CN109695346A - 一种内外墙抹灰拍浆施工方法 - Google Patents
一种内外墙抹灰拍浆施工方法 Download PDFInfo
- Publication number
- CN109695346A CN109695346A CN201710983823.4A CN201710983823A CN109695346A CN 109695346 A CN109695346 A CN 109695346A CN 201710983823 A CN201710983823 A CN 201710983823A CN 109695346 A CN109695346 A CN 109695346A
- Authority
- CN
- China
- Prior art keywords
- slurry
- plastering
- clapped
- wall
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
一种内外墙抹灰拍浆施工方法,其特征在于包括以下步骤:a、制作拍浆工具,b、配制抹灰拍浆料,c、把将要抹灰的墙面进行洒水湿润,d、将适量抹灰拍浆料放置在拍浆工具的镀锌钢丝网片上,操作人员手执竹片按顺序将抹灰拍浆料拍至砖墙,或混凝土墙面上,e、抹灰拍浆完成后,用喷雾器喷水养护5天。本发明的内外墙抹灰拍浆施工方法具有抹灰拍浆工具结构简单、制作方便,在施工现场熬制浆料,用多少就熬制多少量,并在斗车里拌制拍浆料,方便运输;很好解决了墙面抹灰易出现的空鼓、裂纹等质量难题,减少返工率,提高抹灰质量,降低工程成本,取代抹灰墙面易出现空鼓、裂缝等质量问题的喷浆和刷浆,以及施工简单和操作方法易掌握的优点。
Description
技术领域
本发明涉及一种内外墙面施工方法,具体地说,是一种内外墙抹灰拍浆施工方法。
背景技术
民建类项目的装饰装修,尤其是抹灰作业存在不规范的现象。墙面抹灰经常出现空鼓、裂纹等质量通病,修补后观感又差,且造成工程成本浪费。
因此已知的内外墙抹灰施工存在上述种种不便和问题。
发明内容
本发明的目的,在于提出一种降低墙面空鼓、裂纹的内外墙抹灰拍浆施工方法。
为实现上述目的,本发明的技术解决方案是:
一种内外墙抹灰拍浆施工方法,其特征在于包括以下步骤:
a、制作拍浆工具
用若干层镀锌钢丝网片相互叠合结成整体,每一镀锌钢丝网片尺寸400×300mm,其方形孔径为4x4mm,或者5x5mm;提供一根25×1000mm竹片,将镀锌钢丝网片与竹片组装绑扎制作成拍浆用具,拍浆用具外形如苍蝇拍;
b、配制抹灰拍浆料:
(1)熬制胶水:在Ø600×900mm桶内注入1/3的清水用火烧开,将聚乙烯醇12.5kg缓慢倒入桶内,并搅拌均匀,然后往桶内注满清水,再用火熬制20-30min后冷却待用;
(2)拌制浆料:采用工地普通运输斗车一辆,在斗车内放入1/2熬制好的胶水,再放入3袋水泥,搅拌均匀,再放入4-5铁铲细砂后用小型电钻搅拌机拌和均匀即成抹灰拍浆料;
c、把将要抹灰的墙面进行洒水湿润;
d、将适量抹灰拍浆料放置在拍浆用具的镀锌钢丝网片上,操作人员手执竹片按顺序将抹灰拍浆料拍至砖墙,或混凝土墙面上,与墙体粘接牢固;
e、抹灰拍浆完成后,用喷雾器喷水养护5天。
本发明的内外墙抹灰拍浆施工方法还可以采用以下的技术措施来进一步实现。
前述的方法,其中所述镀锌钢丝网片的镀锌钢丝直径Ø0.8 mm。
前述的方法,其中所述镀锌钢丝网片设为八层。
前述的方法,其中所述抹灰拍浆料要均匀拍至墙面上。
前述的方法,其中所述抹灰拍浆施工要使墙面上的抹灰拍浆料毛刺感强。
前述的方法,其中所述水泥为普通硅酸盐水泥,每袋50kg。
采用上述技术方案后,本发明的内外墙抹灰拍浆施工方法具有以下优点:
1、抹灰拍浆用具结构简单、制作方便;
2、在施工现场熬制浆料,用多少就熬制多少量,并在斗车里拌制拍浆料,方便运输;很好的解决了墙面抹灰易出现的空鼓、裂纹等质量难题,减少了返工率,提高了抹灰质量;
3、降低工程成本,取代了抹灰墙面易出现空鼓、裂缝等质量问题的喷浆和刷浆,施工工艺简单,操作方法容易掌握。
附图说明
图1为本发明实施例的抹灰拍浆工具结构示意图;
图2为图1的侧视图。
图中:1镀锌钢丝网片,2竹片。
具体实施方式
以下结合实施例及其附图对本发明作更进一步说明。
实施例1
本发明的内外墙抹灰拍浆施工方法,包括以下步骤:
a、制作拍浆工具
现请参阅图1和图2,图1为本发明实施例的抹灰拍浆用具结构示意图,图2为图1的侧视图。如图所示,用八层镀锌钢丝网片相互叠合结成整体,每一镀锌钢丝网片尺寸400×300mm,其方形孔径为4x4mm;提供一根25×1000mm竹片,将镀锌钢丝网片与竹片组装绑扎制作成拍浆用具,拍浆用具外形如苍蝇拍。所述镀锌钢丝网片的镀锌钢丝直径Ø0.8 mm。
b、配制抹灰拍浆料:
(1)熬制胶水:在Ø600×900mm桶内注入1/3的清水用火烧开,将聚乙烯醇12.5kg缓慢倒入桶内,并搅拌均匀,然后往桶内注满清水,再用火熬制20-30min后冷却待用。
(2)拌制浆料:采用工地普通运输斗车一辆,在斗车内放入1/2熬制好的胶水,再放入3袋水泥,搅拌均匀,再放入4-5铁铲细砂后用小型电钻搅拌机拌和均匀即成抹灰拍浆料。所述水泥为普通硅酸盐水泥,每袋50kg。
c、把将要抹灰的墙面进行洒水湿润。
d、将适量抹灰拍浆料放置在拍浆用具的镀锌钢丝网片上,操作人员手执竹片按顺序将抹灰拍浆料拍至砖墙,或混凝土墙面上,与墙体粘接牢固。所述抹灰拍浆料要均匀拍至墙面上,要使墙面上的抹灰拍浆料毛刺感强。
e、抹灰拍浆完成后,用喷雾器喷水养护5天。
本发明具有实质性特点和显著的技术进步,本发明的内外墙抹灰拍浆施工方法,拍浆工具制作简单,所需材料取自施工现场。发明的内外墙抹灰拍浆施工方法取代了抹灰墙面易出现空鼓、裂缝等质量问题的喷浆和刷浆,施工工艺简单,操作方法易掌握,很好的解决了墙面抹灰易出现的空鼓、裂纹等质量难题。
本发明的内外墙抹灰拍浆施工方法,制作工艺简单,易操作,效果好,可广泛用于民建住宅类、民建综合体和工业厂房等工程的内外墙。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变化。因此,所有等同的技术方案也应该属于本发明的范畴,应由各权利要求限定。
Claims (6)
1.一种内外墙抹灰拍浆施工方法,其特征在于包括以下步骤:
a、制作拍浆工具
用若干层镀锌钢丝网片相互叠合结成整体,每一镀锌钢丝网片尺寸400×300mm,其方形孔径为4x4mm,或者5x5mm;提供一根25×1000mm竹片,将镀锌钢丝网片与竹片组装绑扎制作成拍浆工具,拍浆工具外形如苍蝇拍;
b、配制抹灰拍浆料
(1)熬制胶水:在Ø600×900mm桶内注入1/3的清水用火烧开,将聚乙烯醇12.5kg缓慢倒入桶内,并搅拌均匀,然后往桶内注满清水,再用火熬制20-30min后冷却待用;
(2)拌制浆料:采用工地普通运输斗车一辆,在斗车内放入1/2熬制好的胶水,再放入3袋水泥,搅拌均匀,最后放入4-5铁铲细砂后用小型电钻搅拌机拌和均匀即成抹灰拍浆料;
c、把将要抹灰的墙面进行洒水湿润;
d、将适量抹灰拍浆料放置在拍浆用具的镀锌钢丝网片上,操作人员手执竹片按顺序将抹灰拍浆料拍至砖墙,或混凝土墙面上,与墙体粘接牢固;
e、抹灰拍浆完成后,用喷雾器喷水养护5天。
2.如权利要求1所述的内外墙抹灰拍浆施工方法,其特征在于,所述镀锌钢丝网片的镀锌钢丝直径Ø0.8 mm。
3.如权利要求1所述的内外墙抹灰拍浆施工方法,其特征在于,所述镀锌钢丝网片设为八层。
4.如权利要求1所述的内外墙抹灰拍浆施工方法,其特征在于,所述抹灰拍浆料要均匀拍至墙面上。
5.如权利要求1所述的内外墙抹灰拍浆施工方法,其特征在于,所述抹灰拍浆施工要使墙面上的抹灰拍浆料毛刺感强。
6.如权利要求1所述的内外墙抹灰拍浆施工方法,其特征在于,所述水泥为普通硅酸盐水泥,每袋50kg。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710983823.4A CN109695346A (zh) | 2017-10-20 | 2017-10-20 | 一种内外墙抹灰拍浆施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710983823.4A CN109695346A (zh) | 2017-10-20 | 2017-10-20 | 一种内外墙抹灰拍浆施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109695346A true CN109695346A (zh) | 2019-04-30 |
Family
ID=66225258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710983823.4A Pending CN109695346A (zh) | 2017-10-20 | 2017-10-20 | 一种内外墙抹灰拍浆施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109695346A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236588A (zh) * | 2020-02-17 | 2020-06-05 | 潘品鸿 | 一种建筑用墙面拍浆装置 |
CN112376854A (zh) * | 2020-11-02 | 2021-02-19 | 中国建筑第五工程局有限公司 | 一种建筑施工拍浆施工工艺 |
CN115059266A (zh) * | 2022-06-24 | 2022-09-16 | 河南天工建设集团有限公司 | 一种甩浆拍浆用工具、浆料制备方法以及操作方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202202552U (zh) * | 2011-08-18 | 2012-04-25 | 中建四局第六建筑工程有限公司 | 用于墙体粉刷施工的伸缩式甩浆拍 |
CN202416888U (zh) * | 2012-01-05 | 2012-09-05 | 中建三局第二建设工程有限责任公司 | 一种用于抹灰工程基层处理或对墙面进行甩浆的装置 |
CN204456790U (zh) * | 2014-12-31 | 2015-07-08 | 北京首钢建设集团有限公司 | 一种墙面甩浆拉毛用的网丝拍 |
CN205077825U (zh) * | 2015-09-29 | 2016-03-09 | 中国建筑第八工程局有限公司 | 甩浆定型模具装置 |
CN105421688A (zh) * | 2015-12-09 | 2016-03-23 | 中建二局第三建筑工程有限公司 | 一种墙体的拼接拉毛构造及其拉毛施工方法 |
CN107489250A (zh) * | 2017-09-02 | 2017-12-19 | 广东省第二建筑工程有限公司 | 墙体基层抹灰施工工法 |
-
2017
- 2017-10-20 CN CN201710983823.4A patent/CN109695346A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202202552U (zh) * | 2011-08-18 | 2012-04-25 | 中建四局第六建筑工程有限公司 | 用于墙体粉刷施工的伸缩式甩浆拍 |
CN202416888U (zh) * | 2012-01-05 | 2012-09-05 | 中建三局第二建设工程有限责任公司 | 一种用于抹灰工程基层处理或对墙面进行甩浆的装置 |
CN204456790U (zh) * | 2014-12-31 | 2015-07-08 | 北京首钢建设集团有限公司 | 一种墙面甩浆拉毛用的网丝拍 |
CN205077825U (zh) * | 2015-09-29 | 2016-03-09 | 中国建筑第八工程局有限公司 | 甩浆定型模具装置 |
CN105421688A (zh) * | 2015-12-09 | 2016-03-23 | 中建二局第三建筑工程有限公司 | 一种墙体的拼接拉毛构造及其拉毛施工方法 |
CN107489250A (zh) * | 2017-09-02 | 2017-12-19 | 广东省第二建筑工程有限公司 | 墙体基层抹灰施工工法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236588A (zh) * | 2020-02-17 | 2020-06-05 | 潘品鸿 | 一种建筑用墙面拍浆装置 |
CN111236588B (zh) * | 2020-02-17 | 2021-05-25 | 赣州市华阳商品混凝土有限公司 | 一种建筑用墙面拍浆装置 |
CN112376854A (zh) * | 2020-11-02 | 2021-02-19 | 中国建筑第五工程局有限公司 | 一种建筑施工拍浆施工工艺 |
CN115059266A (zh) * | 2022-06-24 | 2022-09-16 | 河南天工建设集团有限公司 | 一种甩浆拍浆用工具、浆料制备方法以及操作方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109695346A (zh) | 一种内外墙抹灰拍浆施工方法 | |
CN104261776B (zh) | 一种保温隔热的建筑材料及其制备方法 | |
CN103266767A (zh) | 混凝土结构与填充墙间裂缝防治施工工法 | |
CN203429831U (zh) | 混凝土浇筑用免拆复合保温模板 | |
CN111975980A (zh) | 一种装配式建筑用外墙板加工工艺 | |
CN103922647B (zh) | 保温屋面施工用生态胶及其用途 | |
CN104652697A (zh) | 一种永久性改性磷石膏复合保温模板及其制作方法 | |
CN104294993A (zh) | 一种建筑用砖和由该砖建成的墙体 | |
CN103276845A (zh) | 一种预制外墙的砌体及其加工工艺 | |
CN103122672A (zh) | 圈梁砖 | |
CN105275206A (zh) | 一种建筑物外墙的建造方法 | |
CN204112570U (zh) | 一种建筑用砖和由该砖建成的墙体 | |
CN205840114U (zh) | 一种防水砌块砖 | |
CN208267392U (zh) | 一种砌筑加气混凝土砌块专用工具 | |
CN209011510U (zh) | 一种勾缝和抹灰两用抹子 | |
CN103790386A (zh) | 一种加砼砌块墙面抹灰裂缝的控制方法 | |
CN206554331U (zh) | 一种隔音抗裂装饰预制室内隔墙板 | |
KR100901335B1 (ko) | 씨아이엠에스 공법에 의한 스티로폼을 이용한 조형물제조방법 | |
CN104612375A (zh) | 一种楼地面回填垫层工艺方法及其结构 | |
CN108640640A (zh) | 一种防火隔音植物纤维隔墙板 | |
CN104290188A (zh) | 一体化混凝土预制构件建造方法 | |
CN204098514U (zh) | 一种砌筑用抹灰工具 | |
CN204235716U (zh) | 一条干拌石膏砂浆生产线 | |
CN204899249U (zh) | 砌体施工工具皮数杆 | |
CN202248857U (zh) | 一种免粉刷混凝土双层模板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190430 |