CN109709922A - Guide type debugging method and debugging equipment - Google Patents

Guide type debugging method and debugging equipment Download PDF

Info

Publication number
CN109709922A
CN109709922A CN201811613200.9A CN201811613200A CN109709922A CN 109709922 A CN109709922 A CN 109709922A CN 201811613200 A CN201811613200 A CN 201811613200A CN 109709922 A CN109709922 A CN 109709922A
Authority
CN
China
Prior art keywords
debugging
link
wizard
adjustment method
parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811613200.9A
Other languages
Chinese (zh)
Inventor
刘华
卓明胜
宋海川
刘慧�
梁飞拓
许静惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201811613200.9A priority Critical patent/CN109709922A/en
Publication of CN109709922A publication Critical patent/CN109709922A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention discloses a guide debugging method and debugging equipment, wherein the guide debugging method divides the debugging process of an object to be debugged into a plurality of links, and defines parameters of each link needing debugging, setting or checking; and starting the links one by one during debugging, acquiring debugging values of parameters corresponding to the links, analyzing and judging the debugging values, and giving a debugging conclusion. The invention can realize the standardization and the standardization of the debugging process and avoid individual difference of personal judgment.

Description

Wizard-like adjustment method, commissioning device
Technical field
The present invention relates to adjustment method and system, the more particularly, to wizard-like adjustment method of air-conditioner set and debugging is set It is standby.
Background technique
Large scale equipment requires to debug before coming into operation and in maintenance, fault detection, existing large scale equipment Be based on the experience of individual commissioning staffs in debugging to carry out, adjustment method, process, result caused to vary with each individual, exist compared with Big difference, in addition whether have debugging basis criterion there is also larger differences.This makes equipment debugging operation very It is lack of standardization, it can not accomplish standardization, quantifiable automatic production requirement.
Summary of the invention
In order to solve to be debugged in the prior art by personal experience, the technical issues of debugging process is not planned, the present invention is mentioned A kind of wizard-like adjustment method is gone out, the debugging process of object to be debugged is divided into several links, defining each link needs The parameter debugged, be arranged or checked;Start one by one when debugging the link, obtain the corresponding parameter of the link debugging be worth into Row analyzes and determines and provides debugging conclusion.
Preferably, if after the debugging value of all parameters of current link reaches requirement, then start next link.If working as When prosomite has the debugging value of parameter not reach requirement, the reference scheme solved the problems, such as and/or reference data are provided automatically.
In one embodiment, the link obtains the debugging value of the parameter automatically.In another embodiment, described Link obtains the debugging value of the parameter by artificial input data.
In an Application Example, the object to be debugged is air-conditioner set.
Specifically, the link include: unit visual examination link, engineering-environment check link, air tightness test link, At least one link of link in is completed in no-load running testing process, unit trial operation link, debugging.Wherein, the zero load Operating testing process includes each component of unit individually or coordination operation is tested.
The invention also provides a kind of commissioning devices, are mounted therein with debugging software, and the debugging software executes when running Wizard-like adjustment method described in above-mentioned technical proposal.
Specifically, the commissioning device accesses air-conditioner set by communication interface to run the debugging software.It is described logical It can be communicated using RS485, wifi, RJ45 Ethernet or bluetooth between communication interface and commissioning device.
The parameter that debugging is carried out link division, determines each link by the present invention, then automatically begins to corresponding link, from The dynamic debugging value to relevant parameter verifies so that the debugging of large scale equipment independent of artificial, realize standardization, Normalizing operation.For water chiller (or other air-conditioner sets), the present invention may be implemented to debug water chiller tuning, maintenance Standardization, informationization, the standardization of the processes such as maintenance, troubleshooting, and debugging tuning, maintenance, troubleshooting were waited Journey proposes reasonable proposed projects.
Detailed description of the invention
Below with reference to embodiment and attached drawing, the present invention is described in detail, in which:
Fig. 1 is the debugging flow chart of one embodiment of the invention.
Specific embodiment
The principle and embodiment that the invention will now be described in detail with reference to the accompanying drawings.
As shown in Figure 1, wizard-like adjustment method proposed by the invention is applicable not only to mainly by taking air-conditioner set as an example Water chiller, and it is also applied for other commercial units.
The debugging process of air-conditioner set is divided into several links first, each link explicitly define out need to debug, The parameter for being arranged or checking.Such as the debugging link of the most common air-conditioner set includes unit visual examination link, engineering-environment Check that link etc. is completed in link, air tightness test link, no-load running testing process, unit trial operation link, debugging.Wherein, Visual examination link needs the parameter debugged or checked to have pipeline state parameter (pipeline intact/deformation/fracture), heat-preservation cotton state Parameter (heat-preservation cotton intact/breakage etc.), state of earth wire parameter (including ENG land, power line, starting cabinet and motor wiring Deng) and valve state parameter (all kinds of valve opening and closings) etc..Engineering-environment checks that link needs the parameter checked to have temperature parameter With humidity parameter etc..The parameter that air tightness test link needs check has the pressure parameter etc. of air-conditioner host after pressurising.Zero load fortune Transfer to test link includes each component of unit is independent or coordination operation is tested etc..
Before debugging, the commissioning device equipped with debugging software is first connected to air-conditioner set by communication interface.It debugs soft When part is run, entire debugging process will be executed.Communication modes between commissioning device and communication interface can there are many, can adopt It is communicated with RS485, wifi, RJ45 Ethernet or bluetooth etc..
Start the link when debugging one by one, come obtain the debugging value of the corresponding parameter of the link analyzed and determined and to Conclusion is debugged out.In this process, it can be debugging software to obtain the debugging value of these parameters automatically, be also possible to by people Work auxiliary enters data to obtain debugging value.And during link jumps automatically, it can also suspend manually.If current The debugging value of all parameters of link has all reached requirement, continues next link, until completing all links.If current When link has the debugging value of parameter not reach requirement, the reference scheme solved the problems, such as and/or reference data are provided automatically.Example Such as: in air tightness test link, 1150 ± 50kPa being pressurized to air-conditioner host with nitrogen, with 0.4 grade of pressure above after 24 hours The pressure that table measures records pressure and the pressure after 24 hours after nitrogen charging on debugging software, if pressure decline is no more than 10%, Qualification, if pressure decrease beyond 10%, be it is unqualified, need to find out leakage and exclude.
The present invention is based on the technologies such as informationization, big data, and the links such as the debugging, detection, troubleshooting of equipment are automated, Realize regulation and standardization, quantifiable debugging evaluation.During above-mentioned debugging, as long-range engineer in need and When field adjustable personnel mutually confirm, long-range video or voice can also be carried out by third party APP and is linked up, it is former when having When barrier, it can also equally be linked up using which, be conducive to going on smoothly for debugging process.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (11)

1. a kind of wizard-like adjustment method, which is characterized in that the debugging process of object to be debugged is divided into several links, it is fixed The parameter that each link of justice needs to debug, be arranged or check;Start the link when debugging one by one, obtain the corresponding ginseng of the link Several debugging values is analyzed and determined and provides debugging conclusion.
2. wizard-like adjustment method as described in claim 1, which is characterized in that if the debugging value of all parameters of current link After reaching requirement, then start next link.
3. wizard-like adjustment method as described in claim 1, which is characterized in that if current link has the debugging value of parameter not have When reaching requirement, the reference scheme solved the problems, such as and/or reference data are provided automatically.
4. wizard-like adjustment method as described in claim 1, which is characterized in that the link obtains the tune of the parameter automatically Examination value.
5. wizard-like adjustment method as described in claim 1, which is characterized in that the link is obtained by artificial input data The debugging value of the parameter.
6. the wizard-like adjustment method as described in claim 1 to 5 any one, which is characterized in that the object to be debugged is Air-conditioner set.
7. wizard-like adjustment method as claimed in claim 6, which is characterized in that the link includes: unit visual examination ring Section, engineering-environment check that ring is completed in link, air tightness test link, no-load running testing process, unit trial operation link, debugging At least one link of section in.
8. wizard-like adjustment method as claimed in claim 7, which is characterized in that the no-load running testing process includes unit Each component is individually or coordination operation is tested.
9. a kind of commissioning device, is mounted therein with debugging software, which is characterized in that execute such as right when the debugging software is run It is required that wizard-like adjustment method described in 1 to 8 any one.
10. commissioning device as claimed in claim 9, which is characterized in that the commissioning device accesses air-conditioning by communication interface Unit runs the debugging software.
11. commissioning device as claimed in claim 10, which is characterized in that used between the communication interface and commissioning device RS485, wifi, RJ45 Ethernet or bluetooth are communicated.
CN201811613200.9A 2018-12-27 2018-12-27 Guide type debugging method and debugging equipment Pending CN109709922A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811613200.9A CN109709922A (en) 2018-12-27 2018-12-27 Guide type debugging method and debugging equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811613200.9A CN109709922A (en) 2018-12-27 2018-12-27 Guide type debugging method and debugging equipment

Publications (1)

Publication Number Publication Date
CN109709922A true CN109709922A (en) 2019-05-03

Family

ID=66258768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811613200.9A Pending CN109709922A (en) 2018-12-27 2018-12-27 Guide type debugging method and debugging equipment

Country Status (1)

Country Link
CN (1) CN109709922A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111623473A (en) * 2020-06-08 2020-09-04 珠海格力电器股份有限公司 Adaptive debugging method of air conditioner
CN114484760A (en) * 2022-02-16 2022-05-13 上海美控智慧建筑有限公司 Air conditioning unit and remote debugging method and remote debugging device thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102088790A (en) * 2009-12-03 2011-06-08 华为技术有限公司 Method and equipment for indicating and acquiring modulation mode
CN202041821U (en) * 2011-01-13 2011-11-16 西门子公司 Numerical control machine debugging guide system
CN102713858A (en) * 2011-01-12 2012-10-03 丰田自动车株式会社 Online debugging system for information processing device and online debugging method
US8726209B1 (en) * 2012-02-14 2014-05-13 C{dot over (a)}dence Design System, Inc. Method and system for automatically establishing a component description format (CDF) debugging environment
CN105045462A (en) * 2015-05-21 2015-11-11 深圳市威通科技有限公司 Prompting method and apparatus for human-computer interaction interface of computer-aided test system
CN105565102A (en) * 2016-03-09 2016-05-11 上海贝思特控制技术有限公司 Debugging and guiding method fast to operate and special for elevator
CN108224682A (en) * 2018-01-10 2018-06-29 珠海格力电器股份有限公司 Air conditioning equipment, air conditioning control device and air conditioning debugging method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102088790A (en) * 2009-12-03 2011-06-08 华为技术有限公司 Method and equipment for indicating and acquiring modulation mode
CN102713858A (en) * 2011-01-12 2012-10-03 丰田自动车株式会社 Online debugging system for information processing device and online debugging method
CN202041821U (en) * 2011-01-13 2011-11-16 西门子公司 Numerical control machine debugging guide system
US8726209B1 (en) * 2012-02-14 2014-05-13 C{dot over (a)}dence Design System, Inc. Method and system for automatically establishing a component description format (CDF) debugging environment
CN105045462A (en) * 2015-05-21 2015-11-11 深圳市威通科技有限公司 Prompting method and apparatus for human-computer interaction interface of computer-aided test system
CN105565102A (en) * 2016-03-09 2016-05-11 上海贝思特控制技术有限公司 Debugging and guiding method fast to operate and special for elevator
CN108224682A (en) * 2018-01-10 2018-06-29 珠海格力电器股份有限公司 Air conditioning equipment, air conditioning control device and air conditioning debugging method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111623473A (en) * 2020-06-08 2020-09-04 珠海格力电器股份有限公司 Adaptive debugging method of air conditioner
CN111623473B (en) * 2020-06-08 2021-09-14 珠海格力电器股份有限公司 Adaptive debugging method of air conditioner
CN114484760A (en) * 2022-02-16 2022-05-13 上海美控智慧建筑有限公司 Air conditioning unit and remote debugging method and remote debugging device thereof

Similar Documents

Publication Publication Date Title
RU2628146C2 (en) Method of warning detection of failure in the device, computer program, system and module for warning detection of failure in the device
CN111583590A (en) Equipment fault monitoring early warning system in building
CN109709922A (en) Guide type debugging method and debugging equipment
US20130218522A1 (en) Abnormality diagnostic system and industrial machinery
DE102014117270A1 (en) System and method for detecting a faulty combustion chamber
CN105097059A (en) Nuclear power plant system regular test project analysis design method
US10975794B2 (en) Method of fault isolation for systems with existing diagnostics
CN110672312B (en) Method for predicting bolt residual clamping force based on BP neural network
WO2020189374A1 (en) Maintenance work assistance device, maintenance work assistance method, and maintenance work assistance program
DE102016123338A1 (en) Method for predictive maintenance of field devices of automation technology
CN106228472A (en) A kind of substation equipment intelligent patrol detection failure analysis methods
CN102749916B (en) A kind of automatic testing equipment of train traction system control unit
CN117272032B (en) Air compressor fault diagnosis method and device based on vibration detection
CN114789468A (en) Automatic fault detection and repair system, method, equipment and terminal
DE102017124016A1 (en) Methods and systems for detecting a sensor shutdown
CN103498706A (en) Turboset performance monitoring and diagnosing method based on general logic table
CN110442100B (en) Thermal control intelligent DCS diagnosis early warning method and system
KR101399488B1 (en) System for diagnosing defect of journal bearing
WO2020114315A1 (en) Elevator status multi-information fusion diagnosis method
CN204534076U (en) Laddering centralized lubrication system
CN103499452A (en) Automatic interpretation method for engine testing data
CN109919337A (en) A kind of automobile failure diagnosis and guidance method and system
CN104234775A (en) Measurement method of key pressure of lubricating system
CN115539370A (en) Air compressor multi-valve fault diagnosis method and system based on deep learning
CN109765046A (en) A kind of pressure switch detection device and method of calibration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503