CN109737747A - A kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band - Google Patents

A kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band Download PDF

Info

Publication number
CN109737747A
CN109737747A CN201910024486.5A CN201910024486A CN109737747A CN 109737747 A CN109737747 A CN 109737747A CN 201910024486 A CN201910024486 A CN 201910024486A CN 109737747 A CN109737747 A CN 109737747A
Authority
CN
China
Prior art keywords
furnace body
kiln
air
appendix
sealing cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910024486.5A
Other languages
Chinese (zh)
Other versions
CN109737747B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weishan Dawei New Building Materials Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910024486.5A priority Critical patent/CN109737747B/en
Priority to CN201911078004.0A priority patent/CN110736339A/en
Publication of CN109737747A publication Critical patent/CN109737747A/en
Application granted granted Critical
Publication of CN109737747B publication Critical patent/CN109737747B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B5/00Muffle furnaces; Retort furnaces; Other furnaces in which the charge is held completely isolated
    • F27B5/02Muffle furnaces; Retort furnaces; Other furnaces in which the charge is held completely isolated of multiple-chamber type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B5/00Muffle furnaces; Retort furnaces; Other furnaces in which the charge is held completely isolated
    • F27B5/06Details, accessories, or equipment peculiar to furnaces of these types
    • F27B5/14Arrangements of heating devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B5/00Muffle furnaces; Retort furnaces; Other furnaces in which the charge is held completely isolated
    • F27B5/06Details, accessories, or equipment peculiar to furnaces of these types
    • F27B5/16Arrangements of air or gas supply devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D13/00Apparatus for preheating charges; Arrangements for preheating charges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/004Systems for reclaiming waste heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B5/00Muffle furnaces; Retort furnaces; Other furnaces in which the charge is held completely isolated
    • F27B5/06Details, accessories, or equipment peculiar to furnaces of these types
    • F27B5/16Arrangements of air or gas supply devices
    • F27B2005/161Gas inflow or outflow
    • F27B2005/164Air supply through a set of tubes with openings
    • F27B2005/165Controlled tubes, e.g. orientable or with closable openings

Abstract

The invention discloses a kind of high tenacity colliery wastes brick agglomerating plants of the pre- heat recovery function of band, pass through the concatenated kiln of appendix including multiple, in the end insertion tail gas absorption box of the appendix, the air blower that gas is pumped into the kiln is provided on the kiln of the head end connection of the appendix;The kiln includes furnace body and the supporting leg for supporting fixed furnace body, and the input and output material hole of multiple perforation bottom of furnace body is provided on the furnace body inside bottom surface, runs through in the input and output material hole and is plugged with mounting table, the mounting table is slidably connected with the sealing of input and output material hole.Beneficial effect is: a kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band of the present invention is able to solve the larger problem of humidity in preheated air, pre-heat effect is good, and it is able to extend residence time of the hot-air in kiln, adobe is sintered or is preheated using hot-air to greatest extent, energy consumption is significantly reduced, practicability is good.

Description

A kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band
Technical field
The present invention relates to apparatus fields of baking bricks, and in particular to a kind of high tenacity colliery wastes brick sintering of the pre- heat recovery function of band Equipment.
Background technique
The high tenacity colliery wastes brick agglomerating plant of the existing pre- heat recovery function of band is all that multiple kilns are passed through pipeline string Connection gets up, and then directly blasts in first kiln hot-air by pipeline and is sintered to the adobe in first kiln, Then hot-air enters in second kiln through pipeline and preheats to the adobe in second kiln, later, second kiln Interior hot-air enters in third kiln through pipeline preheats the adobe in third kiln, and such hot-air is past always Conveying, achievees the purpose that make full use of the thermal energy in hot-air in next kiln.Although this kind of agglomerating plant good energy saving property, Be its there are still some problems in actual use;
Such as sintering when hot-air enter after kiln do not stop substantially just enter pipeline leave the kiln, although hot-air is straight It connects and is contacted with adobe, but since hot-air flow velocity is fast, time of contact is short, therefore actually needs to consume more heat ability By adobe sinter molding, therefore traditional agglomerating plant coal consumption or air consumption is generally higher;
In addition, adobe is entered in next kiln by the moisture of thermal evaporation with hot-air, and so, kiln more rearward Interior moisture is heavier, and pre-heat effect is also poorer, therefore more kilns is theoretically arranged can more fully absorb heat, but real Humidity on border in the backward in hot-air is bigger, is unfavorable for the preheating of adobe instead.
Summary of the invention
The object of the invention is that providing a kind of high tenacity coal of pre- heat recovery function of band to solve the above-mentioned problems Spoil brick agglomerating plant, it is high with the high tenacity colliery wastes brick agglomerating plant energy consumption for solving traditional in the prior art, to pre- recuperation of heat Using it is insufficient the problems such as.Preferred technical solution is able to solve wet in preheated air in many technical solutions provided by the invention Larger problem is spent, pre-heat effect is good, and is able to extend residence time of the hot-air in kiln, utilizes heat to greatest extent The technical effects such as air is sintered or preheats to adobe, significant decrease energy consumption, and practicability is good, elaboration as detailed below.
To achieve the above object, the present invention provides following technical schemes:
A kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band provided by the invention, including multiple pass through appendix The end of concatenated kiln, the appendix is inserted into tail gas absorption box, is arranged on the kiln of the head end connection of the appendix The air blower of pump gas in the oriented kiln;
The kiln includes furnace body and the supporting leg for supporting fixed furnace body, is provided with multiple perforation furnace bodies on the furnace body inside bottom surface The input and output material hole of bottom, through mounting table is plugged in the input and output material hole, the mounting table and the sealing sliding of input and output material hole connect It connects, the lower end of the mounting table is fixedly connected with support baseboard, and the support baseboard lower end is provided with lifting seat plate, the lifting One end of seat plate is fixedly connected with the push rod cup of Electrohydraulic push rod lower end, and the Electrohydraulic push rod is fixedly mounted on inboard wall of furnace body vertically On;Concentric protection cylinder is provided with right above the input and output material hole, and the internal diameter of protection cylinder is greater than the hole in input and output material hole Diameter is provided with adobe pile in the protection cylinder, and the adobe pile overlays on mounting table, between the protection cylinder and inboard wall of furnace body It is laid with big coiled pipe, the small coiled pipe being connected to big coiled pipe is laid between the protection cylinder and the central axis of furnace body, The furnace body lower end is provided with the air inlet pipe being connected to big coiled pipe, and the other end of the air inlet pipe is connected to air blower, described It is provided with burner in air inlet pipe, is provided with gas valve and air valve on the burner;
The furnace body upper end cover is equipped with sealing cover, and the sealing cover includes the lower sealing cover and sealing with the upper surface snapping of furnace body The top cover labyrinth of lower sealing cover upper end is snapped onto, escape pipe, the escape pipe lower end are provided on the central axis of the furnace body It is connected to small coiled pipe, the escape pipe upper end is stretched out and is connected to appendix, the escape pipe side from the upper surface of sealing cover Face is provided with pressure maintaining valve, and when the intracorporal air pressure of furnace is more than the threshold value of pressure maintaining valve, the pressure maintaining valve opening makes the intracorporal air of furnace Enter in escape pipe through pressure maintaining valve, the air-flow that the air blower is blown afloat successively passes through air inlet pipe, big coiled pipe, small coiled pipe from out Tracheae upper end enters appendix connection;The lower surface of the top cover labyrinth and the upper surface of lower sealing cover are symmetrically arranged with a pair of of ring Slot is equipped with festoon drier in the annular groove, the number of quantity and protection cylinder is equipped on the lower surface of the festoon drier Equal connection lasso is measured, the protection cylinder upper end insertion connection lasso is interior and is tightly connected therewith;Under the lower sealing cover Surface is provided with the gas vent being connected to annular groove, and the air-flow in the protection cylinder passes through drier from bottom to top and enters annular groove In, the perimeter of protection cylinder in furnace body is finally discharged into from gas vent.
As the significant design of this case, pass through between the top cover labyrinth and lower sealing cover and between sealing cover furnace body Fastening screw is fixedly connected.
As the optimization design of this case, pad is equipped with gasket between the sealing cover and furnace body.
As the optimization design of this case, jack is provided on the side wall of the support baseboard.
As the optimization design of this case, one end of the appendix is connected to the escape pipe of a upper kiln, the gas transmission The other end of pipe is connected to the air inlet pipe of next kiln, and the hot gas that escape pipe is discharged in a upper kiln flows through appendix entrance In big coiled pipe in next kiln.
As the optimization design of this case, relief valve is installed on the furnace body outside, the threshold value of the relief valve is greater than steady The threshold value of pressure valve, when the intracorporal air pressure of furnace is more than the threshold value of relief valve, the relief valve is opened, and reduces the intracorporal air pressure of furnace.
As the optimization design of this case, the furnace body and sealing cover are all made of heat-barrier material production.
Beneficial effect is: a kind of high tenacity colliery wastes brick agglomerating plant energy of the pre- heat recovery function of band of the present invention Enough solve the problems, such as that humidity is larger in preheated air, pre-heat effect is good, and when being able to extend stop of the hot-air in kiln Between, adobe is sintered or is preheated using hot-air to greatest extent, significantly reduces energy consumption, practicability is good.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the main view of kiln of the present invention;
Fig. 3 is the internal structure chart of Fig. 2 of the present invention;
Fig. 4 is the top view of furnace body of the present invention;
Fig. 5 is the bottom view of lower sealing cover of the present invention;
Fig. 6 is the bottom view of top cover labyrinth of the present invention;
Fig. 7 is the partial enlarged view of Fig. 3 of the invention.
The reference numerals are as follows:
1, kiln;2, appendix;3, tail gas absorption box;4, air blower;5, furnace body;6, supporting leg;7, gasket;8, lower sealing cover; 9, top cover labyrinth;10, fastening screw;11, input and output material hole;12, mounting table;13, support baseboard;14, seat plate is lifted;15, electro-hydraulic Push rod;16, jack;17, protection cylinder;18, big coiled pipe;19, small coiled pipe;20, escape pipe;21, air inlet pipe;22, burner; 23, gas valve;24, air valve;25, pressure maintaining valve;26, relief valve;27, annular groove;28, festoon drier;29, gas vent;30, even Female connector circle;31, adobe pile.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical solution of the present invention will be carried out below Detailed description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art are obtained all without making creative work Other embodiment belongs to the range that the present invention is protected.
Refer to figures 1-7, a kind of high tenacity colliery wastes brick sintering of the pre- heat recovery function of band provided by the invention is set It is standby including multiple by the concatenated kiln 1 of appendix 2, it designs in this way, first kiln 1 can carry out high tenacity colliery wastes brick Sintering work, subsequent kiln 1 can preheat high tenacity colliery wastes brick, thus realize the recycling to sintering waste heat, section Can environmental protection, practicability is good, and in the end of appendix 2 insertion tail gas absorption box 3, design in this way can will be hot by tail gas absorption box 3 Toxic contaminants gas in air is absorbed, it is prevented to be immediately discharged to pollute environment in atmosphere, energy conservation and environmental protection, appendix 2 Head end connection kiln 1 on be provided with the air blower 4 that gas is pumped into the kiln 1, air blower 4 is for increasing kiln 1 and kiln 1 Between appendix 2, big coiled pipe 18, small coiled pipe 19, the air flowing in escape pipe 20 and air inlet pipe 21, it is ensured that burner 22 The hot-air that burning is formed can smoothly sequentially pass through each kiln 1 and be expelled in tail gas absorption box 3 from the end of appendix 2;
Referring to fig. 2 shown in-Fig. 7, kiln 1 includes furnace body 5 and the supporting leg 6 for supporting fixed furnace body 5, is arranged in 5 inside bottom surface of furnace body There is the input and output material hole 11 of multiple perforation 5 bottoms of furnace body, input and output material hole 11 facilitates adobe pile 31 to move up and down disengaging furnace body 5, works as brick Base controls Electrohydraulic push rod 15 after being sintered and support baseboard 13 is driven to decline, until adobe pile 31 is all from 11 lower end of input and output material hole It stretches out, then two root cutting bars of fork truck are inserted into respectively in the jack 16 of 13 two sides of support baseboard can be by support baseboard 13 from act It rises and is transported on seat plate 14, through mounting table 12 is plugged in input and output material hole 11, mounting table 12 is for placing adobe pile 31, mounting table 12 are slidably connected with the sealing of input and output material hole 11, and the lower end of mounting table 12 is fixedly connected with support baseboard 13,13 lower end of support baseboard It is provided with lifting seat plate 14, one end of lifting seat plate 14 is fixedly connected with the push rod cup of 15 lower end of Electrohydraulic push rod, Electrohydraulic push rod 15 It is fixedly mounted on 5 inner wall of furnace body vertically;The surface in input and output material hole 11 is provided with concentric protection cylinder 17, and protection cylinder 17 internal diameter is greater than the aperture in input and output material hole 11, designs in this way, and neither influence adobe pile 31 moves up and down, and protects serpent disk Pipe 18 and small coiled pipe 19 will not be pounded by adobe pile 31 to once adobe pile 31 collapses, due to the presence of protection cylinder 17, serpent disk Pipe 18 and small coiled pipe 19 will not be pounded disconnected, and highly-safe, practicability is good, and adobe pile 31, adobe are provided in protection cylinder 17 Pile 31 overlays on mounting table 12, is laid with big coiled pipe 18, protection cylinder 17 and furnace body 5 between 5 inner wall of protection cylinder 17 and furnace body Central axis between be laid with the small coiled pipe 19 being connected to big coiled pipe 18, big coiled pipe 18 and small is set in furnace body 5 The purpose of coiled pipe 19 is the residence time in order to extend hot-air in furnace body 5, to greatest extent using hot-air to adobe It is sintered or preheats, significantly reduce energy consumption, 5 lower end of furnace body is provided with the air inlet pipe 21 being connected to big coiled pipe 18, air inlet pipe 21 other end is connected to air blower 4, and burner 22 is provided in air inlet pipe 21, gas valve 23 and air valve are provided on burner 22 24, specific structure of the gas valve 23 for external combustion gas, burner 22 and gas valve 23 and air valve 24 belongs to the prior art, this Text is not repeating;
Referring to fig. 2 shown in-Fig. 6,5 upper end cover of furnace body is equipped with sealing cover, and sealing cover includes close under the upper surface snapping with furnace body 5 Capping 8 and sealing snap onto the top cover labyrinth 9 of 8 upper end of lower sealing cover, are provided with escape pipe 20 on the central axis of furnace body 5, out 20 lower end of tracheae is connected to small coiled pipe 19, and 20 upper end of escape pipe is stretched out from the upper surface of sealing cover and is connected to appendix 2, out 20 side of tracheae is provided with pressure maintaining valve 25, and when the air pressure in furnace body 5 is more than the threshold value of pressure maintaining valve 25, the opening of pressure maintaining valve 25 makes furnace Air in body 5 enters in escape pipe 20 through pressure maintaining valve 25, thus guarantee stable gas pressure in furnace body 5, the air-flow that air blower 4 is blown afloat Successively enter appendix 2 from 20 upper end of escape pipe by air inlet pipe 21, big coiled pipe 18, small coiled pipe 19 to be connected to;Top cover labyrinth 9 Lower surface and the upper surface of lower sealing cover 8 be symmetrically arranged with a pair of of annular groove 27, festoon drier 28, ring are installed in annular groove 27 The quantity connection lasso 30 equal with the quantity of protection cylinder 17 is installed, 17 upper end of protection cylinder is inserted on the lower surface of shape drier 28 Enter to connect in lasso 30 and be tightly connected therewith, design in this way, guarantees that 17 upper end of protection cylinder is air tight;The following table of lower sealing cover 8 Face is provided with the gas vent 29 being connected to annular groove 27, and the air-flow in protection cylinder 17 passes through drier from bottom to top and enters annular groove 27 In, the perimeter of protection cylinder 17 in furnace body 5 is finally discharged into from gas vent 29.
As optional embodiment, pass through between top cover labyrinth 9 and lower sealing cover 8 and between sealing cover furnace body 5 Fastening screw 10 is fixedly connected, and is designed in this way, not only be ensure that sealing effect, but also convenient disassembly.
Pad is equipped with gasket 7 between sealing cover and furnace body 5, and gasket 7 is used to enhance the sealing between sealing cover and furnace body 5 Property.
Jack 16 is provided on the side wall of support baseboard 13, jack 16 facilitates fork truck to insert support baseboard 13.
One end of appendix 2 is connected to the escape pipe 20 of a upper kiln 1, the other end of appendix 2 and next kiln 1 Air inlet pipe 21 be connected to, the hot gas that escape pipe 20 is discharged in a upper kiln 1 flows through appendix 2 and enters in next kiln 1 In big coiled pipe 18.
Relief valve 26 is installed, the threshold value of relief valve 26 is greater than the threshold value of pressure maintaining valve 25, when in furnace body 5 on 5 outside of furnace body Air pressure be more than relief valve 26 threshold value when, relief valve 26 open, reduce furnace body 5 in air pressure, in this way design, once pressure maintaining valve When 25 damage, relief valve 26 can also be worked normally, to guarantee that air pressure is unlikely excessively high in furnace body 5.
Furnace body 5 and sealing cover are all made of heat-barrier material production, design in this way, can reduce being generated by furnace body 5 and sealing cover Thermal loss, further energy conservation and environmental protection.
The high tenacity colliery wastes brick agglomerating plant of the above-mentioned pre- heat recovery function of a kind of band, in use, first by high tenacity bastard coal Stone brick adobe overlays on mounting table 12, forms adobe pile 31, is then placed on lifting seat plate 14 with equipment such as fork trucks, Later, starting Electrohydraulic push rod 15 drives support baseboard 13 to rise, until mounting table 12 is inserted into input and output material hole 11 and seals therewith Then connection opens gas valve 23 and air valve 24, lights burner 22 and start air blower 4, fired burner 22 by air blower 4 It burns the heat generated to be blown into big coiled pipe 18 by air inlet pipe 21, later, hot-air enters in small coiled pipe 19 and along small snake Coil pipe 19 enters in escape pipe 20, finally enters in appendix 2 from 20 upper end of escape pipe, is then entered by appendix 2 next In the air inlet pipe 21 of kiln 1, last thermal current is injected into the absorbing liquid contained in tail gas absorption box 3, and absorbing liquid is for inhaling The polluted gas such as nitrogen oxides, sulfide in ending gas, since hot-air passes through big coiled pipe 18, small coiled pipe 19 and outlet Kiln 1 is just left after pipe 20, therefore residence time of the hot-air in kiln 1 is longer, compared to traditional hot-air directly under The sintering processing for going to next kiln 1 is out on and after kiln 1, kiln 1 of the invention can significantly extend hot gas Flow flowing time in kiln 1, to make the abundant heating kiln 1 of hot-air, to greatest extent using hot-air to adobe into Row sintering or preheating, significantly reduce energy consumption, and practicability is good, pass through big coiled pipe 18, small coiled pipe 19 and escape pipe in hot-air During 20, big coiled pipe 18, small coiled pipe 19 and the outside radiations heat energy of the meeting of escape pipe 20, Heating guard cylinder 17 are then prevented Casing 17 heats adobe pile 31, so that the sintering of adobe pile 31 is completed, the damp and hot sky generated in 31 sintering process of adobe pile Gas enters from bottom to top in festoon drier 28, and the drying hot-air after festoon drier 28 is dry enters in annular groove 27 simultaneously It is discharged into furnace body 5 by gas vent 29, as big coiled pipe 18, small coiled pipe 19 and escape pipe 20 constantly conduct heat outward, in furnace body 5 Air pressure and temperature it is higher and higher, when temperature be more than pressure maintaining valve 25 threshold value when, pressure maintaining valve 25 open, high-pressure hot air warp Pressure maintaining valve 25 enters in escape pipe 20 and enters in appendix 2 with the hot-air in escape pipe 20, due in sealing cover Add festoon drier 28, thus can ensure be sent into escape pipe 20 in hot-air be it is dry, efficiently solve preheating The larger problem of humidity in air, pre-heat effect are good.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (7)

1. a kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band, it is characterised in that: pass through gas transmission including multiple It manages (2) concatenated kiln (1), in end insertion tail gas absorption box (3) of the appendix (2), the head end of the appendix (2) The air blower (4) of the pump gas into the kiln (1) is provided on the kiln (1) of connection;
The kiln (1) includes furnace body (5) and the supporting leg (6) for supporting fixed furnace body (5), is set in furnace body (5) inside bottom surface It is equipped with the input and output material hole (11) of multiple perforation furnace body (5) bottoms, runs through in the input and output material hole (11) and is plugged with mounting table (12), The mounting table (12) is slidably connected with input and output material hole (11) sealing, and the lower end and support baseboard (13) of the mounting table (12) are solid Fixed connection, support baseboard (13) lower end are provided with lifting seat plate (14), and one end of lifting seat plate (14) is pushed away with electro-hydraulic The push rod cup of bar (15) lower end is fixedly connected, and the Electrohydraulic push rod (15) is fixedly mounted on vertically on furnace body (5) inner wall;It is described into It is provided with right above discharge hole (11) concentric protection cylinder (17), and the internal diameter of protection cylinder (17) is greater than input and output material hole (11) aperture, the protection cylinder (17) is interior to be provided with adobe pile (31), and the adobe pile (31) overlays on mounting table (12), It is laid with big coiled pipe (18) between the protection cylinder (17) and furnace body (5) inner wall, in the protection cylinder (17) and furnace body (5) The small coiled pipe (19) being connected to big coiled pipe (18) is laid between mandrel line, furnace body (5) lower end is provided with and serpent The air inlet pipe (21) of coil pipe (18) connection, the other end of the air inlet pipe (21) are connected to air blower (4), the air inlet pipe (21) On be provided with burner (22), be provided with gas valve (23) and air valve (24) on the burner (22);
Furnace body (5) upper end cover is equipped with sealing cover, and the sealing cover includes the lower sealing cover with the upper surface snapping of furnace body (5) (8) and sealing snaps onto the top cover labyrinth (9) of lower sealing cover (8) upper end, is provided with outlet on the central axis of the furnace body (5) It manages (20), escape pipe (20) lower end is connected to small coiled pipe (19), upper table of escape pipe (20) upper end from sealing cover Face is stretched out and is connected to appendix (2), and escape pipe (20) side is provided with pressure maintaining valve (25), the air pressure in furnace body (5) More than pressure maintaining valve (25) threshold value when, the pressure maintaining valve (25), which is opened, makes the air in furnace body (5) enter through pressure maintaining valve (25) In tracheae (20), the air-flow that the air blower (4) is blown afloat successively passes through air inlet pipe (21), big coiled pipe (18), small coiled pipe (19) enter appendix (2) from escape pipe (20) upper end to be connected to;The lower surface of the top cover labyrinth (9) and lower sealing cover (8) Upper surface is symmetrically arranged with a pair of of annular groove (27), is equipped with festoon drier (28), the ring drying in the annular groove (27) The quantity connection lasso (30) equal with the quantity of protection cylinder (17), the protection cylinder (17) are installed on the lower surface of device (28) It is tightly connected in upper end insertion connection lasso (30) and therewith;The lower surface of the lower sealing cover (8) is provided with and annular groove (27) The gas vent (29) of connection, the air-flow in the protection cylinder (17) pass through drier from bottom to top and enter in annular groove (27), most The perimeter of furnace body (5) interior protection cylinder (17) is discharged into from gas vent (29) afterwards.
2. a kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band according to claim 1, feature exist In: it is solid to pass through fastening screw (10) between the top cover labyrinth (9) and lower sealing cover (8) and between sealing cover furnace body (5) Fixed connection.
3. a kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band according to claim 1 or 2, feature Be: pad is equipped with gasket (7) between the sealing cover and furnace body (5).
4. a kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band according to claim 1, feature exist In: jack (16) are provided on the side wall of the support baseboard (13).
5. a kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band according to claim 1, feature exist In: one end of the appendix (2) is connected to the escape pipe (20) of a upper kiln (1), the other end of the appendix (2) with The air inlet pipe (21) of next kiln (1) is connected to, and the hot gas of the interior escape pipe of a upper kiln (1) (20) discharge flows through appendix (2) enter in the big coiled pipe (18) in next kiln (1).
6. a kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band according to claim 1, feature exist In: it is equipped with relief valve (26) on furnace body (5) outside, the threshold value of the relief valve (26) is greater than the threshold of pressure maintaining valve (25) Value, when the air pressure in furnace body (5) is more than the threshold value of relief valve (26), the relief valve (26) is opened, and is reduced in furnace body (5) Air pressure.
7. a kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band according to claim 1, feature exist In: the furnace body (5) and sealing cover are all made of heat-barrier material production.
CN201910024486.5A 2019-01-10 2019-01-10 High-toughness coal gangue brick sintering equipment with preheating and recycling functions Active CN109737747B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910024486.5A CN109737747B (en) 2019-01-10 2019-01-10 High-toughness coal gangue brick sintering equipment with preheating and recycling functions
CN201911078004.0A CN110736339A (en) 2019-01-10 2019-01-10 preheating and recycling high-toughness coal gangue brick sintering equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910024486.5A CN109737747B (en) 2019-01-10 2019-01-10 High-toughness coal gangue brick sintering equipment with preheating and recycling functions

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201911078004.0A Division CN110736339A (en) 2019-01-10 2019-01-10 preheating and recycling high-toughness coal gangue brick sintering equipment

Publications (2)

Publication Number Publication Date
CN109737747A true CN109737747A (en) 2019-05-10
CN109737747B CN109737747B (en) 2020-05-19

Family

ID=66364476

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201911078004.0A Withdrawn CN110736339A (en) 2019-01-10 2019-01-10 preheating and recycling high-toughness coal gangue brick sintering equipment
CN201910024486.5A Active CN109737747B (en) 2019-01-10 2019-01-10 High-toughness coal gangue brick sintering equipment with preheating and recycling functions

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201911078004.0A Withdrawn CN110736339A (en) 2019-01-10 2019-01-10 preheating and recycling high-toughness coal gangue brick sintering equipment

Country Status (1)

Country Link
CN (2) CN110736339A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3707136A (en) * 1970-12-02 1972-12-26 Continental Oil Co Apparatus for plating heat-resistant articles
JPH0468522A (en) * 1990-07-10 1992-03-04 Tokyo Electron Sagami Ltd Vertical heat treatment device
CN2511929Y (en) * 2001-12-30 2002-09-18 周卫 Kiln with waste heat recoverer
CN104197702A (en) * 2014-09-04 2014-12-10 武汉东川自来水科技开发有限公司 Novel tunnel kiln structure and method for tunnel kiln to process organic polluted soil
CN107421117A (en) * 2017-06-30 2017-12-01 翟延军 A kind of SiC ceramic coil pipe hot-blast stove and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3707136A (en) * 1970-12-02 1972-12-26 Continental Oil Co Apparatus for plating heat-resistant articles
JPH0468522A (en) * 1990-07-10 1992-03-04 Tokyo Electron Sagami Ltd Vertical heat treatment device
CN2511929Y (en) * 2001-12-30 2002-09-18 周卫 Kiln with waste heat recoverer
CN104197702A (en) * 2014-09-04 2014-12-10 武汉东川自来水科技开发有限公司 Novel tunnel kiln structure and method for tunnel kiln to process organic polluted soil
CN107421117A (en) * 2017-06-30 2017-12-01 翟延军 A kind of SiC ceramic coil pipe hot-blast stove and preparation method thereof

Also Published As

Publication number Publication date
CN109737747B (en) 2020-05-19
CN110736339A (en) 2020-01-31

Similar Documents

Publication Publication Date Title
CN203083344U (en) Dry pressing isomerism magnetic tile full-automatic roller way kiln
CN206300425U (en) A kind of plate dryer
CN102052686A (en) Air-cooled dry-type slag discharging system
CN207991265U (en) A kind of calciner for firing environmental protection brick using mine dead meal
CN109737747A (en) A kind of high tenacity colliery wastes brick agglomerating plant of the pre- heat recovery function of band
CN205026658U (en) Utilize device of industry circulating fluidized bed boilerslagremoval heating bunker coal
CN103822498A (en) Kiln waste heat recycling device
CN202747776U (en) Tunnel kiln utilizing residual heat
CN102923719A (en) Dry tail gas waste heat recovery system for white carbon black production
CN203758209U (en) Sealing type hot-blast stove
CN203654084U (en) Waste steam heating device
CN206709613U (en) The brick and tile kiln that a kind of flue gas recirculation utilizes
CN206347842U (en) A kind of tower stove
CN205031908U (en) Sodium lignosulfonate's that papermaking waste liquid drawed dry heating system
CN205560761U (en) Novel high -efficient RTO of environmental protection fires burning furnace
CN205505711U (en) Energy -saving syllogic tunnel cave with ventilation unit
CN205505709U (en) Syllogic tunnel cave with ventilation unit
CN105588431A (en) Energy-saving three-section tunnel kiln with ventilation device
CN210321139U (en) Full-automatic natural gas tunnel cave
CN105276804A (en) Biomass multifunctional combustion engine matched hot-blast stove
CN204611785U (en) One way of life garbage combustion device
CN202792963U (en) Communicated and circulating shuttle kiln
CN207395192U (en) A kind of air draught type hot-blast stove
CN219300743U (en) Environment-friendly cremation machine of intelligent electric control system
CN201610412U (en) Controllable efficient energy-saving safe environment-friendly lime kiln

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 118 Chuangye Avenue, Kechuang Park, Gaogang District, Taizhou City, Jiangsu Province

Patentee after: Zhang Xiang

Address before: 266600 No. 976 A, Luojiaying Village, Chengyang District, Qingdao City, Shandong Province

Patentee before: Zhang Xiang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220819

Address after: 277605 1000 meters north of Bancun, Fucun Town, Weishan County, Jining City, Shandong Province

Patentee after: WEISHAN DAWEI NEW BUILDING MATERIALS Co.,Ltd.

Address before: 118 Chuangye Avenue, Kechuang Park, Gaogang District, Taizhou City, Jiangsu Province

Patentee before: Zhang Xiang

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A High Toughness Coal Gangue Brick Sintering Equipment with Preheating and Recovery Function

Effective date of registration: 20221014

Granted publication date: 20200519

Pledgee: Shandong Weishan Rural Commercial Bank Co.,Ltd.

Pledgor: WEISHAN DAWEI NEW BUILDING MATERIALS Co.,Ltd.

Registration number: Y2022980018505

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231018

Granted publication date: 20200519

Pledgee: Shandong Weishan Rural Commercial Bank Co.,Ltd.

Pledgor: WEISHAN DAWEI NEW BUILDING MATERIALS Co.,Ltd.

Registration number: Y2022980018505

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A High Toughness Coal Gangue Brick Sintering Equipment with Preheating and Recovery Function

Effective date of registration: 20231102

Granted publication date: 20200519

Pledgee: Shandong Weishan Rural Commercial Bank Co.,Ltd.

Pledgor: WEISHAN DAWEI NEW BUILDING MATERIALS Co.,Ltd.

Registration number: Y2023980063872