CN109661000A - Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station - Google Patents

Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station Download PDF

Info

Publication number
CN109661000A
CN109661000A CN201811566509.7A CN201811566509A CN109661000A CN 109661000 A CN109661000 A CN 109661000A CN 201811566509 A CN201811566509 A CN 201811566509A CN 109661000 A CN109661000 A CN 109661000A
Authority
CN
China
Prior art keywords
base station
inefficient
portrait
multidimensional
preset condition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811566509.7A
Other languages
Chinese (zh)
Inventor
谷俊江
杨福理
范毅
徐迟
冷俊
朱凯
宋峻
周菊华
李含华
刘二波
李勃燊
刘明杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Network Communications Group Co Ltd
Original Assignee
China United Network Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Network Communications Group Co Ltd filed Critical China United Network Communications Group Co Ltd
Priority to CN201811566509.7A priority Critical patent/CN109661000A/en
Publication of CN109661000A publication Critical patent/CN109661000A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0631Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/14Network analysis or design
    • H04L41/142Network analysis or design using statistical or mathematical methods
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/04Arrangements for maintaining operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/08Access point devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Algebra (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Physics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Pure & Applied Mathematics (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses a kind of management methods of inefficient base station, device, equipment and readable storage medium storing program for executing, it is screened in information database according to the first preset condition, the base station of first preset condition will be met as inefficient base station, the basic information table of each inefficient base station is obtained parallel, the traffic statistics of alarm data and peripheral base station, according to the basic information table of the inefficient base station, the traffic statistics of alarm data and peripheral base station, multidimensional portrait analysis is carried out to each inefficient base station, generate multidimensional portrait analysis result, it is drawn a portrait using intellectual analysis optimization algorithm to multidimensional and analyzes result progress data mining, export inefficient base station optimizes and revises scheme.In the present solution, quickly screening and judging inefficient base station by information-based means, and pass through the origin cause of formation of the inefficient base station of intelligent analysis, while suggestion is optimized and revised in output, is improved network resource utilization, is greatly improved working efficiency, has saved human cost.

Description

Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station
Technical field
The present invention relates to the communications field more particularly to a kind of management method, device, equipment and the readable storages of inefficient base station Medium.
Background technique
Since operation is opened in mobile network (such as 4G net) networking, the management of inefficient base station is always the tight of puzzlement operator Weight problem.One base station can bring construction meaning of the great benefit concerning this base station site, because of low discharge or zero stream Amount cell can neither bring prospective earnings for mobile network, waste high networking investment, and can influence user indirectly Usage experience.
The distribution of low discharge cell is both that the intuitive embodiment of user distribution and behavior and one of ownership guide, Some recessive network problems present in discovery network are also contributed to simultaneously.And traditional mobile network optimization, mainly pass through It is artificial to extract traffic indicator or artificial collection in worksite test data, manual analysis is carried out, needs to find net from the data of magnanimity Network problem, and the cause of network problem is analyzed, it then reintroduces solution and carries out implementation optimization.
And as network structure becomes increasingly complex, operation while 2G/3G/4G tri- opens mobile communications network, wireless base station Scale rapid development, the prior art are handled using full manual analysis, are primarily present following problems: each base station of manual analysis Configuration data, performance data, traffic data, and heavy workload is analyzed in conjunction with wireless environment locating for each base station, personnel, Low efficiency.Different personnel are when analyzing same problem, since the otherness of the structure of knowledge and experience accumulation are different, point Analysis result has differences, and is unfavorable for the quick basic solution of inefficient base station problem.Traditional carries out data processing using EXCEL Mode cannot fully meet the demand of routine analysis, routine optimization working efficiency due to existing net base station cell substantial amounts It is lower.Traditional analysis analytical cycle is long, analysis the inefficient base station reason netted cannot occurs in the quick or short time.
Summary of the invention
In view of this, the embodiment of the invention provides management method, device, equipment and the readable storages of a kind of inefficient base station Medium promotes network resource utilization can quickly and efficiently improve the inefficient base station case of the whole network, promotes working efficiency, Save human cost.
In a first aspect, the embodiment of the invention provides a kind of management methods of inefficient base station, comprising:
It is screened in information database according to the first preset condition, the base station for meeting first preset condition is made For inefficient base station;
The traffic statistics of the basic information table of each inefficient base station, alarm data and peripheral base station are obtained parallel;
According to the traffic statistics of the basic information table of the inefficient base station, alarm data and peripheral base station, to each Inefficient base station carries out multidimensional portrait analysis, generates multidimensional portrait analysis result;
It is drawn a portrait using intellectual analysis optimization algorithm to multidimensional and analyzes result progress data mining, export the optimization of inefficient base station Adjusted Option.
In one possible implementation, described pre- according to first in the above method provided in an embodiment of the present invention Before if condition is screened in information database, further includes:
Establish all basic station over network basic information table, basic information table include: base station type, longitude and latitude, region, covering scene, It stands high, inclination angle;
All basic station over network traffic statistics are extracted from traffic statistics library using crawler software, and are mentioned from record alert database Take all basic station over network alarm data;
All basic station over network information database is established, the associated storage basic information table of each base station, words in information database Statistical data of being engaged in and alarm data.
In one possible implementation, described to each inefficient in the above method provided in an embodiment of the present invention Base station carries out multidimensional portrait analysis, specifically includes:
Base station type, region and the covering scene for including to the first portrait are analyzed;
The frequency occurred in preset time range to the inefficient base station that the second portrait includes is analyzed;
The traffic statistics of the distribution of inefficient surrounding sites zone user and peripheral base station that third portrait includes are carried out Analysis;
The distribution of inefficient surrounding sites zone user and peripheral base station coverage condition for include to the 4th portrait are analyzed;
Judge whether inefficient base station is that the base stations of specific needs is analyzed to what the 5th portrait included.
In one possible implementation, in the above method provided in an embodiment of the present invention, the first default item Part includes:
The monthly daily flow of single base station is less than preset quantity, and the monthly daily flow of single base station is monthly less than origin base station Daily flow;Wherein,
In one possible implementation, described to utilize intelligence point in the above method provided in an embodiment of the present invention It analyses optimization algorithm and data mining is carried out to multidimensional portrait analysis result, export inefficient base station optimizes and revises scheme, it specifically includes:
Multidimensional portrait analysis result is compared with corresponding second preset condition respectively using intellectual analysis optimization algorithm Compared with;
If the multidimensional portrait analysis result meets corresponding second preset condition, obtains to optimize and revise accordingly and build View will respectively optimize and revise the corresponding inefficient base station of suggestion composition and optimize and revise scheme;
Export the inefficient base station optimizes and revises scheme;
Wherein, the second preset condition is the condition for needing to optimize and revise.
Second aspect, the embodiment of the invention provides a kind of managing devices of inefficient base station, comprising:
It is pre- will to meet described first for being screened in information database according to the first preset condition for screening module If the base station of condition is as inefficient base station;
Module is obtained, if the basic information table, alarm data and peripheral base station for obtaining each inefficient base station parallel Business statistical data;
Analysis module, for being united according to the traffic of the basic information table of the inefficient base station, alarm data and peripheral base station It counts, multidimensional portrait analysis is carried out to each inefficient base station, generate multidimensional portrait analysis result;
Output module analyzes result progress data mining, output for drawing a portrait using intellectual analysis optimization algorithm to multidimensional Optimize and revise scheme in inefficient base station.
In one possible implementation, in above-mentioned apparatus provided in an embodiment of the present invention, further includes:
Module is established, screens it for carrying out in information database in the screening module according to the first preset condition Before, establish all basic station over network basic information table, basic information table include: base station type, longitude and latitude, region, covering scene, stand it is high, Inclination angle;All basic station over network traffic statistics are extracted from traffic statistics library using crawler software, and are extracted from record alert database All basic station over network alarm data;All basic station over network information database is established, the associated storage basis of each base station in information database Information table, traffic statistics and alarm data.
In one possible implementation, in above-mentioned apparatus provided in an embodiment of the present invention, the analysis module, tool Body is used for:
Base station type, region and the covering scene for including to the first portrait are analyzed;
The frequency occurred in preset time range to the inefficient base station that the second portrait includes is analyzed;
The traffic statistics of the distribution of inefficient surrounding sites zone user and peripheral base station that third portrait includes are carried out Analysis;
The distribution of inefficient surrounding sites zone user and peripheral base station coverage condition for include to the 4th portrait are analyzed;
Judge whether inefficient base station is that the base stations of specific needs is analyzed to what the 5th portrait included.
In one possible implementation, in above-mentioned apparatus provided in an embodiment of the present invention, the first default item Part includes:
The monthly daily flow of single base station is less than preset quantity, and the monthly daily flow of single base station is monthly less than origin base station Daily flow;Wherein,
In one possible implementation, in above-mentioned apparatus provided in an embodiment of the present invention, the output module, packet It includes:
Comparing unit: for using intellectual analysis optimization algorithm that multidimensional portrait analysis result is pre- with corresponding second respectively If condition is compared;
Obtaining unit meets corresponding second preset condition if drawing a portrait for the multidimensional and analyzing result, obtains corresponding Optimize and revise suggestion, will respectively optimize and revise suggestion and form corresponding inefficient base station and optimize and revise scheme;
Output unit optimizes and revises scheme for export the inefficient base station;
Wherein, the second preset condition is the condition for needing to optimize and revise.
The third aspect, the embodiment of the invention provides a kind of electronic equipment, comprising: memory and processor;
The memory, for storing computer program;
Wherein, the processor executes the computer program in the memory, to realize any one of first aspect institute The method stated.
Fourth aspect, the embodiment of the invention provides a kind of computer readable storage mediums, are stored thereon with computer journey Sequence, for realizing method described in any one of first aspect when the computer program is executed by processor.
Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station provided by the invention, according to the first default item Part is screened in information database, using the base station for meeting first preset condition as inefficient base station, is obtained parallel each The traffic statistics of the basic information table of a inefficient base station, alarm data and peripheral base station, according to the base of the inefficient base station The traffic statistics of plinth information table, alarm data and peripheral base station carry out multidimensional portrait analysis to each inefficient base station, generate The analysis of multidimensional portrait carries out data mining as a result, drawing a portrait using intellectual analysis optimization algorithm to multidimensional and analyzing result, exports inefficient Optimize and revise scheme in base station.In the present solution, quickly screening by information-based means and judging inefficient base station, and pass through intelligence Change the origin cause of formation for analyzing inefficient base station, while suggestion is optimized and revised in output, can quickly and efficiently improve the inefficient base station feelings of the whole network Condition improves network resource utilization, greatly improves working efficiency, has saved human cost, is also subsequent network optimization Information-based analysis transition provide direction.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is the present invention Some embodiments be also possible to obtain other drawings based on these drawings for those of ordinary skill in the art.
Fig. 1 is the flow diagram of the management method for the inefficient base station that the embodiment of the present invention one provides;
Figure 1A be another embodiment of the present invention provides inefficient base station management method flow diagram;
Fig. 2 is the structural schematic diagram of the managing device of inefficient base station provided by Embodiment 2 of the present invention;
Fig. 3 is the structural schematic diagram for the electronic equipment that the embodiment of the present invention three provides.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Every other reality obtained based on the embodiments of the present invention Example is applied, shall fall within the protection scope of the present invention.
Embodiment one
Fig. 1 is the flow diagram of the management method for the inefficient base station that the embodiment of the present invention one provides, as shown in Figure 1, should Method may comprise steps of:
S101, it is screened in information database according to the first preset condition, first preset condition will be met Base station is as inefficient base station.
In practical application, the executing subject of the present embodiment can be the managing device of inefficient base station.In practical applications, should The managing device of inefficient base station can be by virtual bench, such as software code realization, can also be by being written with related execution The entity apparatus of code, for example, USB flash disk is realized, then alternatively, can also be real by being integrated with the related entity apparatus for executing code It is existing, for example, chip, intelligent terminal etc..
Optionally, the information database pre-establishes, and therefore, according to embodiment of the present invention, such as schemes Shown in 1A, before carrying out above-mentioned S101 step, can also include:
S101a, all basic station over network basic information table is established, basic information table includes: base station type, longitude and latitude, region, covering Scene, high, inclination angle of standing.
S101b, using crawler software from traffic statistics library extract all basic station over network traffic statistics, and from alarm number All basic station over network alarm data is extracted according to library.
S101c, all basic station over network information database is established, the associated storage basic information of each base station in information database Table, traffic statistics and alarm data.
Preferably, can be using the MySQL database of open source, the application is it is not limited here.
Optionally, according to embodiment of the present invention, first preset condition may include: that single base station is monthly Daily flow is less than preset quantity, and the monthly daily flow of single base station is less than the monthly daily flow of origin base station;Wherein,
For example, first preset condition can be set to the monthly daily flow of single base station less than 1GB, and it is less than the base station The monthly daily flow of 10 base stations of surrounding, it is qualified to be judged as inefficient base station.
In the present embodiment, for example, can be by crawler software link information database, while SQL statement is write, if Required screening and Rule of judgment are set, SQL statement is then executed by crawler software, it can be inefficient into network with quick obtaining Base station.
The traffic statistical number of S102, the basic information table for obtaining each inefficient base station parallel, alarm data and peripheral base station According to.
Specifically, the traffic statistics of peripheral base station can be 5 or other nearest with current inefficient base station distance The traffic statistics of quantity base station.
S103, according to the traffic statistics of the basic information table of the inefficient base station, alarm data and peripheral base station, it is right Each inefficient base station carries out multidimensional portrait analysis, generates multidimensional portrait analysis result.
Specifically, the analysis of inefficient base station carries out " multidimensional to inefficient base station using the various dimensions for generating strong correlation with traffic Portrait ", specifically includes:
Base station type, region and the covering scene for including to the first portrait are analyzed, such as: judge inefficient base station to be macro It stands or room is divided, inefficient base station affiliated area (core city, suburb, county town, small towns rural area) is analyzed, such as the inefficient base of nucleus Needs of standing are paid close attention to, and debugging and antenna feeder problem analyze inefficient base station affiliated scene (campus, high-speed rail, subway, scenic spot, residence People's cell etc.), if the inefficient base station in campus needs to pay close attention to, debugging and antenna feeder problem, this rigid demand base station in scenic spot, Antenna feeder problem is excluded, can continue to pay close attention to, without processing.
The frequency occurred in preset time range to the inefficient base station that the second portrait includes is analyzed, such as: it is directed to The more base station of monthly frequency of occurrence needs selective analysis, priority processing.The base station few for frequency of occurrence carries out each monthly Current capacity contrast's analysis, the reasons such as debugging.It is analyzed from frequency of occurrence, the inefficient base station of the analysis all occurred every month, weight Point concern, site inspection are found and reason of inefficiency occur, preferentially handled.The monthly frequency of occurrence in inefficient base station is tracked, is analyzed low The reason of base station is by badly improving is imitated, in conjunction with flow traffic monthly, marketing users development reasons is judged whether it is, analyzes inefficient base It stands backward reason, judges whether base station fault or the reasons such as antenna feeder is abnormal cause.Sporadicly occur for centre inefficient Base station needs that traffic and alarm cause is combined to be judged, see flow whether in 1GB critical threshold or base station there are frequent failures Cause.
The traffic statistics of the distribution of inefficient surrounding sites zone user and peripheral base station that third portrait includes are carried out Analysis, such as: analyzed from user profile, can determine whether inefficient base station is in high user distribution region, base station which Orientation user is relatively more, positions reason of inefficiency in conjunction with site inspection situation.It analyzes, analyzes low in conjunction with peripheral base station traffic conditions The nearest two base station call situations in base station are imitated, are all such as low discharge base station, in conjunction with site inspection, judge inefficient to lack reason for user Cause, if peripheral base station flow is higher, site inspection is needed to exclude antenna feeder and failure cause.For being in, user is less, flow The inefficient base station of lower region, is pushed to market in time.
The distribution of inefficient surrounding sites zone user and peripheral base station coverage condition for include to the 4th portrait are analyzed, example Such as: being analyzed from user profile, can determine whether inefficient base station is in whole weak overlay area, which direction region of base station It needs to reinforce to cover.Analyze the combined coverage areas between inefficient base station and the nearest base station of surrounding, if exist and our station is needed to reinforce The place of covering.
Judge whether inefficient base station is that the base stations of specific needs is analyzed to what the 5th portrait included.
Based on above five dimension portrait method, drawing a portrait to certain colleges and universities' list base station, it is as follows to analyze result example:
According to the above five portraits dimensional analysis, the inefficient reason in the base station is that this overlay area of base station is needed without practical traffic It asks, is to lead to inefficient basic reason.But because of teaching building side road surface, there are weak covering problems, can be by drawing the interior Base station is exceptionally beaten, the modes such as remote radio using room, increases the base station by the covering of road pavement.On the one hand it can increase the station Traffic absorbability, while also solving the weak covering problem in road surface.
S104, it is drawn a portrait using intellectual analysis optimization algorithm to multidimensional and analyzes result progress data mining, export inefficient base station Optimize and revise scheme.
In the present embodiment, step S104 be can specifically include: multidimensional being drawn a portrait using intellectual analysis optimization algorithm and analyzes knot Fruit is compared with corresponding second preset condition respectively, if multidimensional portrait analysis result meets corresponding second default item Part then obtains and optimizes and revises suggestion accordingly, will respectively optimize and revise the corresponding inefficient base station of suggestion composition and optimizes and revises scheme, defeated Scheme is optimized and revised in the inefficient base station out, wherein the second preset condition is the condition for needing to optimize and revise.
In practical application, the intellectual analysis analysis of optimization calculating thinking of inefficient base station can be with are as follows:
A, the inefficient base station disconnected station time is longer (monthly analysis is more than 1 day with the cumulative time), Optimizing Suggestions are as follows: when disconnected station Between more than 1 day, need to analyze processing alarm.
B, excessive, Optimizing Suggestions are arranged at 35 meters or more, inclination angle in inefficient surrounding sites base station call flow height, height of standing Are as follows: antenna feeder adjustment is carried out after site inspection.
C, inefficient surrounding sites base station call flow is high, and website height is less than 30 meters, Optimizing Suggestions are as follows: after site inspection Carry out site optimization.
D, inefficient base station covering scene is emphasis scene or the public praise scenes such as campus, high-speed rail, transport hub, needs preferentially to locate Understanding is determined.
E, inefficient base station is room branch scape, if peripheral base station (with the other Remote Radio Unit in place) is inefficient, week While there are weak overlay area, Optimizing Suggestions are as follows: site inspection, being made using outdoor improves inefficient and weak covering.
F, when inefficient base station covering scene is the rigid demands scenes such as scenic spot, basement, Optimizing Suggestions are as follows: site inspection is protected It demonstrate,proves base station covering under normal circumstances, continues to pay close attention to.
G, inefficient surrounding sites base station call flow is all very low, scene is located at rural area or suburb and the works such as antenna tilt join Setting is reasonable, Optimizing Suggestions are as follows: the user situation of site inspection overlay area, certain user are seldom, continue to pay close attention to.
In conjunction with the above analytical mathematics, data mining is carried out to multidimensional analysis result of drawing a portrait, i.e., with corresponding second default item Part is compared, if meeting corresponding second preset condition, acquisition optimizes and revises suggestion accordingly, will respectively optimize and revise suggestion It forms corresponding inefficient base station and optimizes and revises scheme, intellectual analysis optimization algorithm can export the side of optimizing and revising of inefficient base station automatically Case.
For example, WXEBFL857281 (seeing The Orchid Pavilion Music Bureau 29 (zooming out) in mountain) is inefficient base station, is drawn through analysis multidimensional As result is as follows:
Intellectual analysis optimization algorithm, which draws a portrait to multidimensional, analyzes result progress data mining, and the result of excavation is as follows:
Frequency of occurrence is 1 time, and traffic is normal before, and exclusionary zone user lacks reason, which meets condition a (when disconnected station Between more than 1 day, there is alarm).Therefore, intelligent optimization Adjusted Option is the alarm situation for analyzing base station, priority processing alarm.
Due to being handled using information-based means, the time for handling cost is influenced to ignore not by the number of inefficient base station Meter, such as following table, greatly saving analysis time, monthly inefficient base station analysis time is about 1/10th of manual analysis, pole The earth improves working efficiency, and the promotion of working efficiency brings the processing high efficiency of problem, quickly finds the problem, solves to ask Topic, the traffic flow enhancement of inefficient base station bring direct economic benefit.
Compare classification Traditional artificial analysis Information-based means intellectual analysis
Analysis time (100 base stations) 200 minutes 22 minutes
It is influenced by base station number Base station is more, and the time is longer It ignores
Analysis personnel (person-time) 10 person-times 1 person-time
The management method of inefficient base station provided by the invention, is sieved in information database according to the first preset condition Choosing, using the base station for meeting first preset condition as inefficient base station, obtain parallel each inefficient base station basic information table, The traffic statistics of alarm data and peripheral base station, according to basic information table, alarm data and the periphery of the inefficient base station The traffic statistics of base station carry out multidimensional portrait analysis to each inefficient base station, generate multidimensional portrait analysis as a result, utilizing intelligence Energy analysis optimization algorithm, which draws a portrait to multidimensional, analyzes result progress data mining, and export inefficient base station optimizes and revises scheme.We In case, inefficient base station is quickly screened and judged by information-based means, and pass through the origin cause of formation of the inefficient base station of intelligent analysis, together When output optimize and revise suggestion, can quickly and efficiently improve the inefficient base station case of the whole network, improve network resource usage Rate greatly improves working efficiency, has saved human cost, also provides for the information-based analysis transition of subsequent network optimization Direction.
Following is apparatus of the present invention embodiment, can be used for executing the management of the inefficient base station of the offer of the embodiment of the present invention one Method.For undisclosed details in apparatus of the present invention embodiment, embodiment of the present invention method is please referred to.
Embodiment two
Fig. 2 is the structural schematic diagram of the managing device of inefficient base station provided by Embodiment 2 of the present invention, as shown in Fig. 2, should Device may include:
Screening module 210 will meet described first for being screened in information database according to the first preset condition The base station of preset condition is as inefficient base station.
Module 220 is obtained, for obtaining the basic information table of each inefficient base station, alarm data and peripheral base station parallel Traffic statistics.
Analysis module 230, for the traffic according to the basic information table of the inefficient base station, alarm data and peripheral base station Statistical data carries out multidimensional portrait analysis to each inefficient base station, generates multidimensional portrait analysis result.
Output module 240 analyzes result progress data mining for drawing a portrait using intellectual analysis optimization algorithm to multidimensional, defeated Scheme is optimized and revised in inefficient base station out.
According to embodiment of the present invention, above-mentioned apparatus can also include:
Module 200 is established, for being screened in information database in the screening module according to the first preset condition Before, all basic station over network basic information table is established, basic information table includes: base station type, longitude and latitude, region, covering scene, stands High, inclination angle.All basic station over network traffic statistics are extracted from traffic statistics library using crawler software, and are mentioned from record alert database Take all basic station over network alarm data.All basic station over network information database is established, the associated storage base of each base station in information database Plinth information table, traffic statistics and alarm data.
According to embodiment of the present invention, the analysis module 230, is specifically used for:
Base station type, region and the covering scene for including to the first portrait are analyzed.
The frequency occurred in preset time range to the inefficient base station that the second portrait includes is analyzed.
The traffic statistics of the distribution of inefficient surrounding sites zone user and peripheral base station that third portrait includes are carried out Analysis.
The distribution of inefficient surrounding sites zone user and peripheral base station coverage condition for include to the 4th portrait are analyzed.
Judge whether inefficient base station is that the base stations of specific needs is analyzed to what the 5th portrait included.
According to embodiment of the present invention, first preset condition includes:
The monthly daily flow of single base station is less than preset quantity, and the monthly daily flow of single base station is monthly less than origin base station Daily flow.Wherein,
According to embodiment of the present invention, the output module 240, comprising:
Comparing unit 241: for multidimensional to be drawn a portrait analysis result respectively with corresponding the using intellectual analysis optimization algorithm Two preset conditions are compared.
Obtaining unit 242 meets corresponding second preset condition if drawing a portrait for the multidimensional and analyzing result, obtains phase That answers optimizes and revises suggestion, will respectively optimize and revise the corresponding inefficient base station of suggestion composition and optimizes and revises scheme.
Output unit 243 optimizes and revises scheme for export the inefficient base station.
Wherein, the second preset condition is the condition for needing to optimize and revise.
Embodiment three
Fig. 3 is the structural schematic diagram for the electronic equipment that the embodiment of the present invention three provides, as shown in Figure 3, comprising: memory 310 and processor 320.
The memory 310, for storing computer program.
Wherein, the processor 320 executes the computer program in the memory 310, to realize in embodiment one Method.
Example IV
The embodiment of the present invention four provides a kind of computer readable storage medium, is stored thereon with computer program, described For realizing the method in embodiment one when computer program is executed by processor.
It is apparent to those skilled in the art that for convenience and simplicity of description, the device of foregoing description Specific work process, can refer to corresponding processes in the foregoing method embodiment, details are not described herein.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (12)

1. a kind of management method of inefficient base station characterized by comprising
It is screened in information database according to the first preset condition, the base station of first preset condition will be met as low Imitate base station;
The traffic statistics of the basic information table of each inefficient base station, alarm data and peripheral base station are obtained parallel;
According to the traffic statistics of the basic information table of the inefficient base station, alarm data and peripheral base station, to each inefficient Base station carries out multidimensional portrait analysis, generates multidimensional portrait analysis result;
It is drawn a portrait using intellectual analysis optimization algorithm to multidimensional and analyzes result progress data mining, export optimizing and revising for inefficient base station Scheme.
2. the method according to claim 1, wherein it is described according to the first preset condition in information database into Before row screening, further includes:
Establish all basic station over network basic information table, basic information table include: base station type, longitude and latitude, region, covering scene, stand it is high, Inclination angle;
All basic station over network traffic statistics are extracted from traffic statistics library using crawler software, and are extracted entirely from record alert database Net base station alarm data;
All basic station over network information database is established, the associated storage basic information table of each base station, traffic system in information database It counts and alarm data.
3. according to the method described in claim 2, it is characterized in that, described carry out multidimensional portrait analysis to each inefficient base station, It specifically includes:
Base station type, region and the covering scene for including to the first portrait are analyzed;
The frequency occurred in preset time range to the inefficient base station that the second portrait includes is analyzed;
The traffic statistics of the distribution of inefficient surrounding sites zone user and peripheral base station that third portrait includes are analyzed;
The distribution of inefficient surrounding sites zone user and peripheral base station coverage condition for include to the 4th portrait are analyzed;
Judge whether inefficient base station is that the base stations of specific needs is analyzed to what the 5th portrait included.
4. method according to claim 1-3, which is characterized in that first preset condition includes:
The monthly daily flow of single base station is less than preset quantity, and the monthly daily flow of single base station is less than the monthly day stream of origin base station Amount;Wherein,
5. method according to claim 1-3, which is characterized in that described to utilize intellectual analysis optimization algorithm to more Dimension portrait analysis result carries out data mining, and export inefficient base station optimizes and revises scheme, specifically includes:
Multidimensional portrait analysis result is compared with corresponding second preset condition respectively using intellectual analysis optimization algorithm;
If the multidimensional portrait analysis result meets corresponding second preset condition, acquisition optimizes and revises suggestion accordingly, will It respectively optimizes and revises the corresponding inefficient base station of suggestion composition and optimizes and revises scheme;
Export the inefficient base station optimizes and revises scheme;
Wherein, the second preset condition is the condition for needing to optimize and revise.
6. a kind of managing device of inefficient base station characterized by comprising
Screening module will meet the described first default item for being screened in information database according to the first preset condition The base station of part is as inefficient base station;
Module is obtained, for obtaining the traffic system of the basic information table of each inefficient base station, alarm data and peripheral base station parallel It counts;
Analysis module, for the traffic statistical number according to the basic information table of the inefficient base station, alarm data and peripheral base station According to, multidimensional portrait is carried out to each inefficient base station and is analyzed, generation multidimensional portrait analysis result;
Output module is analyzed result progress data mining for being drawn a portrait using intellectual analysis optimization algorithm to multidimensional, exported inefficient Optimize and revise scheme in base station.
7. device according to claim 6, which is characterized in that further include:
Module is established, for building before the screening module is screened in information database according to the first preset condition Vertical all basic station over network basic information table, basic information table include: base station type, longitude and latitude, region, covering scene, high, inclination angle of standing; All basic station over network traffic statistics are extracted from traffic statistics library using crawler software, and extract the whole network base from record alert database It stands alarm data;All basic station over network information database is established, the associated storage basic information table of each base station in information database, Traffic statistics and alarm data.
8. device according to claim 7, which is characterized in that the analysis module is specifically used for:
Base station type, region and the covering scene for including to the first portrait are analyzed;
The frequency occurred in preset time range to the inefficient base station that the second portrait includes is analyzed;
The traffic statistics of the distribution of inefficient surrounding sites zone user and peripheral base station that third portrait includes are analyzed;
The distribution of inefficient surrounding sites zone user and peripheral base station coverage condition for include to the 4th portrait are analyzed;
Judge whether inefficient base station is that the base stations of specific needs is analyzed to what the 5th portrait included.
9. according to the described in any item devices of claim 6-8, which is characterized in that first preset condition includes:
The monthly daily flow of single base station is less than preset quantity, and the monthly daily flow of single base station is less than the monthly day stream of origin base station Amount;Wherein,
10. according to the described in any item devices of claim 6-8, which is characterized in that the output module, comprising:
Comparing unit: for using intellectual analysis optimization algorithm by multidimensional draw a portrait analysis result respectively with corresponding second default item Part is compared;
Obtaining unit meets corresponding second preset condition if drawing a portrait for the multidimensional and analyzing result, obtains corresponding excellent Change adjustment to suggest, will respectively optimize and revise the corresponding inefficient base station of suggestion composition and optimize and revise scheme;
Output unit optimizes and revises scheme for export the inefficient base station;
Wherein, the second preset condition is the condition for needing to optimize and revise.
11. a kind of electronic equipment characterized by comprising memory and processor;
The memory, for storing computer program;
Wherein, the processor executes the computer program in the memory, to realize such as any one of claim 1-5 institute The method stated.
12. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program For realizing method according to any one of claims 1 to 5 when being executed by processor.
CN201811566509.7A 2018-12-19 2018-12-19 Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station Pending CN109661000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811566509.7A CN109661000A (en) 2018-12-19 2018-12-19 Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811566509.7A CN109661000A (en) 2018-12-19 2018-12-19 Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station

Publications (1)

Publication Number Publication Date
CN109661000A true CN109661000A (en) 2019-04-19

Family

ID=66115348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811566509.7A Pending CN109661000A (en) 2018-12-19 2018-12-19 Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station

Country Status (1)

Country Link
CN (1) CN109661000A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111163482A (en) * 2019-12-25 2020-05-15 中国联合网络通信集团有限公司 Data processing method, device and storage medium
CN113453261A (en) * 2021-06-25 2021-09-28 维沃移动通信有限公司 Abnormal cell identification method and device and electronic equipment
WO2022012288A1 (en) * 2020-07-13 2022-01-20 中兴通讯股份有限公司 Traffic parameter optimization method, apparatus and device, and storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1355625A (en) * 2000-11-28 2002-06-26 华为技术有限公司 Method and control system for balancing loads between common frequency small regions in CDMA communication system
CN1384633A (en) * 2001-04-30 2002-12-11 华为技术有限公司 Dynamic capacity regulating method for CDMA communication system
CN102404765A (en) * 2011-11-15 2012-04-04 上海百林通信网络科技有限公司 Dual band network automatic telephone traffic and quality balancing method based on measurement report
CN102547719A (en) * 2011-12-12 2012-07-04 大唐移动通信设备有限公司 Method and device for configuring tidal effect
CN103607773A (en) * 2013-11-28 2014-02-26 中国联合网络通信集团有限公司 Method and device for distributing baseband pool resources
CN104333879A (en) * 2014-10-29 2015-02-04 中国联合网络通信集团有限公司 Load sharing method and device
CN105407486A (en) * 2015-12-02 2016-03-16 中国联合网络通信集团有限公司 Network expansion method and device
CN106559803A (en) * 2017-01-18 2017-04-05 北京市天元网络技术股份有限公司 A kind of base station construction appraisal procedure and device
CN106851736A (en) * 2016-12-15 2017-06-13 北京拓明科技有限公司 LTE adjacent areas parameter automatic optimization method based on load

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1355625A (en) * 2000-11-28 2002-06-26 华为技术有限公司 Method and control system for balancing loads between common frequency small regions in CDMA communication system
CN1384633A (en) * 2001-04-30 2002-12-11 华为技术有限公司 Dynamic capacity regulating method for CDMA communication system
CN102404765A (en) * 2011-11-15 2012-04-04 上海百林通信网络科技有限公司 Dual band network automatic telephone traffic and quality balancing method based on measurement report
CN102547719A (en) * 2011-12-12 2012-07-04 大唐移动通信设备有限公司 Method and device for configuring tidal effect
CN103607773A (en) * 2013-11-28 2014-02-26 中国联合网络通信集团有限公司 Method and device for distributing baseband pool resources
CN104333879A (en) * 2014-10-29 2015-02-04 中国联合网络通信集团有限公司 Load sharing method and device
CN105407486A (en) * 2015-12-02 2016-03-16 中国联合网络通信集团有限公司 Network expansion method and device
CN106851736A (en) * 2016-12-15 2017-06-13 北京拓明科技有限公司 LTE adjacent areas parameter automatic optimization method based on load
CN106559803A (en) * 2017-01-18 2017-04-05 北京市天元网络技术股份有限公司 A kind of base station construction appraisal procedure and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邓智群,杜呈旭: ""基于多维度数据的无线网效能评价及改善体系研究"", 《移动通信》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111163482A (en) * 2019-12-25 2020-05-15 中国联合网络通信集团有限公司 Data processing method, device and storage medium
CN111163482B (en) * 2019-12-25 2022-10-14 中国联合网络通信集团有限公司 Data processing method, device and storage medium
WO2022012288A1 (en) * 2020-07-13 2022-01-20 中兴通讯股份有限公司 Traffic parameter optimization method, apparatus and device, and storage medium
CN113453261A (en) * 2021-06-25 2021-09-28 维沃移动通信有限公司 Abnormal cell identification method and device and electronic equipment

Similar Documents

Publication Publication Date Title
Mao et al. Assessment of the impact of interdependencies on the resilience of networked critical infrastructure systems
CN109661000A (en) Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station
CN110298553A (en) A kind of National land space planing method, system and equipment based on GIS
CN103077604B (en) traffic sensor management method and system
Gorman et al. Are coupled renewable-battery power plants more valuable than independently sited installations?
CN106254166A (en) A kind of cloud platform resource allocation method based on Disaster Preparation Center and system
Bureerat et al. Simultaneous topology and sizing optimization of a water distribution network using a hybrid multiobjective evolutionary algorithm
CN107872808A (en) A kind of WLAN sites prediction analysis method and device
CN111669764B (en) Novel mobile base station site selection method, system and computer equipment based on GIS technology
CN107241743B (en) Power grid private network layout construction method
CN109587219A (en) The setting and management method at Locating Type city Internet of Things edge calculations point station
CN112215427A (en) Vehicle driving track reconstruction method and system under condition of bayonet data loss
CN103489139A (en) Comprehensive analysis and management system for urban distribution network planning
CN110675110A (en) Express delivery distribution hub center site selection method and device based on subway network
Raposo et al. A multi-criteria decision aid methodology to design electric vehicles public charging networks
CN114184881B (en) Fault event positioning method based on topology model tracking analysis
CN114422955B (en) Positioning method and device for 5G indoor weak coverage area, equipment and storage medium
Zhong et al. Multi-objective optimization approach of shelter location with maximum equity: an empirical study in Xin Jiekou district of Nanjing, China
Mahmud et al. Facility location models development to maximize total service area
CN116205374A (en) Urban solar energy utilization resource evaluation and development potential analysis method
CN104517440A (en) Traffic data processing method and apparatus
CN107436945A (en) A kind of information collecting method and system based on electronic map
Lu et al. Ant colony optimization for facility location for large-scale emergencies
Onyeji-Nwogu et al. Big data and the electricity sector in African countries
Franchin et al. A framework for physical simulation of critical infrastructures, accounting for interdependencies and uncertainty

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419