CN109797908A - A kind of partial precast fashioned iron-concrete combination column and its application based on side plate - Google Patents

A kind of partial precast fashioned iron-concrete combination column and its application based on side plate Download PDF

Info

Publication number
CN109797908A
CN109797908A CN201910095743.4A CN201910095743A CN109797908A CN 109797908 A CN109797908 A CN 109797908A CN 201910095743 A CN201910095743 A CN 201910095743A CN 109797908 A CN109797908 A CN 109797908A
Authority
CN
China
Prior art keywords
plate
web
bottom wing
flange
wing listrium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910095743.4A
Other languages
Chinese (zh)
Inventor
邹昀
康金鑫
李天祺
王城泉
杨正俊
周虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangnan University
Original Assignee
Jiangnan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangnan University filed Critical Jiangnan University
Priority to CN201910095743.4A priority Critical patent/CN109797908A/en
Publication of CN109797908A publication Critical patent/CN109797908A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Partial precast fashioned iron-the concrete combination column and its application that the invention discloses a kind of based on side plate, belong to technical field of buildings.Coupled column stress performance of the invention is good, component stable connection, working procedure is few and simple, construction efficiency is high;When the height of coupled column of the present invention is 3000mm, sectional dimension is 350mm × 350mm, I-steel sectional dimension is 350mm × 350mm × 6mm, when upper lower flange is with a thickness of 6mm, ultimate axial compressive strength is up to 5733.2kN, Ultimate Bearing Capacity up to 272.5kNm, ductility factor up to 4.02.

Description

A kind of partial precast fashioned iron-concrete combination column and its application based on side plate
Technical field
Partial precast fashioned iron-the concrete combination column and its application that the present invention relates to a kind of based on side plate, belong to building skill Art field.
Background technique
Composite structure it is many kinds of, in broad terms, composite structure refer to two or more different materials form one Structure or component and cooperative structure (Composite Structure).Wherein, steel-concrete combined structure is after wood The fifth-largest class formation to grow up after structure, masonry structure, reinforced concrete structure and steel construction.
It is partially filled with one kind that steel-concrete coupled column just belongs to steel-concrete combined structure, is referred to by I-steel or H Fashioned iron-concrete combination column that fashioned iron and the concrete for being filled in two side wing edges are constituted, can give full play to steel and concrete Material property embodies are as follows: the concrete in two side wing edge of coupled column is in three received strength shape by the package of the edge of a wing and web State, has certain effect of restraint, the fashioned iron of coupled column due to fill concrete in the edge of a wing, can be effectively suppressed its local buckling or The generation of overall collapse.
Therefore, steel-concrete coupled column is partially filled with due to high with intensity, rigidity, and the advantages such as fire resistance is good are being built Build being concerned for field.
But it need to be using thick and heavy fashioned iron as important primary structure member, to guarantee due to being partially filled with steel-concrete coupled column It is effectively connected, and the general construction complexity of node connection, splicing and the template construction for being partially filled with steel-concrete coupled column are more numerous Trivial, this allows for the labour for being partially filled with steel-concrete coupled column and fund cost is apparently higher than ordinary reinforced concrete structure, It greatly limits and is partially filled with the application of steel-concrete coupled column in practical projects.
Prefabricated construction is a kind of new structure spliced by prefabrication primary structure member, construction site, in advance Assembly concrete coupled column processed is a part in its structural system.Since the main member of prefabricated construction is in factory Production eliminates a large amount of form work engineerings in conventional concrete construction construction, and component quality is more secure, can be effectively improved Construction environment is widelyd popularize by country in recent years.
Therefore, if prefabricated assembled concrete coupled column can be used, which to substitute, is partially partially filled with steel-concrete coupled column, one Surely can significantly solve it is existing be partially filled with complicated steel-concrete coupled column Joint's connection fabrication, splicing and template construction compared with Cumbersome problem.
But the prefabricated assembled member dead weight of tradition is big, scene splicing is difficult, wants to site operation personnel and execution conditions Ask higher, and prefabricated components node region still needs to build template, work progress and simplification not yet in effect, the cast-in-place area of this exterior node There are the congenital problem such as bond-slip, leak, the use of structure and stress performances to be had for the connection of domain and prefabricated components Effect ensures.
Therefore, it is badly in need of designing that a kind of good stress performance, component stable connection, working procedure be few and simple, construction efficiency High partial precast coupled column.
Summary of the invention
[technical problem]
A kind of the technical problem to be solved in the present invention is to provide stress performances good, component stable connection, working procedure it is few and Simply, the high partial precast fashioned iron-concrete combination column of construction efficiency.
[technical solution]
In order to solve the above technical problems, the present invention provides a kind of partial precast fashioned iron-Combined concrete based on side plate Column, the coupled column include the first H profile steel 1, and both ends are connected to the first top flange plate 2 and the first bottom wing of the first H profile steel 1 The side plate 4 of listrium 3 is filled in the cavity that the first top flange plate 2, the first bottom wing listrium 3 and side plate 4 of the first H profile steel 1 are formed Interior cast-in-place concrete 5, and be built in cast-in-place concrete 5 and be connected to 6 two sides of the first web of the first H profile steel 1 Several pegs 7;Cast-in-place concrete 5 is close in the side that the side plate 4 is parallel to the first web 6 and the side plate 4, the other side not with Cast-in-place concrete 5 is in contact.
In one embodiment of the invention, the first top flange plate 2 of first H profile steel 1 and/or the first lower flange Plate 3 is connected to several for connecting the second H profile steel 9 of coupled column Yu girder steel 8;Second top flange plate of second H profile steel 9 10, the second bottom wing listrium 11 and the second web 12 are each perpendicular to the first top flange plate 2 and/or the first bottom wing of the first H profile steel 1 Listrium 3.
In one embodiment of the invention, when the coupled column need to be connected with girder steel 8, coupled column is equipped with encrypted area 13;The encrypted area 13 refers to the partial region and lower section in the region and the overlying regions that coupled column is connected with the second H profile steel 9 Partial region;The height of the partial region is 1 times not less than 8 deck-molding of girder steel and 2 times no more than 8 deck-molding of girder steel;Position Side plate 4 in the encrypted area, which need to replace with, reinforces steel plate 14;
Or the coupled column is when being not required to be connected with girder steel 8, without encrypted area 13 on coupled column.
In one embodiment of the invention, the peg 7 is perpendicular to the first web 6.
In one embodiment of the invention, the length of the peg 7 for 5 times not less than 7 diameter of peg and does not surpass 10 times for crossing 7 diameter of peg.
In one embodiment of the invention, in the peg 7, peg 7 positioned at 6 side of the first web be located at the 7 axial symmetry of peg of one web, 6 other side.
In one embodiment of the invention, in the peg 7, peg 7 positioned at 6 side of the first web be located at the The peg 7 of one web, 6 other side has two column;In two column pegs 7, close to that column peg 7 and first of the first top flange plate 2 The distance between top flange plate 2 be equal to close to the first bottom wing listrium 3 that column peg 7 and the first bottom wing listrium 3 between away from From;Spacing between two column pegs 7 is one third of first web 6 along the length in pillar height direction;Positioned at the peg 7 of same row Between spacing be not less than 12 times of 7 diameter of peg and to be no more than 20 times of 7 diameter of peg.
In one embodiment of the invention, the side plate 4 is corrugated plating.
In one embodiment of the invention, the coupled column also includes several prefabricated boards 15;The prefabricated board 15 is logical Several first bolts 16 are crossed to be fixed on the first top flange plate 2 and/or the first bottom wing listrium 3 of the first H profile steel 1;It is described prefabricated The first top flange plate 2 of the first H profile steel 1 is close in the side of plate 15 and/or the first bottom wing listrium 3 does not connect with cast-in-place concrete 5 The side of touching;First bolt 16 is through entire prefabricated board 15 and part is built in cast-in-place concrete 5.
In one embodiment of the invention, first bolt 16 is built in the length of the part of cast-in-place concrete 5 For 10 times not less than 16 diameter of the first bolt.
In one embodiment of the invention, first bolt 16 is tap bolt.
In one embodiment of the invention, in the prefabricated board 15, tongue and groove is equipped between adjacent two pieces of prefabricated boards 15.
In one embodiment of the invention, the prefabricated board 15 includes waterproof layer 31, insulating layer 32 and decorative layer 33;The waterproof layer 31 is close to the first top flange plate 2 and/or the first bottom wing listrium 3 of the first H profile steel 1;The insulating layer 32 Between waterproof layer 31 and decorative layer 33.
In one embodiment of the invention, the material of the cast-in-place concrete 5 can be glass pumice concrete, haydite One of concrete or normal concrete are a variety of.
In one embodiment of the invention, the material of the cast-in-place concrete 5 is glass pumice concrete.The glass Glass pumice concrete is recorded in the patent application text of Publication No. CN108585682A.
The present invention also provides a kind of above-mentioned partial precast fashioned iron-concrete combination column construction method based on side plate, When coupled column need to be connected with girder steel 8, the method is the first abdomen that peg 7 is welded on to the first H profile steel 1 according to designed distance On plate 6, prefabricated board 15 is fixed on to the first top flange plate 2 or the first bottom wing listrium 3 of the first H profile steel 1 by the first bolt 16 On, the second H profile steel 9 is welded in the first top flange plate 2 and the first lower flange by quantity and position according to the girder steel 8 that need to be connected It is not fixed in plate 3 on one of prefabricated board 15, will reinforce that steel plate 14 is welded on the first H profile steel 1 positioned at encrypted area 13 the Between one top flange plate 2 and the first bottom wing listrium 3, side plate 4 is welded on first of the first H profile steel 1 positioned at non-encrypted area Between flange plate 2 and the first bottom wing listrium 3, prefabricated component is obtained;Prefabricated component is transported to construction site, by concreting in H In the cavity that the first top flange plate 2, the first bottom wing listrium 3, the first web 6 and the side plate 4 of fashioned iron 1 are formed, obtain completing part;
Or when coupled column is not required to be connected with girder steel 11, the method is the first upper limb that side plate 4 is welded on to H profile steel 1 Between listrium 2 and the first bottom wing listrium 3, peg 7 is welded on the first web 6 of the first H profile steel 1 according to designed distance, it will Prefabricated board 15 is fixed on the first top flange plate 2 and/or the first bottom wing listrium 3 of the first H profile steel 1 by the first bolt 16, is obtained To prefabricated component;Prefabricated component is transported to construction site, by concreting H profile steel 1 the first top flange plate 2, the first bottom wing In the cavity that listrium 3, the first web 6 and side plate 4 are formed, obtain completing part.
The present invention also provides a kind of above-mentioned partial precast fashioned iron-concrete combination column and girder steel connections based on side plate Method, the method are by the third top flange plate 17 of girder steel 8, third bottom wing listrium 18 and third web 19 respectively with second The second top flange plate 10, the second bottom wing listrium 11 and the second web 12 of H profile steel 9 are connected;
The third top flange plate 17 is spelled by the first flange splice plate 20, the second flange splice plate 21 and the third edge of a wing Fishplate bar 22 is connected with the second top flange plate 10;First flange splice plate 20 is close to third top flange plate 17 and the second top flange The top of plate 10;Second flange splice plate 21 is close to third top flange plate 17 and the second upper limb with third flange splice plate 22 The lower section of listrium 10;Second flange splice plate 21 is located at third web 19 and the second abdomen with third flange splice plate 22 The two sides of plate 12;First flange splice plate 20 by several second bolts 23 respectively with the second flange splice plate 21 and the Three flange splice plates 22 are connected;The second bolt of part 23 runs through third top flange plate 17, and the second bolt of part 23 is on second Flange plate 10;
The third bottom wing listrium 18 is spelled by the 4th flange splice plate 24, the 5th flange splice plate 25 and the 6th edge of a wing Fishplate bar 26 is connected with the second bottom wing listrium 11;4th flange splice plate 24 is close to third bottom wing listrium 18 and the second bottom wing The lower section of listrium 11;5th flange splice plate 25 and the 6th flange splice plate 26 are close to third bottom wing listrium 18 and second The top of bottom wing listrium 11;5th flange splice plate 25 and the 6th flange splice plate 26 are located at third web 19 and The two sides of two webs 12;4th flange splice plate 24 by several third bolts 27 respectively with the 5th flange splice plate 25 and 6th flange splice plate 26 is connected;Part third bolt 27 runs through third bottom wing listrium 18, and part third bolt 27 runs through second Bottom wing listrium 11;
The third web 19 is connected by the 7th splice plate 28 and the 8th splice plate 29 with the second web 12;Described Seven splice plates 28 and the 8th splice plate 29 are close to the two sides of third web 19 and the second web 12 respectively;7th splice plate 28 It is connected by several 4th bolts 30 with the 8th splice plate 29;The 4th bolt 30 of part runs through third web 19, the 4th spiral shell of part Bolt 30 runs through the second web 12.
The present invention also provides the application of said combination column or above-mentioned construction method or above-mentioned connection method in terms of building.
[beneficial effect]
(1) concrete of coupled column of the present invention is one-piece casting at the construction field (site), can make the stress performance of coupled column more preferably, Component connection is more firm, to guarantee the use function and structure function of each node splicing regions of coupled column;Coupled column of the invention In shape steel web two sides fill concrete, the I-steel disadvantage weak along weak axis direction bending stiffness is improved, coupled column is improved Comprehensive stress performance;Coupled column of the invention has given full play to the performance of two kinds of materials of steel and concrete, fills in fashioned iron mixed Solidifying soil, the presence of fashioned iron enhance the effect of restraint to concrete, and the presence of concrete reduces fashioned iron and local buckling or whole occurs A possibility that body unstability, thus increase the bearing capacity and ductility of coupled column, meanwhile, reach the mesh for reducing combination column cross-section size 's;Coupled column of the invention increases the bonding of cast-in-place concrete Yu two interfaces of fashioned iron using peg, guarantees that two parts are common Work, and participate in undertaking xial feed, it is ensured that the normal use and bearing capacity of coupled column;The side plate of coupled column of the invention is Corrugated plating, higher lateral rigidity had not only improved the effect of restraint to concrete, but also can guarantee and integrated prefabricated plate It connects stronger;Therefore, when the height of coupled column of the present invention is 3000mm, sectional dimension is 350mm × 350mm, I-steel is cut Face is having a size of 350mm × 350mm × 6mm, and when upper lower flange is with a thickness of 6mm, ultimate axial compressive strength is up to 5733.2kN, the limit Anti-bending bearing capacity is up to 272.5kNm, ductility factor up to 4.02;
(2) the steel construction part of coupled column of the present invention can be by prefabrication, from heavy and light, and live concatenation construction is convenient, avoids Traditional prefabricated assembled member dead weight is big, the difficult disadvantage of scene splicing;
(3) shaft of coupled column of the present invention uses water-proof heat preservation ornament integration prefabricated board, meanwhile, coupled column of the present invention Integrated prefabricated plate also serves as non-dismantling formwork, both saves template, improves construction efficiency, and eliminate later period decoration of exterior wall engineering and height The risk of idle job has certain economy, meets the development trend of present building industrialization and building energy conservation;
(4) tongue and groove is arranged at the integrated prefabricated plate place of being vertically connected in coupled column of the invention, can guarantee insulating layer and prevent Effective connection of water layer, and can effectively prevent overflowing when concrete vibrating and starch the generation of phenomenon;
(5) the integrated prefabricated plate of coupled column of the present invention is anchored on flange plate by tap bolt, and protrudes into concrete Certain distance further improves the firmness of integrated prefabricated plate to the effect that bonds of screw rod after casting concrete, increases Its durability;
(6) coupled column of the invention does not use reinforcing bar, on the one hand reduces steel using amount, and eliminates cumbersome reinforcing bar side Bundle process.
Detailed description of the invention
Fig. 1 is the positive structure schematic of coupled column of the present invention.
Fig. 2 is the reverse structure schematic of coupled column of the present invention.
Fig. 3 is the cross-sectional view of coupled column of the present invention.
Fig. 4 is the Longitudinal cross section schematic of coupled column of the present invention.
In Fig. 1-4,1 is the first H profile steel, 2 be the first top flange plate, 3 be the first bottom wing listrium, 4 be side plate, 5 be cast-in-place Concrete, 6 be the first web, 7 be peg, 8 be girder steel, 9 be the second H profile steel, 10 be the second top flange plate, 11 be the second bottom wing Listrium, 12 be the second web, 13 be encrypted area, 14 be reinforce steel plate, 15 be prefabricated board, 16 be the first bolt, 17 be in third Flange plate, 18 be third bottom wing listrium, 19 be third web, 20 be the first flange splice plate, 21 be the second flange splice plate, 22 It is the second bolt for third flange splice plate, 23,24 be the 4th flange splice plate, 25 be the 5th flange splice plate, 26 is the 6th Flange splice plate, 27 be third bolt, 28 be the 7th splice plate, 29 be the 8th splice plate, 30 be the 4th bolt, 31 be waterproof Layer, 32 are insulating layer and 33 are decorative layer.
Specific embodiment
In order to have clearer understanding to technical solution of the present invention, purpose and effect, now in conjunction with attached drawing and embodiment The present invention will be further elaborated:
Normal concrete involved in following embodiments is C40 concrete, every 1m3In the concrete containing water 185kg, Cement 420kg, sand 572kg, stone 1273kg.
Detection method involved in following embodiments is as follows:
Ultimate axial compressive strength detection method:
Capacity under axial experimental study is carried out to integrated combination column test specimen, column upper and lower ends are constrained using flexural pivot, test It is carried out on 10000kN press machine, using disposable conquassation loading method, the incipient stage is using load control load, every grade of lotus Load increment is 50kN, and the duration is about 2min, after yield deformation occurs for column, uses Bit andits control load instead, every grade of displacement increases Amount is 1mm, and the duration is about 2min, slowly continuous load is changed to when the bent deformation of the drum of test specimen steel pipe is violent, until steel pipe Load terminates when corner weld seam tear is serious.
Coupled column upper and lower ends respectively arrange 2 displacement meters, to measure the absolute deformation that coupled column is loaded onto destruction, along shaft Arrange foil gauge to monitor the strain value in loading procedure on fashioned iron, batten plate, concrete at every quartering section;It is cut at one At face, longitudinally arranged two foil gauges of top flange plate, longitudinally arranged two foil gauges of bottom wing listrium, web is along longitudinal direction and horizontal To four foil gauges of arrangement, every side batten plate is transversely respectively arranged a foil gauge, and two sides concrete is along longitudinal direction and laterally total Arrange 4 foil gauges, the arrangement at each section is all the same.
Ultimate Bearing Capacity detection method:
Anti-bending bearing capacity experimental study is carried out to freely-supported coupled column test specimen, using 4 points of curved loading methods, using two 1000kN point liquid servo actuator is loaded, and force snesor, range 300kN, for measuring beam are installed at actuator The payload values being subject to.Test use hierarchical loading, beam cracking before, every grade of increases 5kN of load, combination beam cracking after until destruction Load is changed to every grade of 10kN, and every grade of load duration is about 5min, and load terminates when dropping to the 70% of peak load.
Displacement meter is arranged at span centre and load(ing) point to measure column in the amount of deflection of simple bending section.Foil gauge is arranged in On test specimen span centre and three fashioned iron in load(ing) point section, batten plate and concrete regions, the top flange plate of each region Shaped Steel 3 foil gauges of upper surface equidistant placement, along length on bottom wing listrium lower surface 5 foil gauges of equidistant placement of fashioned iron, batten plate 3 foil gauges are arranged in direction, and 1 strain rosette is arranged in concrete side.
Ductility factor detection method:
Ductility factor DiCalculation formula are as follows:
In formula: ε85%It is 0.85N for load in descending branchuCorresponding longitudinal strain;εy75%/ 0.75, ε75%For strengthening segment Middle load is 0.75NuCorresponding longitudinal strain (specifically refers to document: Tao Zhong, Yu Qing new composite structure column: test, reason By with the Beijing method [M]: Science Press, 2006.).
A kind of embodiment 1: partial precast fashioned iron-concrete combination column based on side plate
Such as Fig. 1-3, a kind of partial precast fashioned iron-concrete combination column based on side plate includes comprising the first H profile steel 1 two End is connected to the first top flange plate 2 of the first H profile steel 1 and the side plate 4 of the first bottom wing listrium 3, is filled in the first H profile steel 1 The first top flange plate 2, the cast-in-place concrete 5 in the cavity that is formed of the first bottom wing listrium 3 and side plate 4, and be built in existing Pouring concrete 5 and be connected to the first H profile steel 16 two sides of the first web several pegs 7;The side plate 4 is parallel to first Cast-in-place concrete 5 is close in the side of web 6 and the side plate 4, and the other side is not in contact with cast-in-place concrete 5.
As further preferably, the first top flange plate 2 of first H profile steel 1 and/or the first bottom wing listrium 3 connect In several for connecting the second H profile steel 9 of coupled column Yu girder steel 8;Under second top flange plate 10, second of second H profile steel 9 Flange plate 11 and the second web 12 are each perpendicular to the first top flange plate 2 and/or the first bottom wing listrium 3 of the first H profile steel 1.
As further preferably, when the coupled column need to be connected with girder steel 8, coupled column is equipped with encrypted area 13;It is described Encrypted area 13 refers to the partial region in the region and the overlying regions that coupled column is connected with the second H profile steel 9 and the part of lower section Region;The height of the partial region is 1 times not less than 8 deck-molding of girder steel and 2 times no more than 8 deck-molding of girder steel;Positioned at described The side plate 4 of encrypted area, which need to replace with, reinforces steel plate 14;
Or the coupled column is when being not required to be connected with girder steel 8, without encrypted area 13 on coupled column.
As further preferably, the peg 7 is perpendicular to the first web 6.
As further preferably, the length of the peg 7 is 5 times not less than 7 diameter of peg and is no more than peg 7 directly 10 times of diameter.
As further preferably, in the peg 7, positioned at 6 side of the first web peg 7 be located at the first web 6 7 axial symmetry of peg of the other side.
As further preferably, in the peg 7, positioned at 6 side of the first web peg 7 be located at the first web 6 The peg 7 of the other side has two column;That column peg 7 and the first top flange in two column pegs 7, close to the first top flange plate 2 The distance between plate 2 is equal to close to the distance between that column peg 7 of the first bottom wing listrium 3 and the first bottom wing listrium 3;Two column Spacing between peg 7 is one third of first web 6 along the length in pillar height direction;Between the peg 7 of same row Spacing is 12 times not less than 7 diameter of peg and 20 times no more than 7 diameter of peg.
As further preferably, the side plate 4 is corrugated plating.
As further preferably, the coupled column also includes several prefabricated boards 15;The prefabricated board 15 passes through several the One bolt 16 is fixed on the first top flange plate 2 and/or the first bottom wing listrium 3 of the first H profile steel 1;The one of the prefabricated board 15 The side that the first top flange plate 2 of the first H profile steel 1 is close in side and/or the first bottom wing listrium 3 is not in contact with cast-in-place concrete 5; First bolt 16 is through entire prefabricated board 15 and part is built in cast-in-place concrete 5.
As further preferably, first bolt 16 be built in the part of cast-in-place concrete 5 length be not less than 10 times of first bolt, 16 diameter.
As further preferably, first bolt 16 is tap bolt.
As further preferably, in the prefabricated board 15, between adjacent two pieces of prefabricated boards 15 be equipped with tongue and groove.
As further preferably, the prefabricated board 15 includes waterproof layer 17, insulating layer 18 and decorative layer 19;It is described anti- Water layer 17 is close to the first top flange plate 2 and/or the first bottom wing listrium 3 of the first H profile steel 1;The insulating layer 18 is located at waterproof layer Between 17 and decorative layer 19.
As further preferably, the material of the cast-in-place concrete 5 can for glass pumice concrete, haydite concrete or One of normal concrete is a variety of.
As further preferably, the material of the cast-in-place concrete 5 is glass pumice concrete.The glass pumice is mixed Solidifying soil is recorded in the patent application text of Publication No. CN108585682A.
A kind of embodiment 2: partial precast fashioned iron-concrete combination column construction method based on side plate
Option A: need to be connected with girder steel
Specific step is as follows:
Peg 7 is welded on the first web 6 of the first H profile steel 1 according to designed distance, prefabricated board 15 is passed through into the first spiral shell Bolt 16 is fixed on the first top flange plate 2 or the first bottom wing listrium 3 of the first H profile steel 1, according to the quantity for the girder steel 8 that need to be connected And position, the second H profile steel 9 is welded in one that prefabricated board 15 is not fixed in the first top flange plate 2 and the first bottom wing listrium 3 On, by reinforce steel plate 14 be welded on the first H profile steel 1 positioned at encrypted area 13 the first top flange plate 2 and the first bottom wing listrium 3 it Between, side plate 4 is welded between the first top flange plate 2 and the first bottom wing listrium 3 of the first H profile steel 1 positioned at non-encrypted area, is obtained To prefabricated component;Prefabricated component is transported to construction site, by concreting H profile steel 1 the first top flange plate 2, the first bottom wing In the cavity that listrium 3, the first web 6 and side plate 4 are formed, obtain completing part.
Option b: it is not required to be connected with girder steel
Specific step is as follows:
Side plate 4 is welded between the first top flange plate 2 of H profile steel 1 and the first bottom wing listrium 3, by peg 7 according to design Distance is welded on the first web 6 of the first H profile steel 1, and prefabricated board 15 is fixed on the first H profile steel 1 by the first bolt 16 On first top flange plate 2 and/or the first bottom wing listrium 3, prefabricated component is obtained;Prefabricated component is transported to construction site, by concrete It is cast in the first top flange plate 2, the first bottom wing listrium 3, the first web 6 and the cavity of the formation of side plate 4 of H profile steel 1, obtains Complete part.
A kind of embodiment 3: partial precast fashioned iron-concrete combination column and girder steel connection method based on side plate
Specific step is as follows:
By the third top flange plate 17 of girder steel 8, third bottom wing listrium 18 and third web 19 respectively with the second H profile steel 9 The second top flange plate 10, the second bottom wing listrium 11 and the second web 12 be connected;
The third top flange plate 17 is spelled by the first flange splice plate 20, the second flange splice plate 21 and the third edge of a wing Fishplate bar 22 is connected with the second top flange plate 10;First flange splice plate 20 is close to third top flange plate 17 and the second top flange The top of plate 10;Second flange splice plate 21 is close to third top flange plate 17 and the second upper limb with third flange splice plate 22 The lower section of listrium 10;Second flange splice plate 21 is located at third web 19 and the second abdomen with third flange splice plate 22 The two sides of plate 12;First flange splice plate 20 by several second bolts 23 respectively with the second flange splice plate 21 and the Three flange splice plates 22 are connected;The second bolt of part 23 runs through third top flange plate 17, and the second bolt of part 23 is on second Flange plate 10;
The third bottom wing listrium 18 is spelled by the 4th flange splice plate 24, the 5th flange splice plate 25 and the 6th edge of a wing Fishplate bar 26 is connected with the second bottom wing listrium 11;4th flange splice plate 24 is close to third bottom wing listrium 18 and the second bottom wing The lower section of listrium 11;5th flange splice plate 25 and the 6th flange splice plate 26 are close to third bottom wing listrium 18 and second The top of bottom wing listrium 11;5th flange splice plate 25 and the 6th flange splice plate 26 are located at third web 19 and The two sides of two webs 12;4th flange splice plate 24 by several third bolts 27 respectively with the 5th flange splice plate 25 and 6th flange splice plate 26 is connected;Part third bolt 27 runs through third bottom wing listrium 18, and part third bolt 27 runs through second Bottom wing listrium 11;
The third web 19 is connected by the 7th splice plate 28 and the 8th splice plate 29 with the second web 12;Described Seven splice plates 28 and the 8th splice plate 29 are close to the two sides of third web 19 and the second web 12 respectively;7th splice plate 28 It is connected by several 4th bolts 30 with the 8th splice plate 29;The 4th bolt 30 of part runs through third web 19, the 4th spiral shell of part Bolt 30 runs through the second web 12.
A kind of embodiment 4: partial precast fashioned iron-concrete combination column detection based on side plate
Specific step is as follows:
The size for choosing the first top flange plate is 350mm × 6mm;The size of first bottom wing listrium is 350mm × 6mm;The The size of one web is 338mm × 6mm;Side plate is having a size of W94 × 20 × 2;Side plate is 2mm corrugated plating, wave height 9mm;Steel plate is equal Using Q235;The diameter of peg is 10mm, length 90mm, quantity 40;Peg positioned at the first web side be located at the The peg of the one web other side has two column and a two column peg axial symmetry, in two column pegs, close to that of the first top flange plate The distance between column peg and the first top flange plate are 110mm, close to that column peg and the first bottom wing of the first bottom wing listrium The distance between listrium is 110mm, and the spacing between two column pegs 7 is 118mm, the spacing between peg in same row For 150mm;Tap bolt diameter is 10mm, and length 200mm, quantity is four;Prefabricated board is with a thickness of 100mm, wherein decoration Layer 20mm, insulating layer 60mm, waterproof layer 20mm;Cast-in-place concrete uses C40 normal concrete.
By the B scheme in embodiment 1 and embodiment 2, a kind of partial precast fashioned iron-coagulation based on side plate is prepared Local soil type's zygostyle, the height of coupled column are 3000mm, and sectional dimension is 350mm × 350mm.
Measure coupled column compression strength, limit bending bearing capacity and weight, testing result are as follows: ultimate axial compressive strength For 5733.2kN, Ultimate Bearing Capacity 272.5kNm, ductility factor 4.02
Comparative example 1: the existing construction method and detection for being partially filled with steel-concrete coupled column
Specific step is as follows:
Choose top flange plate size be 350mm × 6mm, the size that the size of bottom wing listrium is 350mm × 6mm, web For the H profile steel of 338mm × 6mm, steel plate is all made of Q235;Cast-in-place concrete is directly poured to H profile steel flange plate and web shape At cavity in;Cast-in-place concrete uses C40 normal concrete.
Measure coupled column compression strength, limit bending bearing capacity and weight, testing result are as follows: ultimate axial compressive strength It is only 2.58 for 5235.8kN, Ultimate Bearing Capacity 256.9kNm, ductility factor.
Although the present invention has been described by way of example and in terms of the preferred embodiments, it is not intended to limit the invention, any to be familiar with this skill The people of art can do various change and modification, therefore protection model of the invention without departing from the spirit and scope of the present invention Enclosing subject to the definition of the claims.

Claims (10)

1. a kind of partial precast fashioned iron-concrete combination column based on side plate, which is characterized in that the coupled column includes the first H Fashioned iron (1), both ends are connected to the first top flange plate (2) of the first H profile steel (1) and the side plate of the first bottom wing listrium (3) (4), it is filled in the cavity that the first top flange plate (2), the first bottom wing listrium (3) and side plate (4) of the first H profile steel (1) are formed Interior cast-in-place concrete (5), and be built in cast-in-place concrete (5) and be connected to the first web of the first H profile steel (1) (6) several pegs (7) of two sides;The side plate (4) is parallel to the first web (6) and the side abutting of the side plate (4) is cast-in-place Concrete (5), the other side are not in contact with cast-in-place concrete (5).
2. a kind of partial precast fashioned iron-concrete combination column based on side plate as described in claim 1, which is characterized in that institute The first top flange plate (2) and/or the first bottom wing listrium (3) for stating the first H profile steel (1) be connected to it is several for connect coupled column with The second H profile steel (9) of girder steel (8);The second top flange plate (10) of second H profile steel (9), the second bottom wing listrium (11) and Second web (12) is each perpendicular to the first top flange plate (2) and/or the first bottom wing listrium (3) of the first H profile steel (1).
3. a kind of partial precast fashioned iron-concrete combination column based on side plate as claimed in claim 1 or 2, which is characterized in that When the coupled column need to be connected with girder steel (8), coupled column is equipped with encrypted area (13);The encrypted area (13) refer to coupled column with The partial region of the partial region and lower section of the connected region of second H profile steel (9) and the overlying regions;The partial region Height is for 1 times not less than girder steel (8) deck-molding and no more than 2 times of girder steel (8) deck-molding;Side plate (4) positioned at the encrypted area It need to replace with and reinforce steel plate (14);
Or the coupled column is when being not required to be connected with girder steel (8), without encrypted area (13) on coupled column.
4. a kind of partial precast fashioned iron-concrete combination column based on side plate a method according to any one of claims 1-3, feature exist In, in the peg (7), the peg (7) for being located at the first web (6) side and the peg (7) for being located at the first web (6) other side Axial symmetry.
5. a kind of partial precast fashioned iron-concrete combination column based on side plate as described in claim 1-4 is any, feature exist In, in the peg (7), the peg (7) for being located at the first web (6) side and the peg (7) for being located at the first web (6) other side There are two column;In two column pegs (7), close to the first top flange plate (2) that column peg (7) and the first top flange plate (2) it Between distance be equal to that column peg (7) and the distance between first bottom wing listrium (3) close to the first bottom wing listrium (3);Two Spacing between column peg (7) is the one third of the first web (6) along the length in pillar height direction;Positioned at the peg 7 of same row Between spacing be not less than 12 times of 7 diameter of peg and to be no more than 20 times of 7 diameter of peg.
6. a kind of partial precast fashioned iron-concrete combination column based on side plate a method as claimed in any one of claims 1 to 5, feature exist In the side plate (4) is corrugated plating.
7. a kind of partial precast fashioned iron-concrete combination column based on side plate as described in claim 1-6 is any, feature exist In the coupled column also includes several prefabricated boards (15);The prefabricated board (15) is fixed on the by several first bolts (16) On the first top flange plate (2) of one H profile steel (1) and/or the first bottom wing listrium (3);The side of the prefabricated board (15) it is close to the The side that the first top flange plate (2) of one H profile steel (1) and/or the first bottom wing listrium (3) are not in contact with cast-in-place concrete (5); First bolt (16) is through entire prefabricated board (15) and part is built in cast-in-place concrete (5).
8. a kind of partial precast fashioned iron-concrete combination column construction method based on side plate as claimed in claim 7, feature It is, when coupled column need to be connected with girder steel (8), the method is that peg (7) is welded on the first H profile steel according to designed distance (1) on the first web (6), prefabricated board (15) are fixed on to the first top flange of the first H profile steel (1) by the first bolt (16) On plate (2) or the first bottom wing listrium (3), the second H profile steel (9) is welded in by quantity and position according to the girder steel (8) that need to be connected It is not fixed on one of prefabricated board (15) in first top flange plate (2) and the first bottom wing listrium (3), steel plate (14) weldering will be reinforced It connects between the first top flange plate (2) and the first bottom wing listrium (3) of the first H profile steel (1) for being located at encrypted area (13), by side plate (4) it is welded between the first top flange plate (2) of the first H profile steel (1) positioned at non-encrypted area and the first bottom wing listrium (3), obtains To prefabricated component;Prefabricated component is transported to construction site, by concreting H profile steel (1) the first top flange plate (2), first In the cavity that bottom wing listrium (3), the first web (6) and side plate (4) are formed, obtain completing part;
Or when coupled column is not required to be connected with girder steel (11), the method is to be welded on side plate (4) on the first of H profile steel (1) Between flange plate (2) and the first bottom wing listrium (3), peg (7) is welded on the first of the first H profile steel (1) according to designed distance On web (6), by prefabricated board (15) by the first bolt (16) be fixed on the first H profile steel (1) the first top flange plate (2) and/ Or first on bottom wing listrium (3), obtains prefabricated component;Prefabricated component is transported to construction site, by concreting in H profile steel (1) The first top flange plate (2), in the cavity that is formed of the first bottom wing listrium (3), the first web (6) and side plate (4), completed Part.
9. a kind of any partial precast fashioned iron-concrete combination column and girder steel company based on side plate of claim 2-7 Connect method, which is characterized in that the method be by the third top flange plate (17) of girder steel (8), third bottom wing listrium (18) and Third web (19) respectively with the second top flange plate (10) of the second H profile steel (9), the second bottom wing listrium (11) and the second web (12) it is connected;
The third top flange plate (17) passes through the first flange splice plate (20), the second flange splice plate (21) and the third edge of a wing Splice plate (22) is connected with the second top flange plate (10);First flange splice plate (20) be close to third top flange plate (17) and The top of second top flange plate (10);Second flange splice plate (21) is close to third upper limb with third flange splice plate (22) The lower section of listrium (17) and the second top flange plate (10);Second flange splice plate (21) and third flange splice plate (22) point Not Wei Yu third web (19) and the second web (12) two sides;First flange splice plate (20) passes through several second bolts (23) it is connected respectively with the second flange splice plate (21) and third flange splice plate (22);The second bolt of part (23) is through the Three top flange plates (17), the second bolt of part (23) run through the second top flange plate (10);
The third bottom wing listrium (18) passes through the 4th flange splice plate (24), the 5th flange splice plate (25) and the 6th edge of a wing Splice plate (26) is connected with the second bottom wing listrium (11);4th flange splice plate (24) be close to third bottom wing listrium (18) with And second bottom wing listrium (11) lower section;5th flange splice plate (25) and the 6th flange splice plate (26) are close under third The top of flange plate (18) and the second bottom wing listrium (11);5th flange splice plate (25) and the 6th flange splice plate (26) two sides of third web (19) Yu the second web (12) are located at;4th flange splice plate (24) passes through several the Three bolts (27) are connected with the 5th flange splice plate (25) and the 6th flange splice plate (26) respectively;Part third bolt (27) passes through Third bottom wing listrium (18) is worn, part third bolt (27) runs through the second bottom wing listrium (11);
The third web (19) is connected by the 7th splice plate (28) and the 8th splice plate (29) with the second web (12);Institute State the two sides that the 7th splice plate (28) and the 8th splice plate (29) are close to third web (19) and the second web (12) respectively;It is described 7th splice plate (28) is connected by several 4th bolts (30) with the 8th splice plate (29);The 4th bolt (30) of part is through the Three webs (19), the 4th bolt (30) of part run through the second web (12).
10. coupled column as claimed in claim 1 to 7 or construction method according to any one of claims 8 or as claimed in claim 9 Application of the connection method in terms of building.
CN201910095743.4A 2019-01-31 2019-01-31 A kind of partial precast fashioned iron-concrete combination column and its application based on side plate Pending CN109797908A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910095743.4A CN109797908A (en) 2019-01-31 2019-01-31 A kind of partial precast fashioned iron-concrete combination column and its application based on side plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910095743.4A CN109797908A (en) 2019-01-31 2019-01-31 A kind of partial precast fashioned iron-concrete combination column and its application based on side plate

Publications (1)

Publication Number Publication Date
CN109797908A true CN109797908A (en) 2019-05-24

Family

ID=66559207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910095743.4A Pending CN109797908A (en) 2019-01-31 2019-01-31 A kind of partial precast fashioned iron-concrete combination column and its application based on side plate

Country Status (1)

Country Link
CN (1) CN109797908A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318466A (en) * 2019-07-16 2019-10-11 龙元建设集团股份有限公司 H profile steel column high-strength bolts structure and construction method
CN110685373A (en) * 2019-09-16 2020-01-14 浙江绿筑集成科技有限公司 Construction method of integrated exterior wall masonry system
CN113235964A (en) * 2021-05-11 2021-08-10 太原理工大学 Concrete fastening structure for improving local stability of H-shaped steel column and mounting method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202519791U (en) * 2012-03-14 2012-11-07 山东德建集团有限公司 Steel framework H steel column node domain reinforcing equipment
CN202936888U (en) * 2012-12-05 2013-05-15 长安大学 H-shaped beam and H-shaped column main axis joint
CN106638943A (en) * 2016-12-30 2017-05-10 广州大学 Connecting node for steel pipe constrained steel recycled concrete column and steel beam and construction method thereof
CN106759931A (en) * 2016-12-12 2017-05-31 湖南金海钢结构股份有限公司 Industrial premises composite plate horizontal paving docking node apparatus and installation method
CN106836491A (en) * 2017-03-29 2017-06-13 长安大学 A kind of high strength steel pipe concrete column girder connection structure and its construction method
KR20170066192A (en) * 2015-12-04 2017-06-14 주식회사 에스큐브이엔지 Concrete composite column and joint structure of composite column an beam and manufacturing method of concrete composite column
CN108643349A (en) * 2018-07-05 2018-10-12 湖南大学 A kind of through assembled steel reinforced concrete column of beam and steel beam joint connector
CN209780032U (en) * 2019-01-31 2019-12-13 江南大学 Partially prefabricated section steel-concrete combined column based on side plates

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202519791U (en) * 2012-03-14 2012-11-07 山东德建集团有限公司 Steel framework H steel column node domain reinforcing equipment
CN202936888U (en) * 2012-12-05 2013-05-15 长安大学 H-shaped beam and H-shaped column main axis joint
KR20170066192A (en) * 2015-12-04 2017-06-14 주식회사 에스큐브이엔지 Concrete composite column and joint structure of composite column an beam and manufacturing method of concrete composite column
CN106759931A (en) * 2016-12-12 2017-05-31 湖南金海钢结构股份有限公司 Industrial premises composite plate horizontal paving docking node apparatus and installation method
CN106638943A (en) * 2016-12-30 2017-05-10 广州大学 Connecting node for steel pipe constrained steel recycled concrete column and steel beam and construction method thereof
CN106836491A (en) * 2017-03-29 2017-06-13 长安大学 A kind of high strength steel pipe concrete column girder connection structure and its construction method
CN108643349A (en) * 2018-07-05 2018-10-12 湖南大学 A kind of through assembled steel reinforced concrete column of beam and steel beam joint connector
CN209780032U (en) * 2019-01-31 2019-12-13 江南大学 Partially prefabricated section steel-concrete combined column based on side plates

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318466A (en) * 2019-07-16 2019-10-11 龙元建设集团股份有限公司 H profile steel column high-strength bolts structure and construction method
CN110685373A (en) * 2019-09-16 2020-01-14 浙江绿筑集成科技有限公司 Construction method of integrated exterior wall masonry system
CN113235964A (en) * 2021-05-11 2021-08-10 太原理工大学 Concrete fastening structure for improving local stability of H-shaped steel column and mounting method thereof

Similar Documents

Publication Publication Date Title
CN101122159B (en) Steel pipe integral girders for constructing prestressing force and construction method thereof
Keller et al. Flexural behavior of a hybrid FRP and lightweight concrete sandwich bridge deck
CN203768784U (en) Super toughness concrete plate-steel beam light combined bridge structure
CN103696355B (en) The light-duty combined bridge structure of a kind of superhigh tenacity concrete slab-girder steel
CN101139812A (en) Lower edge open truss style corrugated steel web combination beam
CN101892626B (en) Steel pipe concrete flange combining beam with concrete fender
CN109797908A (en) A kind of partial precast fashioned iron-concrete combination column and its application based on side plate
CN101768916A (en) Lower flange improved corrugated steel web plate composite box girder and construction method thereof
CN106193454A (en) A kind of permanent template of post ultra-high performance concrete and preparation method thereof
CN110106972A (en) Between a kind of prefabricated reinforced concrete column and earth pillar or the connection method of itself and girder steel
CN106758813A (en) For the UHPC wells formula rib floorings and its construction method of steel reinforced concrete composite beam bridge
CN209780032U (en) Partially prefabricated section steel-concrete combined column based on side plates
CN107165336A (en) A kind of combination beam and its manufacture method
CN110005109A (en) A kind of open flume type prestressed concrete overlapped slab
Luo et al. Developments of prefabricated steel-concrete composite beams with novel steel-yielding demountable bolt connectors
CN205990762U (en) A kind of cylinder ultra-high performance concrete permanent template
CN106193455A (en) A kind of ultra-high performance concrete cylinder permanent template and preparation method thereof
Cao et al. Experimental study on interfacial shear behavior of PBL shear connector deeply embedded in UHPC
CN200999389Y (en) Panel point for steel pipe concrete column and reinforced concrete beam
Shin Ultra-high performance concrete (UHCP) precast segmental bridges
CN105696453B (en) A kind of steel-concrete combination beam
CN106150086A (en) A kind of cylinder ultra-high performance concrete permanent template and preparation method thereof
Schaumann Hybrid FRP-lightweight concrete sandwich system for engineering structures
CN109469261A (en) A kind of partial precast coupled column based on batten plate and its connection method with beam
CN201411626Y (en) Corrugated steel web pre-bending composite beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190524

RJ01 Rejection of invention patent application after publication