CN109657299A - Shale gas reservoir recovery method - Google Patents

Shale gas reservoir recovery method Download PDF

Info

Publication number
CN109657299A
CN109657299A CN201811449422.1A CN201811449422A CN109657299A CN 109657299 A CN109657299 A CN 109657299A CN 201811449422 A CN201811449422 A CN 201811449422A CN 109657299 A CN109657299 A CN 109657299A
Authority
CN
China
Prior art keywords
well
area
npv
production
npva
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811449422.1A
Other languages
Chinese (zh)
Other versions
CN109657299B (en
Inventor
郭建林
贾爱林
位云生
贾成业
王军磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811449422.1A priority Critical patent/CN109657299B/en
Publication of CN109657299A publication Critical patent/CN109657299A/en
Application granted granted Critical
Publication of CN109657299B publication Critical patent/CN109657299B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Mining & Mineral Resources (AREA)
  • Health & Medical Sciences (AREA)
  • Geometry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Animal Husbandry (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Feedback Control In General (AREA)
  • Solid-Sorbent Or Filter-Aiding Compositions (AREA)

Abstract

A kind of shale gas reservoir recovery method, the following steps are included: using staged fracturing horizontal wells shale gas reservoir, gas flows into crack from stratum, flows into horizontal wellbore from crack, and the corresponding relationship of gas output per well, cumulative production and time is calculated using Life cycle Dynamic Simulation Method.Change Area of a well by well control area width xe, specifies the corresponding relationship of different Area of a well Yu individual well cumulative gas production.Individual well cumulative production curve combination net present value (NPV) NPV model, obtains the corresponding relationship curve of different Area of a well Yu productivity effect relationship.According to productivity effect relation curve, best Area of a well is obtained using graphical method.Shale gas reservoir exploitation is carried out according to best Area of a well.

Description

Shale gas reservoir recovery method
Technical field
The present invention relates to shale gas reservoir development fields, more particularly, to a kind of shale gas reservoir recovery method.
Background technique
Shale gas reservoir is a kind of continuous type gas mineral reserve, and essential characteristic is that distribution area is big, the variation of local geology condition Not significant, exploitation is usually influenced by regional environment and geological conditions.For this feature, the development of shale gas reservoir Mode integrally verifies+development technique breakthrough+step-by-step movement implementation.Once development technique makes a breakthrough, has the base of benefit exploitation This condition, the investment of each well be substantially it is determining, the decision that at this moment operator is faced be how stepping and implementation issue.More Specifically, the control area of distribution every mouth well is how, so that the reserves on per unit obtain utmostly On utilization, obtain greatest benefit the problem of.
Therefore, in order to solve many insufficient and defects of the above-mentioned prior art, it is necessary to study a kind of shale gas reservoir exploitation Method.
Summary of the invention
The present invention is completed in view of at least one above problem, the present invention passes through shale gas well control area and individual well The corresponding relationship curve of cumulative gas production obtains Area of a well and Production Gain relation curve in conjunction with economic model, thus Obtain shale gas reservoir recovery method.
Specifically, according to an aspect of the present invention, a kind of shale gas reservoir recovery method is provided, it is characterised in that including following Step:
A formation fracture dynamic parameter, including Number of Fractures n) are obtained using well testing, productivity testf, fracture length Lf, crack Flow conductivity Fc, stratum inner region permeability Km1With stratum outskirt permeability Km2
Stratum static parameter, including original formation pressure P are obtained using well log interpretation, static pressure testi, formation porosityHorizontal well length DfAnd well control area width xeWith length ye
Gas PVT parameter and youth's Ge Miaoer isothermal adsorption characteristics parameter are obtained using high pressure property and adsorption isotherm experiment VLAnd PL
B) the length y of fixed control areae, by changing width xeChange control plane product value, is measured in conjunction with step A) Parameter determines the corresponding relationship of cumulative gas production and production time under different Area of a well by gas output per well model, Obtain Area of a well-cumulative gas production relation curve;
C the corresponding relationship of net present value (NPV) NPV and production time under different Area of a well) are obtained by economic model, In
Wherein, GP, jFor the annual output in jth year, irFor Annual Percentage Rate, j is jth year, and n is the production cycle, and FC is fixed total throwing Money, CwellFor individual well drilling cost, CfractureFor the main seam pressure break cost of single cluster, nfFor Number of Fractures;
D Area of a well and net present value (NPV) NPV relation curve and Area of a well and average list) are further obtained Plane accumulates benefit NPVa relation curve;
NPVa=NPV/S
Determine Area of a well and increment benefit D relation curve,
D=dNPV/dS
It determines optimum efficiency point S2, makes to meet
dNPV/dS|S=s2=NPV/S |S=s2Or NPV/S |S=s2=Max
As S=S2, the obtained benefit of Area of a well is maximum, i.e. NPVa=K;
E work area area A) is measured, Area of a well is set as S2, sets N=INT (A/S2), in the area A of work area N mouthfuls of wells of even setting and Area of a well are S2, shale gas reservoir exploitation are carried out, to the residual area S in the area A of work areaIt is remainingIt gives over to It exploits in the future, SIt is remaining≥0。
Compared with prior art, the beneficial effects of the present invention are:
The present invention obtains the pass corresponding with the production time net present value (NPV) NPV under different Area of a well by economic model System, and then obtain Area of a well and net present value (NPV) NPV relation curve and Area of a well and per unit benefit NPVa relation curve determines the i.e. best Area of a well of optimum efficiency point S2, to provide foundation for shale gas reservoir exploitation.
Detailed description of the invention
Fig. 1 is that a kind of best Area of a well of the shale gas of preferred embodiment determines flow chart according to the present invention.
Fig. 2 is the staged fracturing horizontal well Production development under a kind of Area of a well of preferred embodiment according to the present invention Physical model.
Fig. 3 is that cumulative production-time under a kind of different Area of a well of preferred embodiment according to the present invention is corresponding Relational graph.
Area of a well and cumulative production pair under the different production times that Fig. 4 is a kind of preferred embodiment according to the present invention Answer relational graph.
Fig. 5 is a kind of corresponding single hop crack overall cost of different pressure break length of preferred embodiment according to the present invention.
Fig. 6 is net present value (NPV)-time corresponding pass under a kind of different Area of a well of preferred embodiment according to the present invention System's figure.
Area of a well is corresponding with net present value (NPV) under the different production times that Fig. 7 is a kind of preferred embodiment according to the present invention Relational graph.
Fig. 8 is a kind of Area of a well of preferred embodiment and productivity effect graph of relation according to the present invention.
Fig. 9 is a kind of analysis chart of preferred embodiment order well Optimal Control area really according to the present invention.
Figure 10 is that a kind of well spacing of preferred embodiment and Area of a well, well spacing density conversion indicate according to the present invention Example.
Figure 11 is a kind of typical well underlying parameter datatable example of preferred embodiment according to the present invention.
Figure 12 is a kind of schematic diagram of the opportunity cost of preferred embodiment according to the present invention.
Specific embodiment
With reference to the accompanying drawing, preferred forms of the invention, specific implementation here are described by preferred embodiment Mode is to explain the present invention in detail, should not be construed as limiting the invention, and is not departing from spirit and reality of the invention In the case where matter range, various changes and modifications can be made, these should all be included within protection scope of the present invention.
Embodiment 1
Referring to attached drawing 1-12, it is preferable that the present invention provides one kind to provide a kind of shale gas reservoir recovery method, feature Be the following steps are included:
A formation fracture dynamic parameter, including Number of Fractures n) are obtained using well testing, productivity testf, fracture length Lf, crack Flow conductivity Fc, stratum inner region permeability Km1With stratum outskirt permeability Km2
Stratum static parameter, including original formation pressure P are obtained using well log interpretation, static pressure testi, formation porosityHorizontal well length DfAnd well control area width xeWith length ye
Gas PVT parameter and youth's Ge Miaoer isothermal adsorption characteristics parameter are obtained using high pressure property and adsorption isotherm experiment VLAnd PL
B) the length y of fixed control areae, by changing width xeChange control plane product value, is measured in conjunction with step A) Parameter determines the corresponding relationship of cumulative gas production and production time under different Area of a well by gas output per well model, Obtain Area of a well-cumulative gas production relation curve;
C the corresponding relationship of net present value (NPV) NPV and production time under different Area of a well) are obtained by economic model, In
Wherein, GP, jFor the annual output in jth year, irFor Annual Percentage Rate, j is jth year, and n is the production cycle, and FC is fixed total throwing Money, CwellFor individual well drilling cost, CfractureFor the main seam pressure break cost of single cluster, nfFor Number of Fractures;
D Area of a well and net present value (NPV) NPV relation curve and Area of a well and average list) are further obtained Plane accumulates benefit NPVa relation curve;
NPVa=NPV/S
Determine Area of a well and increment benefit D relation curve,
D=dNPV/dS
It determines optimum efficiency point S2, makes to meet
dNPV/dS|S=s2=NPV/S |S=s2Or NPV/S |S=s2=Max
As S=S2, the obtained benefit of Area of a well is maximum, i.e. NPVa=K;
E work area area A) is measured, Area of a well is set as S2, sets N=INT (A/S2), in the area A of work area N mouthfuls of wells of even setting and Area of a well are S2, shale gas reservoir exploitation are carried out, to the residual area S in the area A of work areaIt is remainingIt gives over to It exploits in the future, SIt is remaining≥0。
Preferably, N=INT (A/S2) is set specifically, being rounded to (A/S2), such as A=100, S2=0.45, (A/S2) =222.22, then N=INT (A/S2)=222.That is, being uniformly arranged 222 mouthfuls of lists within the scope of 100 square metres of work area The gas well that well control area is 0.45 square metre, SIt is remaining=0.1 square metre, then remaining 0.1 quadrature is continued to employ.
Preferably, referring to attached drawing 1-12, it is preferable that the present invention also provides one kind to provide a kind of shale gas reservoir exploitation side Method, it is characterised in that the following steps are included:
A formation fracture dynamic parameter, including Number of Fractures n) are obtained using well testing, productivity testf, fracture length Lf, crack Flow conductivity Fc, stratum inner region permeability Km1With stratum outskirt permeability Km2
Stratum static parameter, including original formation pressure P are obtained using well log interpretation, static pressure testi, formation porosityHorizontal well length DfAnd well control area width xeWith length ye
Gas PVT parameter and youth's Ge Miaoer isothermal adsorption characteristics parameter are obtained using high pressure property and adsorption isotherm experiment VLAnd PL
B) the length y of fixed control areae, by changing width xeChange control plane product value, is measured in conjunction with step A) Parameter determines the corresponding relationship of cumulative gas production and production time under different Area of a well by gas output per well model, Obtain Area of a well-cumulative gas production relation curve;
C the corresponding relationship of net present value (NPV) NPV and production time under different Area of a well) are obtained by economic model, In
Wherein, GP, jFor the annual output in jth year, irFor Annual Percentage Rate, j is jth year, and n is the production cycle, and FC is fixed total throwing Money, CwellFor individual well drilling cost, CfractureFor the main seam pressure break cost of single cluster, nfFor Number of Fractures;
D Area of a well and net present value (NPV) NPV relation curve and Area of a well and average list) are further obtained Plane accumulates benefit NPVa relation curve;
NPVa=NPV/S
Determine Area of a well and increment benefit D relation curve,
D=dNPV/dS
It determines optimum efficiency point S2, makes to meet
dNPV/dS|S=s2=NPV/S |S=s2Or NPV/S |S=s2=Max
As S=S2, the obtained benefit of Area of a well is maximum, i.e. NPVa=K;When S is below or above S2, machine is defined Meeting cost P,
P=K-NPVa
E work area area A) is measured, when A/S2 is integer, Area of a well takes S2;
When A/S2 is non-integer, being rounded to A/S2 is N, determines and is evenly arranged corresponding individual well when N mouthfuls of wells in the area A of work area Corresponding Area of a well S2 "=A/ (N+1) when N+1 mouthfuls of wells is evenly arranged in control area S2 '=A/N, work area area A,
Determine that S takes S2 ' and S2 respectively according to NPVa=NPV/S ' when corresponding NPVa ' and NPVa ", according to P=K-NPVa Determine the P ' and P " when NPVa takes NPVa ' and NPVa " respectively,
When P ' is less than or equal to P ", Area of a well S2 takes S2 ', and otherwise Area of a well S2 takes S2 " F) setting list Well control area is S2, carries out shale gas reservoir exploitation.
Preferably, control area is well control Area length and width xeProduct.
Preferably, gas output per well model specifically: according to physical model shown in Fig. 2, it is raw to construct Life cycle gas well Dynamic mathematical models are produced, the parameter of step A) measurement/underlying parameter was substituted into mathematical model f (), gas well accumulation can be obtained The corresponding relationship of yield G and time t.
Gp(t)=f (Km1, Km2, Lf, Fc, nf;xe, ye;φm, Pi;PVT parameter;VL, PL)
Advantageously, the present invention obtains net present value (NPV) NPV and production time under different Area of a well by economic model Corresponding relationship, and then obtain Area of a well and net present value (NPV) NPV relation curve and Area of a well and mean unit face Product benefit NPVa relation curve, determines the i.e. best Area of a well of optimum efficiency point S2, to mention for shale gas reservoir exploitation For foundation.
Embodiment 2
Referring to Fig. 1-12, it is preferable that the present invention provides a kind of shale gas reservoir recovery methods, with Sichuan Province China basin shale Illustrate implementation process for the typical development well of gas producing region mouthful.Specifically, method includes the following steps:
It in step A), is tested and is tested using mining site and tested, obtained the well static geologic parameter accordingly, utilize pressure break Construction and dynamic monitoring, obtain the corresponding dynamic project parameter of the well, specifically include:
A1 dynamic data) is obtained using well testing, productivity test, relevant stratum, crack dynamic parameter are obtained by analysis, Including Number of Fractures nf, fracture length Lf, fracture condudtiviy Fc, stratum inner region permeability Km1With stratum outskirt permeability Km2
A2 well log interpretation, static pressure test) are utilized, stratum static parameter, including original formation pressure P are obtained by analysisi、 Formation porosityHorizontal well length DfAnd the width x of well control areaeWith length ye
A3 gas PVT parameter, youth's Ge Miaoer isothermal adsorption characteristics parameter) are obtained using high pressure property and adsorption isotherm experiment VLAnd PL
The above sound state Data Summary is in Figure 11.
In step B), fixed control area length, by changing control area width xeTo change control plane product value.It is excellent Selection of land, ratio is set as constant I between fracture length and area width herex=Lf/xe.Control area is set in the present embodiment xe=100~450m, corresponding fracture length Lf=80~360m, the underlying parameter provided in conjunction with step A) substitute into individual well and produce gas Amount model is calculated.Fig. 3 reflects the corresponding relationship of cumulative production and production time under different Area of a well, individual well control Area processed is bigger, and cumulative production is higher.Fig. 4 reflects the pass corresponding with cumulative production of Area of a well under the different production times System, the production cycle is longer, and Area of a well influences cumulative production more significant.
In step C), economic model is introduced, wherein net present value (NPV) formula is such as:
Here, GP, jFor the annual output in jth year, irFor Annual Percentage Rate, j is jth year, and n is the production cycle, and FC is fixed total throwing It provides (equipment cost etc.), CwellFor individual well drilling cost, CfractureFor single cluster (main seam) pressure break cost, nfFor Number of Fractures.
In step C1), individual well overall cost (in addition to pressure break) is 40,000,000 yuan, Annual Percentage Rate 10%, gas price 1.2 Member/m3, the period is 20 years.The different exponential increases of pressure break length cost, such as Fig. 5.
In step C2), it is only existing that individual well is obtained according to the individual well cumulative production curve combination formula (1) provided in step B) Value.Fig. 6 shows the corresponding relationship of net present value (NPV) and production time under different Area of a well, shorter for the production time, single In the smaller situation of well control area, individual well net present value (NPV) will appear negative value.Fig. 7 shows Area of a well and list under different cycles Well net present value (NPV) relationship.
In step D), best Area of a well is determined.
In step D1), Area of a well and productivity effect relation curve (curve 1 in Fig. 8) are obtained.
In step D2), Area of a well and per unit benefit (NPVa) relation curve are determined, i.e. scale is imitated Answer (curve 2 in Fig. 8).
NPVa=NPV/S (2)
In step D3), Area of a well and increment benefit (D) relation curve are determined, i.e. edge effect is (bent in Fig. 8 Line 3).
D=dNPV/dS (3)
In step D4), breakeven point S1 (Fig. 9) is determined, be to meet
NPV|S=s1=0 or NPVa |S=s1=0 (4)
This is Area of a well lowest limit, and individual well Production Gain will not support investment when being lower than this value.
In step D5), determines optimum efficiency point S2 (Fig. 9), make to meet
dNPV/dS|S=s2=NPV/S |S=s2Or NPV/S |S=s2=Max (5)
S2 is determined as best Area of a well.
E Area of a well) is set as S2, carries out shale gas reservoir exploitation.
Preferably, as S=S2, the obtained benefit of Area of a well is maximum, i.e. NPVa=K, when S is below or above S2 When, actual benefit is below this value.Referring to Figure 12, opportunity cost P is determined, define
P=K-NPVa (6)
Then P can measure the size of opportunity cost.Its meaning is the probable lost revenue when S value deviates optimal value.Its Chance is, if having an opportunity to supply insufficient area or being used to the area for being more than beat new well, can obtain more effects Benefit.The difference of this better benefit and actual benefit is exactly probable opportunity loss.For continuity oil reservoir, such chance It is existing for reality, it is probable just to become inevitable.It, can according to P value to the sensibility and P value of S in the asymmetry of S2 point two sides Effectively to instruct decision process.Preferably, work area area A is measured, when A/S2 is integer, Area of a well is taken S2;
When A/S2 is non-integer, being rounded to A/S2 is N, determines and is evenly arranged corresponding individual well when N mouthfuls of wells in the area A of work area Corresponding Area of a well S2 "=A/ (N+1) when N+1 mouthfuls of wells is evenly arranged in control area S2 '=A/N, work area area A,
Determine that S takes S2 ' and S2 respectively according to NPVa=NPV/S ' when corresponding NPVa ' and NPVa ", according to P=K-NPVa Determine the P ' and P " when NPVa takes NPVa ' and NPVa " respectively,
When P ' is less than or equal to P ", Area of a well S2 takes S2 ', and otherwise Area of a well S2 takes S2 ".
Embodiment 3
Preferably, the present invention provides a kind of shale gas reservoir recovery methods, method includes the following steps:
Step A), according to fig. 2 in physical model, using staged fracturing horizontal wells shale gas reservoir, gas is from stratum It flows into crack, flow into horizontal wellbore from crack.Gas output per well, cumulative production are calculated using Life cycle Dynamic Simulation Method With the corresponding relationship of time.
Step B), the present invention changes Area of a well by well control area width xe, specifies different single well-controlled faces The long-pending corresponding relationship with individual well cumulative gas production.Well control area width (i.e. corresponding well away from) and Area of a well, well spacing density Transformational relation is summarised in Figure 10.
Step C), individual well cumulative production curve combination net present value (NPV) NPV model, obtains different Area of a well and production is imitated The corresponding relationship curve of beneficial relationship.The corresponding pressure break cost of difference Area of a well is different in net present value model.
Step D), according to productivity effect relation curve, best Area of a well and/or corresponding is obtained using graphical method Best techniques parameter.
In conclusion the beneficial effects of the present invention are:
The present invention obtains the pass corresponding with the production time net present value (NPV) NPV under different Area of a well by economic model System, and then obtain Area of a well and net present value (NPV) NPV relation curve and Area of a well and per unit benefit NPVa relation curve determines the i.e. best Area of a well of optimum efficiency point S2, to provide foundation for shale gas reservoir exploitation.
The present invention is not limited to above-mentioned specific embodiments.It is understood that not departing from spirit and substance of the present invention model In the case where enclosing, various changes and modifications can be made, these should all be included within protection scope of the present invention.

Claims (2)

1. a kind of shale gas reservoir recovery method, it is characterised in that the following steps are included:
A formation fracture dynamic parameter, including Number of Fractures n) are obtained using well testing, productivity testf, fracture length Lf, fracture guide Ability Fc, stratum inner region permeability Km1With stratum outskirt permeability Km2
Stratum static parameter, including original formation pressure P are obtained using well log interpretation, static pressure testi, formation porosityWater Horizontal well length DfAnd well control area width xeWith length ye
Gas PVT parameter and youth's Ge Miaoer isothermal adsorption characteristics parameter V are obtained using high pressure property and adsorption isotherm experimentLWith PL
B) the length y of fixed control areae, by changing width xeChange control plane product value, the parameter measured in conjunction with step A) By gas output per well model, the corresponding relationship of cumulative gas production and production time under different Area of a well is determined, obtain Area of a well-cumulative gas production relation curve;
C the corresponding relationship of net present value (NPV) NPV and production time under different Area of a well) are obtained by economic model, wherein
Wherein, GP, jFor the annual output in jth year, irFor Annual Percentage Rate, j is jth year, and n is the production cycle, and FC is fixed gross investment, CwellFor individual well drilling cost, CfractureFor the main seam pressure break cost of single cluster, nfFor Number of Fractures;
D Area of a well and net present value (NPV) NPV relation curve and Area of a well and mean unit face) are further obtained Product benefit NPVa relation curve;
NPVa=NPV/S
Determine Area of a well and increment benefit D relation curve,
D=dNPV/dS
It determines optimum efficiency point S2, makes to meet
dNPV/dS|S=s2=NPV/S |S=s2Or NPV/S |S=s2=Max
As S=S2, the obtained benefit of Area of a well is maximum, i.e. NPVa=K;
E work area area A) is measured, Area of a well is set as S2, sets N=INT (A/S2), uniformly set in the area A of work area It sets N mouthfuls of wells and Area of a well is S2, shale gas reservoir exploitation is carried out, to the residual area S in the area A of work areaIt is remainingIt gives over in the future Exploitation, SIt is remaining≥0。
2. according to the method described in claim 1, it is characterized by: Area of a well is equal to well control Area length and width Product.
CN201811449422.1A 2018-11-28 2018-11-28 Shale gas reservoir mining method Active CN109657299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811449422.1A CN109657299B (en) 2018-11-28 2018-11-28 Shale gas reservoir mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811449422.1A CN109657299B (en) 2018-11-28 2018-11-28 Shale gas reservoir mining method

Publications (2)

Publication Number Publication Date
CN109657299A true CN109657299A (en) 2019-04-19
CN109657299B CN109657299B (en) 2023-01-17

Family

ID=66111953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811449422.1A Active CN109657299B (en) 2018-11-28 2018-11-28 Shale gas reservoir mining method

Country Status (1)

Country Link
CN (1) CN109657299B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112241801A (en) * 2019-07-18 2021-01-19 中国石油天然气股份有限公司 Method and device for determining optimal development well spacing of shale gas

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606129A (en) * 2012-04-10 2012-07-25 中国海洋石油总公司 Method and system for thin interbed oilfield development
EP2550422A1 (en) * 2010-03-25 2013-01-30 Bruce A. Tunget Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining
CN103161434A (en) * 2013-04-07 2013-06-19 赵万福 Mining method for low permeability reservoir of shale gas and the like
CN104948163A (en) * 2014-03-24 2015-09-30 中国石油化工股份有限公司 Method for measuring shale gas well capacity
CN106150477A (en) * 2015-04-23 2016-11-23 中国石油化工股份有限公司 A kind of method determining single well controlled reserves

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2550422A1 (en) * 2010-03-25 2013-01-30 Bruce A. Tunget Pressure controlled well construction and operation systems and methods usable for hydrocarbon operations, storage and solution mining
CN102606129A (en) * 2012-04-10 2012-07-25 中国海洋石油总公司 Method and system for thin interbed oilfield development
CN103161434A (en) * 2013-04-07 2013-06-19 赵万福 Mining method for low permeability reservoir of shale gas and the like
CN104948163A (en) * 2014-03-24 2015-09-30 中国石油化工股份有限公司 Method for measuring shale gas well capacity
CN106150477A (en) * 2015-04-23 2016-11-23 中国石油化工股份有限公司 A kind of method determining single well controlled reserves

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
WILSON K C,ET AL.: "Optimization of shale gas field development using direct search techniques and reducedphysics models", 《JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING》 *
郭小哲等: "页岩气压裂水平井组布井参数研究", 《非常规油气》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112241801A (en) * 2019-07-18 2021-01-19 中国石油天然气股份有限公司 Method and device for determining optimal development well spacing of shale gas

Also Published As

Publication number Publication date
CN109657299B (en) 2023-01-17

Similar Documents

Publication Publication Date Title
CN109441422B (en) Shale gas well spacing optimization mining method
CN106869911B (en) Evaluation method for describing compressibility of shale reservoir
CN102041995B (en) System for monitoring complicated oil deposit flooding conditions
CN109209333B (en) Shale gas multi-well group efficient mining interval optimization method
CN110704888A (en) Unconventional oil and gas reservoir encrypted well volume fracturing construction parameter optimization design method
CN103573263B (en) The horizontal well stream of a kind of tight sandstone reservoir fracturing production is installed with meter method
CN104695950A (en) Prediction method for volcanic rock oil reservoir productivity
CN109236265B (en) Method for optimizing tight gas reservoir well pattern
CN103742130A (en) High permeability band characterization method based on time varying
CN110952976B (en) Single-well exploitation stable yield potential evaluation method in gas reservoir development mode
CN106408208B (en) Volume fracturing correctional effect evaluation method
CN111927417A (en) Shale gas staged fracturing horizontal well group reserve utilization condition evaluation method
Ailin et al. Technical measures of deliverability enhancement for mature gas fields: A case study of Carboniferous reservoirs in Wubaiti gas field, eastern Sichuan Basin, SW China
CN108952657A (en) A kind of horizontal well platform fracturing fracture length determining method and device
CN109577967A (en) Recover of Tight Sandstone Gas Reservoir recovery method
CN114427432A (en) Method for determining development potential of residual gas in gas reservoir
CN109657299A (en) Shale gas reservoir recovery method
CN111950111B (en) Dynamic analysis method suitable for open-bottom carbonate reservoir
CN107704646B (en) Modeling method after compact reservoir volume modification
CN108875115B (en) Method for determining rock strength
CN109339745A (en) Shale gas reservoir recovery method based on optimal Area of a well
CN115860266A (en) Shale gas/coal bed gas well productivity evaluation method and system and electronic equipment
Olsen et al. Waterflood performance evaluation in a chalk reservoir with an ensemble of tools
CN106845685B (en) Parameter optimization method for reducing horizontal well oil testing fracturing operation cost
CN109630103A (en) Recover of Tight Sandstone Gas Reservoir recovery method based on enrichment region

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Jia Ailin

Inventor after: Guo Jianlin

Inventor after: Yun Sheng Wei

Inventor after: Jia Chengye

Inventor after: Wang Junlei

Inventor before: Guo Jianlin

Inventor before: Jia Ailin

Inventor before: Yun Sheng Wei

Inventor before: Jia Chengye

Inventor before: Wang Junlei

GR01 Patent grant
GR01 Patent grant