CN109719843A - It concrete prefabricated element production line and its pours and smashes device - Google Patents

It concrete prefabricated element production line and its pours and smashes device Download PDF

Info

Publication number
CN109719843A
CN109719843A CN201810548433.9A CN201810548433A CN109719843A CN 109719843 A CN109719843 A CN 109719843A CN 201810548433 A CN201810548433 A CN 201810548433A CN 109719843 A CN109719843 A CN 109719843A
Authority
CN
China
Prior art keywords
line
cross drive
transmission line
vertical transmission
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810548433.9A
Other languages
Chinese (zh)
Inventor
陈实
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Remac Equipment Information Technology Co Ltd
Original Assignee
Ningbo Liancheng Housing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Liancheng Housing Technology Co Ltd filed Critical Ningbo Liancheng Housing Technology Co Ltd
Priority to CN201810548433.9A priority Critical patent/CN109719843A/en
Publication of CN109719843A publication Critical patent/CN109719843A/en
Pending legal-status Critical Current

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The invention discloses a kind of concrete prefabricated element production lines, including lateral part and vertical section, the lateral part includes being parallel to each other, and several cross drive lines being arranged in order, several processing stations and movable platform mould are provided on the every cross drive line, described mould can be displaced to next processing stations from a upper processing stations, the vertical section includes at least two vertical transmission lines being parallel to each other, the leading portion of several cross drive lines has a vertical transmission line, the back segment of several cross drive lines has another vertical transmission line, the vertical transmission line connects several described cross drive lines, so that platform mould cyclic shift on several cross drive lines and vertical transmission line.Device is smash for pouring for concrete prefabricated element production line invention additionally discloses a kind of, to meet various production and processing needs.

Description

It concrete prefabricated element production line and its pours and smashes device
Technical field
The present invention relates to concrete prefabricated element production technical field, in particular to a kind of concrete prefabricated element production line And its it pours and smashes device.
Background technique
With the development of assembled architecture industry, to provide production efficiency, reducing labor intensity of workers, most of prefabricated structure Part manufacturing enterprise is all producing the shapes phases such as Side fascia, lining, non-prestressed superimposed sheet floor using pipelining mode To the prefabricated components of rule.Existing prefabricated components manufacturing enterprise, the assembly line used mainly point single cycle assembly line and Two-way Cycle Two kinds of assembly line.
Wherein, single cycle assembly line is flexible poor, and the type that can produce component is substantially single, once and there is work on production line When position equipment breaks down, whole line needs to stop work, and leads to the reduction of the production line utilization of capacity;Meanwhile single cycle is raw under same area Producing line arranges that station is less, production capacity is low.
In view of the above-mentioned problems, having enterprise using bicirculating mode to handle, still, in the actual production process, especially It is when producing the complicated prefabricated components for needing to pour more than twice with beam inner-outer wall, shearing exterior wall etc., to occur needing to carry out multiple Circulation production (such as: it starts to walk from the starting end of production line, completes one-time-concreting if only needing one-time-concreting and be back to starting end, If secondary need to pour, midway detour is being returned, one-time-concreting is being carried out again using process is poured for the first time, after the completion, returns again to To starting end), or even the situation that can not be produced.The production repeatedly recycled not only increases the path of single component operation, and The productive temp for seriously affecting assembly line setting, greatly reduces the production efficiency of assembly line.
Meanwhile the component of two-step pouring meaning production needs to organize mould twice, installs built-in fitting twice, places steel mesh twice The processes such as piece, and how mold is stored and is transported when Two-way Cycle production line does not account for secondary group of mould at all, secondary installing Built-in fitting how to store with it is online, the reinforced mesh of secondary installing how to store with it is online, these cause present production material mixed Disorderly, organization of production is unordered, greatly reduces the effect of flow line production, while increasing the difficulty of production management.
Summary of the invention
The purpose of the present invention is to provide a kind of concrete prefabricated element production lines, it can produce the secondary complexity poured Prefabricated components, and the simple prefabricated components of one-time-concreting can be produced, and only need one cycle that can smoothly produce all kinds of complexity Prefabricated components, and have production smooth, high-efficient, hence it is evident that reduce equipment cost.
Another object of the present invention also reside in provide it is a kind of smash device for pouring for concrete prefabricated element production line, with full The various production and processings of foot need.
The object of the present invention is achieved like this:
A kind of concrete prefabricated element production line, including lateral part and vertical section, the lateral part include be parallel to each other, And several cross drive lines being arranged in order, several processing stations are provided on the every cross drive line and can position The platform mould of shifting, described mould can be displaced to next processing stations from a upper processing stations, and the vertical section includes at least two The vertical transmission line being parallel to each other, the leading portion of several cross drive lines have a vertical transmission line, several described cross Another vertical transmission line is had to the back segment of transmission line, the vertical transmission line connects several described cross drive lines Come, so that platform mould cyclic shift on several cross drive lines and vertical transmission line.
Above-mentioned concrete prefabricated element production line, can produce the secondary complicated prefabricated components poured and production is primary The simple prefabricated components poured, and only need one cycle that can smoothly produce all kinds of complicated prefabricated components, and have production suitable Freely, high-efficient, without increase new equipment can realize the mistake of material across problem, and manage concentratedly, path is optimal, is substantially reduced Equipment cost.
The present invention can also be solved using following technical measures:
Further, several described cross drive lines include the first cross drive line, the second cross drive line, third cross drive Line and the 4th cross drive line, this four cross drive lines, cooperate vertical transmission line, may make up at least two or more independence Cyclic process process.
Further, the cross drive line includes two rows of independent driving wheels and its driving motor being parallel to each other, platform mould It is arranged on the driving wheel, is displaced platform mould by driving motor driving driving wheel.
Further, the vertical transmission line includes two rows of tracks being parallel to each other, and run on the track Described mould is sent to another cross drive line from a cross drive line by travelling platform, the travelling platform.
Further, the vertical section includes that the first vertical transmission line, the second vertical transmission line and third vertically transmit Line, the first vertical transmission line are crossed on the front end of several cross drive lines, and the vertical transmission line of third is crossed on several The rear end of cross drive line, the second vertical transmission line is between the first vertical transmission line and the vertical transmission line of third and across setting In the middle section of several cross drive lines, the vertical transmission line of third be can be used as between the middle section of each cross drive line, or with outside Between transmission.
Further, the first cross drive line, the vertical transmission line of third, the second cross drive line and/or first are perpendicular An independent fabrication cycles are constituted to transmission line.
Further, the 4th cross drive line, the vertical transmission line of third, third cross drive line and/or first are perpendicular Another independent fabrication cycles is constituted to transmission line.
Further, several movable platform moulds are provided on the every cross drive line, each mould is suitable by front and back Sequence sequence setting, can meet mass production needs in this way.
Further, the first cross drive line, the second cross drive line, third cross drive line and the 4th laterally pass Storage insulation board, secondary group of mould mold, the reinforced mesh of secondary reinforcement installation and secondary built-in fitting peace are equipped with by the back segment of line sending The pre-buried assorted warehouse of dress, the material unified management that complicated prefabricated components can in this way needed, path are most short, reduce production pipe Difficulty is managed, improving production efficiency, (how material placement is associated with production line technology scheme, and how these materials enter production Line), at the same it is secondary pour there is no partial circulating path, keep production line more smooth, it is more efficient, more have exploitativeness.
Further, the first cross drive line, the second cross drive line, third cross drive line and the 4th laterally pass The back segment of line sending is provided with casting and compacting of concrete process, to meet in same cyclic process process, realizes that a casting and compacting of concrete adds Work, to meet various processing needs.
Beneficial effects of the present invention are as follows:
(1) present invention realizes the feasibility of flexible production line, can produce the secondary complicated prefabricated components poured and production The simple prefabricated components of one-time-concreting.
(2) break Two-way Cycle production line, secondary detour circulation is needed when producing the secondary complicated prefabricated components poured Problem only needs one cycle that can smoothly produce all kinds of complicated prefabricated components, and production is more smooth, more efficient.
(3) entire flexible production line fully considers a whole set of logistics, without adding new equipment, so that it may realize the mistake of material across Problem, while the management of material needed for also solving the secondary complicated prefabricated components poured, centralized management, path are optimal.
(4) form of the present invention seem be two single lines superposition, but fully considered the utilization rate of equipment, such as: sharing and support Material distributing machine can be shared between shield kiln and two lateral production lines, the superposition of opposite two single lines, hence it is evident that reduce equipment cost.
Detailed description of the invention
Fig. 1 is the schematic illustration of concrete prefabricated element production line of the present invention.
Fig. 2 is the schematic diagram of the present invention two kinds of simple prefabricated components of production.
Fig. 3 is the schematic diagram of the complicated prefabricated composition of present invention production.
Specific embodiment
As shown in Figure 1 to Figure 3, a kind of concrete prefabricated element production line, including lateral part 1 and vertical section 2, it is described Lateral part 1 includes several cross drive lines 3 for being parallel to each other and being arranged in order, and is arranged on the every cross drive line 3 There are several processing stations and movable platform mould 5, described mould 5 can be displaced to next processing work from a upper processing stations Position, the vertical section 2 include at least two vertical transmission lines 4 being parallel to each other, the leading portions of several cross drive lines 3 across Equipped with a vertical transmission line 4, the back segment of several cross drive lines 3 has another vertical transmission line 4, described vertical Transmission line 4 connects several described cross drive lines 3, so that platform mould 5 is in several described cross drive lines 3 and vertical transmission Cyclic shift on line 4.Several movable platform moulds 5 are provided on the every cross drive line 3, each mould 5 is suitable by front and back Sequence sequence setting circulates in the processing stations of production line.
As more perfect scheme, several described cross drive lines 3 include the first cross drive line 31, the second cross drive Line 32, third cross drive line 33 and the 4th cross drive line 34;Wherein, the every cross drive line 3 includes two rows of mutual Parallel independent driving wheel and its driving motor, four cross drive lines can common drive motor, such as two common drives Motor and four common drive motors, platform mould 5 are arranged on the driving wheel, make platform mould 5 by driving motor driving driving wheel It moves.
Every vertical transmission line 4 includes two rows of tracks being parallel to each other, and is run on the track traversing Described mould 5 is sent to another cross drive line 3 from a cross drive line 3 by vehicle, the travelling platform.
As more perfect scheme, the vertical section 2 includes the first vertical transmission line 41, the second vertical 42 and of transmission line The vertical transmission line 43 of third, the first vertical transmission line 41 are crossed on the front end of several cross drive lines 3, and the third is vertical Transmission line 43 is crossed on the rear end of several cross drive lines 3, and the second vertical transmission line 42 is located at the first vertical transmission line 41 and Between three vertical transmission lines 43 and it is crossed on the middle sections of several cross drive lines 3.
As shown in Figure 1, the first cross drive line 31, the vertical transmission line 43 of third, the second cross drive line 32 and/or First vertical transmission line 41 constitutes a fabrication cycles;The 4th cross drive line 34, the vertical transmission line 43 of third, third are horizontal To transmission line 33 and/or the first vertical transmission line structure 41 at another fabrication cycles.Two fabrication cycles formed can produce Simple prefabricated components.
The first cross drive line 31, the second cross drive line 32, third cross drive line 33 and the 4th cross drive Storage insulation board, secondary group of mould mold, the reinforced mesh of secondary reinforcement installation and secondary built-in fitting peace are equipped with by the back segment of line 34 The built-in fitting warehouse 20 of dress.
As shown in Figure 3, the first cross drive line 31, the second cross drive line 2, third cross drive line 33 and the 4th The back segment of cross drive line 34 is provided with casting and compacting of concrete process 25a, 30a, 31b, 27b.
Production line of the invention, can efficiently production form easy prefabricated components be (such as: non-prestressed laminated floor slab, no Band beam inner-outer wall, heat insulation decoration integrated cladding panel etc.), and can efficiently (such as band beam inner-outer wall, cut production form complexity prefabricated components Power exterior wall etc.) flexible production line, the flexible production line cover production prefabricated components needed for all stations, not only include four Cross drive line 3 further includes several vertical transmission lines 4, and the flexible production line is made to form two single-cycle production lines.But it is not Simple single cycle superposition, its secondary material (mold, built-in fitting, reinforced mesh etc.) share warehouse (by the second vertical biography Line sending 42 transports the secondary material for being put in side to the other side or middle position for needing material from shared warehouse), second Pouring and smashing (including fish torpedo ladle, material distributing machine and bumper) shared cloth machine equipment (is that individually, i.e., first and the 4th laterally for the first time Transmission line 31,34 has independent material distributing machine, and complicated prefabricated component need to be poured twice and be smash, i.e., second and third cross drive line 32,33 share One material distributing machine, there are two cloth material mouths for the material distributing machine, respectively to the station of the second cross drive line 32 and third cross drive line 33 Cloth).
The arrangement of entire flexible production line is referring to Fig.1, the production line includes lateral part 1 and vertical section 2, lateral part 1 includes the first cross drive line 31, the second cross drive line 32, third cross drive line 33, the 4th cross drive line 34, vertically Part 2 includes the first vertical transmission line 41, the second vertical transmission line 42, the vertical transmission line 43 of third.Four cross drive lines 3 with The first, the vertical transmission line 41,43 of third constitutes two relatively independent complete production lines.It distributed on every production line several A platform mould 5, several moulds 5 constitute several stations and process of prefabricated components production.According to production prefabricated components type Difference, the station of cross drive line 3 can increase or decrease, pour if you need to secondary, then need secondary die-filling, secondary reinforcing bar, It is smash with secondary pour.
Wherein the first cross drive line 31, the second cross drive line 32, third cross drive line 33, the 4th cross drive line 34 are successively arranged parallel to each other.First vertical transmission line 41, the second vertical transmission line 42, the vertical transmission line 43 of third are successively arranged Column, the first vertical transmission line 41 connect the first cross drive line 31, the second cross drive line 32, third cross drive line 33, the The leading portion of four cross drive lines 34, i.e. head end, the vertical transmission line 43 of third connect the first cross drive line 31, the second cross drive The opposite end of line 32, third cross drive line 33, the 4th cross drive line 34, i.e. end form two independent circulation lifes Producing line, the second vertical transmission line 42 can be displaced between the first vertical transmission line 41 and the vertical transmission line 43 of third, in this implementation In example, the second vertical transmission line 42 is not displaced between the first vertical transmission line 41 and the vertical transmission line 43 of third, and only realizing will For the material transportation of one end to the other end, the second vertical transmission line 42 can be with materials such as conveying steel, built-in fittings from production line one Side to the other side or centre do not need to increase striding equipment, greatly reduce the cost of investment of production line.
The independent driving wheel and driving motor that the cross drive line 3 of lateral part 1 is parallel to each other by two rows form, platform mould 5 It is walked on the drive wheel by motor driven, the platform mould 5 of walking is transferred to next work by a station on lateral production line Position.
The vertical transmission line 4 of vertical section 2 is that travelling platform is run on the track that two column are parallel to each other, and track is fixed on ground Face, travelling platform just move in orbit.Platform mould 5 runs to different station under driving motor along driving wheel and carries out operation, leads to Travelling platform on the vertical transmission line 4 of vertical section 2 is crossed to realize in the first cross drive line 31, the second cross drive line 32, the Cycle operation between three cross drive lines 33, the 4th cross drive line 34.
The flexible production line can produce simple prefabricated components and complicated prefabricated components or simple prefabricated components simultaneously and answer Miscellaneous prefabricated components are one of, and simple prefabricated components are the prefabricated components for only needing one-time-concreting, and complicated prefabricated components are to need two The secondary prefabricated components poured.
Two embodiments are described below and illustrate production line working principles: one, while producing simple prefabricated components and complexity is pre- Component processed, it is a kind of in two, the simple prefabricated components of production and complicated prefabricated components.
Embodiment one: as shown in Figure 2, produce two kinds of simple prefabricated components, it may be assumed that while produce non-prestressed laminated floor slab and Interior wall or light partition wall or decorative heat preservation integrated board are sheared, detailed process is as follows:
Produce non-prestressed laminated floor slab: platform mould 5 enters the first cross drive line 31 from the first vertical transmission line 41, and completes clear Spraying release agent process 8a, scribing process 9a are swept, mold installation procedure 10a, reinforcing bar (including truss bars and steel are next completed Muscle mesh sheet) installation procedure 11a, installation of embedded parts process 12a, casting and compacting of concrete process 13a, pre-hardening 13a reaches third and vertically passes Line sending 43, it is traversing to the second cross drive line 42 by the vertical transmission line 43 of third, plucking process is carried out after initial set again 15a, precuring process 16a, curing kilns maintenance process 19 and stripping process 17a, then again by the first vertical transmission line 41 It is secondary to return to the first cross drive line 31, then lateral 1 end of production line is reached by drive wheel and completes lifting process 18a, it rises The platform mould hung passes through driving wheel again and carries out next circulation.
Produce decorative heat preservation integrated board: platform mould 5 enters the 4th cross drive line 34 from the first vertical transmission line 41, and complete At cleaning and spraying release agent process 8b, scribing process 9b, mold installation procedure 10b, heat insulating decorative board erector are next completed Sequence 11b, reinforced mesh installation procedure 12b, installation of embedded parts process 13b, casting and compacting of concrete process 14b, pre-hardening 15b reach third Vertical transmission line 43, it is traversing to third cross drive line 33 by the vertical transmission line 43 of third, catch up with after initial set again flat Process 16b, precuring process 17b, plastering process 18b, curing kilns conserve process 18b and stripping process 19b, then by the One vertical transmission line 41 turns again to the 4th cross drive line 34 and reaches end completion lifting process 20b.
When producing light partition wall or shearing interior wall, in addition to there is no heat insulating decorative board installation procedure 11b, other processes and production Decorative heat preservation integrated board is identical.
Meanwhile understanding in view of above, which can only produce non-prestressed laminated floor slab, shear interior wall, is light Matter partition wall and decorative heat preservation integrated board any prefabricated components therein.
Embodiment two: as shown in figure 3, producing complicated prefabricated components, i.e., with beam inner-outer wall, with outside beam heat preservation decoration integrative Wallboard and shearing exterior wall, detailed process is as follows.
Production band beam Side fascia: platform mould 5 enters the first cross drive line 31 from the first vertical transmission line 41, and completes to clean Release agent process 20a, scribing process 21a are sprayed, bottom mold (group mould for the first time) installation procedure 22a, reinforcing bar is next completed (including installation reinforced mesh and steel reinforcement cage for the first time) installation procedure 23a, installation of embedded parts (first time installation of embedded parts) process 24a, casting and compacting of concrete (cloth and vibrate) (pour smash for the first time) process 25a, insulation board installation procedure 26a, upper mold (second Secondary group of mould) the installation procedure 27a arrival vertical transmission line 43 of third, it is traversing to the second cross drive by the vertical transmission line 43 of third Line 32 carries out reinforcement installation (second of installation reinforced mesh) process 28a, installation of embedded parts (second of installation built-in fitting) precuring Nurse's sequence 29a, casting and compacting of concrete (pour smash for the second time) process 30a, catch up with flat process 31a, precuring process 32a, plastering process 33a, curing kilns maintenance process 19, upper mold demould 34a, bottom mold releasability 35a, then pass through the first vertical transmission line 41 The first cross drive line 31 is turned again to, then 31 end of the first cross drive line is reached by drive wheel and completes lifting process 36a, the platform mould 5 lifted by crane carry out next circulation by driving wheel again.
Production band beam heat preservation decoration integrative Side fascia: platform mould 5 enters the 4th cross drive from the first vertical transmission line 41 Line 34, and cleaning and spraying release agent process 21b, scribing process 22b are completed, next complete bottom mold (group mould for the first time) peace Fill process 23b, insulation and decoration integrated plate installation procedure 24b, reinforcing bar (including installation reinforced mesh and steel reinforcement cage for the first time) peace Dress process 25b, installation of embedded parts (first time installation of embedded parts) process 26b, casting and compacting of concrete (pour smash for the first time) process 27b, Upper mold (second group of mould) installation procedure 28b reaches the vertical transmission line 43 of third, traversing by the vertical transmission line 43 of third To third cross drive line 33, reinforcement installation (second of installation reinforced mesh) process 29b, (second of installation of embedded parts is carried out Installation built-in fitting) precuring process 30b, casting and compacting of concrete (pour smash for the second time) process 31b, catch up with flat process 32b, precuring process 33b, plastering process 34b, curing kilns maintenance process 19, upper mold demould 35b, bottom mold releasability 36b, then pass through first Vertical transmission line 41 turns again to the 4th cross drive line 34, then reaches 34 end of the 4th cross drive line by drive wheel Lifting process 37b is completed, the platform mould lifted by crane passes through driving wheel again and carries out next circulation.
Production shearing exterior wall is identical as with beam exterior wall process;Band beam lining is produced in addition to having lacked installation of embedded parts process, Other production processes are identical as with beam exterior wall.
Meanwhile understanding in view of above, it is heat insulation decoration integrated which both can only produce band beam inner-outer wall, band beam Any prefabricated components in outside the pale of civilization wallboard and shearing exterior wall, are also possible to two of them.
Present invention solves the technical problem that:
1, the flexible production line is not to have two simple single-cycle overlappings, is to have shared the equipment such as curing kilns, material distributing machine.
2, the flexible production line can not only produce simple prefabricated components, be not required to when moreover, also producing complicated prefabricated components Multiple detour cycle operation is carried out, it only need to be according to production line direction pivots clockwise or counter-clockwise one cycle operation.
3, one or both of simple prefabricated components and complicated prefabricated components had both may be implemented simultaneously in the flexible production line Production also may be implemented simple prefabricated components and complicated prefabricated components mixture manufacturing, be required according to procedures, need to only increase work Bit quantity and the process for changing station.
4, the light mistake of material may be implemented across without additional increase auxiliary using vertical traversing production line in the flexible production line Equipment cross across.
5, the flexible production line has sufficiently examined the secondary problem of management for pouring complicated prefabricated components material, pours phase for secondary Answer station to be located at tail end, establish it is secondary pour complicated prefabricated components needed for material storage warehouse, realize material unified management, object Flow path is optimal.
6, mold is set up in the side of the vertical transmission line of flexible production line first section and try assembled station, when production line needs more When mold exchange, it can shift to an earlier date and carry out assembly outside production line, it is then online by vertical transmission line, it reduces and tries assembly on production line To Influence of production.
7, in lifting station, two circular routes is carried out and independently lift (hanging device shares), solving lifting station can not be same When the problem of lifting by crane.

Claims (10)

1. concrete prefabricated element production line, including lateral part (1) and vertical section (2), characterized in that the lateral part (1) include several cross drive lines (3) for being parallel to each other and being arranged in order, be provided on every cross drive line (3) Several processing stations and movable platform mould (5), described mould (5) can be displaced to next processing work from a upper processing stations Position, the vertical section (2) includes at least two vertical transmission lines (4) being parallel to each other, several cross drive lines (3) Leading portion has a vertical transmission line (4), and the back segment of several cross drive lines (3) has another vertical transmission line (4), the vertical transmission line (4) connects several described cross drive lines (3), so that platform mould (5) is in several cross The cyclic shift on transmission line (3) and vertical transmission line (4).
2. concrete prefabricated element production line according to claim 1, characterized in that several cross drive lines (3) packet Include the first cross drive line (31), the second cross drive line (32), third cross drive line (33) and the 4th cross drive line (34).
3. concrete prefabricated element production line according to claim 1 or claim 2, characterized in that the cross drive line (3) includes The independent driving wheel and its driving motor that two rows are parallel to each other, platform mould (5) are arranged on the driving wheel, are driven by driving motor Driving wheel is displaced platform mould (5).
4. concrete prefabricated element production line according to claim 1, characterized in that the vertical transmission line (4) includes two Arrange the track that is parallel to each other, and the travelling platform run on the track, the travelling platform is by described mould (5) from a cross Another cross drive line (3) is sent to transmission line (3).
5. concrete prefabricated element production line according to claim 2, characterized in that the vertical section (2) includes first Vertical transmission line (41), the second vertical transmission line (42) and the vertical transmission line of third (43), the first vertical transmission line (41) It is crossed on the front end of several cross drive lines (3), the vertical transmission line of third (43) is crossed on several cross drive lines (3) Rear end, the second vertical transmission line (42) is between the first vertical transmission line (41) and the vertical transmission line of third (43) and is crossed on The middle section of several cross drive lines (3).
6. concrete prefabricated element production line according to claim 5, characterized in that the first cross drive line (31), The vertical transmission line of third (43), the second cross drive line (32) and/or the first vertical transmission line (41) constitute a fabrication cycles.
7. concrete prefabricated element production line according to claim 5, characterized in that the 4th cross drive line (34), The vertical transmission line of third (43), third cross drive line (33) and/or the first vertical transmission line structure (41) are followed at another processing Ring.
8. concrete prefabricated element production line according to claim 1, characterized in that on every cross drive line (3) Several movable platform moulds (5) are provided with, each mould (5) is by tandem sequence setting.
9. concrete prefabricated element production line according to claim 5, characterized in that the first cross drive line (31), Storage heat preservation is equipped with by the back segment of second cross drive line (32), third cross drive line (33) and the 4th cross drive line (34) Plate, secondary group of mould mold, the reinforced mesh of secondary reinforcement installation and secondary installation of embedded parts built-in fitting warehouse (20).
10. smashing device for pouring for concrete prefabricated element production line as claimed in claim 5, characterized in that described first is horizontal It is set to the back segment of transmission line (31), the second cross drive line (2), third cross drive line (33) and the 4th cross drive line (34) It is equipped with casting and compacting of concrete process (25a, 30a, 31b, 27b).
CN201810548433.9A 2018-05-31 2018-05-31 It concrete prefabricated element production line and its pours and smashes device Pending CN109719843A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810548433.9A CN109719843A (en) 2018-05-31 2018-05-31 It concrete prefabricated element production line and its pours and smashes device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810548433.9A CN109719843A (en) 2018-05-31 2018-05-31 It concrete prefabricated element production line and its pours and smashes device

Publications (1)

Publication Number Publication Date
CN109719843A true CN109719843A (en) 2019-05-07

Family

ID=66293866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810548433.9A Pending CN109719843A (en) 2018-05-31 2018-05-31 It concrete prefabricated element production line and its pours and smashes device

Country Status (1)

Country Link
CN (1) CN109719843A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110421690A (en) * 2019-06-21 2019-11-08 浙江双友物流器械股份有限公司 A kind of cement board producing equipment
CN111186009A (en) * 2019-11-29 2020-05-22 广西建工集团建筑产业投资有限公司 Preparation method of PC prefabricated part double-circulation production line
CN111203972A (en) * 2020-01-19 2020-05-29 安徽省交通控股集团有限公司 Automatic production line for pile plate type structural bridge deck

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104626348A (en) * 2014-11-20 2015-05-20 中民筑友有限公司 Prefabricated part production line
CN104647578A (en) * 2013-11-15 2015-05-27 艾乐迈铁科公司 Method and manufacturing facility for casting concrete products
CN105690552A (en) * 2016-02-02 2016-06-22 中建科技有限公司 Prefabricated concrete component production system
CN105773827A (en) * 2016-05-03 2016-07-20 国新德 Three-dimensional production system of prefabricated components
CN107740611A (en) * 2017-11-23 2018-02-27 河北雪龙机械制造有限公司 A kind of twin spans two-wire production system of assembling type buildings material
CN208629675U (en) * 2018-05-31 2019-03-22 宁波联城住工科技有限公司 Concrete prefabricated element process units

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104647578A (en) * 2013-11-15 2015-05-27 艾乐迈铁科公司 Method and manufacturing facility for casting concrete products
CN104626348A (en) * 2014-11-20 2015-05-20 中民筑友有限公司 Prefabricated part production line
CN105690552A (en) * 2016-02-02 2016-06-22 中建科技有限公司 Prefabricated concrete component production system
CN105773827A (en) * 2016-05-03 2016-07-20 国新德 Three-dimensional production system of prefabricated components
CN107740611A (en) * 2017-11-23 2018-02-27 河北雪龙机械制造有限公司 A kind of twin spans two-wire production system of assembling type buildings material
CN208629675U (en) * 2018-05-31 2019-03-22 宁波联城住工科技有限公司 Concrete prefabricated element process units

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110421690A (en) * 2019-06-21 2019-11-08 浙江双友物流器械股份有限公司 A kind of cement board producing equipment
CN111186009A (en) * 2019-11-29 2020-05-22 广西建工集团建筑产业投资有限公司 Preparation method of PC prefabricated part double-circulation production line
CN111203972A (en) * 2020-01-19 2020-05-29 安徽省交通控股集团有限公司 Automatic production line for pile plate type structural bridge deck

Similar Documents

Publication Publication Date Title
CN108890850B (en) Intelligent production line and production process capable of producing various standard PC components
CN105082346B (en) A kind of prefabricated intelligent flow production line of shield duct piece
CN104626348B (en) Prefabricated components production line
CN109203215A (en) Concrete prefabricated element production line
CN208629675U (en) Concrete prefabricated element process units
CN109719843A (en) It concrete prefabricated element production line and its pours and smashes device
CN208068545U (en) A kind of three-dimensional production system of prefabricated component
CN108058266A (en) Prefabricated components integrated production line
CN206085314U (en) Prefabricated component flexible production line
CN105690552A (en) Prefabricated concrete component production system
CN108381746B (en) Construction method of sliding type pedestal prefabricated box girder
EP2878415B1 (en) Method and manufacturing facility for casting concrete products
CN208529391U (en) A kind of production line for the processing transhipment of assembled architecture factory semi-finished product
CN110877405A (en) Prefabricated component production line
CN111186011A (en) Automatic assembly line arrangement structure for factory prefabrication of laminated slab beams and production method
CN110014497A (en) A kind of sandwich heat preservation overlapping load-bearing wall panel and its production technology
CN209350532U (en) Concrete prefabricated element production line
WO2023103691A1 (en) Automated three-dimensional assembly line for pc component production and production process thereof
CN204525744U (en) The vertical formwork erection production line of light composite wallboard
CN108265981A (en) A kind of design method of building element production technology layout
CN110936487A (en) Novel prefabricated part production system
CN110065136A (en) A kind of two-sided composite wallboard and its production technology
CN110027084A (en) A kind of sandwich heat preservation load-bearing wall panel and its production technology with hole
CN103128846A (en) Automatic mechanical production line device of waste residue cement foam battens or building blocks
CN104669430B (en) PC wallboard production systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190429

Address after: 528300 Guanglong Industrial Park, Chencun Town, Shunde District, Foshan City, Guangdong Province, No. 6, No. 14 Xingye Road

Applicant after: Guangdong Liancheng Housing Equipment Information Technology Co., Ltd.

Address before: 315832 Room 118, No.1 Office Building, Meishan Salt Farm, Beilun District, Ningbo City, Zhejiang Province

Applicant before: Ningbo Liancheng Housing Technology Co., Ltd.

SE01 Entry into force of request for substantive examination