CN109811100A - A kind of rinse-system of blast-furnace soft water pipeline and purging method - Google Patents

A kind of rinse-system of blast-furnace soft water pipeline and purging method Download PDF

Info

Publication number
CN109811100A
CN109811100A CN201910291998.8A CN201910291998A CN109811100A CN 109811100 A CN109811100 A CN 109811100A CN 201910291998 A CN201910291998 A CN 201910291998A CN 109811100 A CN109811100 A CN 109811100A
Authority
CN
China
Prior art keywords
water
pipe
total
soft
soft water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910291998.8A
Other languages
Chinese (zh)
Other versions
CN109811100B (en
Inventor
章锐
晋杰
邓传启
崔学峰
朱绍林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Magang Equipment Overhaul Co Ltd
Original Assignee
Anhui Magang Equipment Overhaul Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Magang Equipment Overhaul Co Ltd filed Critical Anhui Magang Equipment Overhaul Co Ltd
Priority to CN201910291998.8A priority Critical patent/CN109811100B/en
Publication of CN109811100A publication Critical patent/CN109811100A/en
Application granted granted Critical
Publication of CN109811100B publication Critical patent/CN109811100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)
  • Blast Furnaces (AREA)

Abstract

The invention discloses a kind of rinse-system of blast-furnace soft water pipeline, communicating pipe is added between the total water supplying pipe of the soft water and total return pipe;A blind plate is added between the total return pipe of the soft water and soft water water supply pump group;Water supplying pipe is added at the soft water water supply pump group end, and water supplying pipe connects refrigerant pond outlet pipe and then connection refrigerant pond, so that the total water supplying pipe of the soft water is connected to total return pipe in Blast Furnace Bottom position;Total return pipe adds drainpipe I after cooler between refrigerant pond.The purging method of blast-furnace soft water pipeline is also disclosed in the present invention, by the starting for guaranteeing softened water pump from the method for refrigerant pond diversion;The starting for guaranteeing secondary pressing pump by the method for introducing water at atmospheric pressure before secondary pressing pump, completes the flushing of entire general pipeline, branch pipe;The backwash of cooling wall is directly carried out by water at atmospheric pressure, flushing speed is fast, improves flush efficiency, and pass through Pipe Cutting inspection after rinsing, rinsing quality is good.

Description

A kind of rinse-system of blast-furnace soft water pipeline and purging method
Technical field
The present invention relates to field of steel metallurgy, more specifically to the method for blast-furnace soft water pipe flushing.
Background technique
Blast-furnace soft water system is a closed-cycle system, and soft water is for Blast Furnace Bottom water cooling tube, cooling wall, blow-through The cooling of pipe, tuyere medium sleeve, hot-blast valve and damping down valve.Soft water is divided into two when supplying water through soft water water supply pump group to Blast Furnace Bottom position Road is supplied to furnace roof through furnace bottom water cooling tube, belly pipe all the way, is supplied to furnace roof through cooling wall all the way, and two path water converges in furnace roof to furnace roof After soft water endless tube, secondary pressurized pump group is flowed into, divides two-way after pressurization again, be used for the cooling of tuyere medium sleeve all the way, all the way for heat The cooling of air-valve and damping down valve, this two path water enters total water return pipeline after converging, after degassing tank, expansion drum and cooler, The recycling of soft water water supply pump group is entered back into, a small amount of soft water consumed in blast furnace production process is by moisturizing pump group moisturizing.Due to soft Water system is directly supplied water by pond, the flow very little of moisturizing pump group moisturizing, is directly rinsed with soft water uneconomical yet.So soft The flushing of water requires consideration for how the circulation flushing that big flow is realized by external water source.
In blast furnace construction, the set-up time that cooling wall piping often lags general pipeline is more, and rinsing is first general pipeline, branch Pipe, then equipment pipe is arrived, so cooling wall should not also participate in rinsing at the beginning.And it is to flow through that blast-furnace soft water, which has 94% flow, Cooling wall, soft water pump group and secondary pressurized pump group in the case where cooling wall is not involved in flushing, actually in soft water system It all can not work normally, that is, soft water general pipeline, branch pipe rinse be difficult to realize in advance.Soft water general pipeline, branch pipe flushing finish Afterwards, such as the flushing of the way of supplying water progress cooling wall by production, then the flushing water of cooling wall can from bottom to top enter cooling wall, then Import the general pipeline rinsed, in branch pipe.On the one hand this purging method not can guarantee the flushing effect of cooling wall, on the other hand Also flushed general pipeline, branch pipe be polluted.
Through retrieving, existing patent formula is disclosed.Such as Chinese patent: application number: 201711337221.8, publication date: 2018 On May 18, a kind of back-flushing method of blast furnace cooling stave of the disclosure of the invention, it is ensured that the flushing effect of cooling wall, and And flushed soft water general pipeline, branch pipe are not influenced, but patent is not involved with the purging method of general pipeline, branch pipe, Er Qiechong Wash water is to enter cooling wall, since flow is smaller, each road cooling wall branch pipe after entering furnace roof water supply endless tube by furnace bottom water cooling tube Flushing cannot carry out simultaneously, need to be implemented in batches according to the flow of water supply.
For another example Chinese patent: application number: 201711495352.9, publication date: on June 22nd, 2018, the invention provides A kind of moisturizing and the method that hot-blast stove cooling water is independent from entire blast-furnace soft water system, are related to hot-blast stove cooling water Flushing, but moisturizing be mend after secondary pressurized, when main purpose is to guarantee blast furnace overhaul, the cooling water of hot-blast stove It can be used normally in the case where not starting secondary pressing pump.
Summary of the invention
To solve the above problems, guaranteeing to have abundant water resources when each stage rinses, when pipe flushing rinsed afterwards, does not pollute The pipeline of flushing, the present invention provides a kind of rinse-system of blast-furnace soft water pipeline and purging methods.
The specific technical proposal of the invention is: a kind of rinse-system of blast-furnace soft water pipeline, including soft water water supply pump group, heat Each valve of wind furnace, secondary pressing pump, cooling wall, refrigerant pond, total water supplying pipe, total return pipe and several valves, the soft water are total Water supplying pipe is respectively disconnected with total return pipe, is added in Blast Furnace Bottom position and communicating pipe is connected total water supplying pipe and total return pipe;It is described The total return pipe of soft water and soft water water supply pump group between add a blind plate;Water supplying pipe is added at the soft water water supply pump group end, is supplied water Pipe connects refrigerant pond outlet pipe and then connection refrigerant pond, so that the total water supplying pipe of the soft water and total return pipe are in State of Blast Furnace The connection of bottom position;Total return pipe adds drainpipe I after cooler between refrigerant pond.
Further, the rinse-system further includes normal pressure water system;The communicating pipe is removed, soft water always supplies water Pipe respectively connects again with total return pipe, has additional connecting tube before the normal pressure water system and secondary pressing pump and connect pipe valve Door;Drainpipe II is had additional on the cooling water return pipeline of each valve of the hot-blast stove and drain valve is connected to cast house rhone In;The cooling wall water supply endless tube passes through the sewage pipe added and blowdown valve is connected in water at atmospheric pressure return main.
Further, the secondary pressing pump is provided with bypass pipe and bypass tube valve.
Further, the purging method of a kind of blast-furnace soft water pipeline, comprising the following steps:
1) by starting soft water pump group flushing pipe from the diversion of refrigerant pond
The flushing water of soft water system may be derived from refrigerant pond, and it is blind that the total return pipe of soft water is increased to one before soft water water supply pump group Plate;The total water supplying pipe of soft water is respectively disconnected with total return pipe, is added in Blast Furnace Bottom position and connects total water supplying pipe and total communicating pipe Return pipe;Water supplying pipe is added at soft water water supply pump group end, water supplying pipe connects refrigerant pond outlet pipe and then connection refrigerant pond;Always Return pipe adds drainpipe I after cooler between refrigerant pond;
It intakes from refrigerant pond, starts soft water water supply pump group, water is added between total return pipe by total water supplying pipe, total supply water Communicating pipe, total return pipe and the drainpipe I added, return water to refrigerant pond;
2) pass through the moisturizing starting secondary pressing pump flushing pipe before secondary pressing pump
The communicating pipe between the total water supplying pipe of soft water and total return pipe is removed first, respectively with total return pipe by the total water supplying pipe of soft water It reconnects;
Start a soft water water supply pump, water enters furnace roof water supply endless tube by furnace bottom water cooling tube, enters back into secondary pressing pump;By In furnace bottom water cooling tube this pipe diameter is smaller all the way, so from total water supplying pipe come flushing water a part to be supplied water by cooling wall Sewage pipe on endless tube branches in water at atmospheric pressure return main;
Restart water at atmospheric pressure water supply pump group, water is allowed to pass through the connecting tube added before normal pressure water system and secondary pressing pump, with The water sent from soft water pump group is collected to the pipeline before secondary pressing pump;
Start secondary pressing pump, opens the drain valve connected on the cooling water return pipeline of each valve of hot-blast stove, make flushing water logical Drainpipe II is crossed to be connected in nearest cast house rhone;
3) backwash of cooling wall is carried out by water at atmospheric pressure
The valve between secondary pressing pump, furnace bottom water cooling tube and furnace roof water supply endless tube is closed, the valve before and after tuyere medium sleeve is closed Door and the valve between cooling wall water supply endless tube and total water supplying pipe;
The aperture of total return pipe degassing tank late gate is adjusted, starts water at atmospheric pressure water supply pump, water is by secondary pressurized pump bypass Enter cooling wall through each valve cooling tube of hot-blast stove, furnace roof water supply endless tube, and passes through the sewage pipe blowdown on cooling wall water supply endless tube Into water at atmospheric pressure return main.
Further, after the step 2) pipe flushing is clean, the aperture of drain valve is adjusted, allows water to enter furnace roof total Pipe, a part of water flow into secondary pressing pump from furnace roof water supply endless tube, and a part of water is back to refrigerant pond from total return pipe.
Further, the secondary pressing pump is provided with bypass pipe and bypass tube valve, and secondary pressing pump is in use, side Siphunculus valve is closed.
Compared with prior art, rinse-system of the invention can be by guaranteeing softened water pump from the method for refrigerant pond diversion Starting;The starting for guaranteeing secondary pressing pump by the method for introducing water at atmospheric pressure before secondary pressing pump, completes entire general pipeline, branch pipe Flushing;The backwash of cooling wall is directly carried out by water at atmospheric pressure, flushing speed is fast, improves flush efficiency, and pass through after rinsing Pipe Cutting inspection, rinsing quality are good.
Detailed description of the invention
Fig. 1 is from refrigerant pond diversion flushing pipe schematic diagram;
Fig. 2 is that furnace tubes rinse configuration diagram;
In figure: 1, blind plate, 2, water supplying pipe, 3, drainpipe I, 4, communicating pipe, 5, refrigerant pond outlet pipe, 6, sewage pipe, 7, Blowdown valve, 8, connecting tube, 9, connection tube valve, 10, drain valve, 11, drainpipe II, 22, water at atmospheric pressure return main.
Specific embodiment
Further detailed description is done to the present invention with specific embodiment with reference to the accompanying drawings of the specification.
Embodiment 1
As shown in Figure 1 and Figure 2, a kind of rinse-system of blast-furnace soft water pipeline, including soft water water supply pump group, each valve of hot-blast stove, Secondary pressing pump, cooling wall, refrigerant pond, total water supplying pipe, total return pipe and several valves.
As shown in Figure 1, the total water supplying pipe of soft water is respectively disconnected with total return pipe, communicating pipe 4 is added in Blast Furnace Bottom position Connect total water supplying pipe and total return pipe;A blind plate 1 is added between the total return pipe of soft water and soft water water supply pump group;Soft water water supply pump group Water supplying pipe 2 is added at end, and water supplying pipe 2 connects refrigerant pond outlet pipe 5 and then connection refrigerant pond, so that the soft water always supplies water Pipe is connected to total return pipe in Blast Furnace Bottom position;Total return pipe also adds drainpipe I3 after cooler between refrigerant pond. In use, starting softened water pump, water the communicating pipe 4 added between total return pipe, total return pipe and is added by total water supplying pipe, total supply water Drainpipe I3, return water to refrigerant pond.The debugging of soft water water supply pump can be carried out in this way, and can carry out pump house to stokehold soft water Total circulation flushing to supply water with total return pipe.
As shown in Fig. 2, rinse-system further includes normal pressure water system.Communicating pipe 4 is removed, the total water supplying pipe of soft water and total return water Pipe respectively connects again.Connecting tube 8 and connection tube valve 9 are had additional before normal pressure water system and secondary pressing pump, starting in this way is normal When pressing water water supply pump, water can by connecting tube 8, with from the water that soft water pump group is sent be collected to secondary pressing pump before pipeline, this Sample secondary pressing pump can normal use.
Drainpipe II11 is had additional on the cooling water return pipeline of each valve of hot-blast stove and drain valve 10 is connected to cast house draining In slot;The sewage pipe 6 added and blowdown valve 7 that cooling wall water supply endless tube passes through are connected in water at atmospheric pressure return main 22.
Above-mentioned secondary pressing pump is provided with bypass pipe and bypass tube valve also can in this way when secondary pressing pump is closed So that water flow is logical, to realize subsequent cooling wall backwash.
Cooperate above-mentioned rinse-system, a kind of purging method of blast-furnace soft water pipeline comprising the steps of:
1) by starting soft water pump group flushing pipe from the diversion of refrigerant pond
The flushing water of soft water system may be derived from refrigerant pond, and it is blind that the total return pipe of soft water is increased to one before soft water water supply pump group Plate 1;The total water supplying pipe of soft water is respectively disconnected with total return pipe, Blast Furnace Bottom position add connect communicating pipe 4 total water supplying pipe and Total return pipe;Water supplying pipe 2 is added at soft water water supply pump group end, water supplying pipe 2 connects refrigerant pond outlet pipe 5 and then connection chilled water Pond;Total return pipe adds drainpipe I3 after cooler between refrigerant pond;
In use, intaking from refrigerant pond, start soft water water supply pump group, water is by total water supplying pipe, total water supply and total return pipe Between the communicating pipe 4, total return pipe and the drainpipe I3 added that add, return water to refrigerant pond.Soft water water supply can be carried out in this way The debugging of pump, and pump house can be carried out and always supplied water to stokehold soft water and the circulation flushing of total return pipe.
Due to from soft water water supply pump group come out total water supplying pipe be to be walked in underground vestibule, Blast Furnace Bottom position out Face, total return pipe of furnace bottom cooling water, into the same underground vestibule, go out ground, therefore connect in Blast Furnace Bottom position before cooler The position that siphunculus 4 is connected to is in the outlet port of Blast Furnace Bottom underground vestibule, and two pipes lean on close in this position.Actually this The flushing of step is the flushing of underground vestibule interior conduit, for some not underground vestibules, pipeline be directly it is buried, also cry and bury The flushing of ground pipe.
2) by the moisturizing before secondary pressing pump, start secondary pressing pump flushing pipe
When cooling wall is not involved in flushing, only less than the water of 6% flow, by furnace bottom water cooling tube, this branch is supplied to furnace Water supply endless tube is pushed up, due to the continuous water supply of not no big flow, so secondary pressurized system cannot normally start, it at this time can be by normal Before pressing water moisturizing to secondary pressing pump, the flushing of soft water system general pipeline, branch pipe can be thus carried out in advance.
It removes first the communicating pipe 4 between the total water supplying pipe of soft water and total return pipe, the total water supplying pipe of soft water and total return pipe is each From reconnect;
Start a soft water water supply pump, water enters furnace roof water supply endless tube by furnace bottom water cooling tube, enters back into secondary pressing pump;By In furnace bottom water cooling tube this pipe diameter is smaller all the way, so from total water supplying pipe come flushing water a part to be supplied water by cooling wall Sewage pipe 6 on endless tube branches in water at atmospheric pressure return main 22;
Restart water at atmospheric pressure water supply pump group, water is allowed to pass through the connecting tube 8 added before normal pressure water system and secondary pressing pump, with The water sent from soft water pump group is collected to the pipeline before secondary pressing pump;
Start secondary pressing pump, open the drain valve 10 connected on the cooling water return pipeline of each valve of hot-blast stove, allows flushing water It is connected to by drainpipe II11 in nearest cast house rhone;
After drainpipe II11 outflow water become clean i.e. pipe flushing it is clean after, adjust drain valve 10 aperture, allow water into Enter furnace roof general pipeline, a part of water flows into secondary pressing pump from furnace roof water supply endless tube, and a part of water is back to chilled water from total return pipe Pond.
3) backwash of cooling wall is carried out by water at atmospheric pressure
The valve 14,16 between secondary pressing pump, furnace bottom water cooling tube and furnace roof water supply endless tube is closed, is closed before and after tuyere medium sleeve Valve 17,18 and the valve 12 between cooling wall water supply endless tube and total water supplying pipe;
The aperture of total return pipe degassing tank late gate 21 is adjusted, water at atmospheric pressure water supply pump is started, water is bypassed by secondary pressing pump Pipe (has this bypass pipe, when secondary pressurized pump operation, bypass tube valve is closed in design;Secondary pressing pump is closed, bypass pipe is opened Water can directly pass through when valve) enter cooling wall through each valve cooling tube of hot-blast stove, furnace roof water supply endless tube, and supplied water by cooling wall 6 blowdown of sewage pipe on endless tube is into water at atmospheric pressure return main 22.
Embodiment 2
Using the rinse-system and purging method for implementing the blast-furnace soft water pipeline in 1, this method is in the Changjiang river steel 1080m3 Blast furnace, bis- iron head factory 2500m of Ma Gang3Blast furnace, 3200m3It using in blast furnace construction, flushing terminates in one week, by Pipe Cutting inspection, Rinsing quality has reached code requirement.
The above-mentioned description to embodiment is for the ease of those skilled in the art it will be appreciated that and using this Case technology, person skilled in the art obviously can make various modifications to these examples easily, and described herein one As principle be applied in other embodiments without having to go through creative labor.Therefore, this case is not limited to above embodiments, ability According to the disclosure of this case, the improvement and modification made for this case all should be in the protection scopes of this case by the technical staff in domain.

Claims (6)

1. a kind of rinse-system of blast-furnace soft water pipeline, including soft water water supply pump group, each valve of hot-blast stove, secondary pressing pump, cooling Wall, refrigerant pond, total water supplying pipe, total return pipe and several valves, characterized in that the total water supplying pipe of the soft water and total return water Pipe respectively disconnects, and adds communicating pipe (4) in Blast Furnace Bottom position and connects total water supplying pipe and total return pipe;The total return water of the soft water A blind plate (1) is added between pipe and soft water water supply pump group;The soft water water supply pump group end is added water supplying pipe (2), and water supplying pipe (2) is even Connect refrigerant pond outlet pipe (5) and then connection refrigerant pond;Total return pipe is added between refrigerant pond after cooler Drainpipe I (3).
2. a kind of rinse-system of blast-furnace soft water pipeline according to claim 1, characterized in that the rinse-system is also Including normal pressure water system;The communicating pipe (4) is removed, the total water supplying pipe of soft water respectively connects again with total return pipe, described Normal pressure water system and secondary pressing pump before have additional connecting tube (8) and connection tube valve (9);Each valve of the hot-blast stove is cooling Water return pipeline on have additional drainpipe II (11) and drain valve (10) is connected in cast house rhone;The cooling wall supplies Water ring pipe passes through the sewage pipe (6) added and blowdown valve (7) is connected in water at atmospheric pressure return main (22).
3. a kind of rinse-system of blast-furnace soft water pipeline according to claim 1, characterized in that the secondary pressing pump It is provided with bypass pipe and bypass tube valve.
4. requiring a kind of described in any item purging methods of blast-furnace soft water pipeline of 1-3 according to power, characterized in that including following step It is rapid:
1) by starting soft water pump group flushing pipe from the diversion of refrigerant pond
The flushing water of soft water system may be derived from refrigerant pond, and the total return pipe of soft water is increased by a blind plate before soft water water supply pump group (1);The total water supplying pipe of soft water is respectively disconnected with total return pipe, (4) is added communicating pipe in Blast Furnace Bottom position and connects total water supplying pipe With total return pipe;It is added water supplying pipe (2) at soft water water supply pump group end, water supplying pipe (2) connects refrigerant pond outlet pipe (5) and then joins Logical refrigerant pond;Total return pipe adds drainpipe I (3) after cooler between refrigerant pond;
It intakes from refrigerant pond, starts soft water water supply pump group, water is by total water supplying pipe, total connection added between total return pipe of supplying water Manage (4), total return pipe and the drainpipe I (3) added, return water to refrigerant pond;
2) pass through the moisturizing starting secondary pressing pump flushing pipe before secondary pressing pump
The communicating pipe (4) between the total water supplying pipe of soft water and total return pipe is removed first, respectively with total return pipe by the total water supplying pipe of soft water It reconnects;
Start a soft water water supply pump, water enters furnace roof water supply endless tube by furnace bottom water cooling tube, enters back into secondary pressing pump;Due to furnace Bottom water cooling tube this pipe diameter is smaller all the way, so to be supplied water from flushing water a part that total water supplying pipe comes by cooling wall endless tube On sewage pipe (6) branch in water at atmospheric pressure return main (22);
Restart water at atmospheric pressure water supply pump group, allow water by the connecting tube (8) added before normal pressure water system and secondary pressing pump, with from The water that soft water pump group is sent is collected to the pipeline before secondary pressing pump;
Start secondary pressing pump, opens the drain valve (10) connected on the cooling water return pipeline of each valve of hot-blast stove, make flushing water logical Drainpipe II (11) is crossed to be connected in nearest cast house rhone;
3) backwash of cooling wall is carried out by water at atmospheric pressure
The valve (14,16) between secondary pressing pump, furnace bottom water cooling tube and furnace roof water supply endless tube is closed, is closed before and after tuyere medium sleeve Valve (12) between valve (17,18) and cooling wall water supply endless tube and total water supplying pipe;
The aperture of total return pipe degassing tank late gate (21) is adjusted, starts water at atmospheric pressure water supply pump, water is by secondary pressurized pump bypass Enter cooling wall through each valve cooling tube of hot-blast stove, furnace roof water supply endless tube, and passes through sewage pipe (6) row on cooling wall water supply endless tube Dirt is into water at atmospheric pressure return main (22).
5. a kind of purging method of blast-furnace soft water pipeline according to weighing and require 3, characterized in that step 2) the pipeline punching After wash clean, the aperture of drain valve (10) is adjusted, water is allowed to enter furnace roof general pipeline, a part of water flows into secondary from furnace roof water supply endless tube Force (forcing) pump, a part of water are back to refrigerant pond from total return pipe.
6. a kind of purging method of blast-furnace soft water pipeline according to weighing and require 3, characterized in that the secondary pressing pump is set It is equipped with bypass pipe and bypass tube valve, secondary pressing pump is in use, bypass tube valve is closed.
CN201910291998.8A 2019-04-12 2019-04-12 Flushing system and flushing method for blast furnace soft water pipeline Active CN109811100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910291998.8A CN109811100B (en) 2019-04-12 2019-04-12 Flushing system and flushing method for blast furnace soft water pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910291998.8A CN109811100B (en) 2019-04-12 2019-04-12 Flushing system and flushing method for blast furnace soft water pipeline

Publications (2)

Publication Number Publication Date
CN109811100A true CN109811100A (en) 2019-05-28
CN109811100B CN109811100B (en) 2020-12-22

Family

ID=66611735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910291998.8A Active CN109811100B (en) 2019-04-12 2019-04-12 Flushing system and flushing method for blast furnace soft water pipeline

Country Status (1)

Country Link
CN (1) CN109811100B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566934A (en) * 2019-09-26 2019-12-13 贵州电网有限责任公司 boiler water circulating pump cooling system pipeline flushing device and method
CN110923382A (en) * 2019-11-22 2020-03-27 上海宝冶集团有限公司 Flushing method for blast furnace pure water closed circulating water system
CN114480761A (en) * 2021-12-17 2022-05-13 中国华冶科工集团有限公司 Blast furnace soft water closed cycle cooling system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030053614A (en) * 2001-12-22 2003-07-02 주식회사 포스코 An apparatus for filtering cooling water for removing dust in gas of a blast furnace and a method for cleaning gas by using the same apparatus
CN201981217U (en) * 2010-12-29 2011-09-21 北京京诚科林环保科技有限公司 Circulating cooling water system for blast furnace tuyere small sleeve
CN103421917A (en) * 2013-08-15 2013-12-04 北京首钢国际工程技术有限公司 Blast furnace soft water closed-recirculation cooling system
CN108048609A (en) * 2017-12-14 2018-05-18 安徽马钢设备检修有限公司 A kind of back-flushing method of blast furnace cooling wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030053614A (en) * 2001-12-22 2003-07-02 주식회사 포스코 An apparatus for filtering cooling water for removing dust in gas of a blast furnace and a method for cleaning gas by using the same apparatus
CN201981217U (en) * 2010-12-29 2011-09-21 北京京诚科林环保科技有限公司 Circulating cooling water system for blast furnace tuyere small sleeve
CN103421917A (en) * 2013-08-15 2013-12-04 北京首钢国际工程技术有限公司 Blast furnace soft water closed-recirculation cooling system
CN108048609A (en) * 2017-12-14 2018-05-18 安徽马钢设备检修有限公司 A kind of back-flushing method of blast furnace cooling wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566934A (en) * 2019-09-26 2019-12-13 贵州电网有限责任公司 boiler water circulating pump cooling system pipeline flushing device and method
CN110566934B (en) * 2019-09-26 2024-04-23 贵州电网有限责任公司 Pipeline flushing device and flushing method for boiler water circulating pump cooling system
CN110923382A (en) * 2019-11-22 2020-03-27 上海宝冶集团有限公司 Flushing method for blast furnace pure water closed circulating water system
CN114480761A (en) * 2021-12-17 2022-05-13 中国华冶科工集团有限公司 Blast furnace soft water closed cycle cooling system and method

Also Published As

Publication number Publication date
CN109811100B (en) 2020-12-22

Similar Documents

Publication Publication Date Title
CN109811100A (en) A kind of rinse-system of blast-furnace soft water pipeline and purging method
CN102798317A (en) Cooling system capable of cleaning heat exchanger on line and cleaning method thereof
CN206859397U (en) The flushing desilting system of gravity stream sewage pipe in pipe gallery
CN102764748B (en) Method for washing hydraulic lubricating system
CN108262314A (en) Hydraulic pipeline high-efficiency rinsing method
CN211172272U (en) System for flushing and shunting municipal sewage pipe
CN217928975U (en) Hydrophobic hierarchical recovery unit of heat supply network
CN106906320B (en) Blast furnace water slag-flushing bottom of pond portion backwashing system
CN108193009B (en) The cooling water system of hot-blast stove and control method
CN106180089B (en) A kind of aircraft toilet plumbing drain cleaning system
CN210741241U (en) Benzene hydrogenation pre-evaporator shell pass on-line cleaning system
CN211621785U (en) Secondary water supply pipeline system
CN110566934B (en) Pipeline flushing device and flushing method for boiler water circulating pump cooling system
CN107605552B (en) Lubricating and flushing system for lubricating oil pipeline of steam turbine generator unit
CN108048609A (en) A kind of back-flushing method of blast furnace cooling wall
CN110923382A (en) Flushing method for blast furnace pure water closed circulating water system
CN203030588U (en) Flushing system of heat supply hot water pipe network
CN217877191U (en) Dirt and silt removing equipment for ternary circulating water system
CN114480761B (en) Blast furnace soft water closed cycle cooling system and method
CN219572810U (en) Central air conditioning hot and cold water pipeline washing unit
CN211027378U (en) Pipeline flushing and water pool leakage testing device
CN215235314U (en) Dredging device
CN211563922U (en) Waste heat circulating water washs pre-filming system
CN219355358U (en) Water-saving backwashing device for filter tank
CN214890537U (en) Quick switching system for pipeline flushing and filtering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant