CN109812047A - One kind is to pull-type steel plate shear force wall strengthening construction structure and method - Google Patents

One kind is to pull-type steel plate shear force wall strengthening construction structure and method Download PDF

Info

Publication number
CN109812047A
CN109812047A CN201910246480.2A CN201910246480A CN109812047A CN 109812047 A CN109812047 A CN 109812047A CN 201910246480 A CN201910246480 A CN 201910246480A CN 109812047 A CN109812047 A CN 109812047A
Authority
CN
China
Prior art keywords
steel plate
wall
shear wall
shear
pull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910246480.2A
Other languages
Chinese (zh)
Inventor
李永胜
林道树
李红梅
卢春燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201910246480.2A priority Critical patent/CN109812047A/en
Publication of CN109812047A publication Critical patent/CN109812047A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention provides one kind to pull-type steel plate shear force wall strengthening construction structure and method, it shears face of wall and is laid with one layer of steel plate, sealing welding between steel plate, and modified epoxyn is coated between steel plate and shear wall, distribution is provided with split bolt on shear wall, split bolt runs through wall and steel plate along the width direction of shear wall, and the steel plate of shear wall opposite sides is strained and fixed by split bolt.To solve traditional construction increasing section method for strengthening or affixing steel plate reinforcement method, the problems such as complex procedures, long construction period.Belong to technical field of building construction.

Description

One kind is to pull-type steel plate shear force wall strengthening construction structure and method
Technical field
The present invention relates to one kind to pull-type steel plate shear force wall strengthening construction structure and method, belongs to building construction technology neck Domain.
Background technique
According to national compulsory code requirement, concrete structure detection must be qualified, is unsatisfactory for bearing capacity for detection and wants The wall column asked need to carry out structural strengthening to corresponding construction element structure, and traditional construction increasing section method for strengthening or affixing steel plate add Gu method, complex procedures, long construction period, increasing section method for strengthening will also from basic reinforce to detection and do not conform to compartment, sternly Indoor effective usable floor area is reduced again, affixing steel plate reinforcement method maximum age is shorter, and only 30 years.
Summary of the invention
It is an object of the invention to: one kind is provided to pull-type steel plate shear force wall strengthening construction structure and method, on solving State the problems of prior art.
To solve the above problems, proposed adoption is such a to pull-type steel plate shear force wall strengthening construction structure, shear wall it is outer Surface is laid with one layer of steel plate, sealing welding between steel plate, and modified epoxy resin gluing is coated between steel plate and shear wall Agent, distribution is provided with split bolt on shear wall, and split bolt runs through wall and steel plate along the width direction of shear wall, and shears The steel plate of wall opposite sides is strained and fixed by split bolt.
In aforementioned shear-wall strengthening constructing structure, batten plate is welded on the outside of steel plate, batten plate is transversely arranged, and Batten plate is distributed along the short transverse of shear wall;
In aforementioned shear-wall strengthening constructing structure, the split bolt is equidistantly uniformly distributed setting on shear wall.
To pull-type steel plate shear force wall strengthening construction, the specific method is as follows:
Former shear wall surface rendering layer and weaker zone are cut first, until being completely exposed solid base, for table The biggish column surface of face convex-concave, convex surface are tied with hand hammer, and recess is smoothed out with cement mortar, and corner grinds fillet, and uses wire brush Surface dust is brushed away with hair dryer and is blown off;It is polished with angle grinder and removes corrosion and the dirt of surface of steel plate, expose metallic luster, It is clean with cotton yarn erasing before pasting;It is positioned by Design of Reinforcement position unwrapping wire, is accurately marked in concrete surface and paste position wheel Profile and batten plate position;Steel part is first fabricated to the dimensions of design requirement, and steel plate and shear wall are positioned Then drilling pours into modified epoxyn in reserved grout hole, and uses split bolt by steel plate and shear wall Reinforce connection, guarantees that there is good bonding between the steel plate of outsourcing and shear wall faying face, make the new and old two parts of ruggedized construction It can cooperation.
Compared with prior art, the four story shear walls reinforcing that the present invention uses is surface-treated, and shear-wall strengthening only needs It is reinforced at four layers, does not need to reinforce always from basis to 4 layers, significantly reduce construction period and reduce residential usage face Product, and do not interfere with other floors;Shear-wall strengthening is positioned by Design of Reinforcement position unwrapping wire, is accurately marked in concrete surface Paste position contour line and batten plate position;Steel plate and shear wall are subjected to positioning drilling, guarantee that structural strengthening load is uniform; Covered with Angles grouting liquid guarantees its excellent cementability using modified epoxyn;Steel will be reinforced using split bolt Part and shear wall are reinforced connecting, and guarantee there is good bonding between encased steel plate and component faying face, keep ruggedized construction new and old Two parts energy cooperation;Structural stability is good, long service life, and the Design of Reinforcement subsequent service life meets structure 50 Year time limit requirement;Covered with Angles steel piece surface carries out anti-corrosion fire prevention processing, polishes steel piece surface, removes the rust of steel piece surface Erosion, dirt etc. make steel piece surface without attachments such as visible grease, dirt, oxide skin, iron rust, then brush antirust on surface Paint is not less than the protective layers such as 25mm solid cement mortar, mineral wool mortar, and structure fire safety is effectively ensured.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention will be made below further detailed Explanation.
Embodiment:
Referring to attached drawing 1, the present embodiment provides one kind to pull-type steel plate shear force wall strengthening construction structure, the appearance of shear wall 1 Face is laid with one layer of steel plate 2, and steel plate 2 uses Q345 steel, sealing welding between steel plate 2, and coats between steel plate 2 and shear wall 1 There is modified epoxyn 5, be equidistantly uniformly distributed on shear wall 1 and be provided with split bolt 4, split bolt 4 is M12 Split bolt, split bolt 4 run through wall and steel plate 2, and the steel plate 2 of 1 opposite sides of shear wall along the width direction of shear wall 1 It is strained and fixed by split bolt 4, the outside of steel plate 2 is welded with batten plate 3, and batten plate 3 is transversely arranged, and 3 edge of batten plate The short transverse of shear wall 1 is distributed.
To pull-type steel plate shear force wall strengthening construction, the specific method is as follows:
Former 1 surface rendering layer of shear wall and weaker zone are cut first, until being completely exposed solid base, for table The biggish column surface of face convex-concave, convex surface are tied with hand hammer, and recess is smoothed out with high-grade cement mortar, and corner grinds fillet, is used in combination Wire brush and hair dryer, which brush away surface dust, to be blown off;It is polished with angle grinder and removes corrosion and the dirt on 2 surface of steel plate, expose gold Belong to gloss, it is clean with cotton yarn erasing before pasting;It is positioned by Design of Reinforcement position unwrapping wire, accurately marks stickup in concrete surface 3 position of position contour line and batten plate;Steel part is first fabricated to the dimensions of design requirement, and by steel plate 2 and shear wall 1 Positioning drilling is carried out, then pours into modified epoxyn 5 in reserved grout hole, and use split bolt 4 by steel Plate 2 and shear wall 1 are reinforced connecting, and guarantee there is good bonding between 1 faying face of steel plate 2 and shear wall of outsourcing, make to reinforce The new and old two parts energy cooperation of structure.
Covered with Angles steel piece surface should carry out anti-corrosion fire prevention processing, and steel part minimum thickness used in encased steel plate is no less than 5mm, Beam and the long no less than 50mm of truss outsourcing angle bar limb, column outsourcing angle bar limb is long to be no less than 75mm, uses in the middle part of shear wall 1 Split bolt 4 and steel plate 2 are reinforced, and are anchored at corner or structure interface using angle steel and bolt, outsourcing angle bar both ends Ying Youke By anchoring.For column, angle bar lower end should extend to basic top surface, and be anchored in basis with " reinforced concrete fortifield village set+bar planting " method, Centre passes through each floor plate, and upper end extends to the next level plate plate face of reinforcing layer and with Reinforced Hoop plate soldering and sealing.
The above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although referring to above-described embodiment to this hair It is bright to be described in detail, it will be apparent to an ordinarily skilled person in the art that: still the present invention can be modified or be waited With replacement, without departing from the spirit or scope of the invention, or any substitutions, should all cover in power of the invention In sharp claimed range.

Claims (4)

1. one kind is to pull-type steel plate shear force wall strengthening construction structure, it is characterised in that: the outer surface of shear wall (1) is laid with one layer of steel Plate (2), sealing welding between steel plate (2), and modified epoxyn is coated between steel plate (2) and shear wall (1) (5), distribution is provided with split bolt (4) on shear wall (1), and split bolt (4) runs through wall along the width direction of shear wall (1) And steel plate (2), and the steel plate (2) of shear wall (1) opposite sides is strained and fixed by split bolt (4).
2. one kind is to pull-type steel plate shear force wall strengthening construction structure according to claim 1, it is characterised in that: steel plate (2) Outside is welded with batten plate (3), and batten plate (3) is transversely arranged, and batten plate (3) is distributed along the short transverse of shear wall (1).
3. one kind is to pull-type steel plate shear force wall strengthening construction structure according to claim 1, it is characterised in that: described pair of drawing spiral shell Bolt (4) is equidistantly uniformly distributed setting on shear wall (1).
4. if to the construction party of pull-type steel plate shear force wall strengthening construction structure described in any claim in claims 1 to 3 Method, which is characterized in that specific as follows:
Former shear wall (1) surface rendering layer and weaker zone are cut first, until being completely exposed solid base, for surface The biggish column surface of convex-concave, convex surface are tied with hand hammer, and recess is smoothed out with cement mortar, and corner grinds fillet, and with wire brush with Surface dust is brushed away and is blown off by hair dryer;It is polished with angle grinder and removes corrosion and the dirt on steel plate (2) surface, expose metal light Pool is clean with cotton yarn erasing before pasting;It is positioned by Design of Reinforcement position unwrapping wire, is accurately marked in concrete surface and paste position Contour line and batten plate (3) position;Steel part is first fabricated to the dimensions of design requirement, and by steel plate (2) and shear wall (1) positioning drilling is carried out, is then poured into modified epoxyn (5) in reserved grout hole, and use split bolt (4) steel plate (2) and shear wall (1) are reinforced connecting.
CN201910246480.2A 2019-03-26 2019-03-26 One kind is to pull-type steel plate shear force wall strengthening construction structure and method Pending CN109812047A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910246480.2A CN109812047A (en) 2019-03-26 2019-03-26 One kind is to pull-type steel plate shear force wall strengthening construction structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910246480.2A CN109812047A (en) 2019-03-26 2019-03-26 One kind is to pull-type steel plate shear force wall strengthening construction structure and method

Publications (1)

Publication Number Publication Date
CN109812047A true CN109812047A (en) 2019-05-28

Family

ID=66610786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910246480.2A Pending CN109812047A (en) 2019-03-26 2019-03-26 One kind is to pull-type steel plate shear force wall strengthening construction structure and method

Country Status (1)

Country Link
CN (1) CN109812047A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812046A (en) * 2019-03-27 2019-05-28 中建四局第一建筑工程有限公司 One kind is to pull-type steel plate shear force wall strengthening construction structure and method

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063732A (en) * 2004-08-30 2006-03-09 Shimizu Corp Antiseismic reinforcement structure
CN101672108A (en) * 2009-09-27 2010-03-17 东南大学 Steel plate-brickwork combination stressed building component and production method thereof
CN201610597U (en) * 2008-09-27 2010-10-20 张坦贤 Novel anti-seismic reinforcement ring beam
CN102635245A (en) * 2012-05-14 2012-08-15 武汉大学 Reinforcing body of earthquake resistant walls and reinforcing method of reinforcing body
CN103075018A (en) * 2012-11-09 2013-05-01 河南省建设集团有限公司 Hidden column structure added to existing building masonry and construction method of hidden column structure added to existing building masonry
CN103758358A (en) * 2014-01-06 2014-04-30 北京筑福国际工程技术有限责任公司 Steel plate angle iron combined constructional column and anchor adhering steel plate brickwork reinforcing structure and construction method
CN203808545U (en) * 2014-04-16 2014-09-03 上海其军加固工程有限公司 Wall reinforced through bonding steel
CN205502304U (en) * 2016-01-23 2016-08-24 合肥工业大学 Consolidate double steel plates compound shear wall
CN107524251A (en) * 2017-09-22 2017-12-29 东南大学 Prestress steel strip masonry faced wall
CN207277608U (en) * 2017-09-22 2018-04-27 东南大学 Prestress steel strip masonry faced wall
KR101880494B1 (en) * 2017-08-17 2018-08-16 (주)한국방재기술 Core wall seismic reinforcement structure and construction method of the same
CN207934488U (en) * 2018-03-08 2018-10-02 吴琼文 A kind of Core Walls Structure bottom ruggedized construction
CN208168421U (en) * 2018-04-16 2018-11-30 安徽建筑大学 A kind of plate masonry wall combination beam underpinning structure
CN109113368A (en) * 2018-10-18 2019-01-01 中天建设集团有限公司 A kind of double net pulling type shear walls and its reinforced construction method
CN208455875U (en) * 2018-07-11 2019-02-01 安徽建筑大学 A kind of steel plate of Masonry Wall variable cross-section is de- to change structure
CN211286754U (en) * 2019-03-26 2020-08-18 中建四局第一建筑工程有限公司 Opposite-pulling type steel plate shear wall reinforcing construction structure

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063732A (en) * 2004-08-30 2006-03-09 Shimizu Corp Antiseismic reinforcement structure
CN201610597U (en) * 2008-09-27 2010-10-20 张坦贤 Novel anti-seismic reinforcement ring beam
CN101672108A (en) * 2009-09-27 2010-03-17 东南大学 Steel plate-brickwork combination stressed building component and production method thereof
CN102635245A (en) * 2012-05-14 2012-08-15 武汉大学 Reinforcing body of earthquake resistant walls and reinforcing method of reinforcing body
CN103075018A (en) * 2012-11-09 2013-05-01 河南省建设集团有限公司 Hidden column structure added to existing building masonry and construction method of hidden column structure added to existing building masonry
CN103758358A (en) * 2014-01-06 2014-04-30 北京筑福国际工程技术有限责任公司 Steel plate angle iron combined constructional column and anchor adhering steel plate brickwork reinforcing structure and construction method
CN203808545U (en) * 2014-04-16 2014-09-03 上海其军加固工程有限公司 Wall reinforced through bonding steel
CN205502304U (en) * 2016-01-23 2016-08-24 合肥工业大学 Consolidate double steel plates compound shear wall
KR101880494B1 (en) * 2017-08-17 2018-08-16 (주)한국방재기술 Core wall seismic reinforcement structure and construction method of the same
CN107524251A (en) * 2017-09-22 2017-12-29 东南大学 Prestress steel strip masonry faced wall
CN207277608U (en) * 2017-09-22 2018-04-27 东南大学 Prestress steel strip masonry faced wall
CN207934488U (en) * 2018-03-08 2018-10-02 吴琼文 A kind of Core Walls Structure bottom ruggedized construction
CN208168421U (en) * 2018-04-16 2018-11-30 安徽建筑大学 A kind of plate masonry wall combination beam underpinning structure
CN208455875U (en) * 2018-07-11 2019-02-01 安徽建筑大学 A kind of steel plate of Masonry Wall variable cross-section is de- to change structure
CN109113368A (en) * 2018-10-18 2019-01-01 中天建设集团有限公司 A kind of double net pulling type shear walls and its reinforced construction method
CN211286754U (en) * 2019-03-26 2020-08-18 中建四局第一建筑工程有限公司 Opposite-pulling type steel plate shear wall reinforcing construction structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812046A (en) * 2019-03-27 2019-05-28 中建四局第一建筑工程有限公司 One kind is to pull-type steel plate shear force wall strengthening construction structure and method

Similar Documents

Publication Publication Date Title
CN109812046A (en) One kind is to pull-type steel plate shear force wall strengthening construction structure and method
CN103643965A (en) Repair and reinforcement construction methods for segments in formed tunnel
CN109812047A (en) One kind is to pull-type steel plate shear force wall strengthening construction structure and method
CN211286754U (en) Opposite-pulling type steel plate shear wall reinforcing construction structure
CN207673041U (en) A kind of existing reinforced concrete chainless drives increase the ruggedized construction of stealthy beam
CN101899887B (en) Composite anti-explosion post of reinforced concrete with encased steel plate and construction method thereof
CN201843223U (en) Butt joint component for building floor expansion joints
CN103352578A (en) Construction method of carbon fiber cloth steel member combination strengthening beam
CN111042350A (en) Anti-crack construction method for plastering layers on different interfaces of building outer wall
CN106759955A (en) The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system
CN110067386A (en) A kind of exterior wall and aproll integral structure construction method
CN110397180A (en) A kind of construction technology of exterior wall
CN201254693Y (en) Guarding system for railway steel bridge deck
CN208363688U (en) A kind of masonry panel carbon fiber mesh fabric ruggedized construction
CN204252572U (en) A kind of ruggedized construction of outer side bar concrete structure
CN110863670A (en) Method for repairing corrosion of tower foot of transmission steel tower
CN2583229Y (en) Steel holding hoop fastening structure of added storey new and old point pitch of high rise building
KR102026864B1 (en) Stainless steel lining panel installed on concrete water purification plant and water tank
CN109622322A (en) A kind of leak stopping and protective coating for corrugated steel site operation
CN206329060U (en) A kind of concrete wall reinforcing structure
CN210216147U (en) Steel bridge deck and steel bridge
CN209144598U (en) Ultra-high performance concrete abrasion-proof terrace
CN205062855U (en) Stagnant water piece
CN210177710U (en) Noise-reduction bearing type floor expansion device
CN202706238U (en) Waterstop for building deformation joint

Legal Events