CN109779233A - A kind of fixation device based on girder construction - Google Patents
A kind of fixation device based on girder construction Download PDFInfo
- Publication number
- CN109779233A CN109779233A CN201711107641.7A CN201711107641A CN109779233A CN 109779233 A CN109779233 A CN 109779233A CN 201711107641 A CN201711107641 A CN 201711107641A CN 109779233 A CN109779233 A CN 109779233A
- Authority
- CN
- China
- Prior art keywords
- girder construction
- fixed link
- fixation device
- connecting rod
- holding clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 58
- 238000003466 welding Methods 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 description 9
- 239000010959 steel Substances 0.000 description 9
- 238000006243 chemical reaction Methods 0.000 description 4
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A kind of fixation device based on girder construction, including the adjusting rod of girder construction upper end and retractable and the holding clamp being arranged on girder construction side wall is arranged in;One end of holding clamp is fixed on the lower section of the adjusting rod;Adjusting rod includes fixed link, connecting rod;Connecting rod can in the fixed link free extension, to adjust the length of fixed device.Compared with prior art, the top of girder construction is arranged in fixed device by the present invention, is not needed that support construction is separately provided again, is saved construction cost, reduces construction space;And length can be adjusted according to the outer diameter of girder construction, and it is applied widely, finally the present invention is based on removing to can be repeated several times use after the completion of the fixation device use of girder construction, save cost.
Description
Technical field
The present invention relates to building engineering fields, in particular to a kind of fixation device based on girder construction.
Background technique
Currently, people are higher and higher for the requirement for building outer moulding, either monomer with the continuous development of construction industry
It builds or is Commercial Complex or super high-rise building, have flower holder structure at the top of roofing, extraneous adornment is generally all
There is curtain wall construction, curtain wall construction is typically carried out using plug-in overhanging hanging basket.Its traditional curtain wall hanging basket is installed on roofing
Hanging basket is fixed by counterweight, is occupied a large amount of areas in roofing periphery, is often influenced subsequent roofing construction, process is caused to be worn
Difficulty is inserted, construction quality is influenced.
China Patent Publication No.: 204343644U discloses a kind of hanging basket fixing device, including cage, it is characterized in that: also
Crossbeam including being set to curtain wall upper end, the cage are connect by safety rope and dynamic ropes with cross rail outer one end, cross rail inner
One end is connect with beams of concrete and ground fixing device respectively by wirerope.
But in above-mentioned technical proposal, due to fixture structure complexity, make inconvenience;Secondly cage can only be installed
In square column, limitation is larger.
Summary of the invention
In consideration of it, the invention proposes a kind of fixation device based on girder construction, it is intended to it is multiple to solve structure in the prior art
The technical issues of miscellaneous, narrow application range.
A kind of fixation device based on girder construction, including the adjusting rod of girder construction upper end and retractable is arranged in and sets
Set the holding clamp on girder construction side wall;
One end of the holding clamp is fixed on the lower section of the adjusting rod;
The adjusting rod includes fixed link, connecting rod;
The connecting rod can in the fixed link free extension, to adjust the length of the fixed device.
Further, the holding clamp is plate structure, the profile of the shape of the holding clamp and the girder construction
Shape is identical.
Further, the holding clamp is arranged two, is symmetrically distributed in the two sides of girder construction, wherein the girder construction
Threaded hole is provided on one side wall.
Further, bolt jackscrew, the bolt are additionally provided on the holding clamp for offering threaded hole side
Jackscrew passes through the threaded hole on holding clamp, the holding clamp to be fixed in the girder construction.
Further, the fixed link is hollow square tube, and the connecting rod is square tube.
Further, the internal diameter of the fixed link is greater than the outer diameter of the connecting rod.
Further, in the inside of wherein one fixed link, the other end is through at another institute for connecting rod one end welding
State in fixed link, can in the fixed link transverse shifting, to adjustment length.
Further, threaded hole is additionally provided in the fixed link being flexibly connected with the connecting rod.
Further, it is additionally provided with fixing bolt in the fixed link for offering threaded hole, to by the connecting rod
It is fixed in the fixed link.
Compared with prior art, the beneficial effects of the present invention are girder construction is arranged in fixed device by the present invention
Top does not need that support construction is separately provided again, saves construction cost, reduces construction space.
Further, in the inside of a wherein fixed link, the other end is through in another fixed link the welding of connecting rod one end, can
The transverse shifting in the fixed link, therefore, fixed device can adjust length according to the outer diameter of girder construction, applied widely.
Further, the present invention can according to need freely adjusts position above girder construction, it is only necessary to unclamp setting and exist
Jackscrew on holding clamp does not need to remove and be installed again, facilitate behaviour then along the manual shift position in girder construction direction
Make, has liberated labour.
Further, the rectangular tube used in the present invention, bolt, steel plate are conventional material, and materials are convenient, at low cost,
Production, which is got up, only needs several places to weld, simple and fast.
Further, the present invention is applied widely, can also be according to the outer of live girder construction in addition to adjustable length is outside one's consideration
Shape is adjusted, it is only necessary to replace the holding clamp being arranged below, if girder construction is square beam, holding clamp is planar rectangular
Steel plate;If girder construction is circular beam, holding clamp is the arch-shaped steel plate that shape matches therewith.
Further, the present invention is based on the installation of the fixation device of girder construction, remove it is very convenient, when installation, it is only necessary to will
The fixation device made is placed to the corresponding position of girder construction, first tightens fixing bolt, then tightens bolt jackscrew;It removes
When, it is only necessary to bolt jackscrew is first unclamped, fixing bolt is unclamped again.
Further, it the present invention is based on removing to can be repeated several times use after the completion of the fixation device use of girder construction, saves
Cost is saved.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field
Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the steel wire rope of windlass conversion support structure of the fixation device provided in an embodiment of the present invention based on girder construction
Schematic diagram.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
It is fully disclosed to those skilled in the art.It should be noted that in the absence of conflict, embodiment in the present invention and
Feature in embodiment can be combined with each other.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
It refering to fig. 1, is the structural schematic diagram of the adjustable steel wire rope of windlass conversion support of the embodiment of the present invention, including can
Freely change the adjusting rod 1 of length, and holding clamp 2, pulley blocks 3;Holding clamp 2 is vertically arranged in the lower section of adjusting rod 1,
Adjusting rod 1 to be fixed in girder construction 4;Pulley blocks 3 are inclined at the both ends of adjusting rod 1, to change hoist engine steel
The direction of cord.
Specifically, adjusting rod 1 includes two 12, one, connecting rod fastening bolts 13 of fixed link 11, one;Fixed link 11 is
Hollow cuboids are horizontally disposed with;Connecting rod 12 is Hollow cuboids or Filled Rectangle block, and the peripheral length and width of connecting rod 12 are less than fixation
The peripheral length and width of bar 11, it is ensured that connecting rod 12 can move freely in fixed link 11 along centerline direction, by one end of connecting rod 12
It is welded in a fixed link 11, the other end is placed in another fixed link 11, and can be along the center line side of place fixed link 11
To moving freely, and it is provided with threaded hole in the fixed link 11 at place, after adjusting good position according to girder construction size, can passed through
Connecting rod 12 is fixed in fixed link 11 by fixing bolt 13.
In the present embodiment, to ensure that connecting rod 12, can be in 11 interior bottom portion of fixed link in 11 center of fixed link
One of boss is arranged in heart position, and one of groove is arranged in 12 exterior base center of connecting rod, is aligned based on boss and groove, connecting rod
12 can be along the opposite sliding in 11 center of fixed link.
Specifically, holding clamp 2 is welded on the bottom of fixed link 11, holding clamp 2 is rectangular steel plates, and shape according to
Depending on the shape of girder construction, if circular beam, holding clamp 2 is the domes that diameter matches therewith;It is fixed if square beam
Fixture 2 is then planar rectangular steel plate;2 left end of holding clamp is provided with threaded hole, and bolt jackscrew 21 can be reinforced by threaded hole
Connection between conversion equipment and girder construction.
Specifically, pulley blocks 3 are fixed in fixed link 11 by connecting rod, two pulleys are located at a left side for conversion support
Right both ends, wirerope are arranged on the outer profile of two pulley blocks, and pulley is in the same plane, and are in sustained height, use
To guarantee that wirerope can be that will not misplace by two pulleys.
Specifically, being provided with clump weight on hoist engine, steel wire rope of windlass can be by required work by pulley blocks
Tool is transported to back portion.
After the completion of use, it is only necessary to unclamp jackscrew and fixing bolt, i.e., it is dismountable, it is reusable.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (9)
1. a kind of fixation device based on girder construction, which is characterized in that including girder construction upper end and retractable is arranged in
Adjusting rod (1) and the holding clamp (2) being arranged on girder construction side wall;
One end of the holding clamp (2) is fixed on the lower section of the adjusting rod (1);
The adjusting rod (1) includes fixed link (11), connecting rod (12);
The connecting rod (12) can be in the fixed link (11) interior free extension, to adjust the length of the fixed device.
2. the fixation device according to claim 1 based on girder construction, which is characterized in that the holding clamp (2) is plate
Shape structure, the shape of the holding clamp (2) are identical with the contours profiles of the girder construction (4).
3. the fixation device according to claim 2 based on girder construction, which is characterized in that holding clamp (2) setting
Two, the two sides of girder construction (4) are symmetrically distributed in, wherein being provided with threaded hole on a side wall of the girder construction (4).
4. the fixation device according to claim 3 based on girder construction, which is characterized in that offering threaded hole side
It is additionally provided with bolt jackscrew (21) on the holding clamp (2), the bolt jackscrew (21) passes through the screw thread on holding clamp (2)
Hole, the holding clamp (2) to be fixed on the girder construction (4).
5. the fixation device according to claim 1 based on girder construction, which is characterized in that the fixed link (11) is hollow
Square tube, the connecting rod (12) are square tube.
6. the fixation device according to claim 5 based on girder construction, which is characterized in that the internal diameter of the fixed link (11)
Greater than the outer diameter of the connecting rod (12).
7. the fixation device according to claim 6 based on girder construction, which is characterized in that connecting rod (12) one end welding
The inside of a fixed link (11) wherein, the other end are through in another described fixed link (11), can be in the fixed link
(11) interior transverse shifting, to adjustment length.
8. the fixation device according to claim 7 based on girder construction, which is characterized in that even with the connecting rod (12) activity
Threaded hole is additionally provided in the fixed link (11) connect.
9. the fixation device according to claim 8 based on girder construction, which is characterized in that offering described in threaded hole
Fixing bolt (13) are additionally provided in fixed link (11), the connecting rod (12) to be fixed on the fixed link (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711107641.7A CN109779233B (en) | 2017-11-10 | 2017-11-10 | Fixing device based on beam structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711107641.7A CN109779233B (en) | 2017-11-10 | 2017-11-10 | Fixing device based on beam structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109779233A true CN109779233A (en) | 2019-05-21 |
CN109779233B CN109779233B (en) | 2024-05-24 |
Family
ID=66485277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711107641.7A Active CN109779233B (en) | 2017-11-10 | 2017-11-10 | Fixing device based on beam structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109779233B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0932168A (en) * | 1995-07-14 | 1997-02-04 | Fujisash Co | Bearing fixing device of frame member and joining bracket |
CN202202558U (en) * | 2011-07-13 | 2012-04-25 | 浙江中成建工集团有限公司 | Girder-riding weight basket hanging mechanism arranged on high-rise roof frame girder |
CN204343644U (en) * | 2014-12-19 | 2015-05-20 | 中建三局集团有限公司 | A kind of Novel hanging basket fastening devices for curtain wall construction |
CN105089291A (en) * | 2015-08-14 | 2015-11-25 | 北京清华同衡规划设计研究院有限公司 | Reinforced steel structure roof for installing solar panel |
CN205133081U (en) * | 2015-11-18 | 2016-04-06 | 郭岩涛 | Novel hanging flower basket system |
CN205777425U (en) * | 2016-07-07 | 2016-12-07 | 中建三局集团有限公司 | A kind of scalable hanging basket support means |
CN106241618A (en) * | 2016-09-20 | 2016-12-21 | 中建八局第四建设有限公司 | A kind of curtain wall profiles boom hoisting |
CN107217836A (en) * | 2017-07-07 | 2017-09-29 | 中国建筑第六工程局有限公司 | A kind of construction hanging basket suspension arrangement for steel construction shelter bridge |
CN207658955U (en) * | 2017-11-10 | 2018-07-27 | 中国二十冶集团有限公司 | A kind of adjustable steel wire rope of windlass conversion support |
-
2017
- 2017-11-10 CN CN201711107641.7A patent/CN109779233B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0932168A (en) * | 1995-07-14 | 1997-02-04 | Fujisash Co | Bearing fixing device of frame member and joining bracket |
CN202202558U (en) * | 2011-07-13 | 2012-04-25 | 浙江中成建工集团有限公司 | Girder-riding weight basket hanging mechanism arranged on high-rise roof frame girder |
CN204343644U (en) * | 2014-12-19 | 2015-05-20 | 中建三局集团有限公司 | A kind of Novel hanging basket fastening devices for curtain wall construction |
CN105089291A (en) * | 2015-08-14 | 2015-11-25 | 北京清华同衡规划设计研究院有限公司 | Reinforced steel structure roof for installing solar panel |
CN205133081U (en) * | 2015-11-18 | 2016-04-06 | 郭岩涛 | Novel hanging flower basket system |
CN205777425U (en) * | 2016-07-07 | 2016-12-07 | 中建三局集团有限公司 | A kind of scalable hanging basket support means |
CN106241618A (en) * | 2016-09-20 | 2016-12-21 | 中建八局第四建设有限公司 | A kind of curtain wall profiles boom hoisting |
CN107217836A (en) * | 2017-07-07 | 2017-09-29 | 中国建筑第六工程局有限公司 | A kind of construction hanging basket suspension arrangement for steel construction shelter bridge |
CN207658955U (en) * | 2017-11-10 | 2018-07-27 | 中国二十冶集团有限公司 | A kind of adjustable steel wire rope of windlass conversion support |
Also Published As
Publication number | Publication date |
---|---|
CN109779233B (en) | 2024-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102071798B (en) | Hydraulic climbing system for wall-attached support frame | |
CN102155089A (en) | Self-jacking construction platform integrating vertical transportation equipment and mold base | |
CN202000646U (en) | Self-lifting construction platform integrating vertical transportation device and mould frame | |
CN109339458A (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN202000658U (en) | Hydraulic climbing system for wall-attached support frame | |
CN204454226U (en) | A kind of welded suspension centre adjustable and balancing beam of I-shaped steel | |
JP4115472B2 (en) | Assembly method for scaffolds in bridge structures | |
CN202176343U (en) | Self-propelled multifunctional template trolley combining device | |
CN109779233A (en) | A kind of fixation device based on girder construction | |
CN209308433U (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN207658955U (en) | A kind of adjustable steel wire rope of windlass conversion support | |
CN210236845U (en) | Adjustable hanger for component steel reinforcement cage | |
CN212895962U (en) | Detachable operation platform for tensioning operation of cantilever irrigation beam | |
CN210002233U (en) | Hoisting system suitable for suspension bridge steel structure bridge deck system | |
CN204079226U (en) | A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts | |
CN211736295U (en) | Detachable multifunctional high-strength bolt construction platform device | |
CN210418963U (en) | Steel construction lifting device for building | |
CN210500795U (en) | Device for installing movable core rib | |
CN209989034U (en) | A hoisting frame for factory building piping erection | |
CN208718417U (en) | A kind of external prestressing structure of building girder | |
CN208899340U (en) | A kind of telescopic platform carrying out the construction of leaning tower column for hydraulic climbing formwork | |
CN211817894U (en) | Construction complementary unit with adjustable scaffold frame installation | |
CN109704207B (en) | Hoisting device and steel beam continuous hoisting method based on same | |
CN216239666U (en) | Eccentric hoist system of inserted lift scaffold | |
CN213763582U (en) | Integral bending forming device for arc-shaped reinforcing steel bar net piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |