CN109763821A - 一种动压采区大巷复合护巷方法 - Google Patents
一种动压采区大巷复合护巷方法 Download PDFInfo
- Publication number
- CN109763821A CN109763821A CN201910198709.XA CN201910198709A CN109763821A CN 109763821 A CN109763821 A CN 109763821A CN 201910198709 A CN201910198709 A CN 201910198709A CN 109763821 A CN109763821 A CN 109763821A
- Authority
- CN
- China
- Prior art keywords
- exploiting field
- main entry
- dynamic pressure
- lane method
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 150000001875 compounds Chemical class 0.000 title claims abstract description 15
- 239000011435 rock Substances 0.000 claims abstract description 13
- 238000005520 cutting process Methods 0.000 claims abstract description 10
- 238000005422 blasting Methods 0.000 claims abstract description 9
- 238000005516 engineering process Methods 0.000 claims abstract description 9
- 239000004568 cement Substances 0.000 claims abstract description 8
- 238000002347 injection Methods 0.000 claims abstract description 6
- 239000007924 injection Substances 0.000 claims abstract description 6
- 239000011378 shotcrete Substances 0.000 claims abstract description 5
- 238000007569 slipcasting Methods 0.000 claims description 15
- 239000003245 coal Substances 0.000 claims description 7
- 238000004880 explosion Methods 0.000 claims description 7
- 230000001186 cumulative effect Effects 0.000 claims description 6
- 238000005065 mining Methods 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010437 gem Substances 0.000 claims description 3
- 229910001751 gemstone Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000007599 discharging Methods 0.000 claims description 2
- 230000002708 enhancing effect Effects 0.000 claims description 2
- 239000002002 slurry Substances 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 238000005553 drilling Methods 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 230000035899 viability Effects 0.000 abstract description 3
- 238000009423 ventilation Methods 0.000 description 3
- 230000003245 working effect Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
发明提供一种动压采区大巷复合护巷方法,包括如下步骤,1、在靠近上一采区采空侧的新采区回风大巷掘出之后,并实施锚网索联合支护,自回风大巷顶板斜向上布置一排定向切顶卸压钻孔;在定向切顶卸压钻孔内实施定向聚能***技术切断老顶,3、自采区大巷两帮中上部斜向上分别布置两组顶帮连接杆,保证顶板与两帮的整体性,4、向巷道表面喷射水泥浆,增强支护***的整体性,5、向巷道围岩实施长短孔注水泥浆技术,保证巷道的稳定性。有效降低采区大巷服务期间的巷道变形量,保证巷道通风、运输、行人等生产过程的顺畅。
Description
技术领域
本发明属于煤矿安全技术领域,特别是涉及一种动压采区大巷复合护巷方法。
背景技术
一个采区回采结束之后,大面积的煤层顶板受采动影响发生变形、下沉及垮落,导致该采区周围的实体煤层中形成高应力区。若新采区采用单翼布置方式,为了尽可能回收煤炭资源,采区区段煤柱留设30~50m,新采区大巷很可能就布置在上一采区的高应力区内。在上一采区顶板回转垮落的过程中,极易造成新采区大巷顶板下沉、两帮移近量大、帮鼓底鼓严重等现象发生,巷道变形严重,极不稳定,严重影响新采区的通风、运输、行人等生产过程。
为了解决动压巷道变形失稳问题,需要采取专门的治理措施,目前所采用的动压巷道失稳治理方法大致有以下几种:1、通过优化支护参数进行巷道变形治理;2、通过对巷道围岩实施注浆加固实现巷道变形治理;3、 通过反复刷帮、挑顶、拉低等方式进行巷道变形治理。但是采用现有的巷道变形治理方法对动压采区大巷治理修复后,发现巷道依然不能长时间维护,巷道变形量仍然很大,尤其表现为两帮移近量和帮鼓量较大,严重影响采区大巷的通风和运输。
发明内容
针对现有技术存在的问题,本发明提供一种动压采区大巷复合护巷方法,有效降低采区大巷服务期间的巷道变形量,保证巷道通风、运输、行人等生产过程的顺畅。
为了实现上述目的,本发明采用如下技术方案:一种动压采区大巷复合护巷方法,包括如下步骤:
1、在靠近上一采区采空侧的新采区回风大巷掘出之后,并实施锚网索联合支护,自回风大巷顶板斜向上布置一排定向切顶卸压钻孔;
2、在定向切顶卸压钻孔内实施定向聚能***技术切断老顶,减小老顶悬顶长度,促使上一采区的采动应力峰值向新采区煤体深部转移,降低新采区大巷所在位置的应力集中程度;
3、自采区大巷两帮中上部斜向上分别布置两组顶帮连接杆,保证顶板与两帮的整体性,防止帮顶发生相对滑动,减小两帮移近量;
4、向巷道表面喷射水泥浆,增强支护***的整体性,防止巷道围岩快速风化而降低围岩承载能力;
5、向巷道围岩实施长短孔注水泥浆技术,在巷道周围形成多个承压拱和让压拱,增强巷道的抗破坏能力,保证巷道的稳定性。
所述定向切顶卸压钻孔布置到老顶上边缘,与竖直方向角度为10~15°。
所述定向聚能***技术是通过在钻孔中装入预制好缝隙的聚能PVC管,然后通过电***引爆***而实现***。
所述聚能PVC管是将普通PVC管定向切槽或钻眼,使***后的能量沿预制的若面释放,从而实现定向***。
所述顶帮连接杆与竖直方向打设角度为30~60°。
所述水泥浆层厚为40~60mm。
在所述长短孔注水泥浆技术的注浆管为直径25 mm钢管,短注浆管长度为2~3m,长注浆管长度为6~8m,短孔注浆采用低压大流量注浆方式,长孔注浆采用高压小流量注浆方式。
本发明的有益效果:
本发明提供的动压巷道变形治理方法,构成了“切顶+支护+注浆”的动压巷道复合护巷方案,有效降低了动压采区大巷服务期间的变形量,减少了巷道修复的工程量,提高了采掘衔接效率,保障了新采区的通风、运输、行人等安全生产过程。
附图说明
图1为采区大巷与上一采区的相对位置关系平面示意图。
图2为采区大巷与上一采区的相对位置关系剖面示意图。
图3为采区大巷锚网索联合支护示意图。
图4为采区大巷注浆护巷示意图。
图中,1、采区皮带巷,2、采区材料巷,3、采区回风巷,4、上一采区采空区,5、煤层,6、直接顶,7、老顶,8、上覆岩层,9、切顶卸压钻孔,10、锚杆,11、锚索,12、顶帮连接杆,13、水泥喷浆层,14、承压拱Ⅰ,15、承压拱Ⅱ,16、让压拱Ⅰ,17、让压拱Ⅱ。
具体实施方式
下面结合附图和具体实施例对本发明做进一步的详细说明。
一种动压采区大巷复合护巷方法,包括如下步骤:
步骤一:在靠近上一采区采空侧4的新采区回风大巷3掘出之后,并实施锚网索10、11联合支护,自回风大巷3顶板斜向上布置一排定向切顶卸压钻孔9,定向切顶卸压钻孔9要布置到老顶7上边缘,与竖直方向角度为10~15°;
步骤二:在定向切顶卸压钻孔9内实施定向聚能***技术切断老顶,减小老顶7悬顶长度,促使上一采区的上覆岩层8的采动应力峰值向新采区煤体5深部转移,降低新采区大巷1、2、3所在位置的应力集中程度;定向聚能***技术是通过在切顶卸压钻孔9中装入预制好缝隙的聚能PVC管,然后通过电***引爆***而实现***,聚能PVC管是将普通PVC管定向切槽或钻眼,使***后的能量沿预制的若面释放,从而实现定向***;
步骤三:自采区大巷1、2、3两帮中上部斜向上分别布置两组顶帮连接杆12,与竖直方向打设角度为30~60°,保证顶板与两帮的整体性,防止帮顶发生相对滑动,减小两帮移近量,顶帮连接杆12;
步骤四:向采区大巷1、2、3表面喷射水泥浆13,水泥浆层13厚为40~60mm,增强支护***的整体性,防止巷道围岩快速风化而降低围岩承载能力;
步骤五:向采区大巷1、2、3围岩实施长短孔注水泥浆技术,在巷道周围形成多个承压拱14、15和让压拱16、17,增强巷道的抗破坏能力,保证巷道的稳定性。在长短孔注水泥浆技术的注浆管为直径25 mm钢管,短注浆管长度为2~3m,长注浆管长度为6~8m,短孔注浆采用低压大流量注浆方式,长孔注浆采用高压小流量注浆方式。
实施例中的方案并非用以限制本发明的专利保护范围,凡未脱离本发明所为的等效实施或变更,均包含于本案的专利范围中。
Claims (7)
1.一种动压采区大巷复合护巷方法,包括如下步骤:
1、在靠近上一采区采空侧的新采区回风大巷掘出之后,并实施锚网索联合支护,自回风大巷顶板斜向上布置一排定向切顶卸压钻孔;
2、在定向切顶卸压钻孔内实施定向聚能***技术切断老顶,减小老顶悬顶长度,促使上一采区的采动应力峰值向新采区煤体深部转移,降低新采区大巷所在位置的应力集中程度;
3、自采区大巷两帮中上部斜向上分别布置两组顶帮连接杆,保证顶板与两帮的整体性,防止帮顶发生相对滑动,减小两帮移近量;
4、向巷道表面喷射水泥浆,增强支护***的整体性,防止巷道围岩快速风化而降低围岩承载能力;
5、向巷道围岩实施长短孔注水泥浆技术,在巷道周围形成多个承压拱和让压拱,增强巷道的抗破坏能力,保证巷道的稳定性。
2.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:所述定向切顶卸压钻孔布置到老顶上边缘,与竖直方向角度为10~15°。
3.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:所述定向聚能***技术是通过在钻孔中装入预制好缝隙的聚能PVC管,然后通过电***引爆***而实现***。
4.根据权利要求3所述的动压采区大巷复合护巷方法,其特征在于:所述聚能PVC管是将普通PVC管定向切槽或钻眼,使***后的能量沿预制的若面释放,从而实现定向***。
5.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:所述顶帮连接杆与竖直方向打设角度为30~60°。
6.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:所述水泥浆层厚为40~60mm。
7.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:在所述长短孔注水泥浆技术的注浆管为直径25 mm钢管,短注浆管长度为2~3m,长注浆管长度为6~8m,短孔注浆采用低压大流量注浆方式,长孔注浆采用高压小流量注浆方式。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910198709.XA CN109763821B (zh) | 2019-03-15 | 2019-03-15 | 一种动压采区大巷复合护巷方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910198709.XA CN109763821B (zh) | 2019-03-15 | 2019-03-15 | 一种动压采区大巷复合护巷方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109763821A true CN109763821A (zh) | 2019-05-17 |
CN109763821B CN109763821B (zh) | 2024-02-09 |
Family
ID=66459191
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910198709.XA Active CN109763821B (zh) | 2019-03-15 | 2019-03-15 | 一种动压采区大巷复合护巷方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109763821B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110529151A (zh) * | 2019-08-29 | 2019-12-03 | 山西潞安环保能源开发股份有限公司漳村煤矿 | 一种综掘工作面分级分区综合加固过陷落柱方法 |
CN110552700A (zh) * | 2019-09-04 | 2019-12-10 | 天地科技股份有限公司 | 一种基于二氧化碳***的顶板深部围岩卸压方法及*** |
CN111156031A (zh) * | 2020-01-10 | 2020-05-15 | 山西晋煤集团技术研究院有限责任公司 | 一种综采工作面构造区深孔分阶段增压注浆方法 |
CN111946352A (zh) * | 2020-07-22 | 2020-11-17 | 中国矿业大学(北京) | 一种采动巷道的变形控制方法 |
CN114233340A (zh) * | 2021-12-14 | 2022-03-25 | 山西潞安环保能源开发股份有限公司漳村煤矿 | 一种煤矿井下巷道顶板防淋水施工方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4603910A (en) * | 1983-03-23 | 1986-08-05 | Jcc Construction Company Ab | Method of blasting rock caverns with large cross-sectional area |
CN101713290A (zh) * | 2009-12-10 | 2010-05-26 | 天地科技股份有限公司 | 煤矿深部全煤巷道冲击地压解危方法 |
CN103233740A (zh) * | 2013-04-22 | 2013-08-07 | 中国矿业大学(北京) | 一种近距离薄煤层切顶成巷无煤柱开采方法 |
CN104763425A (zh) * | 2015-02-03 | 2015-07-08 | 杨洪兴 | 一种卸压预裂***沿空留巷无煤柱开采方法 |
CN205117366U (zh) * | 2015-07-27 | 2016-03-30 | 山西潞安矿业(集团)有限责任公司 | 一种大断面松软破碎煤巷双承压拱支护装置 |
CN107035387A (zh) * | 2016-12-12 | 2017-08-11 | 贵州理工学院 | 一种强烈动压影响下巷道围岩控制方法 |
CN108035754A (zh) * | 2017-11-10 | 2018-05-15 | 张蓓 | 一种巷道锚杆锚索组合支护方法 |
CN108661643A (zh) * | 2018-04-25 | 2018-10-16 | 太原理工大学 | 一种采煤工作面末采回撤通道切顶卸压护巷方法 |
CN109026024A (zh) * | 2018-08-30 | 2018-12-18 | 河南理工大学 | 一种高水平应力作用巷道顶板变形控制方法 |
CN109372555A (zh) * | 2018-12-26 | 2019-02-22 | 中国矿业大学 | 一种断层破碎区巷道三维立体注浆支护方法 |
-
2019
- 2019-03-15 CN CN201910198709.XA patent/CN109763821B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4603910A (en) * | 1983-03-23 | 1986-08-05 | Jcc Construction Company Ab | Method of blasting rock caverns with large cross-sectional area |
CN101713290A (zh) * | 2009-12-10 | 2010-05-26 | 天地科技股份有限公司 | 煤矿深部全煤巷道冲击地压解危方法 |
CN103233740A (zh) * | 2013-04-22 | 2013-08-07 | 中国矿业大学(北京) | 一种近距离薄煤层切顶成巷无煤柱开采方法 |
CN104763425A (zh) * | 2015-02-03 | 2015-07-08 | 杨洪兴 | 一种卸压预裂***沿空留巷无煤柱开采方法 |
CN205117366U (zh) * | 2015-07-27 | 2016-03-30 | 山西潞安矿业(集团)有限责任公司 | 一种大断面松软破碎煤巷双承压拱支护装置 |
CN107035387A (zh) * | 2016-12-12 | 2017-08-11 | 贵州理工学院 | 一种强烈动压影响下巷道围岩控制方法 |
CN108035754A (zh) * | 2017-11-10 | 2018-05-15 | 张蓓 | 一种巷道锚杆锚索组合支护方法 |
CN108661643A (zh) * | 2018-04-25 | 2018-10-16 | 太原理工大学 | 一种采煤工作面末采回撤通道切顶卸压护巷方法 |
CN109026024A (zh) * | 2018-08-30 | 2018-12-18 | 河南理工大学 | 一种高水平应力作用巷道顶板变形控制方法 |
CN109372555A (zh) * | 2018-12-26 | 2019-02-22 | 中国矿业大学 | 一种断层破碎区巷道三维立体注浆支护方法 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110529151A (zh) * | 2019-08-29 | 2019-12-03 | 山西潞安环保能源开发股份有限公司漳村煤矿 | 一种综掘工作面分级分区综合加固过陷落柱方法 |
CN110552700A (zh) * | 2019-09-04 | 2019-12-10 | 天地科技股份有限公司 | 一种基于二氧化碳***的顶板深部围岩卸压方法及*** |
CN110552700B (zh) * | 2019-09-04 | 2021-04-20 | 天地科技股份有限公司 | 一种基于二氧化碳***的顶板深部围岩卸压方法及*** |
CN111156031A (zh) * | 2020-01-10 | 2020-05-15 | 山西晋煤集团技术研究院有限责任公司 | 一种综采工作面构造区深孔分阶段增压注浆方法 |
CN111946352A (zh) * | 2020-07-22 | 2020-11-17 | 中国矿业大学(北京) | 一种采动巷道的变形控制方法 |
CN114233340A (zh) * | 2021-12-14 | 2022-03-25 | 山西潞安环保能源开发股份有限公司漳村煤矿 | 一种煤矿井下巷道顶板防淋水施工方法 |
CN114233340B (zh) * | 2021-12-14 | 2024-02-13 | 山西潞安环保能源开发股份有限公司漳村煤矿 | 一种煤矿井下巷道顶板防淋水施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109763821B (zh) | 2024-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109763821A (zh) | 一种动压采区大巷复合护巷方法 | |
CN101509395B (zh) | 一种控制放顶护巷方法 | |
CN102562065B (zh) | 一种分段空场嗣后充填采矿方法 | |
CN102635392B (zh) | 超前留巷施工抽采工程的无煤柱煤与瓦斯共采方法 | |
CN108518222A (zh) | 膏体充填结合顶板预裂复采特厚煤层停采线煤柱的方法 | |
CN103244180B (zh) | 一种留小煤柱沿空掘巷围岩控制方法 | |
CN104632220B (zh) | 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法 | |
CN105626083A (zh) | 一种通透肋式连拱隧道的施工方法 | |
CN102953732A (zh) | 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法 | |
CN109098714A (zh) | 一种高瓦斯三软极不稳定煤层综放工作面沿空留巷方法 | |
WO2011103620A1 (en) | A method of reducing subsidence or windblast impacts from longwall mining | |
CN212296427U (zh) | 双巷布置工作面外圈巷道窄煤柱稳定支护结构 | |
CN103161480A (zh) | 主动支撑巷旁充填沿空留巷的方法 | |
CN107893658A (zh) | 强地压环境下极厚大矿体阶段空场嗣后充填采矿方法 | |
CN107829742A (zh) | 一种崩落‑充填‑空场‑崩落采矿方法 | |
CN103306713A (zh) | 一种高突煤层穿层钻孔网络化加固方法 | |
CN102678126A (zh) | 山岭隧道软弱围岩破碎带或浅埋偏压地段的开挖方法 | |
WO2022247176A1 (zh) | 一种充填崩落采矿法 | |
CN102518470A (zh) | 环形截水巷处理冻结管防治水方法 | |
CN106988760A (zh) | 易滑地层隧道洞口加固构造及施工方法 | |
CN104863588A (zh) | 超前预设墩柱沿空留巷方法 | |
CN109812269A (zh) | 一种适用于复采工作面的无煤柱开采方法 | |
CN114542069A (zh) | 一种巨厚顶板上断下切沿空留巷***方法 | |
CN106089207A (zh) | 特厚煤层工作面沿空掘巷窄煤柱留设方法 | |
CN108979666A (zh) | 一种钢管混凝土桩控制巷道底鼓的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |