CN109763821A - 一种动压采区大巷复合护巷方法 - Google Patents

一种动压采区大巷复合护巷方法 Download PDF

Info

Publication number
CN109763821A
CN109763821A CN201910198709.XA CN201910198709A CN109763821A CN 109763821 A CN109763821 A CN 109763821A CN 201910198709 A CN201910198709 A CN 201910198709A CN 109763821 A CN109763821 A CN 109763821A
Authority
CN
China
Prior art keywords
exploiting field
main entry
dynamic pressure
lane method
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910198709.XA
Other languages
English (en)
Other versions
CN109763821B (zh
Inventor
罗明坤
芦志刚
张亮
刘祥龙
王伟林
张玮
王冕
于嘉南
杨敏超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Luan Mining Group Co Ltd
Original Assignee
Shanxi Luan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Luan Mining Group Co Ltd filed Critical Shanxi Luan Mining Group Co Ltd
Priority to CN201910198709.XA priority Critical patent/CN109763821B/zh
Publication of CN109763821A publication Critical patent/CN109763821A/zh
Application granted granted Critical
Publication of CN109763821B publication Critical patent/CN109763821B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

发明提供一种动压采区大巷复合护巷方法,包括如下步骤,1、在靠近上一采区采空侧的新采区回风大巷掘出之后,并实施锚网索联合支护,自回风大巷顶板斜向上布置一排定向切顶卸压钻孔;在定向切顶卸压钻孔内实施定向聚能***技术切断老顶,3、自采区大巷两帮中上部斜向上分别布置两组顶帮连接杆,保证顶板与两帮的整体性,4、向巷道表面喷射水泥浆,增强支护***的整体性,5、向巷道围岩实施长短孔注水泥浆技术,保证巷道的稳定性。有效降低采区大巷服务期间的巷道变形量,保证巷道通风、运输、行人等生产过程的顺畅。

Description

一种动压采区大巷复合护巷方法
技术领域
本发明属于煤矿安全技术领域,特别是涉及一种动压采区大巷复合护巷方法。
背景技术
一个采区回采结束之后,大面积的煤层顶板受采动影响发生变形、下沉及垮落,导致该采区周围的实体煤层中形成高应力区。若新采区采用单翼布置方式,为了尽可能回收煤炭资源,采区区段煤柱留设30~50m,新采区大巷很可能就布置在上一采区的高应力区内。在上一采区顶板回转垮落的过程中,极易造成新采区大巷顶板下沉、两帮移近量大、帮鼓底鼓严重等现象发生,巷道变形严重,极不稳定,严重影响新采区的通风、运输、行人等生产过程。
为了解决动压巷道变形失稳问题,需要采取专门的治理措施,目前所采用的动压巷道失稳治理方法大致有以下几种:1、通过优化支护参数进行巷道变形治理;2、通过对巷道围岩实施注浆加固实现巷道变形治理;3、 通过反复刷帮、挑顶、拉低等方式进行巷道变形治理。但是采用现有的巷道变形治理方法对动压采区大巷治理修复后,发现巷道依然不能长时间维护,巷道变形量仍然很大,尤其表现为两帮移近量和帮鼓量较大,严重影响采区大巷的通风和运输。
发明内容
针对现有技术存在的问题,本发明提供一种动压采区大巷复合护巷方法,有效降低采区大巷服务期间的巷道变形量,保证巷道通风、运输、行人等生产过程的顺畅。
为了实现上述目的,本发明采用如下技术方案:一种动压采区大巷复合护巷方法,包括如下步骤:
1、在靠近上一采区采空侧的新采区回风大巷掘出之后,并实施锚网索联合支护,自回风大巷顶板斜向上布置一排定向切顶卸压钻孔;
2、在定向切顶卸压钻孔内实施定向聚能***技术切断老顶,减小老顶悬顶长度,促使上一采区的采动应力峰值向新采区煤体深部转移,降低新采区大巷所在位置的应力集中程度;
3、自采区大巷两帮中上部斜向上分别布置两组顶帮连接杆,保证顶板与两帮的整体性,防止帮顶发生相对滑动,减小两帮移近量;
4、向巷道表面喷射水泥浆,增强支护***的整体性,防止巷道围岩快速风化而降低围岩承载能力;
5、向巷道围岩实施长短孔注水泥浆技术,在巷道周围形成多个承压拱和让压拱,增强巷道的抗破坏能力,保证巷道的稳定性。
所述定向切顶卸压钻孔布置到老顶上边缘,与竖直方向角度为10~15°。
所述定向聚能***技术是通过在钻孔中装入预制好缝隙的聚能PVC管,然后通过电***引爆***而实现***。
所述聚能PVC管是将普通PVC管定向切槽或钻眼,使***后的能量沿预制的若面释放,从而实现定向***。
所述顶帮连接杆与竖直方向打设角度为30~60°。
所述水泥浆层厚为40~60mm。
在所述长短孔注水泥浆技术的注浆管为直径25 mm钢管,短注浆管长度为2~3m,长注浆管长度为6~8m,短孔注浆采用低压大流量注浆方式,长孔注浆采用高压小流量注浆方式。
本发明的有益效果:
本发明提供的动压巷道变形治理方法,构成了“切顶+支护+注浆”的动压巷道复合护巷方案,有效降低了动压采区大巷服务期间的变形量,减少了巷道修复的工程量,提高了采掘衔接效率,保障了新采区的通风、运输、行人等安全生产过程。
附图说明
图1为采区大巷与上一采区的相对位置关系平面示意图。
图2为采区大巷与上一采区的相对位置关系剖面示意图。
图3为采区大巷锚网索联合支护示意图。
图4为采区大巷注浆护巷示意图。
图中,1、采区皮带巷,2、采区材料巷,3、采区回风巷,4、上一采区采空区,5、煤层,6、直接顶,7、老顶,8、上覆岩层,9、切顶卸压钻孔,10、锚杆,11、锚索,12、顶帮连接杆,13、水泥喷浆层,14、承压拱Ⅰ,15、承压拱Ⅱ,16、让压拱Ⅰ,17、让压拱Ⅱ。
具体实施方式
下面结合附图和具体实施例对本发明做进一步的详细说明。
一种动压采区大巷复合护巷方法,包括如下步骤:
步骤一:在靠近上一采区采空侧4的新采区回风大巷3掘出之后,并实施锚网索10、11联合支护,自回风大巷3顶板斜向上布置一排定向切顶卸压钻孔9,定向切顶卸压钻孔9要布置到老顶7上边缘,与竖直方向角度为10~15°;
步骤二:在定向切顶卸压钻孔9内实施定向聚能***技术切断老顶,减小老顶7悬顶长度,促使上一采区的上覆岩层8的采动应力峰值向新采区煤体5深部转移,降低新采区大巷1、2、3所在位置的应力集中程度;定向聚能***技术是通过在切顶卸压钻孔9中装入预制好缝隙的聚能PVC管,然后通过电***引爆***而实现***,聚能PVC管是将普通PVC管定向切槽或钻眼,使***后的能量沿预制的若面释放,从而实现定向***;
步骤三:自采区大巷1、2、3两帮中上部斜向上分别布置两组顶帮连接杆12,与竖直方向打设角度为30~60°,保证顶板与两帮的整体性,防止帮顶发生相对滑动,减小两帮移近量,顶帮连接杆12;
步骤四:向采区大巷1、2、3表面喷射水泥浆13,水泥浆层13厚为40~60mm,增强支护***的整体性,防止巷道围岩快速风化而降低围岩承载能力;
步骤五:向采区大巷1、2、3围岩实施长短孔注水泥浆技术,在巷道周围形成多个承压拱14、15和让压拱16、17,增强巷道的抗破坏能力,保证巷道的稳定性。在长短孔注水泥浆技术的注浆管为直径25 mm钢管,短注浆管长度为2~3m,长注浆管长度为6~8m,短孔注浆采用低压大流量注浆方式,长孔注浆采用高压小流量注浆方式。
实施例中的方案并非用以限制本发明的专利保护范围,凡未脱离本发明所为的等效实施或变更,均包含于本案的专利范围中。

Claims (7)

1.一种动压采区大巷复合护巷方法,包括如下步骤:
1、在靠近上一采区采空侧的新采区回风大巷掘出之后,并实施锚网索联合支护,自回风大巷顶板斜向上布置一排定向切顶卸压钻孔;
2、在定向切顶卸压钻孔内实施定向聚能***技术切断老顶,减小老顶悬顶长度,促使上一采区的采动应力峰值向新采区煤体深部转移,降低新采区大巷所在位置的应力集中程度;
3、自采区大巷两帮中上部斜向上分别布置两组顶帮连接杆,保证顶板与两帮的整体性,防止帮顶发生相对滑动,减小两帮移近量;
4、向巷道表面喷射水泥浆,增强支护***的整体性,防止巷道围岩快速风化而降低围岩承载能力;
5、向巷道围岩实施长短孔注水泥浆技术,在巷道周围形成多个承压拱和让压拱,增强巷道的抗破坏能力,保证巷道的稳定性。
2.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:所述定向切顶卸压钻孔布置到老顶上边缘,与竖直方向角度为10~15°。
3.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:所述定向聚能***技术是通过在钻孔中装入预制好缝隙的聚能PVC管,然后通过电***引爆***而实现***。
4.根据权利要求3所述的动压采区大巷复合护巷方法,其特征在于:所述聚能PVC管是将普通PVC管定向切槽或钻眼,使***后的能量沿预制的若面释放,从而实现定向***。
5.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:所述顶帮连接杆与竖直方向打设角度为30~60°。
6.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:所述水泥浆层厚为40~60mm。
7.根据权利要求1所述的动压采区大巷复合护巷方法,其特征在于:在所述长短孔注水泥浆技术的注浆管为直径25 mm钢管,短注浆管长度为2~3m,长注浆管长度为6~8m,短孔注浆采用低压大流量注浆方式,长孔注浆采用高压小流量注浆方式。
CN201910198709.XA 2019-03-15 2019-03-15 一种动压采区大巷复合护巷方法 Active CN109763821B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910198709.XA CN109763821B (zh) 2019-03-15 2019-03-15 一种动压采区大巷复合护巷方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910198709.XA CN109763821B (zh) 2019-03-15 2019-03-15 一种动压采区大巷复合护巷方法

Publications (2)

Publication Number Publication Date
CN109763821A true CN109763821A (zh) 2019-05-17
CN109763821B CN109763821B (zh) 2024-02-09

Family

ID=66459191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910198709.XA Active CN109763821B (zh) 2019-03-15 2019-03-15 一种动压采区大巷复合护巷方法

Country Status (1)

Country Link
CN (1) CN109763821B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110529151A (zh) * 2019-08-29 2019-12-03 山西潞安环保能源开发股份有限公司漳村煤矿 一种综掘工作面分级分区综合加固过陷落柱方法
CN110552700A (zh) * 2019-09-04 2019-12-10 天地科技股份有限公司 一种基于二氧化碳***的顶板深部围岩卸压方法及***
CN111156031A (zh) * 2020-01-10 2020-05-15 山西晋煤集团技术研究院有限责任公司 一种综采工作面构造区深孔分阶段增压注浆方法
CN111946352A (zh) * 2020-07-22 2020-11-17 中国矿业大学(北京) 一种采动巷道的变形控制方法
CN114233340A (zh) * 2021-12-14 2022-03-25 山西潞安环保能源开发股份有限公司漳村煤矿 一种煤矿井下巷道顶板防淋水施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4603910A (en) * 1983-03-23 1986-08-05 Jcc Construction Company Ab Method of blasting rock caverns with large cross-sectional area
CN101713290A (zh) * 2009-12-10 2010-05-26 天地科技股份有限公司 煤矿深部全煤巷道冲击地压解危方法
CN103233740A (zh) * 2013-04-22 2013-08-07 中国矿业大学(北京) 一种近距离薄煤层切顶成巷无煤柱开采方法
CN104763425A (zh) * 2015-02-03 2015-07-08 杨洪兴 一种卸压预裂***沿空留巷无煤柱开采方法
CN205117366U (zh) * 2015-07-27 2016-03-30 山西潞安矿业(集团)有限责任公司 一种大断面松软破碎煤巷双承压拱支护装置
CN107035387A (zh) * 2016-12-12 2017-08-11 贵州理工学院 一种强烈动压影响下巷道围岩控制方法
CN108035754A (zh) * 2017-11-10 2018-05-15 张蓓 一种巷道锚杆锚索组合支护方法
CN108661643A (zh) * 2018-04-25 2018-10-16 太原理工大学 一种采煤工作面末采回撤通道切顶卸压护巷方法
CN109026024A (zh) * 2018-08-30 2018-12-18 河南理工大学 一种高水平应力作用巷道顶板变形控制方法
CN109372555A (zh) * 2018-12-26 2019-02-22 中国矿业大学 一种断层破碎区巷道三维立体注浆支护方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4603910A (en) * 1983-03-23 1986-08-05 Jcc Construction Company Ab Method of blasting rock caverns with large cross-sectional area
CN101713290A (zh) * 2009-12-10 2010-05-26 天地科技股份有限公司 煤矿深部全煤巷道冲击地压解危方法
CN103233740A (zh) * 2013-04-22 2013-08-07 中国矿业大学(北京) 一种近距离薄煤层切顶成巷无煤柱开采方法
CN104763425A (zh) * 2015-02-03 2015-07-08 杨洪兴 一种卸压预裂***沿空留巷无煤柱开采方法
CN205117366U (zh) * 2015-07-27 2016-03-30 山西潞安矿业(集团)有限责任公司 一种大断面松软破碎煤巷双承压拱支护装置
CN107035387A (zh) * 2016-12-12 2017-08-11 贵州理工学院 一种强烈动压影响下巷道围岩控制方法
CN108035754A (zh) * 2017-11-10 2018-05-15 张蓓 一种巷道锚杆锚索组合支护方法
CN108661643A (zh) * 2018-04-25 2018-10-16 太原理工大学 一种采煤工作面末采回撤通道切顶卸压护巷方法
CN109026024A (zh) * 2018-08-30 2018-12-18 河南理工大学 一种高水平应力作用巷道顶板变形控制方法
CN109372555A (zh) * 2018-12-26 2019-02-22 中国矿业大学 一种断层破碎区巷道三维立体注浆支护方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110529151A (zh) * 2019-08-29 2019-12-03 山西潞安环保能源开发股份有限公司漳村煤矿 一种综掘工作面分级分区综合加固过陷落柱方法
CN110552700A (zh) * 2019-09-04 2019-12-10 天地科技股份有限公司 一种基于二氧化碳***的顶板深部围岩卸压方法及***
CN110552700B (zh) * 2019-09-04 2021-04-20 天地科技股份有限公司 一种基于二氧化碳***的顶板深部围岩卸压方法及***
CN111156031A (zh) * 2020-01-10 2020-05-15 山西晋煤集团技术研究院有限责任公司 一种综采工作面构造区深孔分阶段增压注浆方法
CN111946352A (zh) * 2020-07-22 2020-11-17 中国矿业大学(北京) 一种采动巷道的变形控制方法
CN114233340A (zh) * 2021-12-14 2022-03-25 山西潞安环保能源开发股份有限公司漳村煤矿 一种煤矿井下巷道顶板防淋水施工方法
CN114233340B (zh) * 2021-12-14 2024-02-13 山西潞安环保能源开发股份有限公司漳村煤矿 一种煤矿井下巷道顶板防淋水施工方法

Also Published As

Publication number Publication date
CN109763821B (zh) 2024-02-09

Similar Documents

Publication Publication Date Title
CN109763821A (zh) 一种动压采区大巷复合护巷方法
CN101509395B (zh) 一种控制放顶护巷方法
CN102562065B (zh) 一种分段空场嗣后充填采矿方法
CN102635392B (zh) 超前留巷施工抽采工程的无煤柱煤与瓦斯共采方法
CN108518222A (zh) 膏体充填结合顶板预裂复采特厚煤层停采线煤柱的方法
CN103244180B (zh) 一种留小煤柱沿空掘巷围岩控制方法
CN104632220B (zh) 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN105626083A (zh) 一种通透肋式连拱隧道的施工方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN109098714A (zh) 一种高瓦斯三软极不稳定煤层综放工作面沿空留巷方法
WO2011103620A1 (en) A method of reducing subsidence or windblast impacts from longwall mining
CN212296427U (zh) 双巷布置工作面外圈巷道窄煤柱稳定支护结构
CN103161480A (zh) 主动支撑巷旁充填沿空留巷的方法
CN107893658A (zh) 强地压环境下极厚大矿体阶段空场嗣后充填采矿方法
CN107829742A (zh) 一种崩落‑充填‑空场‑崩落采矿方法
CN103306713A (zh) 一种高突煤层穿层钻孔网络化加固方法
CN102678126A (zh) 山岭隧道软弱围岩破碎带或浅埋偏压地段的开挖方法
WO2022247176A1 (zh) 一种充填崩落采矿法
CN102518470A (zh) 环形截水巷处理冻结管防治水方法
CN106988760A (zh) 易滑地层隧道洞口加固构造及施工方法
CN104863588A (zh) 超前预设墩柱沿空留巷方法
CN109812269A (zh) 一种适用于复采工作面的无煤柱开采方法
CN114542069A (zh) 一种巨厚顶板上断下切沿空留巷***方法
CN106089207A (zh) 特厚煤层工作面沿空掘巷窄煤柱留设方法
CN108979666A (zh) 一种钢管混凝土桩控制巷道底鼓的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant