CN109811603A - The transfer device and conveyer method of newly built railway gapless track steel rail laying - Google Patents

The transfer device and conveyer method of newly built railway gapless track steel rail laying Download PDF

Info

Publication number
CN109811603A
CN109811603A CN201910175162.1A CN201910175162A CN109811603A CN 109811603 A CN109811603 A CN 109811603A CN 201910175162 A CN201910175162 A CN 201910175162A CN 109811603 A CN109811603 A CN 109811603A
Authority
CN
China
Prior art keywords
trolley
lifting
rail
column
afterframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910175162.1A
Other languages
Chinese (zh)
Other versions
CN109811603B (en
Inventor
赵立财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201910175162.1A priority Critical patent/CN109811603B/en
Publication of CN109811603A publication Critical patent/CN109811603A/en
Application granted granted Critical
Publication of CN109811603B publication Critical patent/CN109811603B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses the transfer device and conveyer method of a kind of newly built railway gapless track steel rail laying, solve the problems, such as that the transhipment of the gapless track gapless line in newly built railway is laid a railway track is difficult.Two frame trolleies are set on the railway track for be laid with completion, the pulley suspender that can be moved left and right is set on the crossbeam of frame trolley, after the rail transported in advance is sling by pulley suspender, it is suspended between two crossbeams of two frame trolley of front and back, two trolley of front and back can lift 8 rail simultaneously, by manually pushing two trolley of front and back that 8 rail are transported to position of laying a railway track, rail is waited to dissipate paving after unloading.It improves work efficiency, shortens the duration, two rail lifting push trolleies only need 4 people to cooperate promotion, labour and transportation cost is greatly saved.

Description

The transfer device and conveyer method of newly built railway gapless track steel rail laying
Technical field
The present invention relates to a kind of newly built railway lay a railway track in gapless rail transloading equipment, in particular to one kind in newly built railway Steel rail laying during to rail high efficiency transhipment push trolley and its conveyer method.
Background technique
The track of China express railway and speed rail is using 500 meters of gapless track gapless lines, and gapless line dissipates paving Speed is particularly critical to the control for construction period of laying a railway track.Currently, there are two types of the scattered laying methods of existing gapless line: first is that utilizing tool Rail is laid to engineering line, and by gapless line entrucking to long rail train, then by long rail train, gapless line is transported to laying scene, It carries out dissipating paving after unloading;Structure is complicated for long rail train itself, and car body weight is big, and it is highly inconvenient to drive into and sail out of track, in vehicle In left and right station track in standing, the operation such as entrucking, point of rail, push, all can normal transport order in severe jamming station, steel Rail transports locomotive in upper and lower orbit program complexity, and this Transfer method haves the defects that construction cost height and construction period are long.Two It is the method using artificial hand steered monorail transport cart or railroad track flat bogie, the method is both needed to more people while operating, just may be used Single steel rail is lifted, after manually lifting single steel rail, exist can not precisely align the monorail transport cart being placed on track or The defect of railroad track flat bogie needs more people to push rail to inboard on the outside of rail, exerts oneself simultaneously with rail worker is lifted, Single steel rail can just be fallen on monorail transport cart or railroad track flat bogie;This operating method is dangerous in the presence of operating, It is easy damage rail in operation, single steel rail can only be lifted every time, waste a large amount of manpower, construction efficiency is too low.
Summary of the invention
The present invention provides the transfer devices and conveyer method of a kind of newly built railway gapless track steel rail laying, solve Newly built railway is laid a railway track the difficult technical problem of transhipment of middle gapless track gapless line.
The present invention is to solve the above technical problem by the following technical programs:
The present general inventive concept is: two frame trolleies being arranged on the railway track for be laid with completion, in frame trolley The pulley suspender that can be moved left and right is set on crossbeam, after slinging the rail transported in advance by pulley suspender, is suspended in front and back two Between two crossbeams of frame trolley, two trolley of front and back can lift 8 rail simultaneously, by manually pushing two trolley of front and back by 8 Rail is transported to position of laying a railway track, and waits rail to dissipate paving after unloading.
A kind of transfer device of newly built railway gapless track steel rail laying, including railroad sleeper has been spread, spreading rail It is provided on pillow and has spread railway track, front baffle trolley and afterframe trolley, front frame are respectively arranged on having spread railway track The structure of frame trolley and the structure of afterframe trolley be it is identical, the right body chassis of front baffle trolley is to be movably arranged on It has spread on the right side rail of railway track, the left body chassis of front baffle trolley is to be movably arranged on the left side for having spread railway track On the rail of side, it is fixedly installed right herringbone column on right body chassis, is fixedly installed Zuoren on left body chassis It is horizontal to be fixedly connected with the horizontal square tube in top between the top of right herringbone column and the top of Zuoren font column for font column Beam, water before being connected between the upper end of the front side battered leg of the upper end and Zuoren font column of the front side battered leg of right herringbone column Flat crossbeam is connected between the upper end of the rear side battered leg of the upper end and Zuoren font column of the rear side battered leg of right herringbone column Horizontal gird afterwards is formed with strip gap, the left and right horizontal in strip gap between preceding horizontal gird and rear horizontal gird Central axis and the left and right horizontal central axis of the horizontal square tube beam in top are in same vertical plane, which is With spread that railway track is arranged substantially perpendicular to each other, being provided in the horizontal square tube beam in top can be along the lifting that crossbeam moves left and right Trolley hangs in the lower end of lifting trolley and is connected to chain block, and chain block jack and chain block jack suspension hook are worn from the top down It is hooked together after too long strip slot with the annular steel strand wires circle of lifting, is fixedly connected in the lower end for lifting by crane annular steel strand wires circle Steel rail fixture is lifted by crane, the front end of lifting transhipment rail is hanging connected in lifting steel rail fixture, and the rear end of lifting transhipment rail is hanging connected in In lifting steel rail fixture on afterframe trolley.
Idler wheel is provided on lifting trolley, idler wheel is movably arranged on the top end face of the horizontal square tube beam in top, The lower end of lifting trolley is provided with hook and hangs outbound, chain block is hanging connected in hook and hangs in outbound;In top level side Activity, which is worn, in pipe crossbeam is connected to rod iron.
Activity, which is placed with, between preceding horizontal gird and rear horizontal gird hangs outbound column, and suspention is mounted on hanging outbound column Annular steel strand wires circle, the lower end of the annular steel strand wires circle of suspention are connected with suspention steel rail fixture after passing through from strip gap, have hanged The front end setting of transhipment rail is hung in suspention steel rail fixture, the rear end for having suspended transhipment rail in midair is hanging connected on afterframe trolley It suspends in midair in steel rail fixture.
A kind of conveyer method of newly built railway gapless track steel rail laying, comprising the following steps:
The right body chassis of front baffle trolley is movably arranged on the right side rail for having spread railway track by the first step, by front frame The left body chassis of frame trolley is movably arranged on the left side rail for having spread railway track, is fixedly installed on right body chassis Right herringbone column is fixedly installed Zuoren font column on left body chassis, top and Zuoren in right herringbone column The horizontal square tube beam in top is fixedly connected between the top of font column, in the upper end and a left side of the front side battered leg of right herringbone column Be fixedly connected with preceding horizontal gird between the upper end of the front side battered leg of herringbone column, right herringbone column rear side battered leg it is upper It holds and is fixedly connected with rear horizontal gird between the upper end of the rear side battered leg of Zuoren font column, in preceding horizontal gird and rear horizontal cross Strip gap is formed between beam, in the horizontal square tube beam in top setting can along the lifting trolley that crossbeam moves left and right, The lower end of lifting trolley, which is hung, is connected to chain block, and chain block jack and chain block jack suspension hook pass through strip from the top down It is hooked together behind gap with the annular steel strand wires circle of lifting, is fixedly connected with lifting rail in the lower end for lifting by crane annular steel strand wires circle Fixture;
Second step is set up on having spread railway track with method identical with the first step and completes afterframe trolley;In top level Activity, which is worn, in square tube beam connects rod iron, and is exposed at the both ends of rod iron on the outside of the port of the horizontal square tube beam in top;
Lifting transhipment rail is placed on the railroad sleeper of paving between front baffle trolley and afterframe trolley by third step, will Lifting steel rail fixture is connected to the front end of lifting transhipment rail, and then, the lifting ring steel connecting with lifting steel rail fixture is twisted The upper end of coil is articulated on chain block jack suspension hook, and the rear end of lifting transhipment rail is connected to rear end lifting steel rail fixture On, and rear end lifting steel rail fixture is connected on the chain block jack suspension hook on afterframe trolley, while operating front baffle Lifting transhipment rail level is sling, leaves and spread railway by the chain block on chain block and afterframe trolley on trolley Sleeper is arranged in the top of horizontal gird, will hang outbound column after so that the upper end for lifting by crane annular steel strand wires circle is passed through strip gap It wears and connects in the upper end inner ring of hanging ring shape steel strand wires circle, operate chain block, decline chain block jack suspension hook, calabash will be pulled Reed jack suspension hook and the upper end for lifting by crane annular steel strand wires circle are detached from, at this point, lifting transhipment rail is hung by lifting by crane annular steel strand wires circle It connects between the preceding horizontal gird of front baffle trolley and the preceding horizontal gird of afterframe trolley;
4th step will can be moved to next along top horizontal square tube beam along the lifting trolley that crossbeam moves left and right and hang in advance and connects The surface of lifting transhipment rail repeats third step step, and it is small in front baffle that the lifting transhipment rail connect is hung in next of completion in advance Hanging between vehicle and afterframe trolley connects;The lifting transhipment of 6-8 root is connected to until hanging between front baffle trolley and afterframe trolley Rail;
5th step pushes simultaneously or draws front baffle trolley and afterframe trolley, and synchronization is moved on having spread railway track, by 6- 8 lifting transhipment rail are transported to and want at steel rail laying.
The present invention provides a kind of push frame trolleies of the transhipment of high efficiency route rail, meet the fortune of gapless line It is defeated, the quantity of rail carrying is increased, solves the problems, such as that yard station track interior rail high efficiency dissipates paving, improves work efficiency, is contracted Short duration, two rail lifting push trolleies only need 4 people to cooperate to push, be greatly saved labour and transport at This.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram of front baffle trolley of the invention.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
A kind of transfer device of newly built railway gapless track steel rail laying, including railroad sleeper 1 has been spread, spreading railroad sleeper 1 On be provided with and spread railway track 2, front baffle trolley and afterframe trolley, front frame are respectively arranged on having spread railway track 2 The structure of frame trolley and the structure of afterframe trolley be it is identical, the right body chassis 3 of front baffle trolley is movable setting On the right side rail for having spread railway track 2, the left body chassis 4 of front baffle trolley is to be movably arranged on to have spread railway track On 2 left side rail, right herringbone column 5 is fixedly installed on right body chassis 3, fixation is set on left body chassis 4 It is equipped with Zuoren font column 6, is fixedly connected with top between the top of right herringbone column 5 and the top of Zuoren font column 6 Hold horizontal square tube beam 23, the front side battered leg of right herringbone column 5 upper end and the front side battered leg of Zuoren font column 6 it is upper Horizontal gird 7 before being connected between end, in the upper end of the rear side battered leg of right herringbone column 5 and the rear side of Zuoren font column 6 It is connected with rear horizontal gird 8 between the upper end of battered leg, strip seam is formed between preceding horizontal gird 7 and rear horizontal gird 8 Gap 9, the left and right horizontal central axis in strip gap 9 and the left and right horizontal central axis of the horizontal square tube beam 23 in top are same In one vertical plane, which is and to have spread railway track 2 arranged substantially perpendicular to each other, in the horizontal square tube beam 23 in top On be provided with and can be hung in the lower end of lifting trolley 10 along the lifting trolley 10 that crossbeam moves left and right and be connected to chain block 13, pulled Cucurbit jack 14 and chain block jack suspension hook 15 are hung after passing through strip gap 9 from the top down with the annular steel strand wires circle 16 of lifting It is connected together, is fixedly connected with lifting steel rail fixture 17 in the lower end for lifting by crane annular steel strand wires circle 16, lifting transhipment rail 18 Front end is hanging connected in lifting steel rail fixture 17, and the rear end of lifting transhipment rail 18 is hanging connected in the hoisting steel rail clip on afterframe trolley In tool.
Idler wheel 11 is provided on lifting trolley 10, idler wheel 11 is the top for being movably arranged on the horizontal square tube beam 23 in top On face, the lower end of lifting trolley 10 is provided with hook and hangs outbound 12, chain block 13 is to be hanging connected in hook to hang in outbound 12 's;Activity, which is worn, in the horizontal square tube beam 23 in top is connected to rod iron 24.
Activity, which is placed with, between preceding horizontal gird 7 and rear horizontal gird 8 hangs outbound column 19, mounts on hanging outbound column 19 Suspention steel is connected with after having the annular steel strand wires circle 20 of suspention, the lower end of the annular steel strand wires circle 20 of suspention to pass through from strip gap 9 Rail clip tool 21 has suspended the front end setting of transhipment rail 22 in midair in suspention steel rail fixture 21, has suspended the rear end of transhipment rail 22 in midair It is hanging connected in the suspention steel rail fixture on afterframe trolley.
A kind of conveyer method of newly built railway gapless track steel rail laying, comprising the following steps:
The right body chassis 3 of front baffle trolley is movably arranged on the right side rail for having spread railway track 2 by the first step, will before The left body chassis 4 of frame trolley is movably arranged on the left side rail for having spread railway track 2, fixed on right body chassis 3 It is provided with right herringbone column 5, Zuoren font column 6 is fixedly installed on left body chassis 4, in right herringbone column 5 The horizontal square tube beam 23 in top is fixedly connected between top and the top of Zuoren font column 6, in the front side of right herringbone column 5 Horizontal gird 7 before being fixedly connected between the upper end of battered leg and the upper end of the front side battered leg of Zuoren font column 6, it is vertical in right herringbone Rear horizontal gird 8 is fixedly connected between the upper end of the rear side battered leg of column 5 and the upper end of the rear side battered leg of Zuoren font column 6, It is formed with strip gap 9 between preceding horizontal gird 7 and rear horizontal gird 8, setting can edge in the horizontal square tube beam 23 in top The lifting trolley 10 that crossbeam moves left and right hangs in the lower end of lifting trolley 10 and is connected to chain block 13, chain block jack 14 and Chain block jack suspension hook 15 is hooked together after passing through strip gap 9 from the top down with the annular steel strand wires circle 16 of lifting, The lower end for lifting by crane annular steel strand wires circle 16 is fixedly connected with lifting steel rail fixture 17;
Second step is set up on having spread railway track 2 with method identical with the first step and completes afterframe trolley;In top level Activity, which is worn, in square tube beam 23 connects rod iron 24, and is exposed at the both ends of rod iron 24 outside the port of the horizontal square tube beam 23 in top Side;
Lifting transhipment rail 18 is placed on the railroad sleeper of paving 1 between front baffle trolley and afterframe trolley by third step, Steel rail fixture 17 will be lifted by crane and be connected to the front end that rail 18 is transported in lifting, then, the lifting that will be connect with lifting steel rail fixture 17 The upper end of annular steel strand wires circle 16 is articulated on chain block jack suspension hook 15, after the rear end of lifting transhipment rail 18 is connected to In end lifting steel rail fixture, and rear end lifting steel rail fixture is connected on the chain block jack suspension hook on afterframe trolley, The chain block on the chain block 13 and afterframe trolley on front baffle trolley is operated simultaneously, lifting transhipment rail 18 is horizontal It slings, leaves and spread railroad sleeper 1, be arranged after so that the upper end for lifting by crane annular steel strand wires circle 16 is passed through strip gap 9 in level The top of crossbeam 8, will hang outbound column 19 and wears and connect in the upper end inner ring of hanging ring shape steel strand wires circle 16, operates chain block 13, makes Chain block jack suspension hook 15 declines, and chain block jack suspension hook 15 and the upper end for lifting by crane annular steel strand wires circle 16 are detached from, this When, lifting transhipment rail 18 by lift by crane annular steel strand wires circle 16 be hanging connected in front baffle trolley preceding horizontal gird 7 and afterframe it is small Between the preceding horizontal gird of vehicle;
4th step will can be moved to next along the horizontal square tube beam 23 in top along the lifting trolley 10 that crossbeam moves left and right and hang in advance The surface of the lifting transhipment rail connect, repeats third step step, completes next and hangs the lifting transhipment rail connect in advance in front frame Hanging between frame trolley and afterframe trolley connects;The lifting of 6-8 root is connected to until hanging between front baffle trolley and afterframe trolley Transport rail;
5th step pushes simultaneously or draws front baffle trolley and afterframe trolley, and synchronization is moved on having spread railway track 2, will 6-8 root lifting transhipment rail, which is transported to, to be wanted at steel rail laying.

Claims (4)

1. a kind of transfer device of newly built railway gapless track steel rail laying, including railroad sleeper (1) has been spread, spreading rail It is provided on pillow (1) and has spread railway track (2), be respectively arranged with front baffle trolley and afterframe on having spread railway track (2) Trolley, the structure of front baffle trolley and the structure of afterframe trolley are identical, which is characterized in that the right side of front baffle trolley Vehicle body bottom frame (3) is movably arranged on the right side rail for having spread railway track (2), the left body chassis of front baffle trolley (4) it is to be movably arranged on the left side rail for having spread railway track (2), is fixedly installed right people on right body chassis (3) Font column (5) is fixedly installed Zuoren font column (6) on left body chassis (4), on the top of right herringbone column (5) It is fixedly connected with the horizontal square tube beam in top (23) between end and the top of Zuoren font column (6), in right herringbone column (5) Front side battered leg upper end and Zuoren font column (6) front side battered leg upper end between be connected with preceding horizontal gird (7), on the right side Rear water is connected between the upper end of the rear side battered leg of the upper end and Zuoren font column (6) of the rear side battered leg of herringbone column (5) Flat crossbeam (8) is formed with strip gap (9), strip gap (9) between preceding horizontal gird (7) and rear horizontal gird (8) Left and right horizontal central axis and the left and right horizontal central axis of the horizontal square tube beam in top (23) be in same vertical plane , which be provided in the horizontal square tube beam in top (23) It can be hung in the lower end of lifting trolley (10) along the lifting trolley (10) that crossbeam moves left and right and be connected to chain block (13), pull calabash Reed jack (14) and chain block jack suspension hook (15) pass through from the top down strip gap (9) afterwards with lift by crane annular steel strand wires circle (16) it is hooked together, is fixedly connected with lifting steel rail fixture (17) in the lower end for lifting by crane annular steel strand wires circle (16), lifting turns The front end of fortune rail (18) is hanging connected in lifting steel rail fixture (17), and it is small that the rear end of lifting transhipment rail (18) is hanging connected in afterframe In lifting steel rail fixture on vehicle.
2. a kind of transfer device of newly built railway gapless track steel rail laying according to claim 1, which is characterized in that It is provided on lifting trolley (10) idler wheel (11), idler wheel (11) is the top end face for being movably arranged on the horizontal square tube beam in top (23) On, the lower end of lifting trolley (10) is provided with hook and hangs outbound (12), chain block (13) is to be hanging connected in hook to hang outbound (12) on;Activity, which is worn, in the horizontal square tube beam in top (23) is connected to rod iron (24).
3. a kind of transfer device of newly built railway gapless track steel rail laying according to claim 2, which is characterized in that Activity, which is placed with, between preceding horizontal gird (7) and rear horizontal gird (8) hangs outbound column (19), is mounted on hanging outbound column (19) Suspend annular steel strand wires circle (20) in midair, the lower end of the annular steel strand wires circle (20) of suspention is connected with outstanding after passing through from strip gap (9) Steel rail fixture (21) are hung, the front end setting of transhipment rail (22) has been suspended in midair in suspention steel rail fixture (21), has suspended transhipment steel in midair The rear end of rail (22) is hanging connected in the suspention steel rail fixture on afterframe trolley.
4. a kind of conveyer method of newly built railway gapless track steel rail laying, comprising the following steps:
The right body chassis (3) of front baffle trolley is movably arranged on the right side rail for having spread railway track (2) by the first step, The left body chassis (4) of front baffle trolley is movably arranged on the left side rail for having spread railway track (2), in right body chassis (3) it is fixedly installed right herringbone column (5) on, Zuoren font column (6) is fixedly installed on left body chassis (4), It is fixedly connected with the horizontal square tube beam in top (23) between the top of right herringbone column (5) and the top of Zuoren font column (6), It is fixed between the upper end of the front side battered leg of the upper end and Zuoren font column (6) of the front side battered leg of right herringbone column (5) to connect Preceding horizontal gird (7) are connect, in the upper end of the rear side battered leg of right herringbone column (5) and the rear side battered leg of Zuoren font column (6) Upper end between be fixedly connected with rear horizontal gird (8), be formed with strip between preceding horizontal gird (7) and rear horizontal gird (8) Shape gap (9), setting can be small lifting along the lifting trolley (10) that crossbeam moves left and right in the horizontal square tube beam in top (23) The lower end of vehicle (10), which is hung, to be connected to chain block (13), and chain block jack (14) and chain block jack suspension hook (15) are from the top down It is hooked together afterwards with the annular steel strand wires circle (16) of lifting across strip gap (9), is lifting by crane annular steel strand wires circle (16) Lower end is fixedly connected with lifting steel rail fixture (17);
Second step is set up on having spread railway track (2) with method identical with the first step and completes afterframe trolley;In top water Activity, which is worn, in flat square tube beam (23) connects rod iron (24), and the both ends of rod iron (24) is made to be exposed at the horizontal square tube beam in top (23) Port on the outside of;
Lifting transhipment rail (18) is placed into the paving railroad sleeper between front baffle trolley and afterframe trolley by third step (1) on, steel rail fixture (17) will be lifted by crane and be connected to the front end that rail (18) are transported in lifting, it then, will be with lifting steel rail fixture (17) upper end of the lifting annular steel strand wires circle (16) connected is articulated on chain block jack suspension hook (15), and steel is transported in lifting The rear end of rail (18) is connected in rear end lifting steel rail fixture, and rear end lifting steel rail fixture is connected on afterframe trolley On chain block jack suspension hook, while operating the chain block (13) on front baffle trolley and pulling calabash on afterframe trolley Lifting transhipment rail (18) level is sling, leaves and spread railroad sleeper (1), make to lift by crane the upper of annular steel strand wires circle (16) by reed The tops of horizontal gird (8) is arranged in across strip gap (9) afterwards for end, will hang outbound column (19) and wears and connects in hanging ring shape steel strand wires It encloses in the upper end inner ring of (16), operates chain block (13), decline chain block jack suspension hook (15), by chain block jack Suspension hook (15) and the upper end for lifting by crane annular steel strand wires circle (16) are detached from, at this point, lifting transhipment rail (18) is twisted by lifting ring steel Coil (16) is hanging connected between the preceding horizontal gird (7) of front baffle trolley and the preceding horizontal gird of afterframe trolley;
4th step will can be moved to next along the horizontal square tube beam in top (23) along the lifting trolley (10) that crossbeam moves left and right The surface for hanging the lifting transhipment rail connect in advance, repeats third step step, and next of completion hangs the lifting transhipment rail connect in advance and exists Hanging between front baffle trolley and afterframe trolley connects;6-8 root is connected to until hanging between front baffle trolley and afterframe trolley Lifting transhipment rail;
5th step pushes simultaneously or draws front baffle trolley and afterframe trolley, and synchronization is moved on having spread railway track (2), 6-8 root lifting transhipment rail is transported to and is wanted at steel rail laying.
CN201910175162.1A 2019-03-08 2019-03-08 Transfer device and transfer method for laying steel rail on seamless track of newly-built railway Active CN109811603B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910175162.1A CN109811603B (en) 2019-03-08 2019-03-08 Transfer device and transfer method for laying steel rail on seamless track of newly-built railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910175162.1A CN109811603B (en) 2019-03-08 2019-03-08 Transfer device and transfer method for laying steel rail on seamless track of newly-built railway

Publications (2)

Publication Number Publication Date
CN109811603A true CN109811603A (en) 2019-05-28
CN109811603B CN109811603B (en) 2024-02-09

Family

ID=66608383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910175162.1A Active CN109811603B (en) 2019-03-08 2019-03-08 Transfer device and transfer method for laying steel rail on seamless track of newly-built railway

Country Status (1)

Country Link
CN (1) CN109811603B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104002A (en) * 2019-05-30 2019-08-09 中铁四局集团第四工程有限公司 Carrying trolley for high-speed railway construction
CN110356782A (en) * 2019-07-17 2019-10-22 成都南方电子仪表有限公司 A kind of bogie movement system
CN110733985A (en) * 2019-10-24 2020-01-31 江苏师范大学 manifold blind plate dismounting hanger
CN111573507A (en) * 2020-05-21 2020-08-25 中国二十冶集团有限公司 Welding installation equipment and construction method of hot-melt welded pipe
CN111705567A (en) * 2020-06-30 2020-09-25 汪美霞 Urban rail transit line track laying and installing method
CN112938776A (en) * 2021-04-16 2021-06-11 攀钢集团西昌钢钒有限公司 Steel rail hoisting device
CN113201983A (en) * 2021-04-28 2021-08-03 张本强 Novel hanging pillow device suitable for rail transit
CN113734984A (en) * 2020-05-29 2021-12-03 中冶宝钢技术服务有限公司 Flat rail replacing equipment and method
CN116027160A (en) * 2023-02-24 2023-04-28 中交第一航务工程局有限公司 Track plate insulation detection device and method
CN116354214A (en) * 2023-03-02 2023-06-30 东台市鑫航船用配件有限公司 Hoisting mechanism for large marine accessory production

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1098807A (en) * 1954-03-24 1955-08-22 Albert Collet Fils D Process for laying and renewing railway tracks
FR2371547A2 (en) * 1976-11-19 1978-06-16 Installations Ferroviaires Ste Railway line laying system - uses temporary wide gauge track to support gantry assembly receiving rail and sleepers from double deck supply train
CN1031820A (en) * 1988-06-21 1989-03-22 北京铁路局大修工程处 The synchronous long-rail positioning hoister device
DE102006049408A1 (en) * 2006-10-16 2008-04-17 Stahlberg Roensch Gmbh & Co. Kg Replacing a defective or worn rail, in a permanent way, positions the wagon across the rail length for it to be cut and lifted free for a new length to be lowered for bonding in place
CN106183670A (en) * 2016-07-27 2016-12-07 中国路桥工程有限责任公司 Transport vehicle for track sections
CN107012749A (en) * 2017-05-29 2017-08-04 中铁十四局集团第四工程有限公司 CRTS I type non-fragment orbit repetition measurement steel rail transport trains
FR3057279A1 (en) * 2016-10-11 2018-04-13 Societe Des Anciens Etablissements L. Geismar SYSTEM FOR TRANSPORTING, LOADING AND UNLOADING RAILS OF A RAILWAY
CN209907126U (en) * 2019-03-08 2020-01-07 中铁十九局集团第三工程有限公司 Transfer device for laying steel rail on seamless track of newly-built railway

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1098807A (en) * 1954-03-24 1955-08-22 Albert Collet Fils D Process for laying and renewing railway tracks
FR2371547A2 (en) * 1976-11-19 1978-06-16 Installations Ferroviaires Ste Railway line laying system - uses temporary wide gauge track to support gantry assembly receiving rail and sleepers from double deck supply train
CN1031820A (en) * 1988-06-21 1989-03-22 北京铁路局大修工程处 The synchronous long-rail positioning hoister device
DE102006049408A1 (en) * 2006-10-16 2008-04-17 Stahlberg Roensch Gmbh & Co. Kg Replacing a defective or worn rail, in a permanent way, positions the wagon across the rail length for it to be cut and lifted free for a new length to be lowered for bonding in place
CN106183670A (en) * 2016-07-27 2016-12-07 中国路桥工程有限责任公司 Transport vehicle for track sections
FR3057279A1 (en) * 2016-10-11 2018-04-13 Societe Des Anciens Etablissements L. Geismar SYSTEM FOR TRANSPORTING, LOADING AND UNLOADING RAILS OF A RAILWAY
CN107012749A (en) * 2017-05-29 2017-08-04 中铁十四局集团第四工程有限公司 CRTS I type non-fragment orbit repetition measurement steel rail transport trains
CN209907126U (en) * 2019-03-08 2020-01-07 中铁十九局集团第三工程有限公司 Transfer device for laying steel rail on seamless track of newly-built railway

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104002A (en) * 2019-05-30 2019-08-09 中铁四局集团第四工程有限公司 Carrying trolley for high-speed railway construction
CN110356782A (en) * 2019-07-17 2019-10-22 成都南方电子仪表有限公司 A kind of bogie movement system
CN110733985A (en) * 2019-10-24 2020-01-31 江苏师范大学 manifold blind plate dismounting hanger
CN111573507A (en) * 2020-05-21 2020-08-25 中国二十冶集团有限公司 Welding installation equipment and construction method of hot-melt welded pipe
CN111573507B (en) * 2020-05-21 2022-03-29 中国二十冶集团有限公司 Welding installation equipment and construction method of hot-melt welded pipe
CN113734984A (en) * 2020-05-29 2021-12-03 中冶宝钢技术服务有限公司 Flat rail replacing equipment and method
CN111705567B (en) * 2020-06-30 2022-04-15 汪美霞 Urban rail transit line track laying and installing method
CN111705567A (en) * 2020-06-30 2020-09-25 汪美霞 Urban rail transit line track laying and installing method
CN112938776A (en) * 2021-04-16 2021-06-11 攀钢集团西昌钢钒有限公司 Steel rail hoisting device
CN113201983A (en) * 2021-04-28 2021-08-03 张本强 Novel hanging pillow device suitable for rail transit
CN113201983B (en) * 2021-04-28 2022-12-23 张本强 Novel hanging pillow device suitable for rail transit
CN116027160A (en) * 2023-02-24 2023-04-28 中交第一航务工程局有限公司 Track plate insulation detection device and method
CN116354214A (en) * 2023-03-02 2023-06-30 东台市鑫航船用配件有限公司 Hoisting mechanism for large marine accessory production
CN116354214B (en) * 2023-03-02 2024-01-19 东台市鑫航船用配件有限公司 Hoisting mechanism for large marine accessory production

Also Published As

Publication number Publication date
CN109811603B (en) 2024-02-09

Similar Documents

Publication Publication Date Title
CN109811603A (en) The transfer device and conveyer method of newly built railway gapless track steel rail laying
CN205348733U (en) Furred ceiling operation platform
CN203866654U (en) Mobile assembly platform used for ballastless track laying construction
CN210566648U (en) Installation device for directional sliding of large pipeline in limited space
CN209907126U (en) Transfer device for laying steel rail on seamless track of newly-built railway
CN210260641U (en) Working face cable dragging device
CN209482742U (en) Extra small camber angle Glass Curtain Wall Construction equipment
CN206156620U (en) Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction
CN204038857U (en) Low-floor light rail vehicle body Universal hanger
CN207108294U (en) Vehicle-mounted lifting appliance for template trolley
CN206645746U (en) A kind of quick pulling off device of sintering pallet
CN205653063U (en) Gantry crane of hoist and mount container
CN203593962U (en) Movable transversally-tensioning device of T-shaped beam bridge floor system
CN208201527U (en) A kind of integrated sleeper bed accurate adjustment vehicle
CN207468039U (en) Complete non-maintaining simple and easy hoisting system manually
JP2003180009A (en) Method of transferring power line
CN103738352B (en) Monorail crane locomotive entirety moving process
CN207275585U (en) A kind of rope suspension type power-assisted transportation system
CN106702911B (en) A kind of secondary traversing construction method for hanging of cable-carried arch bridge rib-lifting section
CN204508635U (en) Container handling crane move leg system
JP6828951B2 (en) Cargo handling method by container crane and container crane
CN207225430U (en) A kind of travelling bogie for high ferro rescue
CN105133446B (en) Embedded sleeve type sleeper hoisting device
CN104344075A (en) Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction
CN108002252A (en) A kind of hanging method of Along Railway construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant