CN109784846A - It is a kind of to judge whether list generates the method and computer equipment of subordinate list according to quantity - Google Patents

It is a kind of to judge whether list generates the method and computer equipment of subordinate list according to quantity Download PDF

Info

Publication number
CN109784846A
CN109784846A CN201811641031.XA CN201811641031A CN109784846A CN 109784846 A CN109784846 A CN 109784846A CN 201811641031 A CN201811641031 A CN 201811641031A CN 109784846 A CN109784846 A CN 109784846A
Authority
CN
China
Prior art keywords
list
field
subordinate list
subordinate
public field
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811641031.XA
Other languages
Chinese (zh)
Other versions
CN109784846B (en
Inventor
黄子礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hua Min Tongda Information Technology Co Ltd
Original Assignee
Fujian Hua Min Tongda Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hua Min Tongda Information Technology Co Ltd filed Critical Fujian Hua Min Tongda Information Technology Co Ltd
Priority to CN201811641031.XA priority Critical patent/CN109784846B/en
Publication of CN109784846A publication Critical patent/CN109784846A/en
Application granted granted Critical
Publication of CN109784846B publication Critical patent/CN109784846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Stored Programmes (AREA)

Abstract

The present invention provides a kind of method for judging whether list generates subordinate list according to quantity, and 1, establish public field table, and define different public field groups;2, the subordinate list template library needed for being established according to different engineering project demands, and define the citation criteria of each general subordinate list;3, each subordinate list chooses public field group from public field table and carries out field definition and bind;4, the inspection item in the list of Yao Shengcheng subordinate list chooses public field group from public field table and carries out field definition and bind;5, subordinate list and related list are associated by public field table, and choose corresponding subordinate list;6, parameter list is set, and calculating should fill out data volume;7, setting can fill out the data volume upper limit;8, judgement should fill out data volume and can fill out data volume, fill in Area generation subordinate list to beyond data.The present invention also provides a kind of computer equipments, increase table utilization rate, reduce resource waste, convenient for the unified management of list data.

Description

It is a kind of to judge whether list generates the method and computer equipment of subordinate list according to quantity
Technical field
The present invention relates to communication technique field more particularly to a kind of methods for judging according to quantity whether list generates subordinate list And computer equipment.
Background technique
At present in engineering project, since data volume is bigger, the situation under data are filled in not in the table is encountered when software When, mainly realized in such a way that table adds page or manually slotting row.Wherein, it is handled by the way of table plus page When, adding page is the table for increasing one page as former table content, since only the overabundance of data of some or subitem time needs Newly plus table in fill in, so newly plus table in will appear only subitem time have a value and other it is secondary be all blank The case where, this will cause the wasting of resources;And when being handled in such a way that table inserts row manually, slotting guild causes table style The variation of typesetting is not easy to the unified management of list data.
Application No. is 201410370145.0 Chinese inventions filed on 07 30th, 2014, discloses one kind and be based on The statistics list rapid generation and system of metadata, system include metadatabase management module and Report Customization module;Member Database management module includes: attribute metadata library definition unit, measurement unit metadatabase definition unit, classification metadata library Definition unit and shared index metadatabase definition unit;Report Customization module includes report attribute definition unit, template definition Unit, index definition unit, report style definition unit, administration authority definition unit, access definition unit, preview definition are single Member;By configuring structure of report rule, when structure of report changes, Report Engine voluntarily adjusts report knot according to variation Structure generates new report, improves Report Customization flexibility;Using management model level of control title and Criterion Attribute, When index name and Criterion Attribute change, it is only necessary to modify the metadata in metadatabase, simplify investigation index customization Mode.The invention is to be related to the generation method of list, do not refer in main table inadequate number completion according to when, the process how to solve. Therefore, the invention and the present invention are distinct.
Summary of the invention
One of the technical problem to be solved in the present invention, is to provide and a kind of judges whether list generates subordinate list according to quantity Method increases table utilization rate, reduces resource waste, convenient for the unified management of list data.
One of problem of the invention is achieved in that
A method of judging whether list generates subordinate list according to quantity, comprising the following steps:
Step S1, public field table is established in project management system, and according to different engineering projects in the public affairs With defining different public field groups on field list;
Step S2, the subordinate list template library needed for being established in project management system according to different engineering project demands, And the citation criteria of each general subordinate list in subordinate list template library is defined, according to the table of the different general subordinate lists of different engineering projects setting Head Section and fill substance area form a plurality of independent subordinate lists;
Step S3, each subordinate list chooses public field group from public field table and carries out field definition, passes through public field Group and the binding of public field table;
Step S4, the inspection item in the list of Yao Shengcheng subordinate list chooses public field group from public field table and carries out word Duan Dingyi is bound by public field group and public field table;
Step S5, subordinate list and related list are associated by public field table, according in the list of subordinate list to be generated The format and content of inspection item choose corresponding subordinate list;
Step S6, before filling in different lists, data volume setting pair that project management system must fill in table The parameter list answered, project management system calculate different inspection items in list according to the numerical value filled in the parameter list Data volume should be filled out;
Step S7, set the fill substance area of different inspection items in list in project management system can number completion According to the amount upper limit;
Step S8, into after filling in form interface, project management system judges in list answering for different inspection items Filling out data volume and can fill out data volume, automatically generate corresponding independent subordinate list to the inspection item beyond the data amount of filling in, subordinate list with The format of correspondence proving project is consistent in list.
Further, the step S3 specifically:
After choosing subordinate list, then public field table is chosen, addition group field column or corresponding field are chosen from public field table Column chooses corresponding public field group as the field in subordinate list from addition group field column or corresponding field column, thus will Each subordinate list is bound by public field group and public field table.
Further, the step S4 specifically:
After the list for choosing subordinate list to be generated, then public field table is chosen, addition group field is chosen from public field table Corresponding public field group is chosen as the word in list from addition group field column or corresponding field column in column or corresponding field column Section, is thus bound each subordinate list by public field group and public field table.
Further, in the step S8 further include:
Step S9, when project management system calculate certain inspection items in list should fill out data volume without departing from The data volume upper limit can be filled out, but when actual demand will add subordinate list, user adds the subordinate list of the inspection item in list manually, increased Project management system changes the subordinate list state of the inspection item in subordinate list display field automatically while adding subordinate list.
The second technical problem to be solved by the present invention is to provide a kind of computer equipment, increases table utilization rate, subtract The wasting of resources is lacked, convenient for the unified management of list data.
The two of problem of the invention, are achieved in that
A kind of computer equipment can be run on a memory and on a processor including memory, processor and storage Computer program, the processor perform the steps of when executing described program
Step S1, public field table is established in project management system, and according to different engineering projects in the public affairs With defining different public field groups on field list;
Step S2, the subordinate list template library needed for being established in project management system according to different engineering project demands, And the citation criteria of each general subordinate list in subordinate list template library is defined, according to the table of the different general subordinate lists of different engineering projects setting Head Section and fill substance area form a plurality of independent subordinate lists;
Step S3, each subordinate list chooses public field group from public field table and carries out field definition, passes through public field Group and the binding of public field table;
Step S4, the inspection item in the list of Yao Shengcheng subordinate list chooses public field group from public field table and carries out word Duan Dingyi is bound by public field group and public field table;
Step S5, subordinate list and related list are associated by public field table, according in the list of subordinate list to be generated The format and content of inspection item choose corresponding subordinate list;
Step S6, before filling in different lists, data volume setting pair that project management system must fill in table The parameter list answered, project management system calculate different inspection items in list according to the numerical value filled in the parameter list Data volume should be filled out;
Step S7, set the fill substance area of different inspection items in list in project management system can number completion According to the amount upper limit;
Step S8, into after filling in form interface, project management system judges in list answering for different inspection items Filling out data volume and can fill out data volume, automatically generate corresponding independent subordinate list to the inspection item beyond the data amount of filling in, subordinate list with The format of correspondence proving project is consistent in list.
Further, the step S3 specifically:
After choosing subordinate list, then public field table is chosen, addition group field column or corresponding field are chosen from public field table Column chooses corresponding public field group as the field in subordinate list from addition group field column or corresponding field column, thus will Each subordinate list is bound by public field group and public field table.
Further, the step S4 specifically:
After the list for choosing subordinate list to be generated, then public field table is chosen, addition group field is chosen from public field table Corresponding public field group is chosen as the word in list from addition group field column or corresponding field column in column or corresponding field column Section, is thus bound each subordinate list by public field group and public field table.
Further, in the step S8 further include:
Step S9, when project management system calculate certain inspection items in list should fill out data volume without departing from The data volume upper limit can be filled out, but when actual demand will add subordinate list, user adds the subordinate list of the inspection item in list manually, increased Project management system changes the subordinate list state of the inspection item in subordinate list display field automatically while adding subordinate list.
The present invention has the advantage that a certain region that the present invention realizes table can increase automatically when not enough filling in data The specific subordinate list in the region breaks the limitation that list integrally adds page to fill in when the data of conventional list are not enough filled in, increases table Utilization rate reduces resource waste, convenient for the unified management of list data.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1, which is that the present invention is a kind of, judges whether list generates the method execution flow chart of subordinate list according to quantity.
Fig. 2 is the arrangement schematic diagram of the measured value of list in the present invention, deviation and design value.
Fig. 3 is that public field table establishes schematic diagram in the present invention.
Fig. 4 is the schematic diagram of subordinate list template library in the present invention.
Fig. 5 is the frame diagram of the general subordinate list of inspection report in the present invention.
Fig. 6 is the schematic diagram of subordinate list field definition in the present invention.
Fig. 7 is the selection schematic diagram of subordinate list field in the present invention.
Fig. 8 is the schematic diagram of main table extraction group word selection section from addition group field frame in the present invention.
Fig. 9 is the schematic diagram that main table selectes corresponding field frame in the present invention.
Figure 10 is the schematic diagram that main table extracts Optional Field from corresponding field frame in the present invention.
Figure 11 is that main table has selected the effect picture after field in the present invention.
Figure 12 is subordinate list association schematic diagram corresponding with main table in the present invention.
Figure 13 is the specification schematic diagram that points are detected in the present invention.
Figure 14 is that inspection frequency control representation is intended in the present invention
Figure 15 is the setting schematic diagram of the detection points of inspection report in the present invention.
Figure 16 is one of the effect picture that subordinate list generates in the present invention.
Figure 17 is the two of the effect picture that subordinate list generates in the present invention.
Figure 18 is the three of the effect picture that subordinate list generates in the present invention.
Specific embodiment
To be clearer and more comprehensible the present invention, now with a preferred embodiment, and attached drawing is cooperated to be described in detail below.
As shown in Figure 1, a kind of method for judging whether list generates subordinate list according to quantity of the invention, including following step It is rapid:
Step S1, public field table is established in project management system, and according to different engineering projects in the public affairs With defining different public field groups on field list;
Step S2, the subordinate list template library needed for being established in project management system according to different engineering project demands, There is different general subordinate lists in subordinate list template library, engineering project subordinate list type that may be present added in general subordinate list library, There is new requirement that can add new template at any time;And the citation criteria of each general subordinate list in subordinate list template library is defined, according to not With engineering project setting, the gauge outfit area and fill substance area of different general subordinate lists, form a plurality of independent subordinate lists;Subordinate list pattern It is identical with list needed for project, it is divided into two regions: gauge outfit area and fill substance area;
Step S3, each subordinate list chooses public field group from public field table and carries out field definition, passes through public field Group and the binding of public field table;Specifically: after choosing subordinate list, then public field table is chosen, addition is chosen from public field table Corresponding public field group is chosen as subordinate list from addition group field column or corresponding field column in group field column or corresponding field column In field, thus each subordinate list is bound and (is associated with) with public field table by public field group, different is attached The field type of table binding is different;
Step S4, the inspection item in the list of Yao Shengcheng subordinate list chooses public field group from public field table and carries out word Duan Dingyi is bound by public field group and public field table;Specifically: after the list for choosing subordinate list to be generated, then choose public affairs Field list altogether chooses addition group field column or corresponding field column from public field table, from addition group field column or corresponding field Corresponding public field group is chosen in column as the field in list, each subordinate list is thus passed through into public field group and public Field list is bound (association);After clicking addition group field column or corresponding field column, it is fixed in public field table to will pop up The public field group of justice, field needed for selection will generate the list of subordinate list establish different types of field groups, click after determining New field groups will be generated in following list.Form fields association is identical with subordinate list field correlating method;
Step S5, subordinate list and related list are associated by public field table, according in the list of subordinate list to be generated The format and content of inspection item choose corresponding subordinate list;
Step S6, before filling in different lists, data volume setting pair that project management system must fill in table The parameter list answered, project management system calculate different inspection items in list according to the numerical value filled in the parameter list Data volume should be filled out;
Step S7, set the fill substance area of different inspection items in list in project management system can number completion According to the amount upper limit;
Step S8, into after filling in form interface, project management system judges in list answering for different inspection items It fills out data volume and data volume can be filled out, corresponding independent subordinate list, engineering item are automatically generated to the inspection item beyond the data amount of filling in The state that mesh management system changes the inspection item automatically becomes subordinate list form, the lattice of correspondence proving project in subordinate list and list Formula is consistent;
Step S9, when project management system calculate certain inspection items in list should fill out data volume without departing from The data volume upper limit can be filled out, but when actual demand will add subordinate list, user adds the subordinate list of the inspection item in list manually, increased Project management system changes the subordinate list state of the inspection item in subordinate list display field automatically while adding subordinate list.
As shown in Figure 1, a kind of computer equipment of the invention, including memory, processor and storage are on a memory simultaneously The computer program that can be run on a processor, the processor perform the steps of when executing described program
Step S1, public field table is established in project management system, and according to different engineering projects in the public affairs With defining different public field groups on field list;
Step S2, the subordinate list template library needed for being established in project management system according to different engineering project demands, There is different general subordinate lists in subordinate list template library, engineering project subordinate list type that may be present added in subordinate list template library, There is new requirement that can add new template at any time;And the citation criteria of each general subordinate list in subordinate list template library is defined, according to not With engineering project setting, the gauge outfit area and fill substance area of different general subordinate lists, form a plurality of independent subordinate lists;Subordinate list pattern It is identical with list needed for project, it is divided into two regions: gauge outfit area and fill substance area;
Step S3, each subordinate list chooses public field group from public field table and carries out field definition, passes through public field Group and the binding of public field table;Specifically: after choosing subordinate list, then public field table is chosen, addition is chosen from public field table Corresponding public field group is chosen as subordinate list from addition group field column or corresponding field column in group field column or corresponding field column In field, thus each subordinate list is bound and (is associated with) with public field table by public field group, different is attached The field type of table binding is different;
Step S4, the inspection item in the list of Yao Shengcheng subordinate list chooses public field group from public field table and carries out word Duan Dingyi is bound by public field group and public field table;Specifically: after the list for choosing subordinate list to be generated, then choose public affairs Field list altogether chooses addition group field column or corresponding field column from public field table, from addition group field column or corresponding field Corresponding public field group is chosen in column as the field in list, each subordinate list is thus passed through into public field group and public Field list is bound (association);After clicking addition group field column or corresponding field column, it is fixed in public field table to will pop up The public field group of justice, field needed for selection will generate the list of subordinate list establish different types of field groups, click after determining New field groups will be generated in following list.Form fields association is identical with subordinate list field correlating method;
Step S5, subordinate list and related list are associated by public field table, according in the list of subordinate list to be generated The format and content of inspection item choose corresponding subordinate list;
Step S6, before filling in different lists, data volume setting pair that project management system must fill in table The parameter list answered, project management system calculate different inspection items in list according to the numerical value filled in the parameter list Data volume should be filled out;
Step S7, set the fill substance area of different inspection items in list in project management system can number completion According to the amount upper limit;
Step S8, into after filling in form interface, project management system judges in list answering for different inspection items It fills out data volume and data volume can be filled out, corresponding independent subordinate list, engineering item are automatically generated to the inspection item beyond the data amount of filling in The state that mesh management system changes the inspection item automatically becomes subordinate list form, the lattice of correspondence proving project in subordinate list and list Formula is consistent;
Step S9, when project management system calculate certain inspection items in list should fill out data volume without departing from The data volume upper limit can be filled out, but when actual demand will add subordinate list, user adds the subordinate list of the inspection item in list manually, increased Project management system changes the subordinate list state of the inspection item in subordinate list display field automatically while adding subordinate list.
By taking highway engineering practical operation as an example:
1, establish public field table: list, which actually fills out, has measured value, deviation, design value etc., as shown in Fig. 2, institute When establishing public field table, different types of public field group can be established, every group includes serial number, title, data type, length Degree, typing box type etc., as shown in Figure 3;
2, it after public field group has been established, establishes and draws the general subordinate list of definition.
(1) the general subordinate list needed for being established according to engineering project demand, as shown in Figure 4 and Figure 5;
(2) general subordinate list is defined, the citation criteria of detection project, tolerance deviation is mainly defined;
3, subordinate list is associated with public field group, and association process is shown in as shown in Figure 6 and Figure 7;It is general to every by the above process Subordinate list carries out field binding;
4, Yao Shengcheng subordinate list list choose field groups and and public field group binding, such as " Tetranychus turkestani quality in site inspection Test report " concrete operations are as shown in Figs. 8 to 11;
5, general subordinate list is selected to be associated with related list, concrete operations are as shown in figure 12;
6, as shown in Figure 13 and Figure 14, input value is respectively as follows: detection road section length 1000.000m, detects section bend number It is 4 for 4, detection section number of track-lines, flexure, which should fill in data volume by the practical list of calculating of system, should be at 160 points;
7, setting regions fills out the upper limit of the number;It is 48 that points, which can be filled out, such as the normal list of " deflection value " detection project, Setting can fill out 24 points of the upper limit of the number when definition, as shown in figure 15;Data volume can be filled out to set, should fill out data volume is basis What project or code requirement calculated, such as the amount detection such as code requirement of flexure;
8, project management system judges that exceed this at 160 points of the data volume that should be filled in of flexure inspection item in list Item time setting fills in 24 points of the upper limit, and the state that system changes the region automatically becomes subordinate list form, as shown in figure 16;Into attached After table it can be seen that as list format, the independent subordinate list of the check item time is as shown in figure 17;
If 9, the calculated data volume of some district systems is without departing from region, but when actual demand will add subordinate list, The subordinate list of this time can also be added manually.Such as following figure effect: the subordinate list of addition compactness check item, system increase subordinate list manually While the district system change the state in the region automatically, as shown in figure 18.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered according to modification and variation equivalent made by spirit of the invention
In scope of the claimed protection of the invention.

Claims (8)

1. a kind of method for judging whether list generates subordinate list according to quantity, it is characterised in that: the following steps are included:
Step S1, public field table is established in project management system, and according to different engineering projects in the public word Different public field groups is defined on segment table;
Step S2, the subordinate list template library needed for being established in project management system according to different engineering project demands, and it is fixed The citation criteria of each general subordinate list in adopted subordinate list template library, according to the gauge outfit area of the different general subordinate lists of different engineering projects setting With fill substance area, a plurality of independent subordinate lists are formed;
Step S3, each subordinate list chooses public field group from public field table and carries out field definition, by public field group and The binding of public field table;
Step S4, it is fixed to choose public field group progress field from public field table for the inspection item in the list of Yao Shengcheng subordinate list Justice is bound by public field group and public field table;
Step S5, subordinate list and related list are associated by public field table, according to the inspection in the list of subordinate list to be generated The format and content for looking into project chooses corresponding subordinate list;
Step S6, before filling in different lists, the data volume setting that project management system must fill in table is corresponding Parameter list, project management system calculate in list should filling out for different inspection items according to the numerical value filled in the parameter list Data volume;
Step S7, the fill substance area of different inspection items in list is set in project management system fills out data volume The upper limit;
Step S8, into after filling in form interface, what project management system judged in list different inspection items answers number completion According to amount and data volume can be filled out, corresponding independent subordinate list, subordinate list and list are automatically generated to the inspection item beyond the data amount of filling in The format of middle correspondence proving project is consistent.
2. a kind of method for judging whether list generates subordinate list according to quantity according to claim 1, it is characterised in that: institute State step S3 specifically:
After choosing subordinate list, then public field table is chosen, addition group field column or corresponding field column are chosen from public field table, from Corresponding public field group is chosen as the field in subordinate list in addition group field column or corresponding field column, it thus will be each attached Table is bound by public field group and public field table.
3. a kind of method for judging whether list generates subordinate list according to quantity according to claim 1, it is characterised in that: institute State step S4 specifically:
After the list for choosing subordinate list to be generated, then choose public field table, chosen from public field table addition group field column or Corresponding field column, chooses corresponding public field group as the field in list from addition group field column or corresponding field column, Thus each subordinate list is bound by public field group and public field table.
4. a kind of method for judging whether list generates subordinate list according to quantity according to claim 1, it is characterised in that: institute It states in step S8 further include:
Step S9, when what project management system calculated certain inspection items in list should fill out data volume without departing from can fill out The data volume upper limit, but when actual demand will add subordinate list, user adds the subordinate list of the inspection item in list manually, increases attached Project management system changes the subordinate list state of the inspection item in subordinate list display field automatically while table.
5. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor Calculation machine program, which is characterized in that the processor performs the steps of when executing described program
Step S1, public field table is established in project management system, and according to different engineering projects in the public word Different public field groups is defined on segment table;
Step S2, the subordinate list template library needed for being established in project management system according to different engineering project demands, and it is fixed The citation criteria of each general subordinate list in adopted subordinate list template library, according to the gauge outfit area of the different general subordinate lists of different engineering projects setting With fill substance area, a plurality of independent subordinate lists are formed;
Step S3, each subordinate list chooses public field group from public field table and carries out field definition, by public field group and The binding of public field table;
Step S4, it is fixed to choose public field group progress field from public field table for the inspection item in the list of Yao Shengcheng subordinate list Justice is bound by public field group and public field table;
Step S5, subordinate list and related list are associated by public field table, according to the inspection in the list of subordinate list to be generated The format and content for looking into project chooses corresponding subordinate list;
Step S6, before filling in different lists, the data volume setting that project management system must fill in table is corresponding Parameter list, project management system calculate in list should filling out for different inspection items according to the numerical value filled in the parameter list Data volume;
Step S7, the fill substance area of different inspection items in list is set in project management system fills out data volume The upper limit;
Step S8, into after filling in form interface, what project management system judged in list different inspection items answers number completion According to amount and data volume can be filled out, corresponding independent subordinate list, subordinate list and list are automatically generated to the inspection item beyond the data amount of filling in The format of middle correspondence proving project is consistent.
6. a kind of computer equipment according to claim 5, it is characterised in that: the step S3 specifically:
After choosing subordinate list, then public field table is chosen, addition group field column or corresponding field column are chosen from public field table, from Corresponding public field group is chosen as the field in subordinate list in addition group field column or corresponding field column, it thus will be each attached Table is bound by public field group and public field table.
7. a kind of computer equipment according to claim 5, it is characterised in that: the step S4 specifically:
After the list for choosing subordinate list to be generated, then choose public field table, chosen from public field table addition group field column or Corresponding field column, chooses corresponding public field group as the field in list from addition group field column or corresponding field column, Thus each subordinate list is bound by public field group and public field table.
8. a kind of computer equipment according to claim 5, it is characterised in that: in the step S8 further include:
Step S9, when what project management system calculated certain inspection items in list should fill out data volume without departing from can fill out The data volume upper limit, but when actual demand will add subordinate list, user adds the subordinate list of the inspection item in list manually, increases attached Project management system changes the subordinate list state of the inspection item in subordinate list display field automatically while table.
CN201811641031.XA 2018-12-29 2018-12-29 Method for judging whether form generates attached form or not according to quantity and computer equipment Active CN109784846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811641031.XA CN109784846B (en) 2018-12-29 2018-12-29 Method for judging whether form generates attached form or not according to quantity and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811641031.XA CN109784846B (en) 2018-12-29 2018-12-29 Method for judging whether form generates attached form or not according to quantity and computer equipment

Publications (2)

Publication Number Publication Date
CN109784846A true CN109784846A (en) 2019-05-21
CN109784846B CN109784846B (en) 2022-09-13

Family

ID=66499495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811641031.XA Active CN109784846B (en) 2018-12-29 2018-12-29 Method for judging whether form generates attached form or not according to quantity and computer equipment

Country Status (1)

Country Link
CN (1) CN109784846B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113032633A (en) * 2021-04-15 2021-06-25 内蒙古金财信息技术有限公司 Method for customizing table by using reference data item

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763433A (en) * 2010-01-12 2010-06-30 浪潮(北京)电子信息产业有限公司 Data storage system and method
CN103544572A (en) * 2013-11-05 2014-01-29 镇江硅谷信息科技有限公司 Refined management system
CN103942184A (en) * 2013-12-30 2014-07-23 远光软件股份有限公司 Collocation method, generation method and system with addition item summary statement
US20160132557A1 (en) * 2014-11-10 2016-05-12 International Business Machines Corporation Materialized query tables with shared data
CN107818114A (en) * 2016-09-14 2018-03-20 ***通信有限公司研究院 A kind of data processing method, device and database
CN108345602A (en) * 2017-01-22 2018-07-31 株式会社日立制作所 Data multidimensional modeling and data multidimensional modeling method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763433A (en) * 2010-01-12 2010-06-30 浪潮(北京)电子信息产业有限公司 Data storage system and method
CN103544572A (en) * 2013-11-05 2014-01-29 镇江硅谷信息科技有限公司 Refined management system
CN103942184A (en) * 2013-12-30 2014-07-23 远光软件股份有限公司 Collocation method, generation method and system with addition item summary statement
US20160132557A1 (en) * 2014-11-10 2016-05-12 International Business Machines Corporation Materialized query tables with shared data
CN107818114A (en) * 2016-09-14 2018-03-20 ***通信有限公司研究院 A kind of data processing method, device and database
CN108345602A (en) * 2017-01-22 2018-07-31 株式会社日立制作所 Data multidimensional modeling and data multidimensional modeling method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113032633A (en) * 2021-04-15 2021-06-25 内蒙古金财信息技术有限公司 Method for customizing table by using reference data item

Also Published As

Publication number Publication date
CN109784846B (en) 2022-09-13

Similar Documents

Publication Publication Date Title
TWI663553B (en) Method and device for generating contract
CN101867494B (en) Soft hardware performance monitoring method based on monitoring template, and system thereof
CN114035773B (en) Configuration-based low-code form development method, system and device
CN104063361B (en) Report design method and Report Form Design system
CN109445783A (en) By the construction method and device of the dynamic configuration application of service driving
CN101694649A (en) Report generating system and method of cluster monitoring
CN111145011B (en) Banking system building method and device
CN101158940A (en) Method and device for dwindling character stuffing in target region
CN106250110A (en) Set up the method and device of model
CN113722289A (en) Method, device, electronic equipment and medium for constructing data service
CN111190814B (en) Method and device for generating software test case, storage medium and terminal
US20100229083A1 (en) Screen display program generating apparatus, screen display system, computer readable storage medium having stored therein a computer program causing a computer to function as the screen display program generating apparatus, and screen display program generating method
CN109784846A (en) It is a kind of to judge whether list generates the method and computer equipment of subordinate list according to quantity
CN106502977B (en) A kind of sheet disposal method and form system based on B/S framework
JP2005032079A (en) Project pre-evaluation method
CN111401023A (en) Report generation method and device, server and storage medium
US20130124484A1 (en) Persistent flow apparatus to transform metrics packages received from wireless devices into a data store suitable for mobile communication network analysis by visualization
JP2015158771A (en) Cloud type electronic cad system for circuit design and printed board design
CN103870624A (en) Simulation analysis template for hung crossbeam
CN115705462A (en) DRC test pattern generation method and device, electronic equipment and storage medium
CN114997813A (en) Flow chart generation method, device, equipment and storage medium
CN109597845B (en) Report configuration method, report configuration device, computer equipment and storage medium
CN114154095A (en) Page picture generation method, device, equipment and storage medium
JP2018032113A (en) Information management device and file management method
CN111797125A (en) Report creating method and device, electronic equipment and computer readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant