Prior art keywords
stirrup
superimposed sheet
screw rod
overlapping
fixing buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910107461.1A
Other languages
Chinese (zh)
Other versions
CN109707173B (en
Inventor
庄金平
陈剑星
陈光辉
潘晨阳
王德奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian University of Technology
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201910107461.1A priority Critical patent/CN109707173B/en
Publication of CN109707173A publication Critical patent/CN109707173A/en
Application granted granted Critical
Publication of CN109707173B publication Critical patent/CN109707173B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention relates to a kind of assembled overlapping beam slab installation auxiliary devices and its construction method, it is characterised in that: wherein assembled overlapping beam slab installation auxiliary device includes the beam prefabricated portion of two overlappings disposed in parallel, the superimposed sheet elevation adjusting device being respectively provided on the beam prefabricated portion's opposite face of two overlappings and the superimposed sheet being supported on superimposed sheet elevation adjusting device.Assembled overlapping beam slab installation auxiliary device can reduce the use of U-stirrups, be conducive to accelerate speed of application.

Description

Assembled overlaps beam slab installation auxiliary device and its construction method
Technical field:
The present invention relates to assembled stoplog plate constructing structure, in particular to a kind of assembled overlapping beam slab installation auxiliary device and its Construction method.
Background technique:
The reinforcing bar that assembly concrete building is referred in body structure portion or is all assembled using precast concrete Concrete structure building.In order to guarantee that the holistic resistant behavior of precast reinforced concrete structure is equal with whole structure of pouring, need Corresponding reliable construction measure and construction method are taken, guarantees the energy such as pre-erection, cast-in-place part, the node in fabricated construction It is enough to cooperate, and ensure that its stress performance pours structure at or above whole.
Currently, vertical member (reinforced concrete wall, column) is cast-in-place, and horizontal member (beam, plate) uses composite beam and overlapping The assembly construction method of plate is also one of common construction method in China.Usual composite beam is opened using open stirrups in band After the composite beam lifting in place of mouth hoop, superimposed sheet is lifted;Then longitudinal reinforcement at the top of installation binding composite beam, composite beam open stirrups Part carries out welded closure using bar dowel;On the one hand this way increases welding workload, the destruction of another aspect weld seam It enbrittles feature, is unfavorable for the safety of structure.In addition, composite beam and superimposed sheet lap-joint, carry out envelope mould processing, to prevent Leak-stopping slurry;Current common practice is that pre-embedded bolt hole is distinguished in precast beam and prefabricated board bottom respectively, for fixing Angle formwork, this Kind way is high to pre-embedded bolt hole required precision, while trouble of constructing.
That is, in traditional assembled overlapping Beam-Slab Construction, due to the reinforcing bar that in superimposed sheet hoisting process, superimposed sheet stretches out Can be with the longitudinal reinforcement intersection-type collision at the top of composite beam, composite beam top rebars are not bound in advance thus, have been lifted to superimposed sheet Cheng Houzai binds composite beam top rebars, however, the stirrup of composite beam needs in order to be put in place composite beam top rebars It is made into the form of open stirrups, open stirrups are welded into closed stirrup with bar dowel again after being put in place by composite beam top rebars, On the one hand this method increases welding workload, on the other hand welding destroys destructive characteristics of enbrittling, and is unfavorable for structure Anti-seismic performance.
In traditional superposed type overlapping Beam-Slab Construction, composite beam and superimposed sheet lap-joint are using on precast beam and prefabricated board Then pre-embedded bolt hole is sealed using the form of pre-buried bolt hole fixed internal corner formwork (such as aluminium alloy angle mould or steel angle mould) Mould, this method increase the difficulty of prefabricated components, it is desirable that being positioned to for pre-embedded bolt hole is accurate.
Summary of the invention:
In view of the deficiencies in the prior art, technical problem to be solved by the invention is to provide a kind of assembled overlapping Installation of beam slab is auxiliary Device and its construction method are helped, assembled overlapping beam slab installation auxiliary device can reduce the use of U-stirrups, be conducive to add Fast speed of application.
Assembled of the present invention overlaps beam slab installation auxiliary device, it is characterised in that: including two composite beams disposed in parallel Prefabricated portion, the superimposed sheet elevation adjusting device being respectively provided on the beam prefabricated portion's opposite face of two overlappings and it is supported on superimposed sheet absolute altitude tune Superimposed sheet on regulating device.
Further, above-mentioned superimposed sheet elevation adjusting device includes L shape steel structure connector that horizontal, stringer board block is constituted and vertical The vertical adjustment screw rod being threaded on L shape steel structure connector transverse slat block, vertical adjustment screw rod top is fixed with flat Plate, the bottom surface of the plate are fixedly connected with horizontal screw thread casing and are threadedly connected to the horizontal screw bolt of horizontal screw thread casing, institute The stringer board block for stating L shape steel structure connector is fixedly connected by bolt with the embedded hole defaulted on the beam prefabricated portion's opposite face of overlapping, The superimposed sheet is supported on plate.
Further, pad is equipped with angle steel template, the angle steel template between above-mentioned plate upper surface and superimposed sheet lower surface It include transverse slat and stringer board, the transverse slat is located between plate upper surface and superimposed sheet lower surface, and stringer board medial surface is attached to folded It closes on beam prefabricated portion's opposite face, the horizontal screw bolt inner end presses against the lateral surface of stringer board.
Further, the beam prefabricated portion of above-mentioned overlapping includes composite beam bottom reinforcing bar, is spaced the envelope being located on the reinforcing bar of composite beam bottom It closes stirrup and is cast in the concrete for overlapping beam prefabricated portion bottom, the top of the closed stirrup is exposed at outside concrete;It is pouring Before concrete, the lower part binding and fixing of composite beam bottom reinforcing bar and closed stirrup are hung with auxiliary bar above closed stirrup, seal The top for closing stirrup, which is connect by stirrup fixing buckle with auxiliary bar, to be pre-fixed, and stirrup is removed after concreting final set and is fixed Button and auxiliary bar.
Further, above-mentioned stirrup fixing buckle is threaded through two pieces of arc panel tops and both ends including two pieces of arc panels, one Straight screw rod with nut, one be threaded through two pieces of arc panel lower parts hang shape screw rod and two are connected to the T for hanging shape screw rod lower part Shape screw rod, the shape screw rod that hangs include horizontal screw rod, the vertical pole for being connected to horizontal screw rod middle section and are connected to there are two the tools of vertical pole lower part The inverted U-shaped connector of stabilizer blade, two branch of the inverted U-shaped connector, which are worn, is connected to T shape screw rod, the head end phase of two T shape screw rods To setting, the auxiliary bar is folded between two pieces of arc panels, and the upper steel rib of the closed stirrup is folded in two T shape spiral shells Between the head end of bar.
The construction method of assembled overlapping beam slab installation auxiliary device of the present invention, it is characterised in that:
The first step makes several stirrup fixing buckles;
Second step, by existing traditional method production template, the lower part of binding composite beam bottom reinforcing bar and stirrup, stirrup upper steel rib It does not bind temporarily, but uses the fixed stirrup of stirrup fixing buckle, i.e., stirrup fixing buckle is through on an auxiliary bar first, Then according to the position of the position adjustment stirrup fixing buckle of interval setting stirrup, straight screw rod is tightened after being adjusted in place and hangs shape screw rod The nut of upper horizontal screw rod, that is, fix stirrup fixing buckle, then auxiliary bar be fixed in template, by adjusting stirrup is tightened T shape screw rod on fixing buckle makes the fixed stirrup of its head end, finally pours composite beam lower concrete, after concrete final set, tear open Except muscle fixing buckle, after maintenance to certain age, form removal forms the Prefabricated superposed beam with closed stirrup;
Step 3: processing prefabricated superimposed sheet by existing traditional method;
Step 4: at the construction field (site) by superimposed sheet and the beam prefabricated portion's transport of overlapping with closed stirrup, vertical member (wall or Column) construction after the completion of, the longitudinal reinforcement at the top of composite beam is pierced into closed stirrup, and back longitudinal reinforcement is temporarily fixed on hoop Back longitudinal reinforcement can also be temporarily fixed on the centre of stirrup, back longitudinal reinforcement when overlapping beam section is enough big by muscle side Be fixed temporarily using iron wire by longitudinal reinforcement bind stirrup on, bind 4-5 at;
Step 5: pressing existing conventional way, the lifting installation of the composite beam after back longitudinal reinforcement will be fixed temporarily and form two-phase To the beam prefabricated portion of the overlapping of setting;
Step 6:, using the embedded hole being embedded on composite beam opposite face in advance, passing through spiral shell after composite beam installation fixes Bolt fixes superimposed sheet elevation adjusting device, before superimposed sheet lifting, an angle steel template or aluminium alloy Angle formwork is placed in folded On plywood elevation adjusting device, height is adjusted by the vertical screw rod on superimposed sheet elevation adjusting device, makes angle steel template or aluminium The top surface of alloy Angle formwork just at superimposed sheet bottom absolute altitude at, the length of steel or aluminium alloy Angle formwork and overlapping beam length phase Together, by tightening the Level tune screw rod of superimposed sheet elevation adjusting device, angle steel template or aluminium alloy angle are held out against in the horizontal direction Template;
Step 7: lifting superimposed sheet respectively, it is placed on angle steel or aluminium alloy Angle formwork, is then folded by existing conventional method Layer concrete pours.
Further, the spacing or a several that superimposed sheet elevation adjusting device is arranged on overlapping beam prefabricated minister's degree direction Determine that every piece of overlapping width is at least provided with 2 superimposed sheet elevation adjusting devices according to the width of every piece of superimposed sheet.
Remarkable advantage of the present invention has 3:
(1) composite beam top rebars are installed in advance, reduces the use of U-stirrups, accelerates speed of application;
(2) Fast Installation positioning of the superimposed sheet in construction is realized;
(3) realize that the fast and flexible of superimposed sheet and composite beam lap-joint seals mould.
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Detailed description of the invention:
Fig. 1 is the schematic diagram of assembled composite beam board mounting structure;
Fig. 2 is superimposed sheet elevation adjusting device and the beam prefabricated portion's connection structure diagram of overlapping;
Fig. 3 is the organigram of the beam prefabricated portion's connection longitudinal reinforcement of overlapping;
Fig. 4 is template, the connection structure diagram for overlapping beam prefabricated portion, auxiliary bar and stirrup fixing buckle;
Fig. 5 is the D structure schematic diagram of stirrup fixing buckle;
Fig. 6 is the local structure schematic diagram of Fig. 5;
Fig. 7 is the side view organigram that stirrup fixing buckle is connect with auxiliary bar and stirrup upper steel rib;
Fig. 8 is profile construction schematic diagram of the Fig. 3 perpendicular to auxiliary bar axial line;
Fig. 9 is the D structure schematic diagram for overlapping beam prefabricated portion;
Figure 10 is the connection structure diagram of plate Yu horizontal screw thread casing.
Specific embodiment:
To make the foregoing features and advantages of the present invention clearer and more comprehensible, special embodiment below, and cooperate attached drawing, make specifically It is bright as follows.
Assembled of the present invention overlapping beam slab installation auxiliary device includes the beam prefabricated portion 1 of two overlappings disposed in parallel, respectively It the superimposed sheet elevation adjusting device 2 that is located on the beam prefabricated portion's opposite face of two overlappings and is supported on superimposed sheet elevation adjusting device Superimposed sheet 3.
One of embodiment, above-mentioned superimposed sheet elevation adjusting device 2 include horizontal, stringer board block composition L shape steel structure connection Part 4 and the vertical adjustment screw rod 5 being threaded on L shape steel structure connector transverse slat block 11 vertically, on the vertical adjustment screw rod 5 Portion is fixed with plate 6, and the bottom surface of the plate 6 is fixedly connected with horizontal screw thread casing 7 and is threadedly connected to horizontal screw thread set The stringer board block 9 of the horizontal screw bolt 8 of pipe, the L shape steel structure connector by bolt 10 and defaults in the beam prefabricated portion's opposite face of overlapping On embedded hole be fixedly connected, the superimposed sheet 3 is supported on plate.
Further, pad is equipped with angle steel template 12, the angle steel mould between above-mentioned plate upper surface and superimposed sheet lower surface Plate includes transverse slat 13 and stringer board 14, and the transverse slat 13 is located between plate upper surface and superimposed sheet lower surface, in stringer board 14 Side is attached on the beam prefabricated portion's opposite face A of overlapping, and 8 inner end of horizontal screw bolt presses against the lateral surface of stringer board.
Further, the beam prefabricated portion 1 of above-mentioned overlapping is located on the reinforcing bar of composite beam bottom including composite beam bottom reinforcing bar 15, interval Closed stirrup 16 and it is cast in the concrete 17 for overlapping beam prefabricated portion bottom, the top of the closed stirrup is exposed at outside concrete; Before casting concrete, the lower part binding and fixing of composite beam bottom reinforcing bar and closed stirrup, the top of closed stirrup 16 is hung with auxiliary Reinforcing bar 18 is helped, 18 both ends of auxiliary bar are supported on template B, and the top of closed stirrup 16 passes through stirrup fixing buckle 19 and auxiliary steel The connection of muscle 18 pre-fixes, and stirrup fixing buckle 19 and auxiliary bar 18 are removed after concreting final set.
Further, above-mentioned stirrup fixing buckle 19 include two pieces arc panel 20, one be threaded through two pieces of arc panel tops and Straight screw rod of the both ends with nut 21, one be threaded through two pieces of arc panel lower parts hang shape screw rod 22 and two are connected to and hang shape screw rod The T shape screw rod 23 of lower part, the shape screw rod 22 that hangs include horizontal screw rod 24, are connected to the vertical pole 25 in horizontal screw rod middle section and are connected to vertical For bar lower part tool there are two the inverted U-shaped connector 26 of stabilizer blade, two branch of the inverted U-shaped connector, which are worn, is connected to T shape screw rod 23, and two The head end 27 of a T shape screw rod is oppositely arranged, and the auxiliary bar 18 is folded between two pieces of arc panels 20, the closed stirrup Upper steel rib 28 is folded between the head end 27 of two T shape screw rods.
Assembled overlapping beam slab installation auxiliary device of the present invention uses closed stirrup since composite beam uses, and opens with tradition Mouth stirrup is compared, and a large amount of welding workload is reduced, and avoids lacking for the stirrup welding potential brittle break of bring Point.Itd is proposed superimposed sheet elevation adjusting device is invented, while there is the regulatory function of horizontal direction and vertical direction, simultaneously It can be used as the fulcrum of Angle formwork, installation and dismounting are flexible and convenient.
The construction method of assembled overlapping beam slab installation auxiliary device of the present invention,
The first step makes several stirrup fixing buckles;
Second step, by the lower part of existing traditional method production template B, binding composite beam bottom reinforcing bar and stirrup, stirrup upper reinforcement Item is not bound temporarily, but uses the fixed stirrup of stirrup fixing buckle, i.e., stirrup fixing buckle is through an auxiliary bar first On 18 (18 both ends of auxiliary bar are supported on template B), then according to the position adjustment stirrup fixing buckle of interval setting stirrup Position tightens straight screw rod and hangs the nut of horizontal screw rod on shape screw rod, that is, fixes stirrup fixing buckle after being adjusted in place, then will be auxiliary It helps reinforcing bar to be fixed in template, by adjusting the T shape screw rod on stirrup fixing buckle is tightened, makes the fixed stirrup of its head end, finally pour Composite beam lower concrete is built, after concrete final set, removes muscle fixing buckle, after maintenance to certain age, form removal is formed Prefabricated superposed beam with closed stirrup;
Step 3: processing prefabricated superimposed sheet by existing traditional method;
Step 4: at the construction field (site) by superimposed sheet and the beam prefabricated portion's transport of overlapping with closed stirrup, vertical member (wall or Column) construction after the completion of, the longitudinal reinforcement 29 at the top of composite beam is pierced into closed stirrup 16, and back longitudinal reinforcement is fixed temporarily In stirrup side, back longitudinal reinforcement can also be temporarily fixed on to the centre of stirrup when overlapping beam section is enough big, back is longitudinal Being fixed temporarily for reinforcing bar is bound longitudinal reinforcement on stirrup using iron wire, is bound at 4-5;
Step 5: pressing existing conventional way, the lifting installation of the composite beam after back longitudinal reinforcement will be fixed temporarily and form two-phase To the beam prefabricated portion of the overlapping of setting;
Step 6:, using the embedded hole being embedded on composite beam opposite face in advance, passing through spiral shell after composite beam installation fixes Bolt fixes superimposed sheet elevation adjusting device, before superimposed sheet lifting, an angle steel template or aluminium alloy Angle formwork is placed in folded On plywood elevation adjusting device, height is adjusted by the vertical screw rod on superimposed sheet elevation adjusting device, makes angle steel template or aluminium The top surface of alloy Angle formwork just at superimposed sheet bottom absolute altitude at, the length of steel or aluminium alloy Angle formwork and overlapping beam length phase Together, by tightening the Level tune screw rod of superimposed sheet elevation adjusting device, angle steel template or aluminium alloy angle are held out against in the horizontal direction Template;
Step 7: lifting superimposed sheet respectively, it is placed on angle steel or aluminium alloy Angle formwork, is then folded by existing conventional method Layer concrete pours.
Further, the spacing or a several that superimposed sheet elevation adjusting device is arranged on overlapping beam prefabricated minister's degree direction Determine that every piece of overlapping width is at least provided with 2 superimposed sheet elevation adjusting devices according to the width of every piece of superimposed sheet.
Remarkable advantage of the present invention has 3:
(4) composite beam top rebars are installed in advance, reduces the use of U-stirrups, accelerates speed of application;
(5) Fast Installation positioning of the superimposed sheet in construction is realized;
(6) realize that the fast and flexible of superimposed sheet and composite beam lap-joint seals mould.
Any technical solution disclosed in aforementioned present invention unless otherwise stated, if it discloses numberical range, Disclosed numberical range is preferred numberical range, and any it should be appreciated by those skilled in the art preferred numberical ranges Only the obvious or representative numerical value of technical effect can not since numerical value is more in many enforceable numerical value Exhaustion, so the present invention just discloses technical solution of the component values to illustrate the present invention, also, the above-mentioned numerical value enumerated is not The limitation to the invention protection scope should be constituted.
If the words such as " first ", " second " are used herein come if limiting components, those skilled in the art are answered This knows: the use of " first ", " second " is intended merely to facilitate in description and is distinguished components as not having Stated otherwise Outside, above-mentioned word has no special meaning.
Meanwhile if aforementioned present invention discloses or relates to the components or structural member of connection fastened to each other, except another There is statement outer, is fixedly connected it is to be understood that connection (such as using bolt or screw connection) can be removedly fixed, it can also To understand are as follows: non-removable to be fixedly connected with (such as riveting, welding), certainly, connection fastened to each other or integral type knot Structure (such as manufacturing using casting technique is integrally formed) is replaced (obviously can not be using except integrally formed technique).
In addition, for indicating the art of positional relationship or shape applied in any technical solution disclosed in aforementioned present invention Its meaning includes approximate with its, similar or close state or shape to language unless otherwise stated.
Either component provided by the invention by multiple individual component parts either assembled, or one The separate part that forming technology manufactures.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent The present invention is described in detail with reference to preferred embodiments for pipe, it should be understood by those ordinary skilled in the art that: still It can modify to a specific embodiment of the invention or some technical features can be equivalently replaced;Without departing from this hair The spirit of bright technical solution should all cover within the scope of the technical scheme claimed by the invention.

Claims (7)

1. a kind of assembled overlaps beam slab installation auxiliary device, it is characterised in that: beam prefabricated including two overlappings disposed in parallel Portion, the superimposed sheet elevation adjusting device being respectively provided on the beam prefabricated portion's opposite face of two overlappings and be supported on superimposed sheet absolute altitude adjust dress The superimposed sheet set.
2. assembled according to claim 1 overlaps beam slab installation auxiliary device, it is characterised in that: the superimposed sheet absolute altitude Regulating device includes horizontal, stringer board block composition L shape steel structure connector and is threaded on L shape steel structure connector transverse slat block vertically Vertical adjustment screw rod, vertical adjustment screw rod top is fixed with plate, and the bottom surface of the plate is fixedly connected with level Threaded sleeve and the horizontal screw bolt for being threadedly connected to horizontal screw thread casing, the stringer board block of the L shape steel structure connector pass through bolt It is fixedly connected with the embedded hole defaulted on the beam prefabricated portion's opposite face of overlapping, the superimposed sheet is supported on plate.
3. assembled according to claim 1 or 2 overlaps beam slab installation auxiliary device, it is characterised in that: on the plate Pad is equipped with angle steel template between surface and superimposed sheet lower surface, and the angle steel template includes transverse slat and stringer board, and the transverse slat is It is located between plate upper surface and superimposed sheet lower surface, stringer board medial surface is attached on the beam prefabricated portion's opposite face of overlapping, the level Screw rod inner end presses against the lateral surface of stringer board.
4. assembled according to claim 3 overlaps beam slab installation auxiliary device, it is characterised in that: the overlapping is beam prefabricated Portion includes composite beam bottom reinforcing bar, is spaced the closed stirrup being located on the reinforcing bar of composite beam bottom and is cast in the beam prefabricated portion bottom of overlapping The top of concrete, the closed stirrup is exposed at outside concrete;Before casting concrete, composite beam bottom reinforcing bar and closed stirrup Lower part binding and fixing, auxiliary bar is hung with above closed stirrup, and the top of closed stirrup passes through stirrup fixing buckle and auxiliary Reinforcing bar connection pre-fixes, and stirrup fixing buckle and auxiliary bar are removed after concreting final set.
5. assembled according to claim 4 overlaps beam slab installation auxiliary device, it is characterised in that: the stirrup fixing buckle Be threaded through two pieces of arc panel tops including two pieces of arc panels, one and straight screw rod of the both ends with nut, one be threaded through two pieces of arcs Shape plate lower part hang shape screw rod and two are connected to the T shape screw rod for hanging shape screw rod lower part, the shape screw rod that hangs includes horizontal screw rod, company Connect horizontal screw rod middle section vertical pole and be connected to vertical pole lower part tool there are two stabilizer blade inverted U-shaped connector, the inverted U-shaped connector Two branch wear and be connected to T shape screw rod, the head end of two T shape screw rods is oppositely arranged, and the auxiliary bar is folded in two pieces of arcs Between plate, the upper steel rib of the closed stirrup is folded between the head end of two T shape screw rods.
6. a kind of construction method using assembled as claimed in claim 5 overlapping beam slab installation auxiliary device, it is characterised in that:
The first step makes several stirrup fixing buckles;
Second step, by existing traditional method production template, the lower part of binding composite beam bottom reinforcing bar and stirrup, stirrup upper steel rib It does not bind temporarily, but uses the fixed stirrup of stirrup fixing buckle, i.e., stirrup fixing buckle is through on an auxiliary bar first, Then according to the position of the position adjustment stirrup fixing buckle of interval setting stirrup, straight screw rod is tightened after being adjusted in place and hangs shape screw rod The nut of upper horizontal screw rod, that is, fix stirrup fixing buckle, then auxiliary bar be fixed in template, by adjusting stirrup is tightened T shape screw rod on fixing buckle makes the fixed stirrup of its head end, finally pours composite beam lower concrete, after concrete final set, tear open Except muscle fixing buckle, after maintenance to certain age, form removal forms the Prefabricated superposed beam with closed stirrup;
Step 3: processing prefabricated superimposed sheet by existing traditional method;
Step 4: at the construction field (site) by superimposed sheet and the beam prefabricated portion's transport of overlapping with closed stirrup, vertical member (wall or Column) construction after the completion of, the longitudinal reinforcement at the top of composite beam is pierced into closed stirrup, and back longitudinal reinforcement is temporarily fixed on hoop Back longitudinal reinforcement can also be temporarily fixed on the centre of stirrup, back longitudinal reinforcement when overlapping beam section is enough big by muscle side Be fixed temporarily using iron wire by longitudinal reinforcement bind stirrup on, bind 4-5 at;
Step 5: pressing existing conventional way, the lifting installation of the composite beam after back longitudinal reinforcement will be fixed temporarily and form two-phase To the beam prefabricated portion of the overlapping of setting;
Step 6:, using the embedded hole being embedded on composite beam opposite face in advance, passing through spiral shell after composite beam installation fixes Bolt fixes superimposed sheet elevation adjusting device, before superimposed sheet lifting, an angle steel template or aluminium alloy Angle formwork is placed in folded On plywood elevation adjusting device, height is adjusted by the vertical screw rod on superimposed sheet elevation adjusting device, makes angle steel template or aluminium The top surface of alloy Angle formwork just at superimposed sheet bottom absolute altitude at, the length of steel or aluminium alloy Angle formwork and overlapping beam length phase Together, by tightening the Level tune screw rod of superimposed sheet elevation adjusting device, angle steel template or aluminium alloy angle are held out against in the horizontal direction Template;
Step 7: lifting superimposed sheet respectively, it is placed on angle steel or aluminium alloy Angle formwork, is then folded by existing conventional method Layer concrete pours.
7. the construction method of assembled overlapping beam slab installation auxiliary device according to claim 6, it is characterised in that: superimposed sheet The spacing or number that elevation adjusting device is arranged on overlapping beam prefabricated minister's degree direction are determining according to the width of every piece of superimposed sheet, Every piece of overlapping width is at least provided with 2 superimposed sheet elevation adjusting devices.
CN201910107461.1A 2019-02-02 2019-02-02 Construction method of assembly type laminated beam plate installation auxiliary device Active CN109707173B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910107461.1A CN109707173B (en) 2019-02-02 2019-02-02 Construction method of assembly type laminated beam plate installation auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910107461.1A CN109707173B (en) 2019-02-02 2019-02-02 Construction method of assembly type laminated beam plate installation auxiliary device

Publications (2)

Publication Number Publication Date
CN109707173A true CN109707173A (en) 2019-05-03
CN109707173B CN109707173B (en) 2023-07-25

Family

ID=66264362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910107461.1A Active CN109707173B (en) 2019-02-02 2019-02-02 Construction method of assembly type laminated beam plate installation auxiliary device

Country Status (1)

Country Link
CN (1) CN109707173B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110238590A (en) * 2019-07-04 2019-09-17 中建桥梁有限公司 A kind of rebar fixing device for steel reinforcement cage welding
CN110318490A (en) * 2019-07-18 2019-10-11 杭州建工集团有限责任公司 A kind of construction method that superimposed sheet is connect with secondary beam and node connecting structure
CN110644781A (en) * 2019-09-29 2020-01-03 上海建工五建集团有限公司 Prefabricated laminated slab installation adjusting device and method
CN111734030A (en) * 2020-07-06 2020-10-02 中铁二十三局集团第四工程有限公司 Mounting construction method for prefabricated building laminated slab
CN113106871A (en) * 2021-04-02 2021-07-13 长安大学 Non-falling-to-ground dynamic height-adjusting support for steel plate composite beam bridge floor construction and construction method
CN113653260A (en) * 2021-09-18 2021-11-16 山东九洲建设集团有限公司 Sleeve type thinning stirrup structure superposed beam and construction method
CN113982282A (en) * 2021-10-26 2022-01-28 成都建工第二建筑工程有限公司 Beam longitudinal rib adjusting device and mounting method of prefabricated composite floor slab
CN114000632A (en) * 2021-11-29 2022-02-01 山东高速德建集团有限公司 Laminated slab construction structure free of ash adhesion and construction process thereof
CN117027498A (en) * 2023-10-10 2023-11-10 福建建工装配式建筑研究院有限公司 Residential building structure with floor system free of supporting and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201106249Y (en) * 2007-07-30 2008-08-27 福建省九龙建设集团有限公司 Reinforced steel bar positioning block
CN202645020U (en) * 2012-07-03 2013-01-02 中建八局第一建设有限公司 Adjustable column rebar positioning hoop
JP5828421B1 (en) * 2015-05-18 2015-12-09 有限会社 菱光建設 Formwork support and beam construction method in precast method
CN105507597A (en) * 2015-12-10 2016-04-20 翟美奎 Auxiliary connector for rebar mounting and fixing
CN105649325A (en) * 2016-03-18 2016-06-08 中建科技河南有限公司 Adjustable tripod supporting system and method of fabricated concrete shear wall structure
CN206053370U (en) * 2016-12-23 2017-03-29 浙江省建工集团有限责任公司 A kind of prefabrication lifting component supports corner brace instrument
CN107060075A (en) * 2017-04-20 2017-08-18 沈阳建筑大学 A kind of supporting construction connected for fabricated construction beam slab and installation method
CN206667465U (en) * 2017-04-20 2017-11-24 沈阳建筑大学 A kind of supporting construction for the connection of fabricated construction beam slab
CN210049614U (en) * 2019-02-02 2020-02-11 福建工程学院 Auxiliary device for mounting assembly type superposed beam plate

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201106249Y (en) * 2007-07-30 2008-08-27 福建省九龙建设集团有限公司 Reinforced steel bar positioning block
CN202645020U (en) * 2012-07-03 2013-01-02 中建八局第一建设有限公司 Adjustable column rebar positioning hoop
JP5828421B1 (en) * 2015-05-18 2015-12-09 有限会社 菱光建設 Formwork support and beam construction method in precast method
CN105507597A (en) * 2015-12-10 2016-04-20 翟美奎 Auxiliary connector for rebar mounting and fixing
CN105649325A (en) * 2016-03-18 2016-06-08 中建科技河南有限公司 Adjustable tripod supporting system and method of fabricated concrete shear wall structure
CN206053370U (en) * 2016-12-23 2017-03-29 浙江省建工集团有限责任公司 A kind of prefabrication lifting component supports corner brace instrument
CN107060075A (en) * 2017-04-20 2017-08-18 沈阳建筑大学 A kind of supporting construction connected for fabricated construction beam slab and installation method
CN206667465U (en) * 2017-04-20 2017-11-24 沈阳建筑大学 A kind of supporting construction for the connection of fabricated construction beam slab
CN210049614U (en) * 2019-02-02 2020-02-11 福建工程学院 Auxiliary device for mounting assembly type superposed beam plate

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110238590A (en) * 2019-07-04 2019-09-17 中建桥梁有限公司 A kind of rebar fixing device for steel reinforcement cage welding
CN110318490A (en) * 2019-07-18 2019-10-11 杭州建工集团有限责任公司 A kind of construction method that superimposed sheet is connect with secondary beam and node connecting structure
CN110644781A (en) * 2019-09-29 2020-01-03 上海建工五建集团有限公司 Prefabricated laminated slab installation adjusting device and method
CN110644781B (en) * 2019-09-29 2024-05-17 上海建工五建集团有限公司 Prefabricated laminated slab installation and adjustment device and method
CN111734030A (en) * 2020-07-06 2020-10-02 中铁二十三局集团第四工程有限公司 Mounting construction method for prefabricated building laminated slab
CN113106871B (en) * 2021-04-02 2022-08-05 长安大学 Non-falling-to-ground dynamic height-adjusting support for steel plate composite beam bridge floor construction and construction method
CN113106871A (en) * 2021-04-02 2021-07-13 长安大学 Non-falling-to-ground dynamic height-adjusting support for steel plate composite beam bridge floor construction and construction method
CN113653260A (en) * 2021-09-18 2021-11-16 山东九洲建设集团有限公司 Sleeve type thinning stirrup structure superposed beam and construction method
CN113982282A (en) * 2021-10-26 2022-01-28 成都建工第二建筑工程有限公司 Beam longitudinal rib adjusting device and mounting method of prefabricated composite floor slab
CN114000632B (en) * 2021-11-29 2022-10-18 山东高速德建集团有限公司 Laminated slab construction structure free of ash adhesion and construction process thereof
CN114000632A (en) * 2021-11-29 2022-02-01 山东高速德建集团有限公司 Laminated slab construction structure free of ash adhesion and construction process thereof
CN117027498A (en) * 2023-10-10 2023-11-10 福建建工装配式建筑研究院有限公司 Residential building structure with floor system free of supporting and construction method thereof
CN117027498B (en) * 2023-10-10 2023-12-08 福建建工装配式建筑研究院有限公司 Residential building structure with floor system free of supporting and construction method thereof

Also Published As

Publication number Publication date
CN109707173B (en) 2023-07-25

Similar Documents

Publication Publication Date Title
CN109707173A (en) Assembled overlaps beam slab installation auxiliary device and its construction method
CN210049614U (en) Auxiliary device for mounting assembly type superposed beam plate
KR101195516B1 (en) Pier Cap Installation Structure Using Precast Concrete Shell And Construction Method Thereof
CN101575840B (en) Steel-concrete combined continuous rigid frame bridge construction method for cantilever jointing steel box section
CN110056086A (en) New type FRP profile quick assembled type beam-column node structure
CN110056092A (en) Bolt plug-in type precast shear wall and superimposed sheet connecting structure and construction method up and down
KR20160005257A (en) Precast Coping, the Combination Structure of Column and Coping, and its Construction Method
CN106836547B (en) The construction method of prefabricated assembled shear wall structure
KR101548114B1 (en) Steel concrete composite beam having increased composite effect of connecting part at the cross-section change part
CN109537811A (en) The assembly method of steel structure node, prefabricated post and preparation method thereof, column beam
CN113550431B (en) Annular steel plate type stirrup for beam column joint area of stiff structure and construction method of annular steel plate type stirrup
CN208777149U (en) Packaged type bridges pier stud super high strength concrete connection structure
CN106978901A (en) A kind of anti-loosening embedded water stop joint and its built-in process
CN106337561B (en) Template reinforcing method for external corner and door opening positions of shear wall body
CN208441304U (en) A kind of LH assembled cast-in-place concrete shear wall is with exempting from demoulding shell
CN106760014A (en) A kind of board-like adjustable damper embedded part of full assembled and installation method
CN206329032U (en) Template suitable for pouring section after assembled beam-column
CN200999389Y (en) Panel point for steel pipe concrete column and reinforced concrete beam
CN210288881U (en) Steel pipe restriction type precast concrete column connecting structure
CN107905423A (en) A kind of assembly concrete floor and its construction method
CN209538372U (en) A kind of combination precast concrete balcony
CN111236419A (en) Novel beam column joint of reinforced concrete structure and construction method
CN110284594A (en) It is a kind of to be bolted Assembled Building board group conjunction joist steel tubular column frame node and its forming method entirely
KR100975539B1 (en) Steel box continuous bridge with irruglar span or regular span and this construction technique
CN110409710A (en) A kind of composite beam, composite beam and cast-in-place column connected node and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant