CN109797642A - Prestressing force assembled UHPC overpass and its construction method - Google Patents

Prestressing force assembled UHPC overpass and its construction method Download PDF

Info

Publication number
CN109797642A
CN109797642A CN201910218618.8A CN201910218618A CN109797642A CN 109797642 A CN109797642 A CN 109797642A CN 201910218618 A CN201910218618 A CN 201910218618A CN 109797642 A CN109797642 A CN 109797642A
Authority
CN
China
Prior art keywords
bridge
shaped body
prestressing force
overpass
uhpc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910218618.8A
Other languages
Chinese (zh)
Other versions
CN109797642B (en
Inventor
黄福云
单玉麟
罗小烨
龙腾飞
陈汉伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201910218618.8A priority Critical patent/CN109797642B/en
Publication of CN109797642A publication Critical patent/CN109797642A/en
Application granted granted Critical
Publication of CN109797642B publication Critical patent/CN109797642B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of prestressing force assembled UHPC overpasses, including bridge pier, support stake is provided with below bridge pier, the U-shaped body of a bridge using UHPC pouring molding is provided with above bridge pier along bridge floor extending direction, rubber support is provided between the U-shaped body of a bridge and support stake, the U-shaped body of a bridge includes several U-shaped body of a bridge units, is provided with bent-up bar in the U-shaped body of a bridge, is provided with longitudinal support beam and lateral support beam below U-shaped body of a bridge unit;The invention further relates to a kind of working methods of prestressing force assembled UHPC overpass.Structure of the invention is reasonable, easy to operate, high from heavy and light, intensity, can be widely used in large span foot bridge field in science of bridge building.

Description

Prestressing force assembled UHPC overpass and its construction method
Technical field
The present invention relates to a kind of prestressing force assembled UHPC overpass and its construction methods.
Background technique
Since reform and opening-up, China's infrastructure is constantly improve, and urban construction and development is rapid, and vehicle is increasing, in order to Improve traffic jam, road constantly widens, allow vehicle fast passing and ensureing people's safety, more than 30m or more it is big across Degree foot bridge comes into being.Traditional foot bridge is mostly concrete bridge, steel bridge etc..But for comparing, concrete gravity is big, easy Cracking is unfavorable for large span construction, and concrete has resulted in environmental pollution.Although steel structural bridge is suitble to large span construction, Price of steel product is expensive, easily get rusty, fire resistance and durability are poor, later period maintenance is costly.
Summary of the invention
In view of this, the object of the present invention is to provide a kind of prestressing force assembled UHPC overpass and its construction parties Method, it is structurally reasonable, easy to operate, it is high from heavy and light, intensity, it can be widely used in large span foot bridge field in science of bridge building.
The technical scheme is that a kind of prestressing force assembled UHPC overpass, including bridge pier, it is set below bridge pier It is equipped with support stake, the U-shaped body of a bridge using UHPC pouring molding is provided with above bridge pier along bridge floor extending direction, in the U-shaped body of a bridge It is provided with rubber support between support stake, the U-shaped body of a bridge includes several U-shaped body of a bridge units, is provided in the U-shaped body of a bridge Bent-up bar is provided with longitudinal support beam and lateral support beam below U-shaped body of a bridge unit.
Further, the U-shaped body of a bridge unit includes transverse slat, and transverse slat two sides are provided with side plate.
Further, setting is provided with prestress hole on transverse slat and side plate.
Further, stirrup is provided in transverse slat, longitudinal support beam and lateral support beam.
Another technical solution provided by the invention is a kind of construction method of prestressing force assembled UHPC overpass, Including the prestressing force assembled UHPC overpass:
(1) in factory that U-shaped body of a bridge unit is prefabricated according to span and the scope of application and load demand, in prefabricated U-shaped bridge During body unit, need to reserve prestress hole in the transverse slat and side plate of U-shaped body of a bridge unit, while in U-shaped body of a bridge unit Every 200mm, bent-up bar is set;
(2) prefabricated U-shaped body of a bridge unit is transported to scene to splice, using post stretching prestressed reinforcement of tensioning, then It is in the milk in prestress hole, then carries out smearing slurry processing in the splicing seams between adjacent U-shaped body of a bridge unit.
Compared with prior art, the beneficial effects of the present invention are: structure of the invention is reasonable, easy to operate, from heavy and light, intensity Height can be widely used in large span foot bridge field in science of bridge building.
To can be more clearly understood the above objects, features and advantages of the present invention, with reference to the accompanying drawing to the present invention Specific embodiment elaborate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the U-shaped body of a bridge unit of the present invention;
Fig. 3 is the main view of Fig. 2 of the embodiment of the present invention;
In figure: 100- bridge pier;200- supports stake;The 300-U type body of a bridge;310-U type body of a bridge unit;311- bent-up bar;312- is vertical To backbar;313- lateral support beam;314- transverse slat;315- side plate;316- prestress hole;317- stirrup;400- rubber support.
Specific embodiment
As shown in Fig. 1 ~ 3, a kind of prestressing force assembled UHPC overpass, including bridge pier, branch is provided with below bridge pier Stake is supportted, is provided with the U-shaped body of a bridge using UHPC pouring molding above bridge pier along bridge floor extending direction, in the U-shaped body of a bridge and support It is provided with rubber support between stake, the U-shaped body of a bridge includes several U-shaped body of a bridge units, is provided in the U-shaped body of a bridge and bends up steel Muscle is provided with longitudinal support beam and lateral support beam below U-shaped body of a bridge unit.Bent-up bar can enhance U-shaped body of a bridge unit Intensity, longitudinal support beam and lateral support beam can play supporting role to U-shaped body of a bridge unit.UHPC has from heavy and light, intensity is high, The characteristics such as tension resistance performance is good, durability and fire resistance are good are suitable for large span and build, and improve conventional concrete self weight Greatly, easy to crack, be unsuitable for that large span construction and steel construction cost are high, maintenance expense is high, easily get rusty, the disadvantage of durability difference.
In the present embodiment, the U-shaped body of a bridge unit includes transverse slat, and transverse slat two sides are provided with side plate.
In the present embodiment, setting is provided with prestress hole on transverse slat and side plate.By the way that prestress hole is arranged, it is convenient for U The splicing of type body of a bridge unit can the grouting in prestress hole when U-shaped body of a bridge unit spliced.
In the present embodiment, stirrup is provided in transverse slat, longitudinal support beam and lateral support beam.Stirrup can enhance cross The intensity of plate, longitudinal support beam and lateral support beam.
Another technical solution provided by the invention is a kind of construction method of prestressing force assembled UHPC overpass, Including the prestressing force assembled UHPC overpass:
(1) in factory that U-shaped body of a bridge unit is prefabricated according to span and the scope of application and load demand, in prefabricated U-shaped bridge During body unit, need to reserve prestress hole in the transverse slat and side plate of U-shaped body of a bridge unit, while in U-shaped body of a bridge unit Every 200mm, bent-up bar is set;
(2) prefabricated U-shaped body of a bridge unit is transported to scene to splice, using post stretching prestressed reinforcement of tensioning, then It is in the milk in prestress hole, then carries out smearing slurry processing in the splicing seams between adjacent U-shaped body of a bridge unit.
Aforesaid operations process and software and hardware configuration are only used as presently preferred embodiments of the present invention, are not intended to limit the present invention The scope of the patents, it is all using equivalents made by description of the invention and accompanying drawing content, be applied directly or indirectly in phase Technical field is closed, is included within the scope of the present invention.

Claims (5)

1. a kind of prestressing force assembled UHPC overpass, it is characterised in that: including bridge pier, support is provided with below bridge pier Stake, is provided with the U-shaped body of a bridge using UHPC pouring molding along bridge floor extending direction above bridge pier, in the U-shaped body of a bridge and support stake Between be provided with rubber support, the U-shaped body of a bridge includes several U-shaped body of a bridge units, is provided in the U-shaped body of a bridge and bends up steel Muscle is provided with longitudinal support beam and lateral support beam below U-shaped body of a bridge unit.
2. prestressing force assembled UHPC overpass according to claim 1, it is characterised in that: the U-shaped body of a bridge unit Including transverse slat, transverse slat two sides are provided with side plate.
3. prestressing force assembled UHPC overpass according to claim 1, it is characterised in that: set on transverse slat and side plate It sets and is provided with prestress hole.
4. prestressing force assembled UHPC overpass according to claim 1 or 2, it is characterised in that: in transverse slat, Zong Xiangzhi Stirrup is provided in bolster and lateral support beam.
5. a kind of construction method of prestressing force assembled UHPC overpass, including prestressing force as described in claim 1 assembly Formula UHPC overpass, it is characterised in that:
It is in factory that U-shaped body of a bridge unit is prefabricated according to span and the scope of application and load demand, in the prefabricated U-shaped body of a bridge During unit, need to reserve prestress hole in the transverse slat and side plate of U-shaped body of a bridge unit, while every in U-shaped body of a bridge unit Every 200mm, bent-up bar is set;
Prefabricated U-shaped body of a bridge unit is transported to scene to splice, using post stretching prestressed reinforcement of tensioning, then toward pre- Stress is in the milk in hole, then carries out smearing slurry processing in the splicing seams between adjacent U-shaped body of a bridge unit.
CN201910218618.8A 2019-03-21 2019-03-21 Prestressed assembled UHPC pedestrian overpass and construction method thereof Active CN109797642B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910218618.8A CN109797642B (en) 2019-03-21 2019-03-21 Prestressed assembled UHPC pedestrian overpass and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910218618.8A CN109797642B (en) 2019-03-21 2019-03-21 Prestressed assembled UHPC pedestrian overpass and construction method thereof

Publications (2)

Publication Number Publication Date
CN109797642A true CN109797642A (en) 2019-05-24
CN109797642B CN109797642B (en) 2023-12-08

Family

ID=66563895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910218618.8A Active CN109797642B (en) 2019-03-21 2019-03-21 Prestressed assembled UHPC pedestrian overpass and construction method thereof

Country Status (1)

Country Link
CN (1) CN109797642B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112921826A (en) * 2021-01-27 2021-06-08 太仓市路桥工程有限公司 Annular corridor pedestrian bridge of quick construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101562603B1 (en) * 2014-12-30 2015-10-23 주식회사 스펙엔지니어링와이엔피 Precast pedestrian crossover bridge and the construction method therefor
CN205576747U (en) * 2016-04-14 2016-09-14 中交第二航务工程局有限公司 Cast -in -place panel braced system of U type roof beam
CN109057148A (en) * 2018-09-29 2018-12-21 中路杜拉国际工程股份有限公司 Ultra-high performance concrete is without regular reinforcement Prestressed U type beam and its construction method
CN209798504U (en) * 2019-03-21 2019-12-17 福州大学 Prestress assembled UHPC pedestrian overpass

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101562603B1 (en) * 2014-12-30 2015-10-23 주식회사 스펙엔지니어링와이엔피 Precast pedestrian crossover bridge and the construction method therefor
CN205576747U (en) * 2016-04-14 2016-09-14 中交第二航务工程局有限公司 Cast -in -place panel braced system of U type roof beam
CN109057148A (en) * 2018-09-29 2018-12-21 中路杜拉国际工程股份有限公司 Ultra-high performance concrete is without regular reinforcement Prestressed U type beam and its construction method
CN209798504U (en) * 2019-03-21 2019-12-17 福州大学 Prestress assembled UHPC pedestrian overpass

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄卿维;吴永银;杜任远;陈宝春;陈宜言;吴庆雄;: "活性粉末混凝土人行天桥试设计研究", 广西大学学报(自然科学版), no. 04 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112921826A (en) * 2021-01-27 2021-06-08 太仓市路桥工程有限公司 Annular corridor pedestrian bridge of quick construction
CN112921826B (en) * 2021-01-27 2022-08-02 太仓市路桥工程有限公司 Annular corridor pedestrian bridge of quick construction

Also Published As

Publication number Publication date
CN109797642B (en) 2023-12-08

Similar Documents

Publication Publication Date Title
CN108677685B (en) Ultra-high-performance concrete-part steel beam combined bent cap and construction method thereof
CN106245511B (en) A kind of two-fold shape combined beam structure and its construction method
CN102352597B (en) Prestressed ultrahigh-performance concrete continuous box girder bridge and construction method thereof
CN108729354B (en) Downstream bridge movable formwork and construction method thereof
CN204530418U (en) A kind of steel plate combination beam bridge
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN103388303A (en) Horizontal splicing corrugated steel web plate combined box girder and construction method
CN102877407B (en) Concrete continuous box girder of corrugated steel web for curved bridge
CN2878478Y (en) Fabricated grooved beam for rear extending pre-stress segment pre-formation
KR20010036486A (en) Method for designing and fabricating multi-step tension prestressed girder
CN209323367U (en) Steel reinforced concrete composite beam bridge panel assembly seam construction based on early strong high performance concrete
CN110644349A (en) Superstructure for wide box girder and short tower cable-stayed bridge and construction method
CN106284046A (en) Bridge steel concrete equals curved combination beam manufacture method
CN109137760A (en) The active reinforcement means of multispan normal reinforced concrete beam bridge
CN203559329U (en) Steel-RPC (reactive powder concrete) combined bridge
CN109797642A (en) Prestressing force assembled UHPC overpass and its construction method
CN211340366U (en) Continuous combined beam bridge
CN210797241U (en) Prestressed high-strength regenerated hybrid continuous rigid frame bridge system
CN209798504U (en) Prestress assembled UHPC pedestrian overpass
CN202323669U (en) Prestressed ultrahigh-performance concrete continuous box girder bridge
CN203383137U (en) Transversely assembled corrugated steel web combined box girder
CN101793012A (en) Novel non-bracket bridge constructing method
CN108978490B (en) Construction method of continuous beam-arch combined beam body and continuous beam-arch combined beam body
CN103669193A (en) Laterally spliced combination T beam with wavy steel webs and construction method thereof
CN211368335U (en) Bridge small box girder transverse connection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant