CN109680613B - Simply supported variable structure continuous bridge construction monitoring method - Google Patents

Simply supported variable structure continuous bridge construction monitoring method Download PDF

Info

Publication number
CN109680613B
CN109680613B CN201811543466.0A CN201811543466A CN109680613B CN 109680613 B CN109680613 B CN 109680613B CN 201811543466 A CN201811543466 A CN 201811543466A CN 109680613 B CN109680613 B CN 109680613B
Authority
CN
China
Prior art keywords
construction
bridge
stage
monitoring
database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201811543466.0A
Other languages
Chinese (zh)
Other versions
CN109680613A (en
Inventor
杨敏
范亮
高燕梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Boxin Engineering Construction Center Testing Co ltd
Southwest Communication Construction Group Co ltd
Chongqing Jiaotong University
Original Assignee
Yunnan Construction Investment Boxin Engineering Construction Center Testing Co ltd
Southwest Communication Construction Group Co ltd
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Boxin Engineering Construction Center Testing Co ltd, Southwest Communication Construction Group Co ltd, Chongqing Jiaotong University filed Critical Yunnan Construction Investment Boxin Engineering Construction Center Testing Co ltd
Priority to CN201811543466.0A priority Critical patent/CN109680613B/en
Publication of CN109680613A publication Critical patent/CN109680613A/en
Application granted granted Critical
Publication of CN109680613B publication Critical patent/CN109680613B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

The invention relates to a method for monitoring construction of a simply supported variable structure continuous bridge, and belongs to the field of civil engineering. The method comprises the following steps: s1: establishing an expert database; s2: building a full construction stage growth BIM bridge structure model; s3: after the working condition of the first construction stage is finished, acquiring and processing geometric data of the bridge after the first construction stage is finished to form an actually measured three-dimensional image of the stage; s4: carrying out deviation comparison on the actually measured three-dimensional image and the BIM bridge model to obtain a deviation control value; s5: inputting the deviation control value into an expert database, and feeding back construction control data; s6: in the next construction stage, the construction of the next stage is finished according to the guidance of construction control data, and meanwhile, the expert database automatically updates the database; s7: and automatically acquiring the real-time three-dimensional image of the bridge again, and comparing the acquired real-time three-dimensional image with the growth BIM bridge model in the full construction stage again to form a cycle. The invention realizes the visual monitoring and control based on the construction process.

Description

Simply supported variable structure continuous bridge construction monitoring method
Technical Field
The invention belongs to the field of civil engineering, relates to a database-based visual monitoring and control system for a construction process, and particularly relates to a simply supported variable structure continuous bridge construction monitoring method.
Background
From the distribution of bridge defects at present, the bridge defects of medium and small span are far more than those of large span bridges. The bridge diseases of the small and medium-span bridges of the bridge depend on the construction quality to a great extent, and the bridge monitoring is mainly applied to the large-span bridge, so that the construction monitoring of the small and medium-span bridges is omitted. The simply supported-structure-after-structure continuous beam bridge is limited by natural environment and various actual conditions in the actual construction process, and the construction process has certain randomness. The research on the factors of creep, temperature action and the like of the simply-supported-structure-after-structure continuous beam bridge is not sufficient. Compared with the traditional monitoring means of simply supporting the continuous beam bridge before structure, the information technology is not sufficiently applied and has no real-time monitoring performance. Therefore, as the most widely applied bridge type, the construction control standard and theory of the simply-supported-structure-after-continuous beam bridge urgently need to utilize an information-based database to assist in realizing construction monitoring and guidance.
Disclosure of Invention
In view of the above, the present invention provides a method for monitoring a continuous bridge construction with a simple support and variable structure, which implements a visual monitoring and control system based on a construction process, thereby ensuring the safety of the bridge construction.
In order to achieve the purpose, the invention provides the following technical scheme:
a method for monitoring the construction of a simply supported variable structure continuous bridge comprises the following steps:
s1: establishing an expert database which has a learning function and reflects the relation between the bridge deviation and the construction control data;
s2: building a full construction stage growth BIM bridge model;
s3: after the working condition of the first construction stage is finished, acquiring and processing geometric data of the bridge after the first construction stage is finished by adopting an automatic optical imaging method to form an actually measured three-dimensional image of the stage;
s4: carrying out deviation comparison on the actually measured three-dimensional image and the BIM bridge model by utilizing a sampling image superposition technology to obtain a deviation control value to be adjusted;
s5: inputting the deviation control value into an expert database, and feeding back construction control data from the expert database;
s6: entering the next construction stage, finishing the construction of the next stage according to the guidance of construction control data, and simultaneously leading the deviation control value to be adjusted and the construction control data fed back from the database into the database by the expert database for learning so as to obtain an updated database;
s7: and automatically acquiring the real-time three-dimensional image of the bridge again, and comparing the acquired real-time three-dimensional image with the growth BIM bridge model in the full construction stage again to form a cycle.
Further, in step S1, the construction control data includes: creep, age of material, temperature, structural system conversion, effective prestress of positive and negative bending moment zones and the like.
Further, in step S1, the relationship between the reaction bridge deviation and the construction control data includes: (1) prefabricating and preparing construction condition standards; (2) controllability of each influencing variable of the dynamic variable field; (3) the sequencing principle of multivariable lower control techniques.
Further, in step S1, the expert database is a database with learning function generated under data optimization based on a neural network. When the system is applied to a specific project, the received data is automatically learned, and a corresponding rule of the variable with a larger sample quantity and the dependent variable is obtained.
Further, in step S2, the full construction stage growth BIM bridge model is obtained by connecting and correcting the ideal growth BIM model and the measured data.
Further, in step S3, the automatic optical imaging method specifically includes: after the bridge after the first construction stage is finished is photographed, point cloud data on the photo is processed in a digital mode, and the digital points are processed to form an image, so that the monitoring process is visualized.
Further, the step S6 specifically includes: inputting the construction guidance data into the next construction stage after the first construction stage is completed again to obtain an ideal model after the next construction stage is completed; then, after the bridge is photographed with the bridge after the next construction stage is finished, points on the photograph are digitally processed, and images formed by processing the digital points are compared; and forming a monitoring cycle combining monitoring and control in each construction stage.
The invention has the beneficial effects that: the invention realizes the interaction of the subsection control of the construction error and the construction monitoring and control by constructing the expert database and adopting the contrastive analysis of the measured data and the ideal data, thereby realizing the visual monitoring and control of the construction process.
Drawings
In order to make the object, technical scheme and beneficial effect of the invention more clear, the invention provides the following drawings for explanation:
FIG. 1 is a flow chart for building an expert database;
FIG. 2 is a flow chart of a comparative analysis of a BIM image and a measured three-dimensional image;
fig. 3 is an expert database workflow diagram.
Detailed Description
Preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
The embodiment provides a method for monitoring construction of a simply supported variable structure continuous bridge, which comprises the following steps of:
s1: determining influence factors influencing the construction of the simple-support variable structure, researching the influence rules of the influence factors, and establishing an expert database of 'dynamic variable field-structure behavior' with a learning function; the study of regularity includes: the effective prestress influence rule of the positive and negative bending moment areas; creep, temperature and other factors influence the law; determining structural system conversion influence factors and influence rules thereof; others may affect the correction law.
Determining influence factors and researching influence factor rules: (1) prefabricating and preparing construction condition standards; (2) controllability of each influence variable of the dynamic variable field; (3) the sequencing principle of multivariable lower control techniques. And generating a multivariate factor structure response expert database with a learning function under the data optimization based on the neural network.
The expert database with learning function is characterized in that: when the system is applied to a specific project, the received data is automatically learned, and a corresponding rule of the variable with a larger sample quantity and the dependent variable is obtained.
S2: and establishing a BIM bridge structure model growing in the whole construction stage.
The growth BIM model can be connected with actually measured data in real time, and the real-time updating model is closer to the actual situation.
S3: acquiring and processing geometric point cloud data of the bridge after the first construction stage is finished by adopting a three-dimensional laser scanning imaging method to form an actually measured three-dimensional image;
the three-dimensional laser scanning imaging method specifically comprises the following steps: after the bridge after the first construction stage is finished is photographed, point cloud data on the photo is processed in a digital mode, and the digital points are processed to form an image, so that the monitoring process is visualized.
S4: a sampled image superposition technology, wherein the actually measured three-dimensional image formed in the step S2 is subjected to deviation comparison with the BIM bridge model obtained in the step S3 to obtain a deviation control value (a) to be adjusted1,a2,a3,…);
S5: the deviation control value (a) required to be adjusted obtained in the step S4 is used1,a2,a3…) to an expert database, the database feeding back construction control data;
s6: inputting the construction guidance data fed back in the step S5 into the next construction stage after the first construction stage is completed again to obtain an ideal model after the next construction stage is completed; then, after the bridge is photographed with the bridge after the next construction stage is finished, points on the photograph are digitally processed, and images formed by processing the digital points are compared; and forming a monitoring cycle combining monitoring and control in each construction stage.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the invention, and that, although the invention has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the scope of the invention as defined by the appended claims.

Claims (5)

1. A method for monitoring the construction of a simply supported variable structure continuous bridge is characterized by comprising the following steps:
s1: establishing an expert database which has a learning function and reflects the relation between the bridge deviation and the construction control data; the expert database is a database with a learning function generated under the data optimization based on a neural network;
s2: building a full construction stage growth BIM bridge model; the full construction stage growth BIM bridge model is obtained by connecting and correcting an ideal growth BIM model and measured data;
s3: after the working condition of the first construction stage is finished, acquiring and processing geometric data of the bridge after the first construction stage is finished by adopting an automatic optical imaging method to form an actually measured three-dimensional image of the stage;
s4: carrying out deviation comparison on the actually measured three-dimensional image and the BIM bridge model by utilizing a sampling image superposition technology to obtain a deviation control value to be adjusted;
s5: inputting the deviation control value into an expert database, and feeding back construction control data from the expert database;
s6: entering the next construction stage, finishing the construction of the next stage according to the guidance of construction control data, and simultaneously leading the deviation control value to be adjusted and the construction control data fed back from the database into the database by the expert database for learning so as to obtain an updated database;
s7: and automatically acquiring the real-time three-dimensional image of the bridge again, and comparing the acquired real-time three-dimensional image with the growth BIM bridge model in the full construction stage again to form a cycle.
2. The method for monitoring the construction of the simply supported and variable structure continuous bridge according to claim 1, wherein in step S1, the construction control data comprises: creep, age of material, temperature, structural system transformation and effective prestressing of positive and negative bending moment zones.
3. The method for monitoring construction of a simple supported variable structure continuous bridge as claimed in claim 1, wherein in step S1, the relationship between the reaction bridge deviation and the construction control data comprises: (1) prefabricating and preparing construction condition standards; (2) controllability of each influencing variable of the dynamic variable field; (3) the sequencing principle of multivariable lower control techniques.
4. The method for monitoring construction of a simply supported and variable structure continuous bridge according to claim 1, wherein in step S3, the automatic optical imaging method specifically comprises: and after the bridge after the first construction stage is finished is photographed, point cloud data on the photograph is subjected to digital processing, and the digital points are processed to form an image.
5. The method for monitoring the construction of the simply supported and variable structure continuous bridge according to claim 1, wherein the step S6 specifically comprises: inputting the construction guidance data into the next construction stage after the first construction stage is completed again to obtain an ideal model after the next construction stage is completed; then, after the bridge is imaged with the bridge after the next construction stage is finished, the image formed by the digital point processing is compared; and forming a monitoring cycle combining monitoring and control in each construction stage.
CN201811543466.0A 2018-12-17 2018-12-17 Simply supported variable structure continuous bridge construction monitoring method Expired - Fee Related CN109680613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811543466.0A CN109680613B (en) 2018-12-17 2018-12-17 Simply supported variable structure continuous bridge construction monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811543466.0A CN109680613B (en) 2018-12-17 2018-12-17 Simply supported variable structure continuous bridge construction monitoring method

Publications (2)

Publication Number Publication Date
CN109680613A CN109680613A (en) 2019-04-26
CN109680613B true CN109680613B (en) 2020-10-09

Family

ID=66186152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811543466.0A Expired - Fee Related CN109680613B (en) 2018-12-17 2018-12-17 Simply supported variable structure continuous bridge construction monitoring method

Country Status (1)

Country Link
CN (1) CN109680613B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111130549B (en) * 2020-02-14 2020-09-22 山东博远重工有限公司 Bridge template on-site intelligent monitoring system and method
CN112575672B (en) * 2020-11-17 2022-09-13 南京理工大学 Method for designing and restraining bridge vortex vibration force vibration absorber based on network synthesis method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57169111A (en) * 1981-04-08 1982-10-18 Taisei Corp Extruding and center line monitor apparatus in beam extrusion construction method
CN105719200A (en) * 2016-01-19 2016-06-29 上海杰图天下网络科技有限公司 Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology
CN107247834A (en) * 2017-05-31 2017-10-13 华中科技大学 A kind of three dimensional environmental model reconstructing method, equipment and system based on image recognition
CN107580206A (en) * 2017-10-13 2018-01-12 湖北聚注通用技术研究有限公司 A kind of decoration construction scene 3-D imaging system based on multi-view image

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57169111A (en) * 1981-04-08 1982-10-18 Taisei Corp Extruding and center line monitor apparatus in beam extrusion construction method
CN105719200A (en) * 2016-01-19 2016-06-29 上海杰图天下网络科技有限公司 Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology
CN107247834A (en) * 2017-05-31 2017-10-13 华中科技大学 A kind of three dimensional environmental model reconstructing method, equipment and system based on image recognition
CN107580206A (en) * 2017-10-13 2018-01-12 湖北聚注通用技术研究有限公司 A kind of decoration construction scene 3-D imaging system based on multi-view image

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于三维激光扫描和BIM 模型在桥梁施工阶段质量管理中的研究;田云峰、祝连波;《建筑设计管理》;20140825(第8期);第87-90页 *

Also Published As

Publication number Publication date
CN109680613A (en) 2019-04-26

Similar Documents

Publication Publication Date Title
CN109680613B (en) Simply supported variable structure continuous bridge construction monitoring method
CN104484524B (en) A kind of method and system interacted based on BIM simulation models with site operation
Massafra et al. Wooden truss analysis, preservation strategies, and digital documentation through parametric 3D modeling and HBIM workflow
CN107123265B (en) Highway traffic state estimation method based on parallel computation
JP2022501737A (en) 3D model generation method, device, device, and storage medium This application is a Chinese patent application filed with the China Patent Office on September 30, 2018, application number 20111160166.4, invention title "Generation of 3D model". Priority is claimed for "methods, devices, devices, and storage media", the entire contents of which are incorporated by reference in this application.
Stokkan et al. Investigation of the grain boundary character and dislocation density of different types of high performance multicrystalline silicon
CN111243045A (en) Image generation method based on Gaussian mixture model prior variation self-encoder
CN115685877B (en) Control method and system for intelligent processing of glass lenses
CN116524299A (en) Image sample generation method, device, equipment and storage medium
CN113408034A (en) Engineering construction intelligent cloud management platform based on BIM building three-dimensional model technology
WO2020160595A1 (en) System and method for automated material take-off
JP2022510667A (en) Methods and equipment for predicting energy consumption
Jang et al. Requirements analysis for development of off-Site construction project management system: Focusing on precast concrete construction
WO2024146164A1 (en) Complex special-shaped component node finite element modeling method based on three-dimensional computer vision
CN114001562A (en) Temperature-regulating PID parameter self-tuning method for cement predecomposition furnace
CN116204793B (en) Industrial Internet cloud edge model aggregation method based on federal learning
CN116102100B (en) Water quality restoration feedback control method and system based on Internet of things equipment
Gladines et al. A continuous motion shape-from-focus method for geometry measurement during 3D printing
CN112989672B (en) Construction method of minimum curved surface gradient structure suitable for complex stress change
CN116765427A (en) Real-time prediction method for size of molten pool in selective laser melting process
Souza et al. Soft sensors in the primary aluminum production process based on neural networks using clustering methods
CN115309052A (en) Online correction method for time sequence prediction result of industrial real-time data
CN112132428A (en) Big data-based predictive control decision method for steam heating network steam distribution station
CN112932745B (en) Titanium alloy bone defect support preparation system based on 3D printing technique
Slepicka et al. Digital Twinning in Additive Manufacturing-Closing the Digital-Physical-Digital Loop by Automated Integration of Captured Geometric Data into Fabrication Information Models

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201009

Termination date: 20211217