CN109779247A - The formwork erection device and construction method of steel column cornerite - Google Patents

The formwork erection device and construction method of steel column cornerite Download PDF

Info

Publication number
CN109779247A
CN109779247A CN201910224513.3A CN201910224513A CN109779247A CN 109779247 A CN109779247 A CN 109779247A CN 201910224513 A CN201910224513 A CN 201910224513A CN 109779247 A CN109779247 A CN 109779247A
Authority
CN
China
Prior art keywords
nut
steel column
screw arbor
back cord
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910224513.3A
Other languages
Chinese (zh)
Inventor
王代发
张春勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910224513.3A priority Critical patent/CN109779247A/en
Publication of CN109779247A publication Critical patent/CN109779247A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of formwork erection device of steel column cornerite and construction methods.Including column foundation, section is that the steel column of H-shaped is mounted on column foundation, column foundation bottom surrounding supporting module, vertical back cord is equipped on the outside of template, the edge of a wing board ends of steel column side install the first, second U-shaped fixture respectively, install jackscrew respectively on the inside of the first, second U-shaped fixture, the outside of first U-shaped fixture is equipped with the first nut, the axis of first nut and the axis of jackscrew are parallel, and the outside of the second U-shaped fixture is equipped with the second nut, and the axis of the second nut and the axis of jackscrew are vertical;One end of first Screw arbor with nut at both-ends is connect with the first nut, and the other end of the first Screw arbor with nut at both-ends passes through template and the first back cord is affixed, and one end of the second Screw arbor with nut at both-ends is connect with the second nut, and the other end of the second Screw arbor with nut at both-ends passes through template and the second back cord is affixed.Steel column cornerite formwork erection device production of the invention is simple, flexible to operation, and pull rod, template uniform force is arranged by center surrounding of steel column.

Description

The formwork erection device and construction method of steel column cornerite
Technical field
The present invention relates to construction, the formwork erection device and construction method of specifically a kind of steel column cornerite.
Background technique
It is well known that in building metallurgy industry, almost most of steel-structure factory building pillar is all to weld I-shaped (or H-type) The single limb column or latticed column form of composition, there are many more the suspension columns such as equipment column, steel platform usually to require to carry out packet suspension column (or back-grouting).Usual workshop packet suspension column from -500mm absolute altitude to+150mm or so, thickness between 500 ~ 650mm, and The formwork erection often drilling in ground base inserts reinforcing bar and carrys out fixed form system, then uses scaffold as lateral back cord, diagonal brace It is adjusted and reinforces.Work progress complexity is cumbersome, low efficiency.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of formwork erection device of steel column cornerite and construction method, templates Uniform force, structure are simple.
The technical solution used to solve the technical problems of the present invention is that:
A kind of formwork erection device of steel column cornerite, including column foundation, section are that the steel column of H-shaped is mounted on column foundation, base for post The outside of the surrounding supporting module of plinth bottom, template is equipped with vertical back cord, and the both ends of the flange plate of steel column side are installed respectively The inside of first U-shaped fixture and the second U-shaped fixture, the first U-shaped fixture and the second U-shaped fixture is installed by jackscrew, the first U-shaped card respectively The outside of tool is equipped with the first nut, and the axis of the first nut and the axis of jackscrew are parallel, and the outside of the second U-shaped fixture is equipped with second Nut, the axis of the second nut and the axis of jackscrew are vertical;One end of first Screw arbor with nut at both-ends is connect with the first nut, first pair of drawing The other end of screw rod passes through template and the first back cord is affixed, and one end of the second Screw arbor with nut at both-ends is connect with the second nut, second pair of drawing The other end of screw rod passes through template and the second back cord is affixed.
The present invention by adopting the above technical scheme, compared with prior art, beneficial effect is:
It gathers materials on the spot, production is simple, and it is flexible to operation, a large amount of scaffold tubes and fastener are reduced, is arranged by center surrounding of steel column Pull rod, template uniform force.
Further, prioritization scheme of the invention is:
The two sides of steel column are symmetrical structure.
First back cord includes the first scaffold tubes and the second scaffold tubes being set side by side, and the outer end of the first Screw arbor with nut at both-ends is placed in Between one scaffold tubes and the second scaffold tubes, the first Screw arbor with nut at both-ends is affixed by connector and nut and the first back cord.
A kind of construction method of the formwork erection device of steel column cornerite, includes the following steps,
A, production U-shaped card tool;
B, installation U-shaped card tool
First U-shaped card tool and the second U-shaped card tool, the first Screw arbor with nut at both-ends and second are respectively symmetrically installed on four edges of a wing of steel column The inner end of Screw arbor with nut at both-ends is connected with the first U-shaped card tool and the second U-shaped card tool respectively;
C, formwork erection
According to packet suspension column outer dimension unwrapping wire, surrounding surface drilling installs spacer bar;
D, spelling mould and the installation of template are carried out;
E, formwork reinforcement
When template system after the installation is completed, back cord is installed, the every side in basis is arranged two groups, and back cord bottom, which covers, to be positioned on the outside of template On reinforcing bar, the outer end of the first Screw arbor with nut at both-ends and the second Screw arbor with nut at both-ends passes through connector and the first back cord and the second back cord lock respectively Tightly;
F, suspension column concrete placings
Suspension column concreting is carried out after formwork erection, which finishes, applies for checking and examination qualification.
Detailed description of the invention
Fig. 1 is the top view of the embodiment of the present invention;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is the first U-shaped fixture schematic diagram of the embodiment of the present invention;
Fig. 4 is the second U-shaped fixture schematic diagram of the embodiment of the present invention;
In figure: column foundation 1;Concrete packet suspension column 2;First steel column 3;Inter-column connecting rod part 4;First Screw arbor with nut at both-ends 5;First back cord 6; First U-shaped card tool 7;First nut 8;Flitch 9;Spacer bar 10;Template 11;Locking nut 12;" 3 " type card 13;Jackscrew 14;The Two Screw arbor with nut at both-ends 15;Second back cord 16;Second U-shaped card tool 17;First nut 18;Second steel column 19.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and examples.
Participate in Fig. 1, Fig. 2, a kind of formwork erection device of steel column cornerite, by column foundation 1, concrete packet suspension column 2, the first steel column 3, Inter-column connecting rod part 4, the first Screw arbor with nut at both-ends 5, the first back cord 6, the first U-shaped card have the 7, first nut 8, flitch 9, spacer bar 10, template 11, locking nut 12,3 type cards 13, jackscrew 14, the second Screw arbor with nut at both-ends 15, the second back cord 16, the second U-shaped card tool 17, First nut 18 and the second steel column 19 are constituted.It is equipped with two steel columns in the present embodiment, is the first steel column 3 and the second steel column respectively 19, intercolumniation connecting rod 4 is installed, the first steel column 3 and the second steel column 19 are mounted on side by side between first steel column 3 and the second steel column 19 On column foundation 1, flitch 9 is installed in the outside of the surrounding installation template 11 of the first steel column 3 and the second steel column 19, template 11, flitch 9 Vertical back cord is installed in outside, and the bottom of back cord is sleeved on spacer bar 10, and positioning bar 10 is inserted into column foundation 1.
First U-shaped fixture 7 and the second U-shaped fixture 17, the first U are installed at the both ends of the flange plate of first steel column, 3 side respectively Shape fixture 7 and the second U-shaped fixture 17 are buckled in respectively on the flange plate of the first steel column 3, the first U-shaped fixture 7 and the second U-shaped fixture 17 It is formed by welding using with a thickness of 10 to 14 millimeters of steel plate strip, headroom is than first in the first U-shaped fixture 7 and the second U-shaped fixture 17 The steel column edge of a wing is 2 to 5 millimeters big, width determines according to actual conditions, general 50 to 200 millimeters.First U-shaped fixture 7 and the second U-shaped Jackscrew 14 is installed in the inside of fixture 17 respectively, and the inside of the first U-shaped fixture 7 and the second U-shaped fixture 17 is machined with open-work respectively, pushes up Silk nut-welding cooperates in the outside of the open-work, jackscrew 14 and jackscrew nut.Shown in first U-shaped fixture 7(Fig. 3) outside welding There is the first nut 8, the axis of the first nut 8 is parallel with the axis of jackscrew 14, the inner end of the first Screw arbor with nut at both-ends 5 and the first nut 8 Connection, the outer end end of the first Screw arbor with nut at both-ends 5 pass through template 11 and connect with the first back cord 6.First back cord 6 by be set side by side first Scaffold tubes 6-1 and the second scaffold tubes 6-2 is constituted, and the outer end of the first Screw arbor with nut at both-ends 5 is placed in the first scaffold tubes 6-1 and the second scaffold tubes Between 6-2, the first Screw arbor with nut at both-ends 5 is fixedly connected by " 3 " type card 13 and locking nut 12 with the first back cord 6.
Shown in second U-shaped fixture 17(Fig. 4) on the outside of be welded with the second nut 18, the axis and jackscrew 14 of the second nut 18 Axis it is vertical;The inner end of second Screw arbor with nut at both-ends 15 is connect with the second nut 18, and the outer end of the second Screw arbor with nut at both-ends 15 passes through template 11 are fixedly connected with the second back cord 16.The two sides of first steel column 3 and the second steel column 19 are symmetrical structure.First Screw arbor with nut at both-ends, 5 He The diameter of second Screw arbor with nut at both-ends 15 is 12 or 14 millimeters.
The construction method of the formwork erection device of above-mentioned steel column cornerite, includes the following steps,
A, production U-shaped card tool
According to the first U-shaped of drawing making fixture 7 and the second U-shaped fixture 17
B, installation U-shaped card tool
First U-shaped card tool 7 and the second U-shaped card tool are respectively symmetrically installed on four edges of a wing of the first steel column 3 and the second steel column 19 17, tighten jackscrew 14, the inner end of the first Screw arbor with nut at both-ends 5 and the second Screw arbor with nut at both-ends 15 is U-shaped with the first U-shaped card tool 7 and second respectively Fixture 17 connects;
C, formwork erection
According to packet suspension column outer dimension unwrapping wire, surrounding surface drilling installs spacer bar 10, as the positioning of template system and perpendicular To the fixed support stress point of steel pipe back cord;
D, spelling mould and the installation of template 11 are carried out;
E, formwork reinforcement
When 11 system of template after the installation is completed, back cord is installed, the every side in basis is arranged two groups, and back cord bottom covers on the outside of template 11 On spacer bar 10, the outer end of the first Screw arbor with nut at both-ends 5 and the second Screw arbor with nut at both-ends 15 pass through respectively 3 " type cards 13 and the first back cord 6 and The locking of second back cord 16;
F, suspension column concrete placings
Suspension column concreting is carried out after template 11, which installs, to be finished and apply for checking and examination qualification.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to change with equivalent structure made by description of the invention and accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (4)

1. a kind of formwork erection device of steel column cornerite, including column foundation, section is that the steel column of H-shaped is mounted on column foundation, column The outside of the surrounding supporting module of foundation bottom, template is equipped with vertical back cord, it is characterised in that: the flange plate of steel column side The first U-shaped fixture and the second U-shaped fixture are installed in both ends respectively, and top is installed in the inside of the first U-shaped fixture and the second U-shaped fixture respectively The outside of silk, the first U-shaped fixture is equipped with the first nut, and the axis of the first nut and the axis of jackscrew are parallel, the second U-shaped fixture Outside is equipped with the second nut, and the axis of the second nut and the axis of jackscrew are vertical;One end of first Screw arbor with nut at both-ends and the first nut The other end of connection, the first Screw arbor with nut at both-ends passes through template and the first back cord is affixed, one end of the second Screw arbor with nut at both-ends and the second nut The other end of connection, the second Screw arbor with nut at both-ends passes through template and the second back cord is affixed.
2. the formwork erection device of steel column cornerite according to claim 1, it is characterised in that: the two sides of steel column are symmetrical junction Structure.
3. the formwork erection device of steel column cornerite according to claim 1, it is characterised in that: the first back cord includes setting side by side The first scaffold tubes and the second scaffold tubes set, the outer end of the first Screw arbor with nut at both-ends are placed between the first scaffold tubes and the second scaffold tubes, First Screw arbor with nut at both-ends is affixed by connector and nut and the first back cord.
4. a kind of construction method of the formwork erection device of the steel column cornerite of any one as described in claim 1, includes the following steps,
A, production U-shaped card tool;
B, installation U-shaped card tool;
First U-shaped card tool and the second U-shaped card tool, the first Screw arbor with nut at both-ends and second are respectively symmetrically installed on four edges of a wing of steel column The inner end of Screw arbor with nut at both-ends is connected with the first U-shaped card tool and the second U-shaped card tool respectively;
C, formwork erection;
According to packet suspension column outer dimension unwrapping wire, surrounding surface drilling installs spacer bar,
D, spelling mould and the installation of template are carried out;
E, formwork reinforcement
When template system after the installation is completed, back cord is installed, the every side in basis is arranged two groups, and back cord bottom, which covers, to be positioned on the outside of template On reinforcing bar, the outer end of the first Screw arbor with nut at both-ends and the second Screw arbor with nut at both-ends passes through connector and the first back cord and the second back cord lock respectively Tightly;
F, suspension column concrete placings
Suspension column concreting is carried out after formwork erection, which finishes, applies for checking and examination qualification.
CN201910224513.3A 2019-03-23 2019-03-23 The formwork erection device and construction method of steel column cornerite Pending CN109779247A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910224513.3A CN109779247A (en) 2019-03-23 2019-03-23 The formwork erection device and construction method of steel column cornerite

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910224513.3A CN109779247A (en) 2019-03-23 2019-03-23 The formwork erection device and construction method of steel column cornerite

Publications (1)

Publication Number Publication Date
CN109779247A true CN109779247A (en) 2019-05-21

Family

ID=66491339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910224513.3A Pending CN109779247A (en) 2019-03-23 2019-03-23 The formwork erection device and construction method of steel column cornerite

Country Status (1)

Country Link
CN (1) CN109779247A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607906A (en) * 2019-10-09 2019-12-24 江苏昊钢建筑科技有限公司 Aluminum alloy template mosaic structure
CN113187223A (en) * 2021-04-15 2021-07-30 浙江信宇建设集团有限公司 Template device of mirror surface bare concrete beam column and construction method thereof
CN113417477A (en) * 2021-07-12 2021-09-21 河南省安装集团有限责任公司 Photovoltaic panel stand column position adjusting device and installation adjusting method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006017834U1 (en) * 2006-11-21 2007-01-25 Otto Wulff Bauunternehmung Gmbh & Co. Kg Adjustable wall connecting panel for facade, has threaded rod and screw nuts, which are provided for adjustment of distance between brick work, concrete wall and column, where base plate is fastened with grouting anchors at brick work
CN205189390U (en) * 2015-12-14 2016-04-27 山西省工业设备安装有限公司 H shaped steel post operation platform
CN205393883U (en) * 2016-02-26 2016-07-27 中国化学工程第三建设有限公司 H shaped steel equipment fixture
TWM542054U (en) * 2017-01-24 2017-05-21 Cash Box Industrial Co Ltd Moldboard retainer
CN207018638U (en) * 2017-08-07 2018-02-16 中建安装工程有限公司 A kind of mounting fixture for being used to for pipeline to be connected to the dome of i-beam structure
CN108005381A (en) * 2017-12-04 2018-05-08 广东中南建设有限公司 Steel reinforced concrete formwork reinforcement structure and construction method
CN108952135A (en) * 2018-08-22 2018-12-07 中国二冶集团有限公司 The erection method of steel post operation platform fixture and operating platform
CN209704012U (en) * 2019-03-23 2019-11-29 中国二十二冶集团有限公司 The formwork erection device of steel column cornerite

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006017834U1 (en) * 2006-11-21 2007-01-25 Otto Wulff Bauunternehmung Gmbh & Co. Kg Adjustable wall connecting panel for facade, has threaded rod and screw nuts, which are provided for adjustment of distance between brick work, concrete wall and column, where base plate is fastened with grouting anchors at brick work
CN205189390U (en) * 2015-12-14 2016-04-27 山西省工业设备安装有限公司 H shaped steel post operation platform
CN205393883U (en) * 2016-02-26 2016-07-27 中国化学工程第三建设有限公司 H shaped steel equipment fixture
TWM542054U (en) * 2017-01-24 2017-05-21 Cash Box Industrial Co Ltd Moldboard retainer
CN207018638U (en) * 2017-08-07 2018-02-16 中建安装工程有限公司 A kind of mounting fixture for being used to for pipeline to be connected to the dome of i-beam structure
CN108005381A (en) * 2017-12-04 2018-05-08 广东中南建设有限公司 Steel reinforced concrete formwork reinforcement structure and construction method
CN108952135A (en) * 2018-08-22 2018-12-07 中国二冶集团有限公司 The erection method of steel post operation platform fixture and operating platform
CN209704012U (en) * 2019-03-23 2019-11-29 中国二十二冶集团有限公司 The formwork erection device of steel column cornerite

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
【日】临时设施工业会: "《模板及支撑工程实务手册》", 地震出版社, pages: 25 - 27 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607906A (en) * 2019-10-09 2019-12-24 江苏昊钢建筑科技有限公司 Aluminum alloy template mosaic structure
CN113187223A (en) * 2021-04-15 2021-07-30 浙江信宇建设集团有限公司 Template device of mirror surface bare concrete beam column and construction method thereof
CN113187223B (en) * 2021-04-15 2022-05-31 浙江信宇建设集团有限公司 Template device of mirror-surface fair-faced concrete beam column and construction method thereof
CN113417477A (en) * 2021-07-12 2021-09-21 河南省安装集团有限责任公司 Photovoltaic panel stand column position adjusting device and installation adjusting method thereof

Similar Documents

Publication Publication Date Title
CN109779247A (en) The formwork erection device and construction method of steel column cornerite
CN109457965B (en) High-efficiency installation method and device of precast concrete wall panel
CN113550431B (en) Annular steel plate type stirrup for beam column joint area of stiff structure and construction method of annular steel plate type stirrup
CN111663457A (en) Assembly module, modular construction platform and method and bridge abutment construction method
CN210888099U (en) Platform beam auxiliary mounting device of platform is encorbelmented in opposite directions in narrow space
CN110258294B (en) Steel truss arch bridge installation system and construction method thereof
CN209704012U (en) The formwork erection device of steel column cornerite
CN108005381B (en) Reinforced structure of steel reinforced concrete template and construction method
CN110700490B (en) Transfer floor large-span steel reinforced concrete beam and construction method
CN210887278U (en) Fixing device for cup mouth type concrete foundation pit stand column
JP2008502822A (en) Architectural elements and construction methods
CN108374350B (en) Assembly jig frame of steel anchor beam and steel corbel unit and installation method
CN217579783U (en) Mounting system of suspension bridge steel pull rod anchoring system
CN213896816U (en) Y-shaped support frame
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN111576891A (en) Construction method of bolt-connected criss-cross H-shaped steel truss
CN111677272A (en) Construction method of cast-in-situ beam slab cover body
CN111395843A (en) Template for pouring large pool wall and mounting method of template
CN219260736U (en) Temporary support frame for steel structure bridge construction
CN115341467B (en) Highway-railway dual-purpose river-crossing A-shaped stay cable anchoring structure and construction method thereof
CN110130391A (en) Isolated footing pre-embedded bolt mounting structure and method
CN218622223U (en) Large-diameter pile foundation reinforcement cage positioning structure arranged on steel platform
CN218562564U (en) Horse board joint construction can be dismantled to girder steel tip subassembly modularization
CN220598729U (en) Large-span stiff concrete beam structure
CN220522122U (en) Jig frame system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521