CN109763569A - A kind of overhanging awning construction method - Google Patents

A kind of overhanging awning construction method Download PDF

Info

Publication number
CN109763569A
CN109763569A CN201910043448.4A CN201910043448A CN109763569A CN 109763569 A CN109763569 A CN 109763569A CN 201910043448 A CN201910043448 A CN 201910043448A CN 109763569 A CN109763569 A CN 109763569A
Authority
CN
China
Prior art keywords
installation
main couple
truss
construction
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910043448.4A
Other languages
Chinese (zh)
Other versions
CN109763569B (en
Inventor
卢春亭
徐前
何志强
牛敬森
马东旭
郭茜
高权法
李齐波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Installation Engineering Co Ltd filed Critical China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority to CN201910043448.4A priority Critical patent/CN109763569B/en
Publication of CN109763569A publication Critical patent/CN109763569A/en
Application granted granted Critical
Publication of CN109763569B publication Critical patent/CN109763569B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention proposes a kind of overhanging awning construction methods, comprising the following steps: S1, sill anchor Embedment Construction;S2, rigid steel pile lifting;The lifting of roof system main couple is divided into 24 installation units by S3;S4 carries out the support installation of first segment main couple;When S5, one section of main couple GHJ1 of construction and installation, one section of first construction hoisting;S6 lifts oblique column, slings the other end with crane, then lifts by crane front end and lifts two sections or next Pin main couple;S7 is supported installation according to step S4-S6 and main couple is installed and to form the first installation unit;S8, tie-rod and jack truss installation are carried out between two Pin main couples, and the jack truss between adjacent main couple uses overhead connection;S9 recycles above-mentioned steps S4-S7, completes remaining 23 installation unit;The present invention solves in tradition overhanging awning work progress the problem of truss span is big, component is long, and difficulty of construction is big, while increasing temporary support, improves single truss structure lateral stability by installing the truss sections in region.

Description

A kind of overhanging awning construction method
Technical field
The present invention relates to the technical fields more particularly to a kind of overhanging awning construction method of overhanging awning construction.
Background technique
In recent years, with the continuous development that Chinese Sport moves, Chinese Sport number is increased significantly, traditional sports field Structural system main body is concrete frame structure, and roof system is cantilever space truss cells structure, but in roof system installation process Since main truss frame member is long, piece truss section is excessive, transport difficult, and entire difficulty of construction is big, and long construction period, sport Field areas span is big, quality weight, and operating condition limits, and single truss structure overhanging span is big, the list Pin in structure installation process The case where lateral stability is poor, is easy to appear offset in the construction process, influences the progress of subsequent handling.
Summary of the invention
Long for traditional roof truss component, quality weight, difficulty of construction is big, and single truss structure overhanging span is big, is tying The technical problem of list Pin lateral stability difference, the present invention propose a kind of overhanging awning construction method in structure installation process.
To solve the above-mentioned problems, the technical scheme of the present invention is realized as follows:
A kind of overhanging awning construction method, comprising the following steps:
S1, point pre-buried to each sill anchor first measure, and pre-embedded bolt all makes in factory process, then on floor After reinforcing bar binding is completed, embedded sill anchor is carried out according to measurement point, anchor bolt is welded and fixed using reinforcing bar, and in mixed The solidifying vertical muscle of earth pillar carries out binding and fixing, then removes and is fixed temporarily template, finally carry out concrete placings, it is pre- to complete sill anchor It buries;
S2 then carries out steel column lifting;
The lifting of roof system main couple is divided into 24 installation units by S3, and each unit has a two Pin main couples, two Pin main couples it Between fill tie-rod and jack truss;
S4, according to live spelling condition, every two Pin main couple forms an assembled rigid unit, by each truss be respectively designated as GHJ1, GHJ2 ... GHJ47, GHJ1 are divided into three sections of liftings to GHJ9, GHJ25 to GHJ33, and GHJ10 to GHJ24, GHJ25 to GHJ47 are not Segmentation, lifting order are successively carried out from unit one to unit 24;
S4 carries out the support installation of first segment main couple;
When S5, one section of main couple GHJ1 of construction and installation, one section of first construction hoisting, the front and back end for lifting one section of main couple is winded up two Node is fallen on the lintel of two temporary supports, and forward mount point and support are in place, and 5 points support to form a liptinite, construction Second step steel column;
S6, then lifts oblique column, and the other end, rotation to designed elevation and first segment master are sling with crane in erection support position Truss related subgroup, component rear and front end use wirerope to be tensioned to two sides respectively, then lift by crane front end and lift two sections or next Pin Main couple;
S7 carries out the 2nd Pin main couple GHJ2 support installation according to step S4-S6 and the second product main couple GHJ2 carries out installation shape At the first installation unit;
S8, tie-rod and jack truss installation are carried out between two Pin main couples, and the jack truss between adjacent main couple uses overhead connection;
S9, circulation above-mentioned steps S4-S7 circulation complete remaining 23 installation unit.
Further, provisional protection plate is welded when the support in the step S5 is installed.
Further, erection sequence of the jack truss in the step S8 in a standard width of a room in an old-style house presses transversal line from a side to another Side successively lifts.
Beneficial effects of the present invention: the present invention is by being divided into 24 installation units for the lifting of roof system main couple, respectively It is lifted, substantially improves the problem of traditional roof system main couple span is big, quality is heavy and difficulty of construction is big, each installation unit purlin It after the completion of frame is spliced by ground, is lifted, avoids the cumbersome of traditional truss long-distance transport, while being increased interim anti- Shield, it is big to solve traditional single truss structure overhanging span, the problem of single truss structure installation process lateral stability difference.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is roof system overall structure diagram in the present invention.
Fig. 2 is main couple top view.
Fig. 3 is main couple sectional view.
Fig. 4 is bearing structure illustration.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under that premise of not paying creative labor Embodiment shall fall within the protection scope of the present invention.
A kind of overhanging awning construction method, comprising the following steps:
S1, point pre-buried to each sill anchor first measures, according to original axis control point and elevation control point to scene The encryption of axis and elevation control point is carried out, measuring goes out the center of each embedded part to the axis then gone out according to control line measuring again Cross wire and at least two elevation control points;
Pre-embedded bolt all makes in factory process, and the frame of each steel column pre-embedded bolt all carries out processing system in factory Make.The production precision of pre-embedded bolt: the spacing of pre-embedded bolt centre to centre ≯ 2 ㎜, relative relief ≯ 2 ㎜ on pre-embedded bolt top; Then after floor reinforcement binding is completed, after floor reinforcement binding is completed, before the beam steel bar colligation of floor, built-in fitting Embedded work can be inserted into.It is according to the axis that measurement work institute's measuring goes out, pre-embedded bolt is integrally in place, find embedded part top accurately first The vertically and horizontally center line of four fixed angle steel, and the reference line of itself and measurement and positioning is made to coincide;Then embedded part is measured with level The mark of bolt top surface on four angles, with reinforcing bar or angle steel under four angles of embedded part following four fixed angle steel when insufficient height Levelling carries out embedded sill anchor according to measurement point, anchor bolt is welded and fixed using reinforcing bar, and in the vertical muscle of concrete column Binding and fixing are carried out, then removes and is fixed temporarily template, finally carry out concrete placings, it is pre-buried to complete sill anchor;
S2 carries out examination before steel column lifting and hangs, and crane is parked in crane operation area close to operation cushion cap position, lifts wirerope It is locked with steel column lifting lug, after safety inspection is qualified, starts to lift by crane capital and sling when one end height is 100~200mm to stop hanging, examine It looks into rigging securely and the stability of crane, while sending special messenger that the security and stability on basis below truck crane, determination is observed continuously It can continue slowly to lift by crane after safety, aerial operation phase crane commander should keep a close eye on the lifting state of component, command mouth It enables harmonious.
It tries there are three the purposes hung: first is that examining lifting lifting equipment security reliability;Second is that checking the standard of suspension centre setting True property;Third is that coordinating from commanding to lifting by crane, pulling wind, lifting speed is observed and total manoeuvre of crane operation.Then carry out steel column Lifting, steel column lifting should be carried out according to the erection sequence of each subregion, and form stable structural system in time, upper and lower steel column butt joint Mismatch adjustment can add jack to carry out by being welded on the L shape stainless steel strut of lower end capital, and timing is first suitably by interim spiral shell Bolt loosens, and is then corrected with jack, tightens bolt again after correction is good.If steel column otic placode is the same as between interim connecting cleat Gap it is excessive, can between column otic placode and interim connecting cleat cushioning steel plate, then tighten bolt again.Finally welded in steel column Cut off the L shape stainless steel strut of auxiliary corrective before construction, it is noted that not hurt base material when cutting, the capital mark of top steel column High and axis location can use total station progress, set up steel pipe behaviour in steel column node location in advance in the lifting of upper section steel column Make body panel, putting up platform securely will there will be security official to exclusively carry out and inspect for acceptance after setting up, qualified rear can be used.
The lifting of roof system main couple is divided into 24 installation units by S3, and each unit has two Pin main couples, two Pin main trusses Tie-rod and jack truss are filled between frame;
S4, according to live spelling condition, every two Pin main couple forms an assembled rigid unit, by each truss be respectively designated as GHJ1, GHJ2 ... GHJ47, GHJ1 are divided into three sections of liftings to GHJ9, GHJ25 to GHJ33, and GHJ10 to GHJ24, GHJ25 to GHJ47 are not Segmentation, lifting order are successively carried out from unit one to unit 24;
S4 carries out the support installation of first segment main couple;
When S5, one section of main couple GHJ1 of construction and installation, hanging device selects a crawler crane and two truck crane cooperation liftings, first One section of construction hoisting, front and back end two nodes that wind up for lifting one section of main couple are fallen on the lintel of two temporary supports, such as Fig. 4 Shown, forward mount point and support are in place, provisional protection plate are welded when support is installed, for increasing stabilization when truss installa-tion Property, it avoids deviating when truss installa-tion, 5 points support to form a liptinite, second step steel column of constructing;
S6 then lifts oblique column such as Fig. 2 and such as Fig. 3, then the other end is sling with the crane of a 25t in erection support position, To designed elevation and first segment main couple related subgroup, steel column installation is in place and completes to reach design to position of joints welding for rotation Level weld seam requirement after, two cranes that component rear and front end uses twice Q16 wirerope to be tensioned to two sides respectively can off the hook, then It lifts by crane front end and lifts two sections or next Pin main couple;
S7 carries out the 2nd Pin main couple GHJ2 support installation according to step S4-S6 and the second product main couple GHJ2 carries out installation shape At the first installation unit;
S8 carries out tie-rod and jack truss installation between two Pin main couples, and the jack truss between adjacent main couple uses overhead connection, Jack truss docking uses truck crane integral hoisting.It all needs to make to lift by the way that two suspension centres are calculated before every truss structure lifting Suspension centre uniform force in journey, guarantees the truss balance in hoisting process, and the erection sequence in a standard width of a room in an old-style house presses transversal line It is successively lifted from a side to the other side;
S9, as shown in Figure 1, circulation above-mentioned steps S4-S7 circulation completes remaining 23 installation unit, roof truss is installed At, one component of every lifting completion, adjustment, checking measurements axis and absolute altitude, accurate rear firm welding, and in main couple It installing, repetition measurement main couple axis, absolute altitude, it is ensured that longitudinal main couple holding position during lifting jack truss is accurate, And it prevents from reversing.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (3)

1. a kind of overhanging awning construction method, which comprises the following steps:
S1, point pre-buried to each sill anchor first measure, and pre-embedded bolt all makes in factory process, then on floor After reinforcing bar binding is completed, embedded sill anchor is carried out according to measurement point, anchor bolt is welded and fixed using reinforcing bar, and in mixed The solidifying vertical muscle of earth pillar carries out binding and fixing, then removes and is fixed temporarily template, finally carry out concrete placings, it is pre- to complete sill anchor It buries;
S2 then carries out steel column lifting;
The lifting of roof system main couple is divided into 24 installation units by S3, and each unit has a two Pin main couples, two Pin main couples it Between fill tie-rod and jack truss;
S4, according to live spelling condition, every two Pin main couple forms an assembled rigid unit, by each truss be respectively designated as GHJ1, GHJ2 ... GHJ47, GHJ1 are divided into three sections of liftings to GHJ9, GHJ25 to GHJ33, and GHJ10 to GHJ24, GHJ25 to GHJ47 are not Segmentation, lifting order are successively carried out from unit one to unit 24;
S4 carries out the support installation of first segment main couple;
When S5, one section of main couple GHJ1 of construction and installation, one section of first construction hoisting, the front and back end for lifting one section of main couple is winded up two Node is fallen on the lintel of two temporary supports, and forward mount point and support are in place, and 5 points support to form a liptinite, construction Second step steel column;
S6, then lifts oblique column, and the other end, rotation to designed elevation and first segment master are sling with crane in erection support position Truss related subgroup, component rear and front end use wirerope to be tensioned to two sides respectively, then lift by crane front end and lift two sections or next Pin Main couple;
S7 carries out the 2nd Pin main couple GHJ2 support installation according to step S4-S6 and the second product main couple GHJ2 carries out installation shape At the first installation unit;
S8, tie-rod and jack truss installation are carried out between two Pin main couples, and the jack truss between adjacent main couple uses overhead connection;
S9, circulation above-mentioned steps S4-S7 circulation complete remaining 23 installation unit.
2. overhanging awning construction method according to claim 1, which is characterized in that when the support in the step S5 is installed Weld provisional protection plate.
3. overhanging awning construction method according to claim 1, which is characterized in that the jack truss in the step S8 is one Erection sequence in a standard width of a room in an old-style house is successively lifted by transversal line from a side to the other side.
CN201910043448.4A 2019-01-17 2019-01-17 Construction method of cantilever awning Active CN109763569B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910043448.4A CN109763569B (en) 2019-01-17 2019-01-17 Construction method of cantilever awning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910043448.4A CN109763569B (en) 2019-01-17 2019-01-17 Construction method of cantilever awning

Publications (2)

Publication Number Publication Date
CN109763569A true CN109763569A (en) 2019-05-17
CN109763569B CN109763569B (en) 2020-12-04

Family

ID=66452327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910043448.4A Active CN109763569B (en) 2019-01-17 2019-01-17 Construction method of cantilever awning

Country Status (1)

Country Link
CN (1) CN109763569B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982655A (en) * 2021-03-10 2021-06-18 艾奕康设计与咨询(深圳)有限公司 Spatial steel structure combined by triangular truss and single-layer latticed shell
CN113529952A (en) * 2021-06-21 2021-10-22 中国航空国际建设投资有限公司 Awning overhanging structure, building and construction method of awning overhanging structure
CN113982284A (en) * 2021-10-28 2022-01-28 中铁三局集团建筑安装工程有限公司 Installation method of large-span special-shaped steel structure toll booth
CN115324256A (en) * 2022-08-22 2022-11-11 中建七局国际工程建设有限公司 Stadium overhanging roof based on triangular truss and construction method thereof
CN115324360A (en) * 2022-07-27 2022-11-11 成都建工第四建筑工程有限公司 Construction method of large-span suspended truss

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3329000C2 (en) * 1983-08-11 1991-11-21 Mbm Multi-Bausysteme Gmbh, 8260 Muehldorf, De
US7143550B1 (en) * 2002-09-19 2006-12-05 Conservatek Industries, Inc. Double network reticulated frame structure
CN204081548U (en) * 2014-08-29 2015-01-07 中国建筑第六工程局有限公司 Cantilever frame temporary support and main couple joint portion device
CN104631838A (en) * 2014-12-08 2015-05-20 永升建设集团有限公司 Method for installing abnormal-shaped extremely-large overhung steel truss under process monitoring construction
CN105133841A (en) * 2015-07-29 2015-12-09 五洋建设集团股份有限公司 Spatial curved surface steel structure pipe truss roof installation construction method
CN106836498A (en) * 2016-12-28 2017-06-13 郑州工业应用技术学院 A kind of super-span Stadium roof system steel truss lifting construction engineering method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3329000C2 (en) * 1983-08-11 1991-11-21 Mbm Multi-Bausysteme Gmbh, 8260 Muehldorf, De
US7143550B1 (en) * 2002-09-19 2006-12-05 Conservatek Industries, Inc. Double network reticulated frame structure
CN204081548U (en) * 2014-08-29 2015-01-07 中国建筑第六工程局有限公司 Cantilever frame temporary support and main couple joint portion device
CN104631838A (en) * 2014-12-08 2015-05-20 永升建设集团有限公司 Method for installing abnormal-shaped extremely-large overhung steel truss under process monitoring construction
CN105133841A (en) * 2015-07-29 2015-12-09 五洋建设集团股份有限公司 Spatial curved surface steel structure pipe truss roof installation construction method
CN106836498A (en) * 2016-12-28 2017-06-13 郑州工业应用技术学院 A kind of super-span Stadium roof system steel truss lifting construction engineering method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982655A (en) * 2021-03-10 2021-06-18 艾奕康设计与咨询(深圳)有限公司 Spatial steel structure combined by triangular truss and single-layer latticed shell
CN113529952A (en) * 2021-06-21 2021-10-22 中国航空国际建设投资有限公司 Awning overhanging structure, building and construction method of awning overhanging structure
CN113529952B (en) * 2021-06-21 2022-11-04 中国航空规划设计研究总院有限公司 Awning overhanging structure, building and construction method of awning overhanging structure
CN113982284A (en) * 2021-10-28 2022-01-28 中铁三局集团建筑安装工程有限公司 Installation method of large-span special-shaped steel structure toll booth
CN115324360A (en) * 2022-07-27 2022-11-11 成都建工第四建筑工程有限公司 Construction method of large-span suspended truss
CN115324256A (en) * 2022-08-22 2022-11-11 中建七局国际工程建设有限公司 Stadium overhanging roof based on triangular truss and construction method thereof

Also Published As

Publication number Publication date
CN109763569B (en) 2020-12-04

Similar Documents

Publication Publication Date Title
CN109763569A (en) A kind of overhanging awning construction method
CN103410322B (en) The parallel Truss Steel corridor construction method of large span
CN111749145A (en) Incremental launching construction method
CN107012949A (en) A kind of method for improving of large-span steel vestibule
CN205558304U (en) Hoist and mount system of large -scale steel gallery truss
CN111794119B (en) Temporary supporting system and hoisting method for basket type steel box tie bar arch
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN103410335B (en) Front support post-tensioning large cantilever beam integral embedded type construction method for hanging
CN107013038A (en) A kind of steel structure slipping of building roof lighting Zhongting changes column construction method
CN112324131B (en) One-frame dual-purpose large-span stiff beam construction structure and construction method thereof
CN104831632B (en) A kind of bridge cable tower entablature and sill construction method
CN114412182B (en) Construction method of ultrahigh large-section stiffness inclined column hanging template
CN104100090A (en) High-altitude comprehensive construction method of big-cantilever steel truss structure
CN108374340A (en) The method of longspan steel truss girder upper bracket assembly sliding roadway arch
CN108894496A (en) A kind of over-the-counter construction method of Large-span Truss String Structure beam
CN108678181B (en) High-altitude construction method for steel truss and concrete combined structure on top of bin
CN102777044B (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN202544423U (en) Hoisting structure of supporting steel column
CN109653517A (en) A kind of multidirectional Load Relief System and the construction method with the system assembly steel vestibule
CN104264781B (en) Latticed cylinder Steel Shell and construction method thereof
CN108343162A (en) A kind of mounting structure and installation method of assembling-type precast hybrid beam and stiffened column
CN114033204A (en) Reconstruction construction method for existing single-column canopy
CN114382015A (en) Construction method for vertical rotation of special-shaped steel main tower of cable-stayed bridge
CN113802461A (en) Steel box girder erection method
CN111847272A (en) Supporting method of tower crane for reconstruction of existing building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant