CN109680990A - A kind of pavilion EPS and preparation method thereof - Google Patents
A kind of pavilion EPS and preparation method thereof Download PDFInfo
- Publication number
- CN109680990A CN109680990A CN201910002862.0A CN201910002862A CN109680990A CN 109680990 A CN109680990 A CN 109680990A CN 201910002862 A CN201910002862 A CN 201910002862A CN 109680990 A CN109680990 A CN 109680990A
- Authority
- CN
- China
- Prior art keywords
- pavilion
- eps
- steel construction
- foam
- cement mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The present invention relates to garden architecture fields, specifically disclose a kind of pavilion EPS, the skeleton for the steel construction being welded and fixed including junction and the Bao Ding being mounted on the skeleton of the steel construction, watt, pillar, rafter, bottom plate, lock a tree, used in making timber for boats plate, column serratd edge, rake angle, ridge tiles and column base.The invention also discloses a kind of production methods in pavilion EPS.The pavilion EPS of the invention is light, fast, cost is 1/5th of traditional handicraft, and cost is very low, moreover it is possible to be easily reached antique effect, and the ancient architecture personage installation of profession can not had to, since the pavilion EPS of the invention is installed on ground, do not have in high-altitude application, material is lighter, security performance is greatly improved, and has saved artificial and timber.
Description
Technical field
The present invention relates to garden architecture field, specifically a kind of pavilion EPS and preparation method thereof.
Background technique
Pavilion is a kind of Chinese traditional architecture, is built in gardens, temple, temple more.Lid is rested for people by the road or in garden,
It takes shelter from rain, the building enjoyed the cool, area is smaller, only pushes up mostly, without wall.
Pavilion is also a kind of garden feature for interspersing garden landscape.
The material in pavilion is mostly based on timber, bamboo wood, stone material, armored concrete, glass, metal, organic material in recent years
Deng being also introduced into this building by people, so that this ancient building system in pavilion has modern fashion to feel.
Traditional pavilion is made by solid wood or cement, at high cost, long in time limit, and shaping speed is slow, some are complicated
Structural modeling precast reinforced concrete, then welding get on, bulky cement products is difficult to install, security performance
Low, solid wood pavilion is long in time limit, at high cost, economizes on resources.
Summary of the invention
The purpose of the present invention is to provide a kind of pavilions EPS and preparation method thereof, to solve to propose in above-mentioned background technique
The problem of.
To achieve the above object, the invention provides the following technical scheme:
A kind of pavilion EPS, the skeleton for the steel construction being welded and fixed including junction and the bone for being mounted on the steel construction
Bao Ding on frame, watt, pillar, rafter, bottom plate, lock a tree, used in making timber for boats plate, column serratd edge, rake angle, ridge tiles and column base;Steel construction cylinder court
Upper to reserve a screw rod, precious tip cutting is screwed on screw rod;Described watt is fixed on bottom plate and described using drilling tail silk
On steel construction;The inside is the pillar of welding for steel structure, and outside is using the processed foam cylindrical cladding of cement mortar;Institute
Rafter is stated to fix using bonding mortar and the installation of drilling tail silk;There is the place of steel construction to be wrapped on the bottom plate using numerical control fluting
Cover steel construction;There is the place of steel construction to carry out cladding steel construction using numerical control fluting on the lock a tree, used in making timber for boats plate;Cement mortar is processed
The column serratd edge, use and be fixed on the steel construction with bonding mortar and drilling tail silk;Cement mortar is processed
The rake angle is used and is fixed on the steel construction with bonding mortar and drilling tail silk;Cement mortar is processed described
Ridge tiles uses bonding mortar and drilling tail silk to be fixed on the steel construction;The inside is the column base of welding for steel structure
Son, outside is using the processed foam cylindrical cladding of cement mortar.
As a further solution of the present invention: the Bao Ding is the foam Bao Ding handled using cement mortar, the screw rod
Length is identical as the precious top.
As a further solution of the present invention: described watt using the processed foam watt of cement mortar or resin tile.
As a further solution of the present invention: the rafter is the processed foam rafter of cement mortar.
As a further solution of the present invention: the bottom plate uses foam substrate, and the two sides of the foam substrate carries out
Mortar processing.
As a further solution of the present invention: the lock a tree, used in making timber for boats plate uses foam lock a tree, used in making timber for boats plate, and the two of the foam lock a tree, used in making timber for boats plate
Face carries out mortar processing.
A kind of production method in the pavilion EPS, comprising the following specific steps
Step (1): two dimension NC auto processes substrate, with glass, each substrate surface of cement mortar processing, above-mentioned substrate packet
Include bottom plate, rafter, lock a tree, used in making timber for boats plate, column serratd edge, watt, sets of brackets on top of the columns, old cantilevered corner beam, Bao Ding, relief materials etc.;
Step (2): being in order assembled in each substrate in step (1) on steel structure framework, and the place of junction is passed through
Glass fiber reticular cloth and cement mortar secondary treatment.
Step (3): the pavilion EPS is installed on ground, is finally hung on and is placed on pillar with crane, after being completed
The pavilion EPS surface is levelling by putty, and Acrylic paint colored drawing coloured silk goes out various patterns, completes the production in the pavilion EPS.
Compared with prior art, the beneficial effects of the present invention are:
The pavilion EPS of the invention is light, and fast, cost is 1/5th of traditional handicraft, and cost is very low, moreover it is possible to easily
Reach antique effect, and the ancient architecture personage installation of profession can not had to, since the pavilion EPS of the invention is installed on ground, no
Used in high-altitude application, material is lighter, and security performance is greatly improved, and has saved artificial and timber.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment.
Fig. 1 is the structural schematic diagram in the pavilion EPS.
In figure: 1- Bao Ding, 2- watts, 3- pillar, 4- rafter, 5- bottom plate, 6- lock a tree, used in making timber for boats plate, 7- column serratd edge, 8- rake angle, 9- ridge
Watt, 10- column base.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below
Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only
To explain the present invention, it is not intended to limit the present invention.
Referring to Fig. 1, in the embodiment of the present invention, a kind of pavilion EPS, the skeleton including the steel construction that junction is welded and fixed
And be mounted on the skeleton of the steel construction precious top 1, watts 2, pillar 3, rafter 4, bottom plate 5, lock a tree, used in making timber for boats plate 6, column serratd edge 7, stick up
Angle 8, ridge tiles 9 and column base 10;Wherein:
The precious top 1 is the foam Bao Ding handled using cement mortar, and steel construction cylinder reserves a screw rod, screw rod upward
Length is identical as the precious top 1, and treasured top 1, which is inserted on screw rod, to be screwed;
Use the processed foam watt of cement mortar or resin tile for described watt 2, described watt 2 is fixed on using drilling tail silk
On bottom plate 5 and the steel construction;The inside is that its outside of the pillar 3 of welding for steel structure uses the processed foam of cement mortar
Cylinder cladding;
The rafter 4 is the processed foam rafter of cement mortar, uses bonding mortar and drilling tail silk to install and fixes;Institute
Bottom plate 5 is stated using foam substrate, and the two sides of the foam substrate carries out mortar processing, there is the ground of steel construction on the bottom plate 5
Fang Caiyong numerical control fluting carries out cladding steel construction;The lock a tree, used in making timber for boats plate 6 uses foam lock a tree, used in making timber for boats plate, and the two sides of the foam lock a tree, used in making timber for boats plate
Mortar processing is carried out, has the place of steel construction to carry out cladding steel construction using numerical control fluting on the lock a tree, used in making timber for boats plate 6;
The processed column serratd edge 7 of cement mortar, uses and is fixed on the steel with bonding mortar and drilling tail silk
In structure;The processed rake angle 8 of cement mortar, uses and is fixed on the steel construction with bonding mortar and drilling tail silk
On;The processed ridge tiles 9 of cement mortar, uses bonding mortar and drilling tail silk to be fixed on the steel construction;In
Face is column base 10 of welding for steel structure, and outside is using the processed foam cylindrical cladding of cement mortar.
Specifically, the precious top 1 in the embodiment of the present invention: the precious top 1 pattern multiplicity, treasured top 1 is processed by two dimension NC auto
It forms, surface glass fibre and mortar processing are smooth, and steel construction cylinder reserves a screw rod upward in installation process, and screw rod is long
Degree is identical as treasured top 1, and treasured top 1, which is inserted on screw rod, to be screwed;
Watts 2: described watt 2 in the embodiment of the present invention can be the foam watt of two dimension NC auto processing, be also possible to resin tile,
Roof clay tile has arc at the position of installation watt, and wherein resin tile installation is that eaily, resin tile can be pacified with large area
Dress, because being easily deformed, the problem of there is no deformations in the place for having arc, and foam watt and roof clay tile are unlikely to deform, and are needed
The splicing of fritter, foam watt are needed by glass fibre and cement mortar processing surface, and watts 2 be all to use during the installation process
Drilling tail silk is fixed on bottom plate and steel construction;
Pillar 3 in the embodiment of the present invention: the pillar 3 is made there are two types of scheme, and one is two dimension NC auto processing
Foam pillar processes two semicircular bodies, handles by glass fibre and cement mortar, and two semicircular bodies are closed when installation
And form a cylindrical body, be inside cylindrical body it is hollow, to coat steel construction, the thickness of cylindrical body appearance during the installation process
Degree changes with the thickness of steel pipe;Another kind is mixed mud pillar, first mounting post submodule to be had on the ground, then in mold
Treated mixed mud is poured into face, waits one day injection-moulded square that can dismantle mold.Welding for steel structure inside foam pillar, outside
The steel construction of cement mortar processed foam cylindrical cladding the inside.
Rafter 4 in the embodiment of the present invention: the rafter 4 is the foam rafter of two dimension NC auto processing, and foam rafter is to need
Surface is handled by glass fibre and cement mortar, rafter 4 is pacified with bonding mortar and drilling tail silk during the installation process
Dress is fixed below bottom plate and on steel construction.
Bottom plate 5 in the embodiment of the present invention: the bottom plate 5 is the foam substrate of two dimension NC auto processing, and foam substrate is to need
Surface is handled by glass fibre and cement mortar, bottom plate 5 is pacified with bonding mortar and drilling tail silk during the installation process
Dress is fixed on steel construction, and needing to slot in the place for having steel construction coats steel construction.
Lock a tree, used in making timber for boats plate 6 in the embodiment of the present invention: the lock a tree, used in making timber for boats plate 6 is the foam lock a tree, used in making timber for boats plate of two dimension NC auto processing, foam lock
A tree, used in making timber for boats plate is needed by glass fibre and cement mortar processing surface, and lock a tree, used in making timber for boats plate 6 is all to use bonding mortar during the installation process
It is fixed on pillar with drilling tail silk.The pillar lock a tree, used in making timber for boats plate of mixed mud is mounted directly, and the pillar of foam needs to open on pillar
Slot installation.
Column serratd edge 7 in the embodiment of the present invention: the column serratd edge 7 is the Thysanophyllum serratd edge of two dimension NC auto processing, Thysanophyllum
Serratd edge is needed by glass fibre and cement mortar processing surface, and column serratd edge 7 is all to use bonding mortar during the installation process
It is fixed on lock a tree, used in making timber for boats plate with drilling tail silk.7 moulding of column serratd edge is complicated, and it is carefully conscientious to have on processing surface.
Rake angle 8 in the embodiment of the present invention: the rake angle 8 is the foam rake angle of two dimension NC auto processing, and foam rake angle is to need
Surface is handled by glass fibre and cement mortar, rake angle 8 is pacified with bonding mortar and drilling tail silk during the installation process
Dress is fixed on spine and steel construction.8 moulding of rake angle is complicated, and it is carefully conscientious to have on processing surface.
Ridge tiles 9 in the embodiment of the present invention: the ridge tiles 9 is the foam ridge tiles of two dimension NC auto processing, and foam ridge tiles is to need
Surface is handled by glass fibre and cement mortar, ridge tiles 9 is pacified with bonding mortar and drilling tail silk during the installation process
Dress is fixed on bottom plate and steel construction.Ridge tiles 9 is made of two parts, and here is a cuboid, is one above cuboid
Semicylinder.
Column base 10 in the embodiment of the present invention: column base 10 is made there are two types of scheme, and one is two dimension NC autos
The Thysanophyllum stand of processing processes two semiellipsoids, handles by glass fibre and cement mortar, two when installation
Semiellipsoid merges, and forms an ellipsoid, be inside ellipsoid it is hollow, to coat steel construction during the installation process, it is oval
The thickness of external table is the thickness with steel pipe and changes.Another kind is mixed mud column base, first to install pillar on the ground
Mold, then treated mixed mud is poured into inside mold waits one day injection-moulded square that can dismantle mold.In Thysanophyllum stand
Face welding for steel structure, the steel construction of outside cement mortar processed foam cylindrical cladding the inside.
A kind of production method in the pavilion EPS, comprising the following specific steps
Step (1): two dimension NC auto processes substrate, with glass, each substrate surface of cement mortar processing, above-mentioned substrate packet
Include bottom plate, rafter, lock a tree, used in making timber for boats plate, column serratd edge, watt, sets of brackets on top of the columns, old cantilevered corner beam, Bao Ding, relief materials etc.;
Step (2): being in order assembled in each substrate in step (1) on steel structure framework, and the place of junction is passed through
Glass fiber reticular cloth and cement mortar secondary treatment.
Step (3): the pavilion EPS is installed on ground, is finally hung on and is placed on pillar with crane, after being completed
The pavilion EPS surface is levelling by putty, and Acrylic paint colored drawing coloured silk goes out various patterns, completes the production in the pavilion EPS.
The pavilion EPS of the invention is that the foam processed by steel construction and two dimension NC auto is installed by cement mortar processing surface
It completes, it is at low cost, it is high-efficient, it economizes on resources
In the description of the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection " are answered
It is interpreted broadly, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be mechanical connect
It connects, is also possible to be electrically connected;It can be directly connected, can also can be in two elements indirectly connected through an intermediary
The connection in portion.For the ordinary skill in the art, the tool of above-mentioned term in the present invention can be understood with concrete condition
Body meaning.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (7)
1. a kind of pavilion EPS, which is characterized in that the skeleton for the steel construction being welded and fixed including junction and be mounted on the steel
Bao Ding (1), watt (2) on the skeleton of structure, pillar (3), rafter (4), bottom plate (5), lock a tree, used in making timber for boats plate (6), column serratd edge (7), rake angle
(8), ridge tiles (9) and column base are sub (10);
The steel construction cylinder reserves a screw rod upward, and Bao Ding (1), which is inserted on screw rod, to be screwed;Described watt (2) use
Drilling tail silk is fixed on bottom plate (5) and the steel construction;The inside is the pillar (3) of welding for steel structure, and outside is adopted
With the processed foam cylindrical cladding of cement mortar;
The rafter (4) is fixed using bonding mortar and the installation of drilling tail silk;There is the place of steel construction using number on the bottom plate (5)
Control fluting carries out cladding steel construction;There is the place of steel construction to carry out cladding steel construction using numerical control fluting on the lock a tree, used in making timber for boats plate (6);
The processed column serratd edge (7) of cement mortar, uses and is fixed on the steel construction with bonding mortar and drilling tail silk;
The processed rake angle (8) of cement mortar, uses and is fixed on the steel construction with bonding mortar and drilling tail silk
On;The processed ridge tiles (9) of cement mortar, uses bonding mortar and drilling tail silk to be fixed on the steel construction;
The inside is that the column base of welding for steel structure is sub (10), and outside is using the processed foam cylindrical cladding of cement mortar.
2. the pavilion EPS according to claim 1, which is characterized in that the Bao Ding (1) is the bubble handled using cement mortar
Foam Bao Ding, the screw rod length are identical as the Bao Ding (1).
3. the pavilion EPS according to claim 1, which is characterized in that described watt (2) uses the processed foam of cement mortar
Watt or resin tile.
4. the pavilion EPS according to claim 1, which is characterized in that the rafter (4) is the processed foam of cement mortar
Rafter.
5. the pavilion EPS according to claim 1, which is characterized in that the bottom plate (5) uses foam substrate, and the bubble
The two sides of foam bottom plate carries out mortar processing.
6. the pavilion EPS according to claim 1, which is characterized in that the lock a tree, used in making timber for boats plate (6) uses foam lock a tree, used in making timber for boats plate, and institute
The two sides for stating foam lock a tree, used in making timber for boats plate carries out mortar processing.
7. a kind of production method in the pavilion EPS as described in claim 1~6 is any, comprising the following specific steps
Step (1): two dimension NC auto processes substrate, and with glass, each substrate surface of cement mortar processing, above-mentioned substrate includes bottom
Plate, rafter, lock a tree, used in making timber for boats plate, column serratd edge, watt, sets of brackets on top of the columns, old cantilevered corner beam, Bao Ding, relief materials etc.;
Step (2): being in order assembled in each substrate in step (1) on steel structure framework, and glass is passed through in the place of junction
Grid cloth and cement mortar secondary treatment.
Step (3): the pavilion EPS is installed on ground, is finally hung on and is placed on pillar with crane, is completed rear EPS
Pavilion surface is levelling by putty, and Acrylic paint colored drawing coloured silk goes out various patterns, completes the production in the pavilion EPS.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910002862.0A CN109680990A (en) | 2019-01-02 | 2019-01-02 | A kind of pavilion EPS and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910002862.0A CN109680990A (en) | 2019-01-02 | 2019-01-02 | A kind of pavilion EPS and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109680990A true CN109680990A (en) | 2019-04-26 |
Family
ID=66191811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910002862.0A Pending CN109680990A (en) | 2019-01-02 | 2019-01-02 | A kind of pavilion EPS and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109680990A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113775206A (en) * | 2021-09-09 | 2021-12-10 | 江苏协和装饰工程有限公司 | Method for constructing assembled pavilion |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85104481A (en) * | 1985-06-09 | 1986-07-16 | 黄半耕 | A kind of booth, pavilion building prefabrication assemble method |
CN103266801A (en) * | 2013-04-02 | 2013-08-28 | 翟舒航 | Self-driving travel villa |
CN105756376A (en) * | 2016-05-09 | 2016-07-13 | 沈阳润达化工有限公司 | Magnesite pavilion |
CN107288371A (en) * | 2017-05-03 | 2017-10-24 | 陶志斌 | Optical wave house |
CN207686346U (en) * | 2017-07-11 | 2018-08-03 | 江西文青园林古建工程有限公司 | Wayside pavilion based on fiber glass resin watt |
-
2019
- 2019-01-02 CN CN201910002862.0A patent/CN109680990A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85104481A (en) * | 1985-06-09 | 1986-07-16 | 黄半耕 | A kind of booth, pavilion building prefabrication assemble method |
CN103266801A (en) * | 2013-04-02 | 2013-08-28 | 翟舒航 | Self-driving travel villa |
CN105756376A (en) * | 2016-05-09 | 2016-07-13 | 沈阳润达化工有限公司 | Magnesite pavilion |
CN107288371A (en) * | 2017-05-03 | 2017-10-24 | 陶志斌 | Optical wave house |
CN207686346U (en) * | 2017-07-11 | 2018-08-03 | 江西文青园林古建工程有限公司 | Wayside pavilion based on fiber glass resin watt |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113775206A (en) * | 2021-09-09 | 2021-12-10 | 江苏协和装饰工程有限公司 | Method for constructing assembled pavilion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821366B (en) | Clear water concrete metope grooved stereo wood pattern decoration construction method | |
CN106382023B (en) | Pseudo-classic architecture and its manufacturing method | |
CN202265937U (en) | Decorative roman column structure | |
CN107816173A (en) | Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method | |
CN108252407A (en) | A kind of building with prefabricated reinforced concrete bearing | |
CN108930404B (en) | Unit type adjustable special-shaped curved surface formwork supporting system and pouring forming method | |
CN109680990A (en) | A kind of pavilion EPS and preparation method thereof | |
CN101654926A (en) | Building free-formwork and one-time compound forming construction method and structure of decorative cover | |
CN100999918A (en) | Pouring polyurethane heat insulating wall | |
CN210976847U (en) | Assembled antique artistic enclosure wall | |
CN206189921U (en) | Archaistic building | |
CN106320662B (en) | Decorating outer wall of building ultra-wide concrete wire construction method | |
CN217151511U (en) | Assembled concrete greening construction enclosure wall | |
CN108252408A (en) | A kind of assembly method of reinforced concrete frame structure system | |
CN108149827A (en) | The compound girt strip floor of assembled with prefabricated reinforced concrete bearing | |
CN204920196U (en) | Grout wallboard formwork | |
CN109372105A (en) | Assembled architecture with prefabricated reinforced concrete convex support | |
CN211850829U (en) | Cast-in-situ reinforced concrete hollowed special-shaped inclined column template | |
CN113700203A (en) | Umbrella-shaped modeling installation design structure of ultrahigh stone-like GRG | |
CN101210442B (en) | Construction method for column and architrave cornice | |
CN207686203U (en) | The bamboo line building decoration cladding panel structure made using traditional rammed earth | |
CN109610795B (en) | Construction method of inverted cone-shaped building | |
CN110630088A (en) | Assembled antique artistic enclosing wall and construction method thereof | |
CN206428913U (en) | A kind of building in the style of the ancients eaves structure | |
CN212506762U (en) | Space abnormal shape concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |