CN109722992A - A kind of device and method of dumbbell-shaped arch rib installation positioning - Google Patents

A kind of device and method of dumbbell-shaped arch rib installation positioning Download PDF

Info

Publication number
CN109722992A
CN109722992A CN201811555755.2A CN201811555755A CN109722992A CN 109722992 A CN109722992 A CN 109722992A CN 201811555755 A CN201811555755 A CN 201811555755A CN 109722992 A CN109722992 A CN 109722992A
Authority
CN
China
Prior art keywords
dumbbell
arch rib
shaped arch
jacking
supporting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811555755.2A
Other languages
Chinese (zh)
Inventor
刘梦星
盛其林
唐继归
高扬
郑玉明
朱瑜
陈凌志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Third Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Original Assignee
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Third Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guangzhou Engineering Group Co Ltd CRECGZ, Third Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd filed Critical China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Priority to CN201811555755.2A priority Critical patent/CN109722992A/en
Publication of CN109722992A publication Critical patent/CN109722992A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of devices of dumbbell-shaped arch rib installation positioning, including positioning element and jacking component.The jacking apparatus being equipped in component for jacking up dumbbell-shaped arch rib is jacked, positioning element includes the limit plate that two pieces of distances are not less than dumbbell-shaped arch rib two sides width, the clamping device being located on different height on limit plate at least provided with two Duis.The device of this dumbbell-shaped arch rib installation positioning, structure is simple and easy to manufacture and install, can effectively improve the degree of regulation of dumbbell-shaped arch rib, while and reduce damage to dumbbell-shaped arch rib, it ensure that welded connecting quality.A kind of method of the dumbbell-shaped arch rib installation positioning of corresponding application device, after the Primary Location adjustment to dumbbell-shaped arch rib, it can efficiently be adjusted under the premise of effectively avoiding traumatogenic to dumbbell-shaped arch rib, it is easy to operate and can largely save manpower and material resources.The invention is suitable for engineering construction field.

Description

A kind of device and method of dumbbell-shaped arch rib installation positioning
Technical field
The present invention relates to engineering construction fields, more particularly to a kind of device and method of dumbbell-shaped arch rib installation positioning.
Background technique
In science of bridge building steel pipe concrete arch rib by it from heavy and light, span is big, structure stress is balanced, aesthetic in appearance etc. Advantage being used widely in railway, highway, municipal works.Dumbbell-shaped arch rib, i.e. dumb-bell shape steel pipe concrete arch rib belong to One of steel-concrete combined structure in science of bridge building.Steel pipe concrete arch rib bridge is the fill concrete in steel pipe, And the expansion of compression concrete is limited due to the radial constraint of steel pipe, so that concrete is in three dimension stress state, thus significantly Improve the compression strength of concrete.And dumb-bell shape steel pipe concrete arch rib is design steel tube arch rib shape similar to dumbbell shaped, is had Upper tube, down tube and the floor for connecting two pipes.
And under normal conditions, complete arch is connected by segmental hoisting steel pipe concrete arch rib, and using welding Shape bridge bracket.For dumb-bell shape steel pipe concrete arch rib, need to guarantee the positioning at its both ends incessantly during the installation process, it must Guarantee vertical degree of the upper tube with respect to down tube simultaneously.It is transferred to other use, is adjusted repeatedly using chain sling or jack after usually every section lifting Limit steel plate that is whole and welding pedestal support and side, and repair welding is constantly cut during the adjustment.It will cause so very big Think error, and need repeatedly that operation is completed repeatedly, it is time-consuming and laborious.And constantly cutting repair welding is easy to influence its welded connecting Effect can have biggish security risk.And general chain sling location and installation mode is needed in dumb-bell shape steel pipe concrete arch rib Ear components are welded, cutting removal is carried out to it again after completing location and installation, irreversible wound can be generated to tubular arch surface.
Summary of the invention
The purpose of the present invention is to provide a kind of dumbbell-shaped arch ribs easy to operate, easy to make to install the device positioned, A kind of dumbbell-shaped arch rib installation and locating method of corresponding application device.
The technical solution used in the present invention is: a kind of device of dumbbell-shaped arch rib installation positioning, including positioning element and Component is jacked, the jacking apparatus being equipped in component for jacking up dumbbell-shaped arch rib is jacked, positioning element includes that two pieces of distances are not small In the clamping device being located on different height on the limit plate of dumbbell-shaped arch rib two sides width, limit plate at least provided with two Duis.
As an improvement of the above scheme, each clamping device include be sequentially connected shake the hand, threaded post and follow block, threaded post Limit plate is passed through by the threaded hole on limit plate, follow block is located on the inside of limit plate for resisting dumbbell-shaped arch rib, shakes the hand and be located at On the outside of limit plate.
As an improvement of the above scheme, positioning element and jacking component are installed on bracket, and bracket is fixed to ground, Positioning element further includes the first supporting block and supporting beam, and supporting beam is fixed on bracket, and supporting beam is used to support the first support Block, the upper surface section of the first supporting block are circular arc and are used to support dumbbell-shaped arch rib.
As an improvement of the above scheme, jacking component further includes being used to support the platform board of jacking apparatus and being used to support mute Second supporting block of bell-shaped arch rib, platform board are fixed on bracket, and jacking apparatus is jack, and the second support frame is located at jack Upper end, the upper surface section of the second supporting block are arc.
As an improvement of the above scheme, supporting beam is drum steel, and is fixed by welding on bracket, and platform board passes through weldering It connects and is fixed on bracket.
As an improvement of the above scheme, tool is equipped with and is connected to the diagonal brace of supporting beam on each limit plate, platform board and bracket it Between be equipped with several ribs.
Correspondingly, a method of positioning being installed using the dumbbell-shaped arch rib of above scheme device, comprising the following steps:
1) it, is positioned using instrument, tooth pad and jacking component;
2), dumbbell-shaped arch rib is lifted between two pieces of limit plates using lifting equipment, and is located at the first supporting block and the On two supporting blocks;
3) it, is tentatively jacked, and records the vertical degree deviation and height tolerance of measurement dumbbell-shaped arch rib;
4) vertical degree deviation, is adjusted using clamping device, adjusts height tolerance using jacking apparatus;
5), the first supporting block and dumbbell-shaped arch rib, supporting beam are welded, complete installation positioning.
As an improvement of the above scheme, it in step 3), carries out after tentatively jacking, is tentatively pressed from both sides using clamping device Tightly, the lifting equipment on lifting dumbbell-shaped arch rib is unclamped.
As an improvement of the above scheme, in step 4), when adjusting height tolerance, the oil of jack after preliminary jacking is recorded The exposed length of cylinder, height tolerance as needed increase or shorten the exposed length of jack cylinder.
As an improvement of the above scheme, in step 4), after the adjustment for completing height tolerance, along the length side of dumbbell-shaped arch rib The first supporting block is bonded with dumbbell-shaped arch rib to the first supporting block is moved.
Beneficial effects of the present invention: the device of this dumbbell-shaped arch rib installation positioning, structure is simple and easy to manufacture and install, Quickly and easily dumbbell-shaped arch rib can be spent vertically and the adjustment of height by the adjustment of positioning element and jacking component, It can effectively improve its degree of regulation, while and reduce damage to dumbbell-shaped arch rib, it ensure that welded connecting quality;Therewith Accordingly, a kind of application device dumbbell-shaped arch rib installation positioning method, can according to design quickly to dumbbell-shaped arch rib into Row adjustment can efficiently adjust it under the premise of effectively avoiding traumatogenic to dumbbell-shaped arch rib, easy to operate and can be with Manpower and material resources are largely saved.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the side structure schematic diagram of the device;
Fig. 2 is cross section structure schematic diagram at the positioning element of the device;
Fig. 3 is cross section structure schematic diagram at the jacking component of the device.
Specific embodiment
Referring to Fig.1~Fig. 3, the present invention are a kind of device of dumbbell-shaped arch rib installation positioning, including positioning element and jacking Component.Positioning element and jacking component are located at the different location of 1 length direction of dumbbell-shaped arch rib, and jacking component is for pushing up Dumbbell-shaped arch rib 1 is risen, positioning element is used to ajust 1 verticality of dumbbell-shaped arch rib and adjusts the position of welding end.Jack component In be equipped with jacking apparatus for jacking up dumbbell-shaped arch rib 1, generally can be the jackings such as jack 22 or some threaded rods dress It sets.Positioning element includes the limit plate 31 that two pieces of distances are not less than 1 two sides width of dumbbell-shaped arch rib, on limit plate 31 at least provided with Two pairs of clamping devices being located on different height.By two pairs of clamping devices can low-key whole dumbbell-shaped arch rib 1 very well it is vertical Degree, general clamping device can be adjusted by screw thread or the gear teeth.General clamping device includes threaded post 312 and follow block 313, hole is equipped in corresponding position in limit plate 31.Screw thread corresponding with threaded post 312 is at least partly equipped in hole, It can be screw thread hole, nut can also be fixed on hole.Follow block 313 is plate, positioned at 312 end of threaded post for supporting Firmly dumbbell-shaped arch rib 1.Threaded post 312 is installed in Hole, and by being threadedly engaged connection, the follow block 313 of 312 end of threaded post is pushed up Firmly dumbbell-shaped arch rib 1.The bolt head of other one section of setting hexagon of threaded post 312 shakes the hand 311, and zigzag can be set Shake the hand 311.Same pair of clamping device is located in same horizontal line and is located at 1 two sides of dumbbell-shaped arch rib, utilizes two sides Bolt head or 311 rotation threaded posts 312 of shaking the hand adjust to the vertical degree of dumbbell-shaped arch rib 1.
It is all at the scene that bracket 4, generally steel pipe support, positioning element and top are installed in steel pipe concrete arch rib construction Ascending part part is installed in above bracket 4.Bracket 4 is affixed directly to ground, or is supported using instrument and equipment, is indirectly connected with Onto ground.And in order to preferably adjust the vertical degree deviation of dumbbell-shaped arch rib 1 and height tolerance, generally by positioning element and Jacking component is located at the both ends of dumbbell-shaped arch rib 1.Dumbbell-shaped arch rib 1 can be installed to positioning followed by front has been installed and determined One section of one end welded of position is known as welding ends, becomes extended segment, positioning element for one section of connection installation positioning below Near welding ends, jacking component is located near elongated end.
As preferred embodiment, positioning element further includes the first supporting block 32 and supporting beam 33.Supporting beam 33 has Certain height and horizontal width, is fixed on bracket 4, is generally welded and fixed together with bracket 4.Supporting beam 33 is used to support The first supporting block 32 and supporting beam 33 are welded and fixed after completing positioning for first supporting block 32.General supporting beam 33 is Drum steel has relatively good support performance, and can be laterally bridged on more brackets 4, enhances support performance.First The upper surface section of bracer 32 is circular arc and is used to support dumbbell-shaped arch rib 1, and horizontally has certain radian, for pasting Close the radian of dumbbell-shaped arch rib 1.
As preferred embodiment, jacking apparatus is jack 22 and platform board 23.Platform board 23 is fixed on bracket End is used to support jack 22, and the bottom of jack 22 can be connected on platform board 23 by detachably installing, be avoided very heavy It is slided during jacking on top 22.Platform board 23 is steel plate, and is fixed by welding on bracket 4, needs to guarantee platform The planar support rigidity of plate 23.The second supporting block 21 is equipped between jack 22 and dumbbell-shaped arch rib 1, the second supporting block 21 Upper surface section is arc.Second supporting block 21 horizontally has certain radian, for being bonded the radian of dumbbell-shaped arch rib 1. It is fixedly connected between second supporting block 21 and jack 22, by welding or being bolted.
As preferred embodiment, the diagonal brace 34 for being connected to supporting beam 33 is equipped on limit plate 31, for guaranteeing limit The rigidity of position plate 31.And several ribs are equipped between platform board 23 and bracket 4, for improving platform board 23 to jack 22 support stiffness.It is also equipped with ribs in the link position of supporting beam 33 and bracket 4 simultaneously, improves coupling stiffness and support Rigidity.
In the present embodiment, general dumbbell-shaped arch rib 1 includes the batten plate of upper tube, down tube and connection upper tube, down tube, inside Mixed mud filled with solidification.First supporting block 32 and the second supporting block 21 are by supporting down tube to support entire dumb-bell shape Arch rib 1.The upper end level of bracket 4 is used as branch close to the dumbbell-shaped arch rib 1 to be fixed, in upper end Welder's fashioned iron of bracket 4 Support beam 33, and welding platform plate 23.Several ribs are added in weld, enhance its structural strength.Two will be had using welding Block limit plate 31 is fixed in supporting beam 33, is parallel to each other between two pieces of limit plates 31, and distance is slightly larger than dumbbell-shaped arch rib 1 Upper tube or down tube.Limit plate 31 is equipped with 4 holes for being located at same level height two-by-two, and one pair of them are located at upper tube At height and position, another pair is located at down tube height and position.Installation threaded post 312, follow block 313 and it will shake the hand and 311 be installed to limit On the plate 31 of position, and shaking the hand 311 keeps follow block 313 together pair close to each other and compress dumbbell-shaped arch rib 1.At this time, Ke Yitong It crosses and shakes one of them and shake the hand 311, decontrol the compression to dumbbell-shaped arch rib 1, and shake another for being located at same level height Shake the hand 311 pairs its compress the adjustings for carrying out vertical degree deviation.Jack 22 is arranged in the lower end of second supporting block 21, carries out height to it Spend the adjustment of deviation.
Correspondingly, a method of positioning being installed using the dumbbell-shaped arch rib of above scheme device, comprising the following steps:
1) it, is positioned using instrument, tooth pad and jacking component;
2), dumbbell-shaped arch rib 1 is lifted between two pieces of limit plates 31 using lifting equipment, and is located at the first supporting block 32 On the second supporting block 21;
3) it, is tentatively jacked, and records the vertical degree deviation and height tolerance of measurement dumbbell-shaped arch rib 1;
4) vertical degree deviation, is adjusted using clamping device, adjusts height tolerance using jacking apparatus;
5), the first supporting block 32 and dumbbell-shaped arch rib 1, supporting beam 33 are welded, complete installation positioning.
It as preferred embodiment, in step 1), is positioned on bracket 4 using total station, releases centralized positioning Transverse axis utilizes setting-out axis tooth pad and jacking component.
As preferred embodiment, in step 2), when dumbbell-shaped arch rib 1 is placed on two pieces of limit plates in positioning element It when between 31, is often tentatively clamped using clamping device, it is avoided to tilt be collapsed limit plate 31.
As preferred embodiment, in step 3), jacking apparatus is jack 22, is jacked using jack 22, And the exposed length of 22 oil cylinder of jack is recorded after preliminary jacking.
As preferred embodiment, in step 4), after the adjustment for completing height tolerance, need along dumbbell-shaped arch rib 1 Length direction moves the first supporting block 32 and guarantees that the first supporting block 32 is bonded with dumbbell-shaped arch rib 1.
As preferred embodiment, in step 5), after having welded the first supporting block 32, jack 22 is moved away, first Bracer 32 stress can support dumbbell-shaped arch rib 1 of having good positioning well.
In embodiment, a method of positioning being installed using the dumbbell-shaped arch rib 1 of the device in above-described embodiment, including Following steps:
1), total station is fixed on bracket 4, ajusts the position of total station according to the design needs.Total station is on bracket 4 Centralized positioning transverse axis, and the positional relationship of the dumbbell-shaped arch rib 1 secured according to the preceding paragraph are released, determines positioning region substantially The installation site of part and jacking component.Meanwhile according to the length of single hop dumbbell-shaped arch rib 1, positioning element and top are adjusted in design The distance of ascending part part.First on bracket 4, Welder's fashioned iron at the position of the dumbbell-shaped arch rib 1 secured close to the preceding paragraph, and Lay out the first supporting block 32.Limit plate 31 is welded in supporting beam 33, the distance of limit plate 31 is slightly larger than the width of dumbbell-shaped arch rib 1 Degree, and will shake the hand 311, threaded post 312 and follow block 313 is installed on limit plate 31.Followed by along 1 extending direction of dumbbell-shaped arch rib Welding platform plate 23, and jack 22 is fixed on platform board 23, jack 22 is on centralized positioning transverse axis.Very heavy The upper end for pushing up 22 oil cylinders is provided with the second supporting block 21, and 21 lower end of the second supporting block and the cylinder upper end of jack 22 are fixed, really The first supporting block 32 and the second supporting block 21 are protected on centralized positioning transverse axis.
2), dumbbell-shaped arch rib 1 is lifted between two pieces of limit plates 31 in positioning element using crane, and is located at the On one supporting block 32 and the second supporting block 21.The first supporting block 32 is adjusted, guarantees the height and position of its welding ends.It is appropriate to jack up Jack 22 enables the second supporting block 21 to support the other end of dumbbell-shaped arch rib 1 well.Meanwhile it being pressed from both sides using clamping device Tight dumbbell-shaped arch rib 1, is tentatively adjusted to vertical for dumbbell-shaped arch rib 1.
3) it, carries out tentatively jacking to designed elevation, and utilizes the vertical degree deviation and height of apparatus measures dumbbell-shaped arch rib 1 Deviation.
4), vertical degree deviation is adjusted using clamping device to unscrew one of them in same pair of clamping device and tighten Another, the side that 1 tuning of dumbbell-shaped arch rib can be unscrewed.Clamping device is utilized simultaneously, moreover it is possible to be realized to dumb-bell shape Arch rib 1 carries out the transfer of lateral position, facilitates ensuring that it, in centralized positioning transverse axis, reduces difficulty of construction.
Height tolerance is adjusted using jack 22, the length that 22 oil cylinder of jack is exposed after tentatively jacking is recorded, according to need Height tolerance is wanted to be adjusted it, concrete operations are as follows:
When dumbbell-shaped arch rib 1 is lower than design value, the protruded length of 22 oil cylinder of jack is recorded.By the oil of jack 22 Cylinder jacking, makes cylinder jacking protruded length measure the sum of length of oil cylinder and height tolerance equal to last time.First supporting block 32 at this time There are gaps with the down tube of dumbbell-shaped arch rib 1, and the first supporting block 32 is moved to far from 21 direction of the second supporting block, guarantees first The down tube of the fitting dumbbell-shaped arch rib 1 of supporting block 32.
When dumbbell-shaped arch rib 1 is higher than design value, to close to mobile first supporting block 32 in 21 direction of the second supporting block.Due to First supporting block has certain thickness, and moving the down tube of rear first supporting block 32 and dumbbell-shaped arch rib 1, there are gaps, avoids subsequent Dumbbell-shaped arch rib 1 is propped up by the first supporting block 32 and is not declined with jack 22 in 22 course of exerting pressure of jack.Thousand are recorded at this time The protruded length of 22 oil cylinders of jin top.Pressure release is carried out to jack 22, measures cylinder jacking protruded length reduced value equal to last time Height tolerance.First supporting block 32 is moved to far from 21 direction of the second supporting block, guarantees that the first supporting block 32 is bonded dumb-bell shape The down tube of steel pipe.
5), the first supporting block 32 and dumbbell-shaped arch rib 1, supporting beam 33 are welded, pressure release is carried out to jack 22, makes stress Point is fallen in the first supporting block 32, thus completes installation positioning.
The welding ends of dumbbell-shaped arch rib 1 can be finally welded on the last period welded dumbbell-shaped arch rib 1, be completed The connecting welding of dumbbell-shaped arch rib 1 works.Jack 22 and limit plate 31 are withdrawn after the completion, and wherein limit plate 31 can be by cutting Cut completion separation.Jack 22 and limit plate 31 can continue in the location and installation work of next section of dumbbell-shaped arch rib 1.
Certainly, the design creation is not limited to above embodiment, and the combination of the various embodiments described above different characteristic can also To reach good effect.Those skilled in the art can also make equivalent change on the premise of without prejudice to spirit of the invention Shape or replacement, these equivalent variation or replacement are all included in the scope defined by the claims of the present application.

Claims (10)

1. a kind of device of dumbbell-shaped arch rib installation positioning, is characterized in that: including positioning element and jacking component, the jacking portion The jacking apparatus for jacking up dumbbell-shaped arch rib (1) is equipped in part, the positioning element includes that two pieces of distances are not less than dumb-bell shape The limit plate (31) of arch rib (1) two sides width, the clamping being located on different height at least provided with two Duis on the limit plate (31) Device.
2. the device of dumbbell-shaped arch rib installation positioning according to claim 1, it is characterised in that: each clamping device is equal Including be sequentially connected shake the hand (311), threaded post (312) and follow block (313), the threaded post (312) passes through limit plate (31) On threaded hole pass through limit plate (31), the follow block (313), which is located at, to be used on the inside of limit plate (31) resist dumbbell-shaped arch rib (1), described shake the hand (311) are located on the outside of limit plate (31).
3. the device of dumbbell-shaped arch rib installation positioning according to claim 2, it is characterised in that: the positioning element and top Ascending part part is installed on bracket (4), and the bracket (4) is fixed to ground, and the positioning element further includes the first supporting block (32) it is fixed on bracket (4) with supporting beam (33), the supporting beam (33), the supporting beam (33) is used to support first Bracer (32), the upper surface section of first supporting block (32) are circular arc and are used to support dumbbell-shaped arch rib (1).
4. the device of dumbbell-shaped arch rib installation positioning according to claim 3, it is characterised in that: the jacking component also wraps The platform board (23) for being used to support jacking apparatus and the second supporting block (21) for being used to support dumbbell-shaped arch rib (1) are included, it is described flat Platen (23) is fixed on bracket (4), and the jacking apparatus is jack (22), and second support frame (21) is located at jack (22) upper end, the upper surface section of second supporting block (21) are arc.
5. the device of dumbbell-shaped arch rib according to claim 4 installation positioning, it is characterised in that: the supporting beam (33) is Drum steel, and be fixed by welding on bracket (4), the platform board (23) is fixed by welding on bracket (4).
6. the device of dumbbell-shaped arch rib installation positioning according to claim 4 or 5, it is characterised in that: each limit plate (31) tool is equipped with the diagonal brace (34) for being connected to supporting beam (33) on, and several add is equipped between the platform board (23) and bracket (4) Strong rib.
7. a kind of method of the dumbbell-shaped arch rib installation positioning using claim 6 described device, it is characterised in that including following Step:
1) it, is positioned using instrument, tooth pad and jacking component;
2), dumbbell-shaped arch rib (1) is lifted between two pieces of limit plates (31) using lifting equipment, and is located at the first supporting block (32) and on the second supporting block (21);
3) it, is tentatively jacked, and records the vertical degree deviation and height tolerance of measurement dumbbell-shaped arch rib (1);
4) vertical degree deviation, is adjusted using clamping device, adjusts height tolerance using jacking apparatus;
5), the first supporting block (32) and dumbbell-shaped arch rib (1), supporting beam (33) are welded, complete installation positioning.
8. according to the method described in claim 7, it is characterized by: carrying out after tentatively jacking in the step 3), utilizing folder Tight device is tentatively clamped, and the lifting equipment in lifting dumbbell-shaped arch rib (1) is unclamped.
9. according to the method described in claim 7, it is characterized by: when adjusting height tolerance, record is just in the step 4) The exposed length of jack (22) oil cylinder after step jacking, height tolerance as needed increase or shorten outside jack (22) oil cylinder The length of dew.
10. according to the method described in claim 9, it is characterized by: in the step 4), after the adjustment for completing height tolerance, Moving the first supporting block (32) along the length direction of dumbbell-shaped arch rib (1) pastes the first supporting block (32) and dumbbell-shaped arch rib (1) It closes.
CN201811555755.2A 2018-12-19 2018-12-19 A kind of device and method of dumbbell-shaped arch rib installation positioning Pending CN109722992A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811555755.2A CN109722992A (en) 2018-12-19 2018-12-19 A kind of device and method of dumbbell-shaped arch rib installation positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811555755.2A CN109722992A (en) 2018-12-19 2018-12-19 A kind of device and method of dumbbell-shaped arch rib installation positioning

Publications (1)

Publication Number Publication Date
CN109722992A true CN109722992A (en) 2019-05-07

Family

ID=66296855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811555755.2A Pending CN109722992A (en) 2018-12-19 2018-12-19 A kind of device and method of dumbbell-shaped arch rib installation positioning

Country Status (1)

Country Link
CN (1) CN109722992A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130226A (en) * 2019-05-08 2019-08-16 中铁六局集团有限公司 The construction method of the positioning of bowstring arch bridge rib-hoisting and absolute altitude control
CN112030755A (en) * 2020-08-19 2020-12-04 中交路桥建设有限公司 Method for installing combined section of inward-inclined arch rib and arch center of steel arch bridge
CN113802479A (en) * 2021-10-29 2021-12-17 合肥工业大学 Combined type unit support structure for dismantling tied arch bridge arch rib
WO2024103644A1 (en) * 2022-11-14 2024-05-23 中铁上海工程局集团有限公司 Space special-shaped arch rib supporting and adjusting device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202559236U (en) * 2012-04-19 2012-11-28 中铁十局集团有限公司 Arch rib limited and fixed steel support
KR20130126381A (en) * 2012-05-11 2013-11-20 주식회사 장헌산업 Construction method of arch rib in arch bridge
CN103628417A (en) * 2013-12-19 2014-03-12 中铁六局集团有限公司 Coordinate adjustment device for mounting arch section of steel arch pipe by supporting method
CN203904848U (en) * 2014-06-26 2014-10-29 葛洲坝集团项目管理有限公司 Temporary fixing jig for buttress anchorage top
CN206109988U (en) * 2016-09-10 2017-04-19 中铁三局集团有限公司 Basket type tied arch encircles section installation micromatic setting
CN107841932A (en) * 2017-10-19 2018-03-27 中国建筑土木建设有限公司 Bowstring arch bridge rib-lifting section makes and installation and locating method
CN207331471U (en) * 2017-10-19 2018-05-08 中国建筑土木建设有限公司 Bowstring arch bridge rib-lifting section positioner
CN207891752U (en) * 2018-02-02 2018-09-21 陕西铁路工程职业技术学院 A kind of limit fixed tray of steel pipe arch bridge arch rib installation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202559236U (en) * 2012-04-19 2012-11-28 中铁十局集团有限公司 Arch rib limited and fixed steel support
KR20130126381A (en) * 2012-05-11 2013-11-20 주식회사 장헌산업 Construction method of arch rib in arch bridge
CN103628417A (en) * 2013-12-19 2014-03-12 中铁六局集团有限公司 Coordinate adjustment device for mounting arch section of steel arch pipe by supporting method
CN203904848U (en) * 2014-06-26 2014-10-29 葛洲坝集团项目管理有限公司 Temporary fixing jig for buttress anchorage top
CN206109988U (en) * 2016-09-10 2017-04-19 中铁三局集团有限公司 Basket type tied arch encircles section installation micromatic setting
CN107841932A (en) * 2017-10-19 2018-03-27 中国建筑土木建设有限公司 Bowstring arch bridge rib-lifting section makes and installation and locating method
CN207331471U (en) * 2017-10-19 2018-05-08 中国建筑土木建设有限公司 Bowstring arch bridge rib-lifting section positioner
CN207891752U (en) * 2018-02-02 2018-09-21 陕西铁路工程职业技术学院 A kind of limit fixed tray of steel pipe arch bridge arch rib installation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130226A (en) * 2019-05-08 2019-08-16 中铁六局集团有限公司 The construction method of the positioning of bowstring arch bridge rib-hoisting and absolute altitude control
CN112030755A (en) * 2020-08-19 2020-12-04 中交路桥建设有限公司 Method for installing combined section of inward-inclined arch rib and arch center of steel arch bridge
CN113802479A (en) * 2021-10-29 2021-12-17 合肥工业大学 Combined type unit support structure for dismantling tied arch bridge arch rib
WO2024103644A1 (en) * 2022-11-14 2024-05-23 中铁上海工程局集团有限公司 Space special-shaped arch rib supporting and adjusting device

Similar Documents

Publication Publication Date Title
CN109722992A (en) A kind of device and method of dumbbell-shaped arch rib installation positioning
CN110409799B (en) Wind tunnel fair-faced concrete construction process
CN108708557B (en) Movable inclined column installation equipment and method
CN110512865B (en) Beam formwork support frame, support structure and construction method
CN110847048B (en) Positioning construction method for corrugated steel web
CN102601605B (en) Device for installing and detaching support shoes of jacks of shield tunneling machine and method for installing and detaching support shoes
CN102720371B (en) Butt joint method for multiple upright posts of steel structure module and temporary butt joint fixing device
CN209275936U (en) A kind of steel structure lift shaft splicing apparatus
CN109338830B (en) Rail-state rail-adjusting supporting frame capable of being installed and dismounted rapidly under all working conditions
CN113123597B (en) Assembled laminated slab splicing seam suspension type formwork structure and construction method thereof
CN209907206U (en) Auxiliary device for installing dumbbell-shaped arch ribs
WO2024077880A1 (en) Inclining jacking-type steel platform construction apparatus and method for inclining walls having large inclination angle
CN107740585B (en) Hanging installation method for ultra-long inclined steel structure circular pipe
CN210263912U (en) Floor support plate connecting piece
CN110700490A (en) Transfer floor large-span steel reinforced concrete beam and construction method
CN115897394A (en) Rapid positioning construction method for parallel double-stranded-wire-pipe cable saddle
CN116005555A (en) Large-tonnage curved surface steel box girder diagonal manufacturing and installation construction process thereof
CN211647283U (en) Plane or cambered surface pouring template
CN214264516U (en) Steel column butt joint welded junction stagger adjustment structure
CN213297135U (en) A stretch-draw strutting arrangement for building carrier plate is pour
CN205654082U (en) Half tunnel formwork
CN212224666U (en) Steel truss assembling system
CN210827533U (en) Device for embedding foundation bolt group
CN208293437U (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure
CN209909301U (en) Auxiliary pipeline installation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190507