CN109779259A - A kind of cast-in-place structural foundation, suspension column screeder - Google Patents

A kind of cast-in-place structural foundation, suspension column screeder Download PDF

Info

Publication number
CN109779259A
CN109779259A CN201910172289.8A CN201910172289A CN109779259A CN 109779259 A CN109779259 A CN 109779259A CN 201910172289 A CN201910172289 A CN 201910172289A CN 109779259 A CN109779259 A CN 109779259A
Authority
CN
China
Prior art keywords
angle steel
suspension column
screeder
cast
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910172289.8A
Other languages
Chinese (zh)
Inventor
何怀旭
沈延弘
王珠明
许晓芳
王宗成
梁晓劼
黄长炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Construction Engineering Group Co., Ltd
FUJIAN JIANGONG GROUP Co.,Ltd.
Original Assignee
Fujian Construction Engineering Refco Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Construction Engineering Refco Group Ltd filed Critical Fujian Construction Engineering Refco Group Ltd
Priority to CN201910172289.8A priority Critical patent/CN109779259A/en
Publication of CN109779259A publication Critical patent/CN109779259A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The present invention provides a kind of cast-in-place structural foundation, suspension column screeder, the screeder includes two angle steel disposed in parallel, the U-shaped button of plural number and an at least harness cord screw rod, two angle steel are oppositely arranged on one side, it is another down and with ground in horizontally disposed, two angle steel it is opposite be provided with the sets of vias of plural groups in correspondence with each other on one side, the through-hole number of each sets of vias is at least two, the both ends of each angle steel are provided with U-shaped button, each U-shaped button is fixed on corresponding angle steel by nut, harness cord screw rod both ends are connected to the middle part of two angle steel by nut.The present invention can easily realize the planarization of foundation, suspension column ground, eliminate the gap of foundation, suspension column template and ground, reduce mortar and leak out to form hole and foundation, suspension column rotten and other issues from gap.

Description

A kind of cast-in-place structural foundation, suspension column screeder
[technical field]
The present invention relates to a kind of cast-in-place structural foundation, suspension column screeder.
[background technique]
Rotten of cast-in-place structural wall column foot is technical quality common fault common in cast-in-place structural construction, generates this quality problems The main reason for be: during wall, column casting and compacting of concrete, mortar leaks out in the gap between template and ground.The loss of mortar It causes surface coarse aggregate exposed, forms the quality problems of hole after concrete formation.In engineering practice, various sides are once used Formula eliminates the gap between template and ground to reduce the generation of rotten common quality defect of shear wall foundation.Mainly have by the way of: 1, manually reinforce floor leveling;2, gap is blocked with mortar;3, angle steel is fixed before installation template.But the above way work consuming consumptive material, There are stronger subjective judgement, implementation result depends on the sense of responsibility of operator, and practice effect is not satisfactory, traditional Way and deficiency.
It is listed below the existing several frequently seen technical solution for solving the problems, such as rotten, wall, suspension column and exists:
A, settling mode: reinforce mattess surface layer and receive light quality;Operating method: it is cleared off using aluminium alloy lath, people To judge ground flat degree;
There are problem and deficiencies: 1, considering from duration and material property, casting and compacting of concrete is mostly to carry on construction work at night, subjective judgement There are uncertainties;2, floor concrete pour smash process quality inspection review difficulty it is larger: concrete is arranged on a large scale before having intensity It looks into and is unfavorable for concrete surface receipts Seterolithography, the operation trace such as many footprints can be left instead, the concrete after having intensity is just It can not carry out detailed treatment;3, reinforcing bar gathers at shear wall and frame column and beam slab node, and operating space is limited, to better reality There are certain operation difficulties for existing ground flat degree;4, level and master of the impression quality of floor concrete mainly by operator See judgement.
B, settling mode: gap is blocked with mortar;Operating method: after wall, column template are installed, seam will be present with mortar It is stifled that the foundation of gap carries out plug;
There are problem and deficiencies: 1, wanting special messenger to count, it would still be possible to there is omission;2, it fills in stifled process mortar and dissipates leakage, influence text Bright construction;3, it is blocked after template installation in bottom, operating difficulties blocks quality and is difficult to control;4, the mortar of closure, after demoulding It is cleared up, material of taking a lot of work.
C, angle steel settling mode: is fixed before installation template;Operating method: before template installation, angle steel is fixed with steel nail The installation site of wall, column template is oriented in mattess;
There are problem and deficiencies: 1, the initial stage that the fixation of angle steel and dismounting are formed in concrete strength, plate face strong concrete Degree is insufficient, be easy to cause cast-in-place structural mass defect;2, angle steel is fixed with steel nail, and form is rough, and material is easy loss;3, cannot The gap of template and ground is solved from root, there are faulting of slab ends phenomenons at gap after demoulding.
[summary of the invention]
The technical problem to be solved in the present invention is to provide a kind of cast-in-place structural foundation, suspension column screeder, can be easily real Show the planarization of foundation, suspension column ground, eliminate the gap of foundation, suspension column template and ground, reduces mortar and leak out to be formed from gap Hole and foundation, suspension column rotten and other issues.
The present invention is implemented as follows:
A kind of cast-in-place structural foundation, suspension column screeder, the screeder include that two angle steel disposed in parallel, plural number are U-shaped Button and an at least harness cord screw rod, two angle steel are oppositely arranged on one side, another down and with ground in horizontally disposed, Two angle steel it is opposite be provided with the sets of vias of plural groups in correspondence with each other on one side, the through-hole number of each sets of vias is extremely Two few, the both ends of each angle steel are provided with U-shaped button, and each U-shaped button is fixed on corresponding angle steel by nut, described Harness cord screw rod both ends are connected to the middle part of two angle steel by nut.
Further, the through-hole number of each sets of vias is at least three.
Further, the shape of each through-hole is ellipse.
Further, each angle steel face directed downwardly is smooth flat.
Further, each nut is also collocated with gasket.
Further, the number of the U-shaped button is 4, and the number of the harness cord screw rod is 2.
The present invention has the advantage that
Cast-in-place structural foundation of the present invention, suspension column screeder can easily realize the planarization of foundation, suspension column ground, eliminate wall The gap of foot, suspension column template and ground reduces mortar and leaks out to form the quality such as hole and foundation, suspension column rotten and ask from gap Topic also has the characteristics that make simple, easy for installation, reusable, good forming effect, reduces concrete floor slab construction In subjective operation, improve the construction quality of foundation, suspension column absolute altitude and flatness, than traditional handicraft save material and manually at This, has significant comprehensive benefit.
[Detailed description of the invention]
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the main view of a kind of cast-in-place structural foundation of the present invention, suspension column screeder.
Fig. 2 is the top view of a kind of cast-in-place structural foundation of the present invention, suspension column screeder.
Fig. 3 is the unilateral angle steel scheme of installation of the present invention.
Fig. 4 is the U-shaped button scheme of installation of the present invention.
Fig. 5 is the cooperation schematic diagram of the present invention with wall reinforcing bar.
[specific embodiment]
Refering to fig. 1-5, the present invention relates to a kind of cast-in-place structural foundation, suspension column screeder, the screeder includes two flat The U-shaped button 2 of angle steel 1, plural number of row setting and at least one harness cord screw rod 3, being oppositely arranged on one side for two angle steel 1 are another Face downward and with ground in horizontally disposed, two angle steel 1 it is opposite be provided with the through-hole of plural groups in correspondence with each other on one side Group 4,41 numbers of through-hole of each sets of vias 4 are at least two, and the both ends of each angle steel 1 are provided with U-shaped button 2, each institute It states U-shaped button 2 to be fixed on corresponding angle steel 1 by nut 5,3 both ends of harness cord screw rod are connected to two angles by nut 5 The middle part of steel 1.
41 numbers of through-hole of each sets of vias 4 are at least three.
The shape of each through-hole 41 is ellipse.
Each angle steel 1 face directed downwardly is smooth flat.
Each nut 5 is also collocated with gasket 6.
The number of the U-shaped button is 4, and the number of the harness cord screw rod is 2.
Further explanation is made to the present invention below in conjunction with specific embodiment.
Embodiment
1, foundation, suspension column screeder (can be fastened by 50 × 50*4 aperture angle steel 1, the U-shaped button 2 of 14 harness cord screw rod of φ 3,25 25 reinforcing bar of φ), matching nut 5 and gasket 6 form.The length of angle steel 1 can be chosen according to the lateral length of specific wall column, it is general to select Taking 1 length of angle steel is 1.2-1.7 meters, when the lateral length of wall is longer, can choose multiple foundation, the installation of suspension column screeder is matched It closes.
1, preparation of construction
The installment work of cast-in-place structural template and wall, column, beam, slab muscle is completed by normal process standard.
2, foundation, suspension column screeder are installed
(1) first unilateral angle steel 1 is placed on by shear wall 10 to be mounted, in order to improve installation effectiveness, unless necessary into It being adjusted when capable cleaning or changes of section, the side of harness cord screw rod 3 does not have to remove always,
(2) angle steel 1 is temporarily fixed on the longitudinal reinforcement 101 of wall 10 using U-shaped button 2, fixed reinforcing bar 101 should use up The identical vertical muscle of model/diameter in amount selection section.
(3) in the way of level or tape measure, the accurate absolute altitude for adjusting angle steel 1, with U-shaped 2 collocation 5 Hes of nut of button Gasket 6 locks reinforcing bar 101.
(4) after the completion of the angle steel 1 of side adjusts, the angle steel 1 of the other side is hung on harness cord screw rod 3, according to (2), (3) step Suddenly the angle steel 1 of the side is fixed.
(5) distance for selecting reinforcing bar crust in (2) step is calculated according to drawing, and harness cord screw rod 3 is recycled to adjust two angles The distance of steel 1.Meanwhile harness cord screw rod 3 can also play the inclined effect of constraint wall column reinforcing bar, avoid during casting and compacting of concrete because The thickness of off-position of steel reinforcing bar influence cover to reinforcement.
3, then start to pour and smash template (i.e. floor) mortar, and the height of mortar is located just at foundation, suspension column screeder Two angle steel face position directed downwardly;After mortar slightly forms, foundation, suspension column screeder are removed.
Cast-in-place structural foundation of the present invention, suspension column screeder can easily realize the planarization of foundation, suspension column ground, eliminate wall The gap of foot, suspension column template and ground reduces mortar and leaks out to form the quality such as hole and foundation, suspension column rotten and ask from gap Topic also has the characteristics that make simple, easy for installation, reusable, good forming effect, reduces concrete floor slab construction In subjective operation, improve the construction quality of foundation, suspension column absolute altitude and flatness, than traditional handicraft save material and manually at This, has significant comprehensive benefit.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (6)

1. a kind of cast-in-place structural foundation, suspension column screeder, it is characterised in that: the screeder includes two angles disposed in parallel The U-shaped button of steel, plural number and an at least harness cord screw rod, two angle steel are oppositely arranged on one side, it is another down and and ground In horizontally disposed, two angle steel it is opposite be provided with the sets of vias of plural groups in correspondence with each other on one side, each sets of vias Through-hole number is at least two, and the both ends of each angle steel are provided with U-shaped button, and each U-shaped button is fixed on pair by nut It answers on angle steel, harness cord screw rod both ends are connected to the middle part of two angle steel by nut.
2. a kind of cast-in-place structural foundation according to claim 1, suspension column screeder, it is characterised in that: each sets of vias Through-hole number be at least three.
3. according to claim 1 or a kind of cast-in-place structural foundation, suspension column screeder, it is characterised in that: each through-hole Shape be ellipse.
4. a kind of cast-in-place structural foundation according to claim 1, suspension column screeder, it is characterised in that: each angle steel court Under face be smooth flat.
5. a kind of cast-in-place structural foundation according to claim 1, suspension column screeder, it is characterised in that: each nut is also It is collocated with gasket.
6. a kind of cast-in-place structural foundation according to claim 1, suspension column screeder, it is characterised in that: of the U-shaped button Number is 4, and the number of the harness cord screw rod is 2.
CN201910172289.8A 2019-03-07 2019-03-07 A kind of cast-in-place structural foundation, suspension column screeder Pending CN109779259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910172289.8A CN109779259A (en) 2019-03-07 2019-03-07 A kind of cast-in-place structural foundation, suspension column screeder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910172289.8A CN109779259A (en) 2019-03-07 2019-03-07 A kind of cast-in-place structural foundation, suspension column screeder

Publications (1)

Publication Number Publication Date
CN109779259A true CN109779259A (en) 2019-05-21

Family

ID=66486221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910172289.8A Pending CN109779259A (en) 2019-03-07 2019-03-07 A kind of cast-in-place structural foundation, suspension column screeder

Country Status (1)

Country Link
CN (1) CN109779259A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114278089A (en) * 2022-01-17 2022-04-05 中建八局第二建设有限公司 Embedded type column root slurry leakage prevention device and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202882410U (en) * 2012-11-15 2013-04-17 福建安厦新型建筑模板制造有限公司 Steel frame template assembly
CN104895319A (en) * 2015-05-11 2015-09-09 中国十七冶集团有限公司 Cast-in-place concrete shear wall and frame column template installation elevation positioning device
CN106284979A (en) * 2016-08-25 2017-01-04 中国十七冶集团有限公司 A kind of shear wall formwork installs root angle steel device
CN207392752U (en) * 2017-10-31 2018-05-22 青岛一建集团有限公司 For preventing the constructing device of grout leakage of formwork root
CN208168363U (en) * 2018-03-30 2018-11-30 中国十七冶集团有限公司 A kind of device preventing concrete column mould bottom spillage
CN210105320U (en) * 2019-03-07 2020-02-21 福建建工集团有限责任公司 Leveling device for wall foot and column foot of cast-in-situ structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202882410U (en) * 2012-11-15 2013-04-17 福建安厦新型建筑模板制造有限公司 Steel frame template assembly
CN104895319A (en) * 2015-05-11 2015-09-09 中国十七冶集团有限公司 Cast-in-place concrete shear wall and frame column template installation elevation positioning device
CN106284979A (en) * 2016-08-25 2017-01-04 中国十七冶集团有限公司 A kind of shear wall formwork installs root angle steel device
CN207392752U (en) * 2017-10-31 2018-05-22 青岛一建集团有限公司 For preventing the constructing device of grout leakage of formwork root
CN208168363U (en) * 2018-03-30 2018-11-30 中国十七冶集团有限公司 A kind of device preventing concrete column mould bottom spillage
CN210105320U (en) * 2019-03-07 2020-02-21 福建建工集团有限责任公司 Leveling device for wall foot and column foot of cast-in-situ structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114278089A (en) * 2022-01-17 2022-04-05 中建八局第二建设有限公司 Embedded type column root slurry leakage prevention device and construction method thereof

Similar Documents

Publication Publication Date Title
CN103899088B (en) Large span ultra-thin overlength cast-in-situ clear-water concrete Slate hanging construction method
CN105040970A (en) Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
CN105755954B (en) A kind of construction technology of intercommunication clear-water concrete anticollision barrier
CN103643603A (en) Ballastless track construction method with sleepers arranged firstly and rail panel assembled later
CN106639319A (en) Rotten root prevention construction method for shear walls, columns and other concrete vertical structures
CN106013750A (en) Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN108677747B (en) Cable-stayed bridge plane rotation swivel construction method
CN107178031A (en) A kind of unit assembled prestressing force Multidirectional displacement bridge expansion device and installation method
CN106120835B (en) A kind of circle concrete structures toe board panel guide rail and its levelling construction
CN109779259A (en) A kind of cast-in-place structural foundation, suspension column screeder
CN113152262A (en) Bridge single-column pier reinforcement construction method
CN106087671A (en) A kind of concreting template
CN105544832B (en) A kind of shell roofing and its construction method
CN210105320U (en) Leveling device for wall foot and column foot of cast-in-situ structure
CN106368362A (en) Hollow floor for GBF high-infusion alloy thin-walled square boxes and manufacturing method
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN115256615B (en) Highway precast box Liang Zhineng shower maintenance standard construction system
CN204487809U (en) Formula steel construction beam making bench beaten by combination cover
CN110042977B (en) Steel structure wall and construction method thereof
CN106869387A (en) Multi-ribbed plate Structural Floor System HZ concrete film construction methods
CN208902723U (en) A kind of device of assembly type flat band method validity test concrete bracing
CN106192699A (en) A kind of homophase out-phase road surface cutting method and device
CN109267580B (en) Concrete reinforcing steel bar combined structure and pouring method
CN110258890A (en) A kind of broken line type exterior wall is connected the construction method of concrete structure with roofing
CN206428716U (en) A kind of circular concrete structures toe board panel guide rail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200924

Address after: 350000, 36 floor, landmark 89, 54 Road, Gulou District, Fujian, Fuzhou

Applicant after: FUJIAN JIANGONG GROUP Co.,Ltd.

Applicant after: Fujian Construction Engineering Group Co., Ltd

Address before: 350000, 36 floor, landmark 89, 54 Road, Gulou District, Fujian, Fuzhou

Applicant before: FUJIAN JIANGONG GROUP Co.,Ltd.

TA01 Transfer of patent application right