CN109818354A - A kind of charging pile team control terminal control method and team control terminal - Google Patents
A kind of charging pile team control terminal control method and team control terminal Download PDFInfo
- Publication number
- CN109818354A CN109818354A CN201910299257.4A CN201910299257A CN109818354A CN 109818354 A CN109818354 A CN 109818354A CN 201910299257 A CN201910299257 A CN 201910299257A CN 109818354 A CN109818354 A CN 109818354A
- Authority
- CN
- China
- Prior art keywords
- load
- charger
- distribution transformer
- redundancy
- switch module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/12—Electric charging stations
Landscapes
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
The invention discloses a kind of charging pile team control terminal control method and team control terminals, it is related to charging pile group control technology field, this method includes the charger charge power demand for acquiring switch state signal and matrix controller feedback and the power allocation case of matrix controller;The information for analyzing acquisition unit and control execution unit feedback, generates the control strategy of the corresponding switch of switch state signal;Row open and close control is put into according to the control strategy is split.Technical solution of the present invention breaches a large amount of charging piles access power distribution networks and influences each other constraint, realizes the access of existing power distribution network a large amount of charging piles in the case where not increase-volume.
Description
Technical field
The present invention relates to charging pile group control technology field, especially a kind of charging pile team control terminal control method and team control are whole
End.
Background technique
With the construction energetically of electric car and its mating electrically-charging equipment, charger terminal utilization rate is low, power distribution network increase-volume
The problems such as at high cost, becomes increasingly conspicuous.All charging modules of mainstream charger use central controlled mode, fixed charging module
Corresponding charger is served, requirements can be obtained from electric car BMS to realize the dynamic adjustment of output power, but there is electricity
Charging ability is insufficient when charging equipment utilization rate is low excessively high with electric car demand power when electrical automobile demand power is too low asks
Topic.For this purpose, charging pile group control technology arises, which can be according to the actual needs of different type electric car automatically from collection
Extract different capacity in middle charging module, meet different stored energy capacitances, different rate of charge charging demand for electric vehicles it is same
When, further improve the transfer efficiency and utilization rate of charging equipment.But there is still a need for distributions for charging pile group control technology at present
Side provides enough power redundancies, proposes great difficulty for old residential area distribution network transform, power distribution network can not be overcome to increase
Hold problem at high cost, therefore, needs a kind of novel intelligent cluster controlled terminal of charging pile.
Summary of the invention
In view of the above drawbacks of the prior art, it is an object of the invention to provide a kind of charging pile team control terminal control sides
Method and team control terminal influence each other constraint to break through a large amount of charging piles access power distribution networks, realize existing power distribution network in not increase-volume
In the case where a large amount of charging piles access, overcome the problems, such as that power distribution network increase-volume is at high cost, further increase the utilization of charger terminal
Rate.
An object of the present invention is to provide a kind of charging pile team control terminal control method, and this method includes,
The charger charge power demand and matrix controller of acquisition switch state signal and matrix controller feedback
Power allocation case;
Analyze switch state signal, charger charge power demand, power allocation case and the control execution unit of acquisition
The control information of feedback generates the control strategy of the corresponding switch of switch state signal;
Row open and close control is put into according to the control strategy is split.
Optionally, the control strategy includes:
Obtain the maximum distribution transformer of redundancy load;
The maximum distribution transformer of the redundancy load is accessed all chargers by the switch for controlling team control terminal;
The load condition and power switch cabinet electric parameter for monitoring charger are determining that when breaking down, disconnection is all to be opened
It closes and shows failure;It does not break down in determination, and the redundancy of the maximum distribution transformer of redundancy load is lower than threshold value
Then start load dynamic adaptation.
Optionally, the control strategy further include:
It does not break down in determination, and when the redundancy of the maximum distribution transformer of redundancy load is not below threshold value,
Monitor the load condition and power switch cabinet electric parameter of charger;And
When determining that dynamic adaptation is completed, the load condition and power switch cabinet electric parameter of charger are monitored, if not
It completes, then disconnect all switches and shows failure.
Optionally, the load dynamic adaptation includes equilibrium assignment;
The equilibrium assignment comprises the following steps:
According to distribution transformer redundancy load and charger charge requirement summation, average each distribution transformer institute is calculated
Weigh the load value shared;
When the existing load of any distribution transformer is with the difference of load is newly shared lower than load threshold value, will be filled by switch
Motor is divided into multiple groups;
Grouping condition meets, and load mean value is close or equal to the load value that the equilibrium of average each distribution transformer institute is shared
One or more charger be divided into one group;
When the existing load of any distribution transformer is with the difference of load is newly shared not less than load threshold value, grouping condition is full
Foot calculates distribution transformer maximum redundancy load total value and shares to the resetting mean value on each charger, passes through flexibility charging heap
Cooperation, charger load resets to the resetting mean value, and is grouped according to distribution transformer maximum redundancy load point.
Optionally, the load dynamic adaptation includes pro rate;
The pro rate includes following step:
Calculate the redundancy duty ratio of each distribution transformer;
Charge requirement summation is calculated according to the redundancy duty ratio, obtains the charge requirement of new charger;
When the existing load of any distribution transformer is with the difference of load is newly shared lower than load threshold value, according to the charging
Charger is simultaneously divided into multiple groups according to the maximum redundancy load of each distribution transformer by demand;
When the existing load of any distribution transformer is with the difference of load is newly shared not less than load threshold value, then by each distribution
Transformer maximum redundancy load total value is calculated according to the redundancy duty ratio, is obtained redundancy charge requirement, is filled by flexibility
Pile cooperation is grouped charger according to redundancy charge requirement and according to each distribution transformer maximum redundancy load point.
Optionally, the preferential distribution comprises the following steps: the load dynamic adaptation includes preferential distribution;
The preferential distribution comprises the following steps:
Each charger is sorted from large to small according to charge requirement respectively, obtains charge requirement queue;And by each distribution
Transformer is sorted from large to small according to maximum redundancy load, obtains the queue of redundancy load;
It will be distributed into charge requirement queue near preceding charger near preceding distribution transformer in redundancy load queue;
When distribution transformer forward in charge requirement queue, which has reached, accommodates the upper limit, then the charging distributed to latter position needs
The distribution transformer for asking queue, until charger is assigned in the end in charge requirement queue;
After charger in redundancy load queue is assigned every time, next charger is required to attempt distribution to charging
In the forward distribution transformer of demand queue, distribution is successively attempted backward if it can not accommodate;
If there is any charger that can not distribute suitable distribution transformer, by flexible heap cooperation of charging, charging is reduced
Demand total value, repeats the above steps, until all chargers complete grouping.
The second object of the present invention is to provide a kind of charging pile team control terminal, the team control terminal includes acquisition unit, control
Execution unit processed and information fusion and decision package;
The acquisition unit, the charger charge power for acquiring switch state signal and matrix controller feedback need
The power allocation case of summation matrix controller;
Information fusion and decision package, for the information that convergence analysis acquisition unit and control execution unit are fed back,
The movement decision of the corresponding switch of switch state signal is completed, and issues action command to control execution unit;
The control execution unit is connected to the information fusion and decision package, and the control execution unit is for holding institute
Action command is stated, control is opened and closed to the switch.
Optionally, the switch includes main switch module and matrix switch module, the main switch module and matrix switch
Module includes controllable switch device and switching branches, and the control execution unit opens master for holding the row action command
Control is opened and closed in the controllable switch device for closing module and matrix switch module.
Optionally, the team control terminal is additionally provided with external interface, and the external interface is used for and power switch cabinet and soft
Property charging heap carry out information transmitting, the power switch cabinet is arranged between the low-pressure side of distribution transformer and main switch module,
The acquisition unit is also used to receive voltage, the electric current, power signal of the power switch cabinet feedback by the external interface.
Optionally, the team control terminal includes N number of main switch module, wherein N >=1, and N is corresponding with ac bus item number,
N*M matrix switch module, wherein M >=1, M is corresponding with charger number, and any matrix switch module includes N number of input terminal
It is separately positioned on corresponding ac bus with N number of input terminal of an output end, any matrix switch module, Ge Gesuo
The output end for stating matrix switch module is connected to the charger of corresponding flexible charging heap.
By adopting the above-described technical solution, the present invention has the advantage that:
Technical solution of the present invention breaches a large amount of charging piles access power distribution networks and influences each other constraint, realizes existing power distribution network
The access of a large amount of charging piles, overcomes the problems, such as that power distribution network increase-volume is at high cost, further increases charger in the case where not increase-volume
Terminal utilization rate.
Other advantages, target and feature of the invention will be illustrated in the following description to a certain extent, and
And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke
To be instructed from the practice of the present invention.
Detailed description of the invention
Detailed description of the invention of the invention is as follows:
Fig. 1 is method flow schematic diagram of the invention;
Fig. 2 is charging pile team control terminal block diagram of the invention;
Fig. 3 is charging pile team control terminal control schematic diagram of the invention.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
Embodiment one, the present invention propose a kind of charging pile team control terminal control method, which comprises the following steps:
The charger charge power demand and matrix controller of acquisition switch state signal and matrix controller feedback
Power allocation case;
The information for analyzing the collected information of acquisition unit and control execution unit feedback, it is corresponding to generate switch state signal
Switch control strategy;
Row open and close control is put into according to the control strategy is split.
As shown in Figure 1, the control strategy includes:
According to each distribution transformer redundancy load, the maximum distribution transformer of redundancy load is filtered out;
The station power distribution transformer is accessed all chargers by the switch for controlling team control terminal, wherein the switch packet of team control terminal
Containing main switch module and matrix switch module;
The load condition and power switch cabinet electric parameter of charger are monitored, and judges whether to break down, if event occurs
Barrier then disconnects all switches and shows failure;
If not breaking down, judge whether the redundancy of distribution transformer is lower than redundancy threshold value, if being not below threshold value
Then continue to monitor in real time, starts load dynamic adaptation if being lower than threshold value;
Judge whether dynamic adaptation is completed, if dynamic adaptation is completed, return to real time monitoring state, if not completing, breaks
It opens all switches and shows failure.
Specifically, above scheme can be described as the charging pile intelligent cluster controlled end based on power distribution network capacity time-sharing multiplex strategy
After holding starting up, maximum one is judged according to each distribution transformer maximum redundancy load, by controlling main switch module
And matrix switch module, all chargers are accessed, monitor charger load condition and power switch cabinet electric parameter situation in real time,
If breaking down, promptly disconnects all switches and show failure, if a certain distribution transformer redundancy is lower than threshold X, open
Dynamic dynamic adaptation, judges whether dynamic adaptation is completed, and executes and be back to real time monitoring state if completing, if not completing tight
It is anxious to disconnect all switches and show failure.
Wherein dynamic adaptation comprises the following steps: judge distribution transformer power load working condition under different periods, if
A certain distribution transformer redundancy is lower than threshold X, then starts dynamic adaptation, is realized by main switch module and matrix switch module
Grouping.
Concocting method includes and is not limited to equilibrium assignment, pro rate, preferentially three kinds of modes of distribution in the present embodiment.
Above-mentioned three kinds of concocting methods are illustrated below
Equilibrium assignment comprises the following steps:
According to distribution transformer redundancy load and charger charge requirement summation, average each distribution transformer institute is calculated
Weigh the load value shared;
Judge whether the existing load of any distribution transformer is lower than load threshold value with the difference for newly sharing load;
Pass through main switch module and matrix switch module if being lower than load threshold value and charger is divided into multiple groups;
Grouping condition meets, and load mean value is close or equal to the load value that the equilibrium of average each distribution transformer institute is shared
One or more charger be divided into one group;
If being not less than load threshold value, grouping condition meets, and calculates distribution transformer maximum redundancy load total value and shares to each
Resetting mean value on a charger is charged heap cooperation by flexibility, and charger load resets to the resetting mean value, and according to matching
Piezoelectric transformer maximum redundancy load point is grouped.
Specifically, equilibrium assignment is calculated average according to distribution transformer redundancy load and charger charge requirement summation
Each distribution transformer the balanced load value W shared;
If the existing load of each distribution transformer is still below load threshold value Y after subtracting the load value newly shared, if being lower than
Charger is then divided by N group by main switch module and matrix switch module, one or more of the mean value close or equal to W is filled
Motor is one group;
If being not less than, calculates distribution transformer maximum redundancy load total value and share to the mean value V on each charger,
Retain certain nargin when calculating distribution transformer maximum redundancy load total value, passes through flexibility charging heap cooperation, charger load weight
It is set to resetting mean value V, the charger lower than resetting mean value V retains initial value, will charge according to distribution transformer maximum redundancy load
Machine is divided into N group.
Pro rate comprises the following steps:
Calculate the redundancy duty ratio of each distribution transformer;
Charge requirement summation is calculated according to the redundancy duty ratio, obtains the charge requirement of new charger;
Charger is divided into multiple groups according to the charge requirement and according to the maximum redundancy load of each distribution transformer;
Judge whether the existing load of any distribution transformer is lower than load threshold value with the difference for newly sharing load, if low
Aforementioned groupings scheme is then used in load threshold value;
If being still not less than load threshold value, by each distribution transformer maximum redundancy load total value according to the redundancy duty ratio
It is calculated, obtains redundancy charge requirement, by flexibility charging heap cooperation, become according to redundancy charge requirement and according to each distribution
Depressor maximum redundancy load point is grouped charger.
Specifically, pro rate is value Z according to a certain percentage, the ratio value can for each distribution transformer redundancy load it
Than, then charge requirement summation calculated according to ratio value Z, new charger charge requirement A is obtained, according to charge requirement
A is divided into N group according to each distribution transformer maximum redundancy load, if each distribution transformer existing load subtracts and newly shares
It is still below threshold value Y after load value, then can then implement this method;If otherwise still not less than threshold value Y, each distribution transformer maximum is superfluous
Remaining load total value is calculated according to ratio value Z, is retained when calculating distribution transformer maximum redundancy load total value certain abundant
Degree, obtains the redundancy charge requirement B of new charger, by flexibility charging heap cooperation, according to redundancy charge requirement B according to each
Charger is divided into N group by distribution transformer maximum redundancy load point.
Preferential distribution comprises the following steps:
Each charger is sorted from large to small according to charge requirement respectively, obtains charge requirement queue;
Each distribution transformer is sorted from large to small according to maximum redundancy load, obtains the queue of redundancy load;
It will be distributed into charge requirement queue near preceding charger near preceding distribution transformer in redundancy load queue;
When distribution transformer forward in charge requirement queue, which has reached, accommodates the upper limit, then the charging distributed to latter position needs
The distribution transformer for asking queue, until charger is assigned in the end in charge requirement queue;
After charger in redundancy load queue is assigned every time, next charger is required to attempt distribution to charging
In the forward distribution transformer of demand queue, distribution is successively attempted backward if it can not accommodate;
If there is any charger that can not distribute suitable distribution transformer, by flexible heap cooperation of charging, charging is reduced
Demand total value repeats abovementioned steps, until all chargers complete grouping.
Specifically, preferential distribution is respectively to sort from large to small each charger according to charge requirement, which is charging
Demand queue C, and each distribution transformer is sorted from large to small according to maximum redundancy load, which is redundancy load queue D,
The distribution transformer that the charger of foremost in D is successively distributed to the foremost into C team, when the distribution transformer of front in C team
It can not accommodate, attempt to distribute to one below distribution transformer, successively until last position in C team;Divide every time in D team
Next charger is required to attempt the distribution transformer that distribution still has redundant space to foremost after matching, if can not accommodate
Then successively attempt downwards;If there is any charger that can not distribute suitable distribution transformer, pass through flexible heap cooperation of charging, drop
Low charge requirement total value E to F, F can repeat above-mentioned process, until all chargers point in proportion or mean value or fixed value setting
It is assigned to N group.
Second embodiment of the invention as shown in Figure 2 provides a kind of charging pile team control terminal, which includes main switch
Module, matrix switch module and cluster control unit;
The main switch module and the matrix switch module are separately positioned on ac bus two sides, the main switch module
It is connected to high-pressure side ac bus by distribution transformer, the matrix switch module setting is in team control terminal and flexible charging heap
Connected side;
The cluster control unit includes acquisition unit, control execution unit and information fusion and decision package;
The acquisition unit is for acquiring main switch module and matrix switch module switch state signal and matrix majorization
The charger charge power demand of device feedback and the power allocation case of matrix controller, the matrix controller are arranged in flexibility
It charges in heap;
The information fusion and decision package are merged for information and decision package is used for convergence analysis acquisition unit and control
The information of execution unit feedback processed, completes the movement decision of main switch module and matrix switch module, and issue action command extremely
Control execution unit;
The control execution unit is connected to the information fusion and decision package, and the control execution unit is for holding institute
Action command is stated, so that control be opened and closed to main control module and matrix switch module.
Specifically, ac bus is made of multiple groups exchange conducting wire in the present embodiment, for transmitting AC energy, master is opened
It closes module and matrix switch module is made of controllable switch device and switching branches, main switch module and matrix switch module are logical
It crosses controllable switch device to be connected with each switching branches, controllable switch device includes contactor or relay, controllable switch device
For executing control command, switching branches are used to feed back the switch state signal of switching branches to acquisition unit, while can also
To execute the order that control execution unit is assigned.
On the basis of previous embodiment, in another embodiment of the invention, team control terminal also includes power conversion unit
With interface display unit, the power conversion unit is used for the intelligent cluster controlled terminal each unit of charging pile and module for power supply, described
Interface display unit is used to show that the human-computer interaction of team control terminal running state and team control terminal, human-computer interaction to include instruction letter
Cease typing, the functions such as historical record downloading.
Team control terminal is additionally provided with external interface, and the external interface is used for and power switch cabinet and the flexible charging heap
Information transmitting is carried out, the power switch cabinet is arranged between the low-pressure side of distribution transformer and main switch module, the acquisition
Unit is also used to receive voltage, the electric current, power signal of the power switch cabinet feedback by the external interface, passes through acquisition
Voltage, electric current, the power signal of power switch cabinet feedback can be realized more accurate control, further increase charger terminal
Utilization rate.
As shown in figure 3, being illustrated in conjunction with practical situation to the present invention program, the whole series are filled in further embodiment of this invention
The group control system of electric stake includes high-pressure side DC bus, distribution transformer, power switch cabinet, charging pile team control terminal, flexibility
Charge heap, electric car.
Electric energy is transmitted to power switch cabinet by distribution transformer by high-pressure side ac bus, includes in power switch cabinet
Power switch cabinet monitor terminal, the monitor terminal are used to monitor state of the electric power by switchgear, and can be by relevant parameter
It uploading, it includes main switch module in team control terminal that power switch cabinet, which is connected to charging pile team control terminal, a plurality of ac bus,
The corresponding ac bus of one of main switch module, the outlet of ac bus is connected to matrix switch module, while master opens
The switch state signal for closing module and matrix switch module is connected to cluster control unit, and the outlet of charging pile team control terminal is connected to soft
Property charging heap, flexibility charging heap includes sequentially connected power distribution area, DC bus and charging terminal group, and charging terminal group connects
Enter electric car for electric car charging, while being additionally provided with matrix controller in flexible charging heap, matrix controller is by signal
It is also coupled in cluster control unit, so that charge parameter in flexible charging heap can be collected by meeting cluster control unit.
In the present embodiment, as shown in Figure 3, it is assumed that distribution transformer be it is N number of, corresponding charger module is M, charging
Pile group control terminal includes 1 cluster control unit, N ac bus, N number of main switch module, N*M matrix switch module, N >=1, M
≥1.Each main switch module includes an input port and an output port, each main switch module input port respectively with it is right
In the power switch cabinet answered distribution transformer breaker side be connected, and each output port respectively with corresponding ac bus
It is connected;Each matrix switch module includes N number of input port and an output port, the input port point of each matrix switch module
It is not connected with corresponding ac bus, and each output port is connected with corresponding charger module in flexibility charging heap.It is each
Main switch module and matrix switch module include a controllable switch device and switching branches, and main switch module and matrix are opened
It closes module to be connected by controllable switch device with each switching branches, controllable switch device includes contactor or relay.
Main switch module mainly selects the distribution transformer of investment, and matrix switch module mainly selects the grouping of charger simultaneously
Access corresponding distribution transformer.Such as distribution transformer has A, B, C tri-, charger has 1,2,3,4,5, No. 6, then main switch
Module is respectively MK1, MK2, MK3, matrix switch module be respectively JK11, JK12...JK16, J21, J22...J26, J31,
J32...J36, as matrix J K are grouped into 1,2, No. 4 access A according to dynamic adaptation, and 3,5 access B, 6 access C, are disconnected according to 0
It opens, 1 is closure, according to grouping situation, then have:
MK=[1 1 1]
Such as distribution transformer has A, B, C tri- again, and charger has 1,2,3,4,5, No. 6, then main switch module is respectively
MK1, MK2, MK3, matrix switch module are respectively JK11, JK12...JK16, J21, J22...J26, J31, J32...J36, root
It is grouped into 1,2,4, No. 5 access A according to dynamic adaptation, 3 access C, and distribution transformer B does not connect, and it is disconnected according to 0 that charger 6, which do not connect,
It opens, 1 is closure, according to grouping situation, then have:
MK=[1 0 1]
On the basis of the above embodiments, main control module and matrix switch module are using blocking criteria design and batch
Metaplasia produces, in this way, being conducive to the standardization of product, the output extension of power switch cabinet may be implemented, system compatibility is strong, can have
Effect ground reduces the production cost and maintenance cost of product, and facilitates installation and maintenance.
Intelligent cluster controlled device is by using the wireless telecommunications such as bluetooth, sound wave, WiFi, LTE and PLC, RS485, RS232, CAN
One or more of equal wire communications mode and switchgear monitor terminal, main switch module, matrix light modules, matrix majorization
Device is connected.Intelligent cluster controlled device preferentially uses CAN communication bus and main switch module, matrix light modules to communicate.Intelligent cluster controlled device
Preferentially communicated using RS485 and switchgear monitor terminal, matrix controller.
Those skilled in the art will be understood that, to ensure implementation of the invention, the present invention implements involved charging pile
Intelligent cluster controlled terminal is also an option that some necessary structures such as ground communication channel, wiring system, protective device, in addition, may be used also
Selectively to include exhaust equipment, cable testing bridge, monitoring system, alarm system, lighting apparatus, fire-fighting system etc., herein no longer
It repeats.
The present invention breaks through a large amount of charging piles access power distribution networks and influences each other constraint, realizes existing power distribution network in the feelings of not increase-volume
The access of a large amount of charging piles, overcomes the problems, such as that power distribution network increase-volume is at high cost under condition, further increases charger terminal utilization rate;This
Invention can be widely applied to electrically-charging equipment construction and distribution network transform.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent
Invention is explained in detail referring to above-described embodiment for pipe, it should be understood by those ordinary skilled in the art that: still
It can be with modifications or equivalent substitutions are made to specific embodiments of the invention, and without departing from any of spirit and scope of the invention
Modification or equivalent replacement, should all cover within the scope of the claims of the present invention.
Claims (10)
1. a kind of charging pile team control terminal control method, which is characterized in that this method includes,
Acquire the charger charge power demand of switch state signal and matrix controller feedback and the power of matrix controller
Distribution condition;
Analyze switch state signal, charger charge power demand, power allocation case and the control execution unit feedback of acquisition
Control information, generate the control strategy of the corresponding switch of switch state signal;
Row open and close control is put into according to the control strategy is split.
2. the method according to claim 1, wherein the control strategy includes:
Obtain the maximum distribution transformer of redundancy load;
The maximum distribution transformer of the redundancy load is accessed all chargers by the switch for controlling team control terminal;
The load condition and power switch cabinet electric parameter for monitoring charger are determining that all switches of disconnection are simultaneously when breaking down
Show failure;It does not break down in determination, and the redundancy of the maximum distribution transformer of redundancy load is then opened lower than threshold value
Dynamic load dynamic adaptation.
3. according to the method described in claim 2, it is characterized in that, the control strategy further include:
It does not break down in determination, and when the redundancy of the maximum distribution transformer of redundancy load is not below threshold value, monitoring
The load condition and power switch cabinet electric parameter of charger;And
When determining that dynamic adaptation is completed, the load condition and power switch cabinet electric parameter of charger are monitored, if not completing,
It then disconnects all switches and shows failure.
4. according to the described in any item methods of claim 2~3, which is characterized in that the load dynamic adaptation includes balanced point
Match;
The equilibrium assignment comprises the following steps:
According to distribution transformer redundancy load and charger charge requirement summation, average each balanced point of distribution transformer institute is calculated
The load value at booth;
When the existing load of any distribution transformer is with the difference of load is newly shared lower than load threshold value, by switching charger
It is divided into multiple groups;
Grouping condition meets, and load mean value is close or equal to the one of the load value that the equilibrium of average each distribution transformer institute is shared
A or multiple chargers are divided into one group;
When the existing load of any distribution transformer is with the difference of load is newly shared not less than load threshold value, grouping condition meets,
It calculates distribution transformer maximum redundancy load total value to share to the resetting mean value on each charger, be matched by flexibility charging heap
It closes, charger load resets to the resetting mean value, and is grouped according to distribution transformer maximum redundancy load point.
5. according to the described in any item methods of claim 2~3, which is characterized in that the load dynamic adaptation includes ratio point
Match;
The pro rate includes following step:
Calculate the redundancy duty ratio of each distribution transformer;
Charge requirement summation is calculated according to the redundancy duty ratio, obtains the charge requirement of new charger;
When the existing load of any distribution transformer is with the difference of load is newly shared lower than load threshold value, according to the charge requirement
And charger is divided by multiple groups according to the maximum redundancy load of each distribution transformer;
When the existing load of any distribution transformer is with the difference of load is newly shared not less than load threshold value, then by each distribution transformer
Device maximum redundancy load total value is calculated according to the redundancy duty ratio, obtains redundancy charge requirement, passes through flexibility charging heap
Cooperation is grouped charger according to redundancy charge requirement and according to each distribution transformer maximum redundancy load point.
6. according to the described in any item methods of claim 2-3, which is characterized in that the preferential distribution comprises the following steps: institute
Stating load dynamic adaptation includes preferential distribution;
The preferential distribution comprises the following steps:
Each charger is sorted from large to small according to charge requirement respectively, obtains charge requirement queue;And by each distribution transformer
Device is sorted from large to small according to maximum redundancy load, obtains the queue of redundancy load;
It will be distributed into charge requirement queue near preceding charger near preceding distribution transformer in redundancy load queue;
When distribution transformer forward in charge requirement queue, which has reached, accommodates the upper limit, then distribute to the charge requirement team of latter position
The distribution transformer of column, until charger is assigned in the end in charge requirement queue;
After charger in redundancy load queue is assigned every time, next charger is required to attempt distribution to charge requirement
In the forward distribution transformer of queue, distribution is successively attempted backward if it can not accommodate;
If there is any charger that can not distribute suitable distribution transformer, by flexible heap cooperation of charging, charge requirement is reduced
Total value repeats the above steps, until all chargers complete grouping.
7. a kind of charging pile team control terminal, which is characterized in that the team control terminal includes, acquisition unit, control execution unit and
Information fusion and decision package;
The acquisition unit, for acquire switch state signal and matrix controller feedback charger charge power demand and
The power allocation case of matrix controller;
The information fusion and decision package are completed for the information that convergence analysis acquisition unit and control execution unit are fed back
The movement decision of the corresponding switch of switch state signal, and action command is issued to control execution unit;
The control execution unit is connected to the information fusion and decision package, and the control execution unit is described dynamic for holding
It orders, control is opened and closed to the switch.
8. a kind of charging pile team control terminal according to claim 7, which is characterized in that the switch includes main switch module
And matrix switch module, the main switch module and matrix switch module include controllable switch device and switching branches, it is described
Control execution unit carries out the controllable switch device of main switch module and matrix switch module for holding the row action command
Open and close control.
9. a kind of charging pile team control terminal according to claim 8, which is characterized in that the team control terminal is additionally provided with outer
Portion's interface, the external interface are used to carry out information transmitting with power switch cabinet and flexible charging heap, and the power switch cabinet is set
It sets between the low-pressure side and main switch module of distribution transformer, the acquisition unit is also used to receive by the external interface
Voltage, the electric current, power signal of the power switch cabinet feedback.
10. a kind of charging pile team control terminal according to claim 8, which is characterized in that the team control terminal includes N number of master
Switch module, wherein N >=1, N is corresponding with ac bus item number, N*M matrix switch module, wherein M >=1, M and charger
Number is corresponding, and any matrix switch module includes N number of input terminal and an output end, the N of any matrix switch module
A input terminal is separately positioned on corresponding ac bus, and the output end of each matrix switch module is connected to corresponding soft
Property charging heap charger.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910299257.4A CN109818354B (en) | 2019-04-15 | 2019-04-15 | Charging pile group control terminal control method and group control terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910299257.4A CN109818354B (en) | 2019-04-15 | 2019-04-15 | Charging pile group control terminal control method and group control terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109818354A true CN109818354A (en) | 2019-05-28 |
CN109818354B CN109818354B (en) | 2020-11-20 |
Family
ID=66611798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910299257.4A Active CN109818354B (en) | 2019-04-15 | 2019-04-15 | Charging pile group control terminal control method and group control terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109818354B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110347204A (en) * | 2019-07-17 | 2019-10-18 | 石家庄通合电子科技股份有限公司 | A kind of tentaculum control algolithm of ring busbars power distribution |
CN111835072A (en) * | 2020-07-31 | 2020-10-27 | 北京兴达智联科技有限公司 | Power exchange cabinet with dynamic current distribution and charging method |
CN112104048A (en) * | 2020-09-29 | 2020-12-18 | 深圳市骑换科技有限公司 | Charging and battery-replacing cabinet control system with charger scheduling function |
CN115782667A (en) * | 2023-02-08 | 2023-03-14 | 云南丁旺科技有限公司 | Method and system for distributing electric capacity for charging stack |
CN118074198A (en) * | 2024-04-22 | 2024-05-24 | 江苏华骋科技有限公司 | Intelligent self-adaptive integrated charging and discharging system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105610218A (en) * | 2016-01-22 | 2016-05-25 | 石家庄科林电气股份有限公司 | Coordinated control method for intelligent charging of electromobile |
CN106033904A (en) * | 2015-03-20 | 2016-10-19 | 深圳奥特迅电力设备股份有限公司 | Matrix-type flexible charging pile and charging method capable of dynamically allocating power |
CN106740224A (en) * | 2017-01-12 | 2017-05-31 | 深圳驿普乐氏科技有限公司 | A kind of charging system for electric automobile and method |
CN107933341A (en) * | 2017-11-08 | 2018-04-20 | 许继电源有限公司 | A kind of electric automobile team control charging system and matrix switch conversion equipment |
CN108528249A (en) * | 2018-04-13 | 2018-09-14 | 许继电源有限公司 | Team control charging system and matrix switch module |
CN208359962U (en) * | 2018-05-09 | 2019-01-11 | 福建省宇伦信息技术有限公司 | A kind of charging pile equipment for having stepless time adjustment group and filling technology |
CN109572454A (en) * | 2018-10-17 | 2019-04-05 | 国网浙江省电力有限公司杭州供电公司 | A kind of electric car Intelligent charging station charging system |
-
2019
- 2019-04-15 CN CN201910299257.4A patent/CN109818354B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106033904A (en) * | 2015-03-20 | 2016-10-19 | 深圳奥特迅电力设备股份有限公司 | Matrix-type flexible charging pile and charging method capable of dynamically allocating power |
CN105610218A (en) * | 2016-01-22 | 2016-05-25 | 石家庄科林电气股份有限公司 | Coordinated control method for intelligent charging of electromobile |
CN106740224A (en) * | 2017-01-12 | 2017-05-31 | 深圳驿普乐氏科技有限公司 | A kind of charging system for electric automobile and method |
CN107933341A (en) * | 2017-11-08 | 2018-04-20 | 许继电源有限公司 | A kind of electric automobile team control charging system and matrix switch conversion equipment |
CN108528249A (en) * | 2018-04-13 | 2018-09-14 | 许继电源有限公司 | Team control charging system and matrix switch module |
CN208359962U (en) * | 2018-05-09 | 2019-01-11 | 福建省宇伦信息技术有限公司 | A kind of charging pile equipment for having stepless time adjustment group and filling technology |
CN109572454A (en) * | 2018-10-17 | 2019-04-05 | 国网浙江省电力有限公司杭州供电公司 | A kind of electric car Intelligent charging station charging system |
Non-Patent Citations (2)
Title |
---|
刘永相等: "电动汽车交流充电桩集群监控***设计", 《测控技术》 * |
胡道栋等: "充电桩群控操作管理单元的设计与实现", 《电力***保护与控制》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110347204A (en) * | 2019-07-17 | 2019-10-18 | 石家庄通合电子科技股份有限公司 | A kind of tentaculum control algolithm of ring busbars power distribution |
CN110347204B (en) * | 2019-07-17 | 2020-06-26 | 石家庄通合电子科技股份有限公司 | Contactor control algorithm for power distribution of annular bus |
CN111835072A (en) * | 2020-07-31 | 2020-10-27 | 北京兴达智联科技有限公司 | Power exchange cabinet with dynamic current distribution and charging method |
CN112104048A (en) * | 2020-09-29 | 2020-12-18 | 深圳市骑换科技有限公司 | Charging and battery-replacing cabinet control system with charger scheduling function |
CN112104048B (en) * | 2020-09-29 | 2021-09-24 | 深圳市骑换科技有限公司 | Charging and battery-replacing cabinet control system with charger scheduling function |
CN115782667A (en) * | 2023-02-08 | 2023-03-14 | 云南丁旺科技有限公司 | Method and system for distributing electric capacity for charging stack |
CN118074198A (en) * | 2024-04-22 | 2024-05-24 | 江苏华骋科技有限公司 | Intelligent self-adaptive integrated charging and discharging system |
Also Published As
Publication number | Publication date |
---|---|
CN109818354B (en) | 2020-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109818354A (en) | A kind of charging pile team control terminal control method and team control terminal | |
CN104518564B (en) | Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method | |
CN106033904B (en) | The charging method of matrix form flexibility charging heap and dynamically distributes power | |
CN106740216B (en) | A kind of charging system for electric automobile | |
CN108312856B (en) | Charging pile system and method for parallel operation of charging piles | |
EP2721706B1 (en) | Method and apparatus for controlling energy services based on market data | |
CN108448699A (en) | The charge/discharge control method of direct current micro-grid system and its electric vehicle | |
CN105762775A (en) | Power grid self-healing system in 110kV chain type power supply mode and self-healing logic | |
CN106828161B (en) | One kind being applied to multichannel charging jack charging equipment of electric automobile and its control method | |
CN106427638A (en) | Intelligent power distribution quick charger and control method thereof | |
CN107463732B (en) | Multi-terminal alternating current-direct current active power distribution network scheduling control simulation system and method | |
CN108110823A (en) | A kind of electric vehicle charging method and system | |
CN109435756A (en) | A kind of charging method | |
CN109747465A (en) | A kind of electric bus rush-harvesting and rush-planting direct-current charging post power intelligent distribution system and method | |
CN110855006A (en) | Distributed light storage and charging regulation and control system based on edge Internet of things agent | |
CN211809139U (en) | Self-adaptive power regulation and control multi-gun alternating-current charging pile | |
CN106961110B (en) | Automatic voltage control method and system for power system | |
CN102185299A (en) | Method and device for processing failures of multi-scheme distribution network | |
CN102427242A (en) | Lithium battery energy storage monitoring system | |
CN110103746A (en) | A kind of matrixing network formula charger system | |
CN210007455U (en) | electric automobile charging equipment suitable for public transport or logistics station | |
CN109361228B (en) | Multi-agent control system and method based on distributed battery energy storage | |
CN201877843U (en) | Vanadium redox battery energy storage monitoring system | |
CN208953679U (en) | A kind of battery carries out the device of capacity checking discharging test automatically | |
JP2019158397A (en) | Storage battery system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |