
The top beam segmental arc of preceding top beam 2 including cavity body structure and mutually cut with top beam segmental arc connection cavity body structure top
Beam straightway.
Several stiffener plates are equipped in the cavity of top beam straightway.
Preceding plate unit is cavity body structure.
The quantity of preceding plate unit is 8 pieces, plate unit 48 before being followed successively by first by bottom to top, plate unit 47 before second, third
Preceding plate unit 46, plate unit 45 before the 4th, plate unit 44 before the 5th, plate unit 43 before the 6th, plate unit 42 before the 7th, before the 8th
Plate unit 41, the intensity of plate unit 44 before the intensity that the intensity of plate unit 45 is greater than plate unit 46 before third before the 4th is greater than the 5th
The intensity of plate unit 42 is greater than before the intensity of plate unit 43 is greater than the 7th before the intensity of plate unit 47 is greater than the 6th before greater than second
The intensity of plate unit 41 before 8th.The design considerations force analysis of each foreboard element thickness obtains.Pass through Mechanics Simulation software mould
The quasi- compartment state that rises, to obtain the best force structure of each part.It is equipped with and reinforces in preceding plate unit.
Compared with the relevant technologies, the present invention uses the front wall of profile lateral arrangement, rationally utilizes cavity of sectional material structure, increases
The overall stiffness of front wallboard, and then front wall stress is improved, to be effectively improved preceding wall construction.Guaranteeing towing plate height not
In the case where disconnected reduction, it can effectively ensure that swollen compartment ability and intensity requirement while can further lightweight structure design.More than
Described is only embodiments of the present invention, it should be noted here that for those of ordinary skill in the art, not departing from
Under the premise of the invention is conceived, improvement can also be made, but these are all belonged to the scope of protection of the present invention.
Claims (10)
1. a kind of aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure, comprising: two columns being oppositely arranged, be separately connected two it is described vertical
The preceding top beam and preceding bottom beam of column, which is characterized in that the aluminium alloy compartment Chinese herbaceous peony wall of the horizontal paving structure further includes several preceding plate units,
Both ends are welded on two columns after the horizontal paving splicing of preceding plate unit.
2. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 1, which is characterized in that two on the preceding top beam
There is the top beam of rectangle to be recessed for end, and the top of two columns is equipped with convex at the top of column corresponding with top beam recess
It rises, the preceding top beam, preceding bottom beam and two columns collectively form the foreboard accommodating space of rectangle, and the foreboard is placed in described
In foreboard accommodating space.
3. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 2, which is characterized in that the preceding bottom beam further includes
Through kidney slot thereon.
4. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 3, which is characterized in that the front wallboard is closed by aluminium
Golden material is made.
5. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 4, which is characterized in that the column is one piece of reality
The arc panel of the heart.
6. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 5, which is characterized in that the preceding top beam includes chamber
The top beam segmental arc of body structure and mutually cut with the top beam segmental arc connection cavity body structure top beam straightway.
7. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 6, which is characterized in that the top beam straightway
Several stiffener plates are equipped in cavity.
8. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 7, which is characterized in that the preceding plate unit is chamber
Body structure.
9. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 8, which is characterized in that the number of the preceding plate unit
Amount is 8 pieces, plate unit before being followed successively by first by bottom to top, plate unit before second, plate unit before third, plate unit before the 4th, the
Plate unit before five, plate unit before the 6th, plate unit before the 7th, plate unit before the 8th, the intensity of plate unit is greater than before the described 4th
The intensity of plate unit is big before the intensity of plate unit is greater than described second before the intensity of plate unit is greater than the described 5th before the third
The intensity of plate unit before the intensity of plate unit is greater than the described 8th before the intensity of plate unit is greater than the described 7th before the described 6th.
10. the aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure according to claim 9, which is characterized in that in the preceding plate unit
Equipped with reinforcing rib, the intensity of preceding plate unit described in the quantity and size adjusting by adjusting reinforcing rib.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711183541.2A CN109823418A (en) | 2017-11-23 | 2017-11-23 | The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711183541.2A CN109823418A (en) | 2017-11-23 | 2017-11-23 | The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109823418A true CN109823418A (en) | 2019-05-31 |
Family
ID=66859580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711183541.2A Pending CN109823418A (en) | 2017-11-23 | 2017-11-23 | The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109823418A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112158265A (en) * | 2020-09-30 | 2021-01-01 | 福建省闽铝轻量化汽车制造有限公司 | Carriage front wall structure of energy-conserving increase-volume |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060065152A1 (en) * | 2004-09-27 | 2006-03-30 | Gunderson, Inc. | Insulative panels for a railway boxcar |
CN201512007U (en) * | 2009-08-31 | 2010-06-23 | 中集车辆(集团)有限公司 | Front wall structure for semi-hanging side curtain car |
CN203804165U (en) * | 2014-04-28 | 2014-09-03 | 上海机床铸造一厂(苏州)有限公司 | Cross-arm pull-column structure of sand box |
CN105083306A (en) * | 2015-08-11 | 2015-11-25 | 南车眉山车辆有限公司 | High-capacity pallet transport boxcar |
CN205098319U (en) * | 2015-11-18 | 2016-03-23 | 辽宁忠旺特种车辆制造有限公司 | Full load bearing structure railway carriage or compartment of aluminum alloy car |
US20170144579A1 (en) * | 2015-11-25 | 2017-05-25 | Pegasus Vans and Trailers, Inc. | Belt Discharge Body |
US9701350B2 (en) * | 2013-09-18 | 2017-07-11 | Titan Trailers Inc. | Trailer sidewall construction |
CN107200029A (en) * | 2017-07-19 | 2017-09-26 | 中车眉山车辆有限公司 | A kind of high temperature is heat-fed steel billet transportation special-purpose vehicle headwall |
-
2017
- 2017-11-23 CN CN201711183541.2A patent/CN109823418A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060065152A1 (en) * | 2004-09-27 | 2006-03-30 | Gunderson, Inc. | Insulative panels for a railway boxcar |
CN201512007U (en) * | 2009-08-31 | 2010-06-23 | 中集车辆(集团)有限公司 | Front wall structure for semi-hanging side curtain car |
US9701350B2 (en) * | 2013-09-18 | 2017-07-11 | Titan Trailers Inc. | Trailer sidewall construction |
CN203804165U (en) * | 2014-04-28 | 2014-09-03 | 上海机床铸造一厂(苏州)有限公司 | Cross-arm pull-column structure of sand box |
CN105083306A (en) * | 2015-08-11 | 2015-11-25 | 南车眉山车辆有限公司 | High-capacity pallet transport boxcar |
CN205098319U (en) * | 2015-11-18 | 2016-03-23 | 辽宁忠旺特种车辆制造有限公司 | Full load bearing structure railway carriage or compartment of aluminum alloy car |
US20170144579A1 (en) * | 2015-11-25 | 2017-05-25 | Pegasus Vans and Trailers, Inc. | Belt Discharge Body |
CN107200029A (en) * | 2017-07-19 | 2017-09-26 | 中车眉山车辆有限公司 | A kind of high temperature is heat-fed steel billet transportation special-purpose vehicle headwall |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112158265A (en) * | 2020-09-30 | 2021-01-01 | 福建省闽铝轻量化汽车制造有限公司 | Carriage front wall structure of energy-conserving increase-volume |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108116205B (en) | Reinforcement for vehicle back door inner plate | |
TWI652192B (en) | Car exterior panel | |
CN104334442B (en) | The frame for cycle piece construction of impact resistant excellent performance | |
CN105722746A (en) | Beam for producing a metal framework | |
US20080250732A1 (en) | Shock-absorbing tie brace | |
US11208150B2 (en) | Automotive frame member and electric vehicle | |
CN109823418A (en) | The aluminium alloy compartment Chinese herbaceous peony wall of horizontal paving structure | |
CN209467202U (en) | A kind of front longitudinal beam and the vehicle with the front longitudinal beam | |
CN107221840A (en) | A kind of combination side crossbeam for power distributing cabinet | |
CN105460083A (en) | Front floor center channel | |
CN203666793U (en) | Doorsill reinforcing structure and automobile | |
CN103213548B (en) | Front anti-collision beam, vehicle frame and there is its automobile | |
CN203580856U (en) | Automobile front bumper | |
CN204956648U (en) | Hinge vehicle reinforcing plate, column assembly and car | |
CN109383542A (en) | A kind of compartment side wall skeleton unit, side wall and compartment | |
CN207683612U (en) | A kind of support plate of car side sill outside plate | |
CN206947736U (en) | A kind of combination side crossbeam for power distributing cabinet | |
CN202541658U (en) | Vehicle compartment side board assembly | |
CN214093959U (en) | Composite material transition section structure | |
CN110525762B (en) | All-aluminum box | |
CN202987285U (en) | Middle cross beam of automobile top cover | |
CN208036438U (en) | Anti- latent holder, rear floor panel assembly and vehicle | |
CN103600710A (en) | Aluminium-alloy front impact crossbeam | |
CN204124211U (en) | A kind of front floor centre gangway | |
CN207683610U (en) | A kind of support construction of front panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211011 Address after: 410200 Shengtong Industrial Park, No. 109, Section 2, Tengfei Road, Wangcheng economic and Technological Development Zone, Changsha City, Hunan Province Applicant after: Shengtong Science and Technology Group Co.,Ltd. Address before: 410200 No. 109, Jinxing Road, Wangcheng District, Changsha City, Hunan Province Applicant before: HUNAN SNTO TIANLI AUTOMOBILE Co.,Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190531 |