CN109723140A - A kind of construction method between precast stair - Google Patents

A kind of construction method between precast stair Download PDF

Info

Publication number
CN109723140A
CN109723140A CN201711042558.6A CN201711042558A CN109723140A CN 109723140 A CN109723140 A CN 109723140A CN 201711042558 A CN201711042558 A CN 201711042558A CN 109723140 A CN109723140 A CN 109723140A
Authority
CN
China
Prior art keywords
platform
floor
stair
cast
interbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711042558.6A
Other languages
Chinese (zh)
Other versions
CN109723140B (en
Inventor
李聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711042558.6A priority Critical patent/CN109723140B/en
Publication of CN109723140A publication Critical patent/CN109723140A/en
Application granted granted Critical
Publication of CN109723140B publication Critical patent/CN109723140B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses the construction method between a kind of precast stair, include the following steps: 1) scribing line positioning;2) installation partition wall and exterior wall and cast-in-place pillar and exterior wall bottom groove connecting portion;3) interbed platform is installed;4) stair are installed;5) beam floor is installed;6) floor platform is installed;7) stair are installed;8) it binds cast-in-place beam steel and pours the connecting portion between Cast-in-situ Beam and component;9) mold and supporting element are removed.Using the construction method between precast stair of the present invention, reinforcing bar quality of connection is safe and reliable between component, the pillar and girder of staircase main body frame are cast-in-place structural, guarantee the stability of building body frame, to improve the globality and shock resistance of staircase;Staircase is entirely prefabricated, operates convenient for subsequent construction, has many advantages, such as to improve staircase assembly rate, reduces template, saves and shore, simplify construction method and shorten the construction time.

Description

A kind of construction method between precast stair
Technical field
Construction method the present invention relates to assembled architecture technical field of construction, between specifically a kind of precast stair.
Background technique
Stair construction method is divided into traditional cast-in-place structural and prefabricated construction in construction.Traditional cast-in-place structural can To give full play to the plasticity of armored concrete, structural behaviour is good, widely applicable, but has that speed of application is slow, formwork is difficult And the disadvantages of complex procedures.And prefabricated construction be using each component first plant produced transport again to construction site into Row installation has and reduces the environmental pollutions such as fugitive dust and building waste, simplify construction method, shorten the construction period and guarantee prefabricated components matter The advantages that amount.Currently, generally using stair to be prefabricated in the construction of staircase, landing and stair division wall are Cast-in-place mode has the shortcomings that assembly rate is small and the construction time is long;In prefabricated construction, building body frame and building The globality and shock resistance of the prefabricated components such as ladder installation are not as good as traditional cast-in-place structural, therefore the installation connection between prefabricated components is outstanding It is important.
Summary of the invention
It is an object of that present invention to provide the construction methods between a kind of precast stair, it is intended to improve assembly rate, saving is shored, letter Change construction method, shorten the construction time, improves the globality and shock resistance of staircase main body frame.
The present invention solves above-mentioned technical problem with following technical solution:
Construction method between precast stair of the present invention, its operating procedure are as follows:
1) scribing line positioning: positioning of crossing on base surface or flooring determines the installation site of each prefabricated components;
2) partition wall and exterior wall are installed: first being starched in the base surface of installation wall or the flooring seat of honour, then by exterior wall and staircase two Side partition wall lifts in place respectively, installs wall bearing diagonal part, by exposed steel bar in the mounting groove of partition wall bottom and base surface or bottom Flooring reserved steel bar is connected and fixed, and binds cast-in-place pillar reinforcing bar, installs the mold of pillar and mounting groove, pillar and mounting groove are poured Full concrete;
3) interbed platform is installed: lifting interbed platform, by the vertical of the installation groove I of interbed platform surrounding and partition wall boss Reserved steel bar I places interbed platform on partition wall boss after being aligned;
4) install stair: stair upper end convex block is placed in the L connected in star II of interbed platform, under stair by lifting stair End convex block is placed in staircase basis pit or the L connected in star IV of floor platform;
5) beam floor is installed: being starched in partition wall head base, lift staircase both sides respectively has beam floor, by beam one end band The groove of protruding bar places beam on partition wall after being aligned with the exposed steel bar at the top of partition wall;
6) install floor platform: lifting floor platform by the installation groove II at III both ends of floor platform L connected in star and has beam The vertical reserved steel bar II of floor boss is placed on floor platform Yu Youliang floor boss after being aligned;
7) install stair: stair both ends convex block is respectively placed in the L connected in star II and floor of interbed platform by lifting stair In the L connected in star IV of platform;
8) connecting portion between Cast-in-situ Beam and component is poured: the scene binding cast-in-place beam steel in staircase both sides, and will have beam Floor both ends protruding bar and floor platform end protruding bar are connected and fixed with cast-in-place beam steel, install Cast-in-situ Beam combination die Tool, pours full concrete by Cast-in-situ Beam pouring molding, while by installation groove I, L connected in star I, installation groove II and L connected in star III;
9) mold and supporting element are removed: removing pillar after the completion of to be onstructed and groove mould, Cast-in-situ Beam group are installed in partition wall bottom The installation between first floor ladder can be completed in molding tool and wall bearing diagonal part, and the staircase installation of every floor is as above-mentioned construction is grasped Make.
First vertical reserved steel bar I and reserved steel bar in installation groove I are connected and fixed before step 8), vertical reserved steel bar II is connected and fixed with reserved steel bar in installation groove II.
First stair protruding bar and interbed platform protruding bar are connected and fixed in L connected in star I before step 8), and will Reserved steel bar or floor platform protruding bar are connected and fixed in stair protruding bar and pit, wherein stair protruding bar and building Layer platform protruding bar is connected and fixed in L connected in star III.
The partition wall, interbed platform, stair, has beam floor and floor platform to transport again in plant produced in advance at exterior wall In-site installation.
The installation groove I of the interbed platform is less than partition wall boss, and the installation groove II of floor platform, which is less than, beam floor Boss.
Compared with prior art, the invention has the following advantages:
1. the pillar and girder of staircase main body frame are cast-in-place structural, guarantee the continuity and stabilization of building body frame Property, to improve the globality and shock resistance of staircase.
2. the stair of staircase, landing, part beam, partition wall and exterior wall be it is prefabricated, staircase is entirely prefabricated, is convenient for Subsequent construction operates, and has raising staircase assembly rate, a large amount of templates of reduction, simplified construction method and shortening construction time etc. excellent Point.
3. in the construction method between precast stair of the present invention, stair and interbed platform and floor platform, interbed platform and two Side partition wall and floor platform and having is all made of reinforcing bar connection and casting concrete between beam floor, quality of connection is good, globality By force, guarantee construction quality.
4. in the construction method between precast stair of the present invention, partition wall uses Partial Shear wall construction, its bearing capacity is improved, Play the role of supporting interbed platform and stair, there is beam floor to play support floor platform and stair, convenient for stair Installation, saving are shored.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of preferred embodiment between precast stair of the present invention.
Fig. 2 is the mounting structure schematic diagram of mid-board between precast stair of the present invention, interbed platform and stair.
Fig. 3 be between precast stair of the present invention in have the mounting structure schematic diagrams of beam floor, floor platform and stair.
In figure: 1. cast-in-place pillars, 2. floor platforms, 3. Cast-in-situ Beams, 4. stair, 5. exterior walls, 6. fenestrate exterior walls, 7. interbeds are flat Platform, 8. partition walls, 9. have beam floor, 10. wall bearing diagonal parts, 11. partition wall boss, 12. vertical reserved steel bars I, 13. installation grooves I, 14.L connected in star II, 15.L connected in star I, 16. interbed platform protruding bars, 17. convex blocks, 18. stair protruding bars, 19. mend Strong reinforcing bar, 20. have a beam floor boss, 21.L connected in star III, 22. installation grooves II, 23.L connected in star IV, outside 24. floor platforms Stretch reinforcing bar, 25. vertical reserved steel bars II.
Specific embodiment
In order to clearly illustrate the technical characterstic of this programme, specific implementation method of the present invention is done further with reference to the accompanying drawing Explanation.
As shown in Figure 1, Figure 2 and Figure 3, the construction method between precast stair of the present invention, its operating procedure are as follows:
1) scribing line positioning: positioning of crossing on base surface or flooring determines the installation site of each prefabricated components;
2) partition wall 8 and exterior wall 5 are installed: first being starched in the base surface of installation wall or the flooring seat of honour, then by exterior wall 5 and staircase Both sides partition wall 8 lifts in place respectively, installs wall bearing diagonal part 10, by exposed steel bar and base surface in 8 bottom mounting groove of partition wall Or bottom flooring reserved steel bar is connected and fixed, and binds cast-in-place 1 reinforcing bar of pillar, installs the mold of pillar and mounting groove, by pillar and Mounting groove pours full concrete;
3) interbed platform 7 is installed: lifting interbed platform 7, by the installation groove I 13 of 7 surrounding of interbed platform and partition wall boss 11 vertical reserved steel bar I 12 places interbed platform 7 on partition wall boss 11 after being aligned;
4) install stair 4: stair upper end convex block 17 is placed in the L connected in star II 14 of interbed platform 7 by lifting stair 4, Stair lower end convex block 17 is placed in staircase basis pit or the L connected in star IV 23 of floor platform 2;
5) beam floor 9 is installed: being starched in 8 head base of partition wall, lift staircase both sides respectively has beam floor 9, by beam one Groove of the end with protruding bar places beam on partition wall 8 after being aligned with the exposed steel bar at 8 top of partition wall;
6) floor platform 2 is installed: lifting floor platform 2, by the installation groove II 22 at III 21 both ends of floor platform L connected in star It is placed on 2 Yu Youliang floor boss 20 of floor platform after being aligned with the vertical reserved steel bar II 25 for having beam floor boss 20;
7) install stair 4: stair both ends convex block 17 is respectively placed in the L connected in star II of interbed platform 7 by lifting stair 4 14 and floor platform 2 L connected in star IV 23 in;
8) connecting portion between Cast-in-situ Beam 3 and component is poured: the reinforcing bar of scene binding staircase both sides Cast-in-situ Beam 3, and will There are 9 both ends protruding bar of beam floor and 2 end protruding bar of floor platform and the reinforcing bar of Cast-in-situ Beam 3 to be connected and fixed, installs cast-in-place Beam composable mold, by 3 pouring molding of Cast-in-situ Beam, and meanwhile installation groove I 13, L connected in star I 15, installation groove II 22 and L shape is recessed Slot III 21 pours full concrete;
9) mold and supporting element are removed: removing pillar after the completion of to be onstructed and groove mould, Cast-in-situ Beam group are installed in partition wall bottom The installation between first floor ladder can be completed in molding tool and wall bearing diagonal part 10, and the staircase installation of every floor is such as above-mentioned construction Operation.
In above-mentioned steps, first vertical reserved steel bar I 12 is connect admittedly with reserved steel bar in installation groove I 13 before step 8) Fixed, vertical reserved steel bar II 25 is connected and fixed with reserved steel bar in installation groove II 22.
In above-mentioned steps, before step 8) first in L connected in star I 15 by stair protruding bar 18 and the overhanging steel of interbed platform Muscle 16 is connected and fixed by increasing reinforcing bar 19, and will be outside reserved steel bar in stair protruding bar 18 and pit or floor platform It stretches reinforcing bar 24 and is connected and fixed by increasing reinforcing bar 19, wherein stair protruding bar 18 and floor platform protruding bar 24 are in L It is connected and fixed in connected in star III 21.
In the method for the present invention, the partition wall 8, interbed platform 7, stair 4, has beam floor 9 and floor platform 2 preparatory at exterior wall 5 In-site installation is transported again in plant produced, wherein staircase exterior wall is divided into windowless exterior wall 5 and fenestrate exterior wall 6;The interbed The installation groove I 13 of platform 7 is less than partition wall boss 11, and the installation groove II 22 of floor platform 2, which is less than, beam floor boss 20.
Using the construction method between precast stair of the present invention, reinforcing bar quality of connection is safe and reliable between component, staircase master The pillar and girder of body frame are cast-in-place structural, guarantee the stability of building body frame, to improve staircase Globality and shock resistance;Staircase is entirely prefabricated, operates convenient for subsequent construction, has and improves staircase assembly rate, reduces mould The advantages that plate, saving are shored, simplify construction method and shorten the construction time.

Claims (5)

1. the construction method between precast stair, which comprises the steps of:
1) scribing line positioning: positioning of crossing on base surface or flooring determines the installation site of each prefabricated components;
2) partition wall and exterior wall are installed: first being starched in the base surface of installation wall or the flooring seat of honour, then by exterior wall and staircase both sides every Wall lifts in place respectively, installs wall bearing diagonal part, by exposed steel bar in the mounting groove of partition wall bottom and base surface or bottom flooring Reserved steel bar is connected and fixed, and binds cast-in-place pillar reinforcing bar, installs the mold of pillar and mounting groove, pillar and mounting groove is poured completely mixed Solidifying soil;
3) install interbed platform: lifting interbed platform reserves the installation groove I of interbed platform surrounding and the vertical of partition wall boss Reinforcing bar I places interbed platform on partition wall boss after being aligned;
4) install stair: stair upper end convex block is placed in the L connected in star II of interbed platform, stair lower end is convex by lifting stair Block is placed in staircase basis pit or the L connected in star IV of floor platform;
5) beam floor is installed: being starched in partition wall head base, lift staircase both sides respectively has beam floor, and beam one end band is overhanging The groove of reinforcing bar places beam on partition wall after being aligned with the exposed steel bar at the top of partition wall;
6) install floor platform: lifting floor platform by the installation groove II at III both ends of floor platform L connected in star and has beam floor The vertical reserved steel bar II of boss is placed on floor platform Yu Youliang floor boss after being aligned;
7) install stair: stair both ends convex block is respectively placed in the L connected in star II and floor platform of interbed platform by lifting stair L connected in star IV in;
8) connecting portion between Cast-in-situ Beam and component is poured: the scene binding cast-in-place beam steel in staircase both sides, and will have beam floor Both ends protruding bar and floor platform end protruding bar are connected and fixed with cast-in-place beam steel, install Cast-in-situ Beam composable mold, will Cast-in-situ Beam pouring molding, while installation groove I, L connected in star I, installation groove II and L connected in star III are poured into full concrete;
9) mold and supporting element are removed: removing pillar after the completion of to be onstructed and groove mould, Cast-in-situ Beam combination die are installed in partition wall bottom The installation between first floor ladder can be completed in tool and wall bearing diagonal part, and the staircase installation of every floor is such as above-mentioned constructing operation.
2. the construction method between precast stair according to claim 1, which is characterized in that first will be vertically pre- before step 8) Reinforcing bar I is stayed to be connected and fixed with reserved steel bar in installation groove I, vertical reserved steel bar II is connect with reserved steel bar in installation groove II It is fixed.
3. the construction method between precast stair according to claim 1, which is characterized in that first recessed in L shape before step 8) Stair protruding bar and interbed platform protruding bar are connected and fixed in slot I, and steel will be reserved in stair protruding bar and pit Muscle or floor platform protruding bar are connected and fixed, wherein stair protruding bar and floor platform protruding bar are in L connected in star III It is connected and fixed.
4. the construction method between precast stair according to claim 1, which is characterized in that the partition wall, exterior wall, interbed are flat Platform, stair have beam floor and floor platform to transport in-site installation again in plant produced in advance.
5. the construction method between precast stair according to claim 1, which is characterized in that the installation of the interbed platform is recessed Slot I is less than partition wall boss, and the installation groove II of floor platform, which is less than, beam floor boss.
CN201711042558.6A 2017-10-30 2017-10-30 Construction method of prefabricated staircase Expired - Fee Related CN109723140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711042558.6A CN109723140B (en) 2017-10-30 2017-10-30 Construction method of prefabricated staircase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711042558.6A CN109723140B (en) 2017-10-30 2017-10-30 Construction method of prefabricated staircase

Publications (2)

Publication Number Publication Date
CN109723140A true CN109723140A (en) 2019-05-07
CN109723140B CN109723140B (en) 2021-02-23

Family

ID=66293053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711042558.6A Expired - Fee Related CN109723140B (en) 2017-10-30 2017-10-30 Construction method of prefabricated staircase

Country Status (1)

Country Link
CN (1) CN109723140B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924568A (en) * 2019-10-24 2020-03-27 中天西北建设投资集团有限公司 Method for constructing stair partition wall by adopting precast concrete hollow wall board
CN111188501A (en) * 2020-02-23 2020-05-22 哈尔滨达城绿色建筑股份有限公司 Split-assembly block building stairwell and wallboard same-layer construction method thereof
CN111962666A (en) * 2019-05-20 2020-11-20 润弘精密工程事业股份有限公司 Construction method of building internal structure
CN112209205A (en) * 2020-10-20 2021-01-12 张跃 Modular elevator/stair structure
CN113789925A (en) * 2021-09-23 2021-12-14 山东大学 Fast-assembling steel pipe concrete superposed shear wall staircase and installation method
CN116335355A (en) * 2023-04-10 2023-06-27 中一达建设集团有限公司 Assembled stair construction process and construction support

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207862A (en) * 1994-01-10 1995-08-08 Fujita Corp Precast concrete stair
CN201217898Y (en) * 2008-06-19 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Concrete prefabricated stairs
CN101787738A (en) * 2010-03-12 2010-07-28 南通建筑工程总承包有限公司 Stair connection joint device
CN103132660A (en) * 2013-03-11 2013-06-05 新疆七星建设科技股份有限公司 Concrete precast stairway fixed end support
CN204418558U (en) * 2015-01-16 2015-06-24 济南轨道交通集团有限公司 A kind of separate type precast hollow landing
CN105839836A (en) * 2016-05-30 2016-08-10 上海建工二建集团有限公司 Precast concrete shear wall component and construction method thereof
CN205712818U (en) * 2016-04-13 2016-11-23 山东齐兴住宅工业有限公司 A kind of lightweight integrally assembling staircase
CN206174195U (en) * 2016-09-29 2017-05-17 沈阳建筑大学建筑设计研究院 Assembled concrete shear force wall split, assemble connection structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207862A (en) * 1994-01-10 1995-08-08 Fujita Corp Precast concrete stair
CN201217898Y (en) * 2008-06-19 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Concrete prefabricated stairs
CN101787738A (en) * 2010-03-12 2010-07-28 南通建筑工程总承包有限公司 Stair connection joint device
CN103132660A (en) * 2013-03-11 2013-06-05 新疆七星建设科技股份有限公司 Concrete precast stairway fixed end support
CN204418558U (en) * 2015-01-16 2015-06-24 济南轨道交通集团有限公司 A kind of separate type precast hollow landing
CN205712818U (en) * 2016-04-13 2016-11-23 山东齐兴住宅工业有限公司 A kind of lightweight integrally assembling staircase
CN105839836A (en) * 2016-05-30 2016-08-10 上海建工二建集团有限公司 Precast concrete shear wall component and construction method thereof
CN206174195U (en) * 2016-09-29 2017-05-17 沈阳建筑大学建筑设计研究院 Assembled concrete shear force wall split, assemble connection structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962666A (en) * 2019-05-20 2020-11-20 润弘精密工程事业股份有限公司 Construction method of building internal structure
CN110924568A (en) * 2019-10-24 2020-03-27 中天西北建设投资集团有限公司 Method for constructing stair partition wall by adopting precast concrete hollow wall board
CN111188501A (en) * 2020-02-23 2020-05-22 哈尔滨达城绿色建筑股份有限公司 Split-assembly block building stairwell and wallboard same-layer construction method thereof
CN112209205A (en) * 2020-10-20 2021-01-12 张跃 Modular elevator/stair structure
CN113789925A (en) * 2021-09-23 2021-12-14 山东大学 Fast-assembling steel pipe concrete superposed shear wall staircase and installation method
CN116335355A (en) * 2023-04-10 2023-06-27 中一达建设集团有限公司 Assembled stair construction process and construction support
CN116335355B (en) * 2023-04-10 2023-11-24 中一达建设集团有限公司 Assembled stair construction process and construction support

Also Published As

Publication number Publication date
CN109723140B (en) 2021-02-23

Similar Documents

Publication Publication Date Title
CN109723140A (en) A kind of construction method between precast stair
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN103470040A (en) Method of splicing laminated floor slab and beam
CN103741792A (en) Whole assembly frame system and construction method thereof
CN111663659B (en) Staggered floor synchronous construction method
CN107859059B (en) Connecting node structure of prefabricated sandwich side wall and prefabricated superposed bottom plate and construction method thereof
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN110512785B (en) Unidirectional superimposed sheet with no rib at end rabbet and formwork structure and construction method
CN210316690U (en) Roof elevator machine room structure
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN104088473A (en) Construction structure and method used for underpinning load-bearing wall
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN206956979U (en) A kind of Linear shear wall with fore-set
CN103321153A (en) Construction method for medium and small span trough girder bridge
CN109868751B (en) Assembled track beam concrete post-pouring notch, template and construction method
CN205474843U (en) Prefabricated T beam -ends head mould board
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN109629714A (en) A kind of prefabricated partition wall of the staircase with installation base and its installation method
CN107476338A (en) Prefabricated longeron assembling method
CN210421568U (en) Assembled beam and plate structure
CN206902987U (en) A kind of T-shaped shear wall with fore-set
CN104878756B (en) Sand-filling hollow structure based cast-in-place special-shaped pile construction method
CN115741985A (en) Production method of pier column containing shear keys
CN109750831A (en) The template system and mold method that kitchen toilet water-stopping platform and floor drop plate pour simultaneously
CN211229702U (en) Assembly structure for overhauling stand column and train overhauling platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210223

Termination date: 20211030

CF01 Termination of patent right due to non-payment of annual fee