CN109736575A - A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method - Google Patents

A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method Download PDF

Info

Publication number
CN109736575A
CN109736575A CN201811499800.7A CN201811499800A CN109736575A CN 109736575 A CN109736575 A CN 109736575A CN 201811499800 A CN201811499800 A CN 201811499800A CN 109736575 A CN109736575 A CN 109736575A
Authority
CN
China
Prior art keywords
reserved
steel bar
length
reserved steel
cartridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811499800.7A
Other languages
Chinese (zh)
Inventor
张东宁
任兆荣
亓玉政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tai'an Construction Engineering Group Co Ltd
Original Assignee
Shandong Tai'an Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tai'an Construction Engineering Group Co Ltd filed Critical Shandong Tai'an Construction Engineering Group Co Ltd
Priority to CN201811499800.7A priority Critical patent/CN109736575A/en
Publication of CN109736575A publication Critical patent/CN109736575A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention proposes a kind of building cast-in-situ layers and preformed layer grouting connection reserved steel bar Exact Location Method, comprising the following steps: determines the position of horizontal direction reserved steel bar;Determine reserved steel bar longitudinal length;Positioning mold makes, and length reserved cartridge is arranged in custom mold;Positioning mold and reserved steel bar are put into template;Reinforcing bar is positioned, the reserved steel bar after positioning is welded with length reserved cartridge, the top of reserved steel bar after positioning is welded and fixed with spacer bar;Length is reserved box filled;Wall pours, and positions to reserved steel bar, is adjusted again after the completion if any error;The filler in length reserved cartridge is cleared up after concrete final set, and the fine tuning of position is carried out by the reinforcing bar of bending length reserved cartridge inner part.Reserved steel bar is exposed the root for pouring build floor datum level part to method of the invention and positioning is fixed by length reserved cartridge and spacer bar respectively before pouring in end, guarantees that reserved steel bar is properly inserted in reserved sleeve.

Description

A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of building cast-in-situ layer and preformed layer grouting connection are reserved Reinforcing bar Exact Location Method.
Background technique
With the development of modern industrial technology, building house can be as machine production, using fabricated construction, in batch It manufactures completely.As long as transporting to that assemble in site gets up can prefabricated house component.Greatly reduce field cast-in-place work Industry greatly reduces.It is several layers of below building to use cast-in-place knot but in some cases, it is desirable to using composite built design Structure, top use fabricated construction, need for prefabricated components and pouring layer to be fixed in the conversion connecting layer of two kinds of structures.In advance The fixed structure and mode of component processed and pouring layer are usually reserved steel bar above pouring layer, reserve casing on prefabricated components, in advance It stays in reinforcing bar insertion casing, then carries out slip casting casting, be finally fixedly attached together reserved steel bar and prefabricated components.It is reserved Reinforcing bar must be corresponded with the position for reserving sleeve on prefabricated board, and status requirement is very accurate, otherwise can not carry out cooperation peace Dress.In addition, the length of reserved steel bar also has design requirement.Currently, the accurate positioning of reserved steel bar is a very big difficulty when pouring Topic.
Summary of the invention
The purpose of the present invention is to overcome above-mentioned the deficiencies in the prior art, provide a kind of building cast-in-situ layer and preformed layer to be in the milk Connect reserved steel bar Exact Location Method.
To achieve the above object, the present invention adopts the following technical solutions: a kind of building cast-in-situ layer and preformed layer grouting connect Reserved steel bar Exact Location Method, comprising the following steps:
One, the accurate setting position of horizontal direction reserved steel bar is determined;
Two, reserved steel bar longitudinal length is determined;
Three, positioning mold makes, setting length reserved cartridge identical with reserved steel bar quantity and position in custom mold, long Reserved cartridge top opening is spent, reserved steel bar passes through length reserved cartridge bottom and penetrating length reserved cartridge;
Four, top layer's pouring layer wall body casting template reinforce correction after by positioning mold and reserved steel bar be put into It pours in the cavity that wall form surrounds, and accurate positioning, and the reserved steel bar length for making exposing pour build floor datum level meets Design requirement, length reserved cartridge top margin are flushed with build floor datum level is poured;
Five, reserved steel bar is positioned, the reserved steel bar after positioning is welded with length reserved cartridge, will be reserved after positioning The top of reinforcing bar is welded and fixed with a lateral spacer bar;
Six, length is reserved box filled, prevents concrete from entering;
Seven, it carries out wall to pour, reserved steel bar is positioned again after the completion of pouring, is adjusted if any error;
Eight, spacer bar is removed after concrete final set, and clears up the filler in length reserved cartridge, to reserved steel bar into Row repositions, and carries out the fine tuning of position by the reinforcing bar of bending length reserved cartridge inner part if any error.
Further, the length reserved cartridge height is to be less than 8cm not less than 4cm.
Further, the length reserved cartridge is 86 electrical box of metal material.
Further, the top of the spacer bar and reserved steel bar is welded.
Further, positioning mold is an angle steel being laterally arranged, and 86 electrical box are welded on angle steel.
The beneficial effects of the present invention are: reserved steel bar is exposed the root for pouring build floor datum level part by method of the invention Positioning is fixed by length reserved cartridge and spacer bar respectively before pouring with end;It is pre- by length after the completion of pouring Reserved part in box is stayed to be lower than the reserved steel bar length for pouring build floor datum level, it can be by being bent this partial-length of reserved steel bar Section is finely adjusted reserved steel bar beyond the specific location for pouring build floor datum level, guarantees that reserved steel bar is properly inserted reserved sleeve It is interior;By to before pouring and pouring rear repeated measurement reserved steel bar and realize the accurate positionin of reserved steel bar.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other drawings based on these drawings.
Fig. 1 is positioning mold structural schematic diagram;
Fig. 2 is that reserved steel bar passes through length reserved cartridge structural schematic diagram.
It is as shown in the figure: 1, reserved steel bar, 2, positioning mold, 3, length reserved cartridge, 4, spacer bar, 5, pour build floor benchmark Face.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention provides a kind of building cast-in-situ layers and preformed layer grouting to connect reserved steel bar Exact Location Method, The following steps are included:
One, the accurate setting position of horizontal direction reserved steel bar 1 is determined;According to design drawing design requirement, determine reserved The position of 1 horizontal direction of reinforcing bar arrangement, determines the accurate placement location of every reserved steel bar.
Two, 1 longitudinal length of reserved steel bar is determined;It is required according to design drawing, determine 1 longitudinal direction of reserved steel bar pours length Degree, and expose the length for pouring build floor datum level 5.
Three, positioning mold 2 makes, setting length reserved cartridge identical with 1 quantity of reserved steel bar and position in custom mold 3,3 top opening of length reserved cartridge, reserved steel bar 1 passes through 3 bottom of length reserved cartridge and penetrating length reserved cartridge 3;
Four, positioning mold 2 and reserved steel bar 1 are put by the wall body casting template of top layer's pouring layer after reinforcing correction It is to be poured to build in the cavity that wall form surrounds, and accurate positioning, and make to expose 1 length of reserved steel bar for pouring build floor datum level 5 Meet design requirement, 3 top margin of length reserved cartridge is flushed with build floor datum level 5 is poured;
Five, reserved steel bar is positioned, the reserved steel bar 1 after positioning is welded with length reserved cartridge 3, it will be pre- after positioning The top of reinforcing bar 1 is stayed to be welded and fixed with a lateral spacer bar 4;
Six, length reserved cartridge 3 is filled, prevents concrete from entering;Filler can for rag, plastic products etc., as long as Length reserved cartridge can be filled up.
Seven, it carries out wall to pour, reserved steel bar 1 is positioned again after the completion of pouring, is adjusted if any error;
Eight, spacer bar 4 is removed after concrete final set, and clears up the filler in length reserved cartridge 3, to reserved steel bar 1 is repositioned, and carries out the fine tuning of position by the reinforcing bar of 3 inner part of bending length reserved cartridge if any error.Bending is reserved The mode of reinforcing bar can use and knock in chock in length reserved cartridge 3, or using modes such as spanner distortions.
It is to be less than 8cm greater than 4cm that length, which reserves 3 box height,.
Length, which reserves 3 boxes, can select 86 electrical box of metal material.
It welds on the top of spacer bar 4 and reserved steel bar 1.
Positioning mold 2 is an angle steel being laterally arranged as depicted in figs. 1 and 2, and 86 electrical box are welded on angle steel.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method, which is characterized in that including following Step:
One, the accurate setting position of horizontal direction reserved steel bar is determined;
Two, reserved steel bar longitudinal length is determined;
Three, positioning mold makes, and setting length reserved cartridge identical with reserved steel bar quantity and position, length are pre- in custom mold Box top opening is stayed, reserved steel bar passes through length reserved cartridge bottom and penetrating length reserved cartridge;
Four, positioning mold and reserved steel bar are put into wait pour by the wall body casting template of top layer's pouring layer after reinforcing correction In the cavity that wall form surrounds, and accurate positioning, and the reserved steel bar length for making exposing pour build floor datum level meets design It is required that length reserved cartridge top margin is flushed with build floor datum level is poured;
Five, reserved steel bar is positioned, the reserved steel bar after positioning is welded with length reserved cartridge, by reserved steel bar after positioning Top and a lateral spacer bar be welded and fixed;
Six, length is reserved box filled, prevents concrete from entering;
Seven, it carries out wall to pour, reserved steel bar is positioned again after the completion of pouring, is adjusted if any error;
Eight, spacer bar is removed after concrete final set, and clears up the filler in length reserved cartridge, reserved steel bar is carried out again Secondary positioning carries out the fine tuning of position if any error by the reinforcing bar of bending length reserved cartridge inner part.
2. reserved steel bar Exact Location Method according to claim 1, it is characterised in that: the length reserved cartridge height is Not less than 4cm, it is less than 8cm.
3. reserved steel bar Exact Location Method according to claim 2, it is characterised in that: the length reserved cartridge is metal 86 electrical box of material.
4. reserved steel bar Exact Location Method according to claim 1, it is characterised in that: the spacer bar and reserved steel It welds on the top of muscle.
5. reserved steel bar Exact Location Method according to claim 3, it is characterised in that: positioning mold is a laterally setting Angle steel, 86 electrical box are welded on angle steel.
CN201811499800.7A 2018-12-09 2018-12-09 A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method Pending CN109736575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811499800.7A CN109736575A (en) 2018-12-09 2018-12-09 A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811499800.7A CN109736575A (en) 2018-12-09 2018-12-09 A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method

Publications (1)

Publication Number Publication Date
CN109736575A true CN109736575A (en) 2019-05-10

Family

ID=66358596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811499800.7A Pending CN109736575A (en) 2018-12-09 2018-12-09 A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method

Country Status (1)

Country Link
CN (1) CN109736575A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127637A (en) * 2020-09-22 2020-12-25 中国五冶集团有限公司 Construction method for pre-buried vertical component steel bars of foundation layer of fabricated building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8415861U1 (en) * 1984-05-24 1984-10-11 Hifra GmbH, Olten DEVICE FOR STORING CONNECTING STEELS FOR CONCRETE COMPONENTS
CN102071805A (en) * 2010-12-30 2011-05-25 山西四建集团有限公司 Method for positioning and embedding concrete exterior wall overhung member precast reinforcements
CN103590510A (en) * 2013-11-27 2014-02-19 上海建工五建集团有限公司 Method for fixedly connecting embedded bars in assembly-type structure and cast-in-place structure
CN105649343A (en) * 2016-03-21 2016-06-08 中铁上海工程局集团第五工程有限公司 Steel fixer
CN205329858U (en) * 2015-12-22 2016-06-22 三新房屋制造股份有限公司 Pre -buried muscle positioner of cast -in -place layer or prefabricated wallboard and connection structure thereof
CN207177102U (en) * 2017-09-16 2018-04-03 中国二十二冶集团有限公司 Prefabricated conversion layer reserves sleeve joint bar accurate-location device
CN207728001U (en) * 2017-12-12 2018-08-14 中国一冶集团有限公司 Wall reserved steel bar connects combination tool

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8415861U1 (en) * 1984-05-24 1984-10-11 Hifra GmbH, Olten DEVICE FOR STORING CONNECTING STEELS FOR CONCRETE COMPONENTS
CN102071805A (en) * 2010-12-30 2011-05-25 山西四建集团有限公司 Method for positioning and embedding concrete exterior wall overhung member precast reinforcements
CN103590510A (en) * 2013-11-27 2014-02-19 上海建工五建集团有限公司 Method for fixedly connecting embedded bars in assembly-type structure and cast-in-place structure
CN205329858U (en) * 2015-12-22 2016-06-22 三新房屋制造股份有限公司 Pre -buried muscle positioner of cast -in -place layer or prefabricated wallboard and connection structure thereof
CN105649343A (en) * 2016-03-21 2016-06-08 中铁上海工程局集团第五工程有限公司 Steel fixer
CN207177102U (en) * 2017-09-16 2018-04-03 中国二十二冶集团有限公司 Prefabricated conversion layer reserves sleeve joint bar accurate-location device
CN207728001U (en) * 2017-12-12 2018-08-14 中国一冶集团有限公司 Wall reserved steel bar connects combination tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127637A (en) * 2020-09-22 2020-12-25 中国五冶集团有限公司 Construction method for pre-buried vertical component steel bars of foundation layer of fabricated building

Similar Documents

Publication Publication Date Title
WO2018219024A1 (en) Steel-plate-encased precast concrete column foot joint and construction method therefor
CN204435542U (en) Integration bean column node formwork structure
CN103061357B (en) Connection joint between basement base plate and underground diaphragm wall
CN206396966U (en) A kind of assembled laminated floor slab plate seam node component
CN109736575A (en) A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method
CN214833726U (en) Prefabricated steel tube bundle shear wall
JPS6156393B2 (en)
CN103758207B (en) Semi-prefabricated semi-cast-in-place type frame structure of integrated building and construction method thereof
CN105155669A (en) Hidden beam floor constructional column structure and construction method thereof
CN109736576A (en) A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar accurate location device
CN214658041U (en) Preset adhesive tape concrete structure and draw seam board
CN212715339U (en) Connecting structure of constructional column and roof floor
CN213563309U (en) Wall post structure embedded reserved hole modular assembly
CN107574934A (en) Fabricated shear wall embedded sleeve barrel joint bar construction method
CN209227784U (en) Wall and Liangping face external link structure and assembled arthitecutral structure system
CN113047530A (en) Vertical steel bar connecting sleeve and connecting method of concrete member or finished steel bar cage
CN213897662U (en) Connecting structure of precast concrete wall and concrete filled steel tube edge column
CN217461180U (en) Assembled template reinforcing bar integration steel pipe restraint reinforced concrete column
CN216949487U (en) Template for pouring concrete in hollow position of concrete column
CN221193967U (en) Prefabricated steel reinforced concrete composite set convenient to constructional column main muscle location
CN214739982U (en) Constructional column pouring structure
CN209457269U (en) Constructional column
CN218521636U (en) Combined type steel reinforcement framework positioning device
CN216516497U (en) Vertical reinforcing bar positioner of assembled concrete shear force wall conversion layer
CN214302231U (en) Connecting structure of precast concrete wall and concrete edge column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Dongning

Inventor after: Chen Weidong

Inventor after: Zhenyuzheng

Inventor after: Ren Zhaorong

Inventor after: Tian Liang

Inventor before: Zhang Dongning

Inventor before: Ren Zhaorong

Inventor before: Zhenyuzheng

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510

RJ01 Rejection of invention patent application after publication