CN109652643A - High quality sinter and preparation method thereof for COREX ironmaking technique of fusion and reduction - Google Patents

High quality sinter and preparation method thereof for COREX ironmaking technique of fusion and reduction Download PDF

Info

Publication number
CN109652643A
CN109652643A CN201910091107.4A CN201910091107A CN109652643A CN 109652643 A CN109652643 A CN 109652643A CN 201910091107 A CN201910091107 A CN 201910091107A CN 109652643 A CN109652643 A CN 109652643A
Authority
CN
China
Prior art keywords
sinter
iron
iron ore
ore concentrate
content
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910091107.4A
Other languages
Chinese (zh)
Other versions
CN109652643B (en
Inventor
朱德庆
潘建
郭正启
李启厚
薛钰霄
李思唯
田宏宇
石玥
鲁胜虎
徐继伟
王欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201910091107.4A priority Critical patent/CN109652643B/en
Publication of CN109652643A publication Critical patent/CN109652643A/en
Application granted granted Critical
Publication of CN109652643B publication Critical patent/CN109652643B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B1/00Preliminary treatment of ores or scrap
    • C22B1/14Agglomerating; Briquetting; Binding; Granulating
    • C22B1/16Sintering; Agglomerating
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B1/00Preliminary treatment of ores or scrap
    • C22B1/14Agglomerating; Briquetting; Binding; Granulating
    • C22B1/24Binding; Briquetting ; Granulating
    • C22B1/2406Binding; Briquetting ; Granulating pelletizing

Abstract

The sinter and preparation method thereof that the present invention provides a kind of for COREX ironmaking technique of fusion and reduction, the solid fuel that the iron ore concentrate of 30-50% and the flux 1 of 4-7% and 1.0-1.5% are distributed from iron ore concentrate total amount carries out ingredient, is made in fluxed after mixing with carbon green pellets;It by iron ore concentrate remaining after shunting and iron-bearing auxiliary material, returns mine, flux 2 and solid fuel progress ingredient, obtains mixture after mixing;Gained green pellets and mixture are subjected to mixing granulation, cloth, igniting, sintering, cooling, broken and screening again, sinter is obtained and returns mine.Sinter prepared by the above method is able to satisfy COREX shaft furnace to sinter low temperature reduction degradation value RDI when basicity is 1.8+6.3>=50% requirement, and sinter charge quality ratio can be greater than 50%, and the cost of iron-smelting furnace charge can be effectively reduced.

Description

High quality sinter and preparation method thereof for COREX ironmaking technique of fusion and reduction
Technical field
The present invention relates to field of steel metallurgy, in particular to a kind of high quality for COREX ironmaking technique of fusion and reduction Sinter and preparation method thereof.
Background technique
COREX be by Voestalpine exploitation it is a kind of make raw material using lump ore or pellet, make reducing agent using mill coal and The ironmaking technique of fusion and reduction of fuel.COREX technique is a kind of currently the only iron making by smelting reduction ironworker for realizing industrialized production Skill uses mill coal as the main disposable energy and reducing agent, and a small amount of coke is only used only, and can produce and blast furnace ironmaking The comparable molten iron of quality greatly reduces dependence of the iron-smelting process to high-quality metallurgical coke, have briquet replacing coke, process it is short, to ring The features such as border pollution is small meets the strategy of sustainable development requirement of China's steel and iron industry.Rich coal resources in China, mill coal storage Measure it is huge, develop COREX smelting reduction technology have congenital energy advantages.But the furnace charge of COREX ironmaking system is mainly ball Nodulizing and lump ore, and China's pellet production capacity is limited, high-quality lump ore scarcity of resources.Therefore, China is developing COREX melting and reducing When technique, the burden structure in external industrial production is continued to use, it is necessary to which outsourcing pelletizing or self-built pelletizing plant substantially increase COREX The cost of material of technique.On the other hand, sinter production capacity is chronically at superfluous state, existing capacity resources in Iron and Steel Enterprises in China It is not fully utilized.Sinter is largely used in COREX technique, can not only be reduced iron-smelting raw material cost, be promoted the technique Development in China, while the existing sinter capacity resources distribution of Iron and Steel Enterprises in China can be optimized.With pellet, lump ore phase Than the reducing property of sinter is preferable, and reduction degradation performance is then poor.According to existing knowhow, in COREX ironmaking system When using sinter, low temperature reduction degradation index of the strict control sinter in COREX shaft furnace is answered.Improve the low temperature of sinter also Former powder performance can be reduced percentage of damage and pulverization rate that sinter occurs when low-temperature region restores in COREX shaft furnace, improve The gas permeability of stock column in COREX shaft furnace, that improves sinter enters furnace ratio.
Adjusting Sinter Component using the method for ore matching is considered as a kind of raising sinter low-temperature reduction powder in blast furnace The effective ways of change, but limited by factors such as resources supplIes, ore matching costs, it is difficult to it promotes and applies;Currently, in the industrial production, The low-temperature reduction that most enterprises inhibit sinter in blast furnace using certain density chloride is sprayed to agglomerate surface Dusting has received good effect.But the chloride for bringing blast furnace into brings furnace wall damage, pipeline rotten to blast furnace process simultaneously The problems such as erosion and exhaust emission aggravation.
Chinese patent CN103409616A disclose it is a kind of inhibit iron ore sintering mine low temperature reduction degradation method, pass through by Iron ore concentrate be prepared into granularity be 3mm-15mm granulation material, then with sinter mixture mix, then cloth, bake with agglomeration;Pass through The dosage of solid fuel dosage and flux in a small amount of flux or solid fuel, optimization sinter mixture, drop are added in granulation material Low frit roasts suction pressure and sinter cooling velocity, so that the low temperature reduction degradation of sinter is suppressed, can effectively change The technical-economic index of kind blast furnace process.
Currently, the document of open report is directed to blast furnace ironmaking system, there is no both at home and abroad directly to for COREX work The technical research of the low reduction and pulverization ratio sinter preparation of skill or industrial report.
Summary of the invention
In order to solve the above-mentioned technical problems, the present invention provides a kind of for the high-quality of COREX ironmaking technique of fusion and reduction Measure sinter and preparation method thereof, it is therefore an objective to be sintered based on domestic iron ore concentrate, prepare with good quality index and It is higher enter furnace ratio sinter, and its low-temperature reduction disintegration in COREX shaft furnace is made to be able to satisfy requirement.
In order to achieve the above object, the technical scheme is that
A kind of preparation method of the high quality sinter for COREX ironmaking technique of fusion and reduction, includes the following steps:
1) preparation of green pellets
The iron ore concentrate that 30-50% is distributed from iron ore concentrate total amount, by the flux 1 of the smart iron ore and 4-7% and The solid fuel of 1.0-1.5% carries out ingredient, and green pellets is made after mixing;
Wherein, flux 1 includes quick lime, further includes one of lime stone, dolomite, magnesite or serpentine or more Kind;
2) preparation of mixture
By iron ore concentrate remaining after shunting and iron-bearing auxiliary material, return mine, flux 2 and solid fuel by mass parts ratio are (50-60): 5:(25-30): (16-29): (4-8) carries out ingredient, obtains mixture after mixing;
Wherein, the iron-bearing auxiliary material is one of steel mill's iron dust containing, iron content pelletizing and minus sieve containing iron ore or more Kind;Flux 2 includes lime stone, further includes one of quick lime, dolomite, magnesite or serpentine or a variety of;
3) preparation of sinter
Green pellets obtained by step 1) is mixed and pelletized with mixture obtained by step 2) again, obtains granulation material;To institute The material that must pelletize carries out cloth, igniting, sintering, cooling, broken and screening process, obtains sinter and returns mine;Wherein, gained is returned mine Return step 2) it continues to use.
Preferably, iron content is greater than 62.5% in the iron ore concentrate;Less than 0.074mm's in the iron ore concentrate granularity Grade mass content is greater than 40%.
Preferably, the solid fuel includes coke powder or anthracite.
Preferably, the basicity of green pellets described in step 1) is 0.8-1.2;The mass fraction of MgO is in the green pellets 1.2-1.8%.
Preferably, the diameter of green pellets described in step 1) is 8-20mm.
The present invention also provides a kind of sinters for COREX ironmaking technique of fusion and reduction, and the sinter is by above-mentioned A kind of method of anticipating is prepared.
Preferably, the partial size of the sinter is 5-40mm;The basicity of the sinter is 1.6-2.0;The sinter The content of middle MgO is 1.6-2.1%.
Preferably, COREX shaft furnace is able to satisfy to sinter low-temperature reduction when the sinter charge quality ratio is higher than 50% The requirement of powder performance.
In conventional sintering process, sinter basicity is greater than 1.8.Sinter basicity is higher, and sinter strength is higher, reduction Better, the low temperature reduction degradation index DRI of property+6.3And RDI+3.15Value it is higher, yield is higher, be more conducive to subsequent smelting procedure, For molten iron production cost with regard to low, fuel consumption is just few.When sinter basicity is lower than 1.2, belong to acid sinter ore, basicity is low, burns It ties mine intensity to increase, low-temperature reduction disintegration can improve, but energy consumption is high, low output.Sinter basicity in 1.4-1.6 intensity and Low-temperature reduction disintegration can be worst.Therefore, in order to smelt iron sinter for COREX technique, using conventional sintering process When, sinter basicity have to be larger than 2.4 and content of MgO be greater than 2.4%, sinter strength and low-temperature reduction disintegration are just able to satisfy It is required that and it enters furnace ratio only 20% or so at this time.Sinter basicity and the height of content of MgO are limited by subsequent smelting, sintering Mine basicity and content of MgO are higher, and the use ratio in subsequent smelting is lower.In order to reduce molten iron production cost, it is desirable to Sinter use ratio is improved in subsequent smelting, must just be reduced sinter basicity and content of MgO, necessarily be led to sinter strength It is deteriorated, low temperature reduction degradation index DRI+6.3And RDI+3.15Decline, won't does influence to subsequent smelting molten iron band, leads to hot metal output Decline, energy consumption rise.Therefore, its intensity and reproducibility, low-temperature reduction when sinter basicity and content of MgO reduce how to be solved Powder performance index remains unchanged substantially, so that ratio of the sinter in subsequent smelting process can be improved, improves business economic Benefit is of great significance.
Above scheme of the invention have it is following the utility model has the advantages that
(1) to may be implemented superelevation ratio using method provided by the invention iron ore concentrate sintered, even complete iron ore concentrate sintered, More reasonably utilize the self-produced iron ore concentrate resource of Iron and Steel Enterprises in China.Part iron ore concentrate is diverted in disc balling machine by this method Pelletizing is carried out, the green-ball with 8-20mm is prepared into, still routinely sintering process is handled other sintering deposit raw materials, after one is mixed and raw Ball mixing carries out two and is blended grain, improves the gas permeability of sinter bed, significantly improves vertical sintering speed and usage factor, overcomes The problem of bed permeability is poor when full concentrate sintering in conventional sintering technique, Sintering Operation Index index error.
(2) method provided by the invention is used, in the case where being sintered mineral products totality basicity and content of MgO is stablized, is led to It crosses and adds a small amount of flux (quick lime, lime stone and dolomite) and solid fuel into shunting iron ore concentrate, green-ball basicity is controlled Within the scope of fluxed pellets, content of MgO properly increase, to improve the intensity of pellet part, improve the low of nodulizing part Warm reduction degradation performance;The mixture basicity of conventional sintering process processing part is improved, content of MgO decline, burns this part Knot mine intensity increases, low-temperature reduction disintegration can improve.Make the mineral composition of final finished sinter and micro- by the above measure Seeing structure is improved, and is ultimately formed the good embedding cloth of pellet of intensity high and low temperature reduction degradation performance and is restored in intensity high and low temperature Embedded structure in the good sinter of powder performance, so that final finished product sinter strength is increased, low temperature reduction degradation Value DRI+6.3And RDI+3.15It increases.Finished product sinter prepared by the present invention is used to can satisfy COREX shaft furnace when basicity is 1.8 To sinter low temperature reduction degradation value RDI+6.3>=50%, RDI+3.15>=70% requirement, and can ensure that sinter is refined in COREX When the mass percent of iron-containing charge reaches 50% or more in iron series system, reducing gas rises unobstructed, furnace in COREX shaft furnace at this time Expect prereduction reaction sufficiently, shaft furnace runs smoothly, and reduces iron-smelting furnace charge cost.Meanwhile considerably reducing COREX ironmaking work Dependence of the skill to coke is the significant development to the blast furnace technology of heavy dependence coke oven ironmaking.
Detailed description of the invention
Fig. 1 is process flow chart of the invention.
Specific embodiment
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool Body embodiment is described in detail.
Comparative example 1
When sinter basicity control is in 1.8, content of MgO control 1.3%, when routinely sintering process prepares sinter, It by iron ore concentrate and iron-bearing auxiliary material (including steel mill's iron dust containing and iron content pelletizing) and returns mine, quick lime, lime stone and white clouds first Stone and solid fuel (coal dust) weighed by following mass fraction (95:5:30:4:6:6:7), ingredient, meets subsequent smelting pair The requirement of sinter chemical analysis, then carries out mixed once (mixing), secondary mixing (granulation) by conventional sintering technique requirement, most The granulation cloth of material, igniting, sintering, cooling, whole grain screening are carried out on sintering machine afterwards, preparing finished product sinter, (partial size is 5-40mm) and return mine (- 5mm).In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min is sintered negative pressure 12kPa, cooling negative pressure 5kPa are sintered under conditions of cooling time 5min.Gained sinter yield rate is 69.60%, is turned Drum intensity is 57.60%, and usage factor (yield) is 1.40tm-2·h-1, solid burnup 35.02kgt-1, COREX is perpendicular Furnace low-temperature reduction disintegration energy RDI+6.3For 23.32%, RDI+3.15It is 57.91%.In basicity 1.8, sinter strength is poor, benefit It is low with coefficient, low-temperature reduction disintegration energy RDI+6.3And RDI+3.15It is far below and requires index.
Comparative example 2
When sinter basicity control is in 2.0, content of MgO control 1.5%, when routinely sintering process prepares sinter, It by iron ore concentrate and iron-bearing auxiliary material (including steel mill's iron dust containing and iron content pelletizing) and returns mine, quick lime, lime stone and white clouds first Stone and solid fuel (coke powder) weighed by certain mass score (92:5:30:4:8:7:7), ingredient, meets subsequent smelting pair The requirement of sinter chemical analysis, then carries out mixed once (mixing), secondary mixing (granulation) by conventional sintering technique requirement, most Cloth, the igniting, sintering, cooling, whole grain screening for carrying out granulation material on sintering machine afterwards, prepare finished product sinter and return mine (partial size is less than 5mm).In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min is sintered negative pressure 12kPa, It is sintered under conditions of cooling negative pressure 5kPa, cooling time 5min.Gained sinter yield rate is 71.36%, drum strength It is 60.24%, usage factor 1.57tm-2·h-1, solid burnup 37.02kgt-1, COREX shaft furnace low-temperature reduction powder Change performance RDI+6.3For 41.56%, RDI+3.15It is 64.78%.In basicity 2.0, sinter strength and the aobvious raising of yield.With it is right Ratio 1 is compared, sinter performance indexes be improved significantly.But low-temperature reduction disintegration energy RDI+6.3And RDI+3.15 It is far below and requires index.
Comparative example 3
When sinter basicity control is in 2.4, content of MgO control 2.0%, when routinely sintering process prepares sinter, It by iron ore concentrate and iron-bearing auxiliary material (including steel mill's iron dust containing) and returns mine, quick lime, lime stone, dolomite and solid fuel first (coal dust) by a certain percentage (90:5:30:4:10:8:6) weighed, ingredient, meet subsequent smelting to sinter chemical analysis It is required that mixed once (mixing), secondary mixing (granulation) then are carried out by conventional sintering technique requirement, it is finally enterprising in sintering machine The cloth of row granulation material, igniting, sintering, cooling, whole grain screening prepare finished product sinter and return mine (partial size is less than 5mm).? Sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min are sintered negative pressure 12kPa, cooling negative pressure 5kPa, cooling It is sintered under conditions of time 5min.Gained sinter yield rate is 73.36%, drum strength 65.24%, usage factor For 1.63tm-2·h-1, solid burnup 38.01kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 56.23%, RDI+3.15It is 70.32%.In basicity 2.4, sinter strength and yield are further increased, low-temperature reduction disintegration It can RDI+6.3And RDI+3.15Reach requirement index.It is calculated according to subsequent smelting burden structure, at this point, basicity is 2.5 The mass percent that sinter enters furnace is 30%.Compared with comparative example 1,2, only basicity is increased to 2.4 and content of MgO control When 2.0%, low-temperature reduction disintegration energy RDI+6.3And RDI+3.15Reach requirement index, but its charge quality is than being only 30%.
Comparative example 4
When sinter basicity control is in 2.6, content of MgO control 2.4%, when routinely sintering process prepares sinter, It by iron ore concentrate and iron-bearing auxiliary material (including steel mill's iron dust containing, iron content pelletizing and minus sieve containing iron ore) and returns mine first, give birth to stone Ash, lime stone, dolomite and solid fuel (coke powder) in proportion (88:5:30:4:11:10:5) weighed, ingredient, after satisfaction It is continuous to smelt to the requirement of sinter chemical analysis, then mixed once (mixing), secondary mixing are carried out by conventional sintering technique requirement (granulation) finally carries out cloth, the igniting, sintering, cooling, whole grain screening of granulation material on sintering machine, prepares finished product sintering Mine and return mine (partial size is less than 5mm).In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min is sintered negative It presses 12kPa, is sintered under conditions of cooling negative pressure 5kPa, cooling time 5min.Gained sinter yield rate is 69.25%, Drum strength is 65.27%, usage factor 1.43tm-2·h-1, solid burnup 36.56kgt-1, COREX shaft furnace is low Warm reduction degradation performance RDI+6.3For 62.18%, RDI+3.15It is 80.64%.In basicity 2.4, sinter strength and yield into One step improves, low-temperature reduction disintegration energy RDI+6.3And RDI+3.15Reach requirement index.According to subsequent smelting burden structure into Row calculates, at this point, the mass percent that the sinter that basicity is 2.5 enters furnace is 25%.
Compare comparative example 1-4 as it can be seen that preparing sinter using conventional sintering process, improve sinter basicity and content of MgO, Sinter strength and yield can be improved, improve sinter low-temperature reduction disintegration energy.Since basicity and content of MgO are in sinter In be uniformly distributed, sinter basicity is only increased to 2.4-2.6, when content of MgO is increased to 2.0-2.4%, sinter low temperature Reduction degradation value RDI+6.3And RDI+3.15It is just able to satisfy subsequent smelting and requires (RDI+6.3>=50%, RDI+3.15>=70%), and When sinter charge quality percentage should control in 25-30%, the balance of basicity of slag and content of MgO could be maintained.Therefore, Using conventional sintering process, it only cannot reach raising sinter charge quality ratio by improving sinter basicity and content of MgO, reduce The purpose of molten iron production cost.
Embodiment 1
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 1.6%.In iron ore concentrate total amount 30% iron ore concentrate is diverted, is added accounts for the smart iron ore 2.5% of shunting gained thereto Fine grinding quick lime, 4% dolomite and 1.4% solid fuel (coke powder) carry out ingredient, mix, obtain mixture 1, wherein Iron ore concentrate granularity -0.074mm > 40%, iron content are greater than 62.5%.Mixture 1 is made in disc balling machine is directly The green-ball of 8mm-20mm, green-ball basicity (CaO and SiO2The ratio of mass percent) it is 1.0, content of MgO 1.8%, solid combustion Expect that mass ratio is 1.4%.
By 70% iron ore concentrate in iron ore concentrate total amount and iron-bearing auxiliary material (including steel mill's iron dust containing, iron content pelletizing) with return Mine, quick lime, lime stone, dolomite and solid fuel are weighed by following mass fraction (60:5:28:3:10:3:7), are matched Material, and mixed once processing is carried out by conventional sintering technique, obtain mixture 2.
Then green-ball and mixture 2 are subjected in trommel mixer second of mixing granulation, obtain granulation material, finally will Granulation material carries out cloth, igniting, sintering, cooling, broken, screening on sintering machine, obtains finished product sinter (partial size 5- 40mm) and return mine (partial size is less than 5mm).
In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min is sintered negative pressure 12kPa, cooling negative Press 5kPa, cooling time 5min.Gained sinter yield rate is 70.05%, drum strength 66.29%, and usage factor is 1.53t·m-2·h-1, solid burnup 34.56kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 69.36%, RDI+3.15It is 75.64%.
Compared with comparative example 3-4,1.8, content of MgO is dropped to by 2.4-2.6 in sinter basicity and is declined by 2.0-2.4% When to 1.6%, not only sinter strength is high, low-temperature reduction disintegration energy RDI+6.3Greater than 50%, RDI+3.15Greater than 70%;It is remote excellent In the performance indexes of comparative example 1-2.And enters furnace ratio and can be increased to 50% by 25-30%.
Embodiment 2
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 1.6%.In iron ore concentrate total amount 50% iron ore concentrate is diverted, is added accounts for the smart iron ore 3% of shunting gained thereto Fine grinding quick lime, 3.5% dolomite and 1.2% solid fuel (anchracite duff) carry out ingredient, mix, and obtain mixture 1, Wherein iron ore concentrate granularity -0.074mm > 40%, iron content are greater than 62.5%.Mixture is made directly in disc balling machine For 8mm-20, green-ball basicity is 1.2, content of MgO 1.7%, solid fuel mass ratio is 1.2%.
By 50% iron ore concentrate in iron ore concentrate total amount and iron-bearing auxiliary material (including steel mill's iron dust containing, iron content pelletizing) with return Mine, quick lime, lime stone, dolomite and solid fuel are weighed and are matched by following mass fraction (50:5:30:3:15:5:6) Material, and mixed once processing is carried out by conventional sintering technique, obtain mixture 2.
Then green pellets and mixture 2 are mixed, carries out mixing granulation in trommel mixer by conventional sintering technique, obtains Expect to granulation, then granulation material is subjected to cloth, igniting, sintering, cooling, broken, screening on sintering machine, obtains finished product sintering Mine (partial size 5-40mm) and return mine (partial size be less than 5mm).
In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min, sinter bed height 700mm are burnt It ties negative pressure 12kPa, is sintered under conditions of cooling negative pressure 5kPa, cooling time 5min, gained sinter yield rate is 70.26%, drum strength 60.60%, usage factor 1.60tm-2·h-1, solid burnup 35.06kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 56.67%, RDI+3.15It is 75.69%.
Compared with Example 1, it is increased to 50% by 30% due to shunting iron ore concentrate ratio, green-ball ratio increases in granulation material Add, material grain partial size increases, and permeability of sintering material bed improves, and Sintering Yield improves, and usage factor increases, under sinter strength Drop, but low-temperature reduction disintegration energy RDI+6.3And RDI+3.15It remains to reach required value, the sinter of preparation remains to do subsequent CCOREX iron-smelting process furnace charge.
Compared with comparative example 3-4,1.8, content of MgO is dropped to by 2.4-2.6 in sinter basicity and is declined by 2.0-2.4% When to 1.6%, not only sinter strength is high, low-temperature reduction disintegration energy RDI+6.3Greater than 50%, RDI+3.15Greater than 70%, it is better than Comparative example 3-4, the farther performance indexes better than comparative example 1-2.And enters furnace ratio and can be increased to 50% by 25-30%.
Embodiment 3
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 1.6%.In iron ore concentrate total amount 60% iron ore concentrate is diverted, is added accounts for the smart iron ore 2% of shunting gained thereto Fine grinding quick lime, 2.5% magnesite and 1.4% solid fuel (coke powder) carry out ingredient, mix, and obtain mixture 1, wherein iron essence Ore particle degree -0.074mm > 40%, iron content are greater than 62.5%.Mixture is made directly in disc balling machine as 8mm- The green-ball of 20mm, green-ball basicity are 0.8, and content of MgO 1.0%, solid fuel mass ratio is 1.4%.
By 40% iron ore concentrate in iron ore concentrate total amount and iron-bearing auxiliary material (including steel mill's iron dust containing, iron content pelletizing and iron content Lump ore minus sieve) with return mine, quick lime, lime stone, serpentine and fuel are by following mass fraction (50:5:28:3:19:5:4) Weighing and ingredient are carried out, and carries out mixed once processing by conventional sintering technique, obtains mixture 2.
Then green pellets and mixture 2 are mixed, carries out mixing granulation in trommel mixer by conventional sintering technique, obtains Expect to granulation, then granulation material is subjected to cloth, igniting, sintering, cooling, broken, screening on sintering machine, obtains finished product sintering Mine (partial size 5-40mm) and return mine (partial size be less than 5mm).
In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min, sinter bed height 700mm are burnt It ties negative pressure 12kPa, is sintered under conditions of cooling negative pressure 5kPa, cooling time 5min, gained sinter yield rate is 68.79%, drum strength 57.89%, usage factor 1.45tm-2·h-1, solid burnup 38.56kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 47.67%, RDI+3.15It is 68.34%.
Compared with embodiment 1 and embodiment 2, it is increased to 60% by 30% and 50% due to shunting iron ore concentrate ratio, system Green-ball ratio further increases in pellet, and material grain partial size is excessive, and permeability of sintering material bed is very good, causes sintering velocity too fast, burns Knot mineral products amount and intensity decline.And low-temperature reduction disintegration energy RDI+6.3And RDI+3.15It is decreased obviously, cannot meet the requirements.
Compared with comparative example 3-4,1.8, content of MgO is dropped to by 2.4-2.6 in sinter basicity and is declined by 2.0-2.4% When to 1.6%, since shunt ratio is up to 60%, not only sinter strength and yield decline, but also low-temperature reduction disintegration energy RDI+6.3And RDI+3.15Although being apparently higher than comparative example, it is not able to satisfy into furnace requirement.Therefore, when iron ore concentrate shunt ratio reaches When 60%, obtained sinter cannot enter furnace.
Embodiment 4
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 1.6%.In iron ore concentrate total amount 15% iron ore concentrate is diverted, is added accounts for the smart iron ore 2% of shunting gained thereto Fine grinding quick lime, 2% dolomite and 1.4% solid fuel (coke powder) carry out ingredient, mix, and obtain mixture 1, wherein iron Granularity of concentrate -0.074mm > 40%, iron content are greater than 62.5%.Mixture is made directly in disc balling machine as 8mm- The green-ball of 20mm, green-ball basicity are 0.6, and content of MgO 0.8%, solid fuel mass ratio is 1.4%.
By 85% iron ore concentrate in iron ore concentrate total amount and iron-bearing auxiliary material (including iron content pelletizing and minus sieve containing iron ore) with It returns mine, quick lime, lime stone, serpentine and fuel are weighed and matched by following mass fraction (55:5:29:3:16:8:8) Material, and mixed once processing is carried out by conventional sintering technique, obtain mixture 2.
Then green pellets and mixture 2 are mixed, carries out mixing granulation in trommel mixer by conventional sintering technique, obtains Expect to granulation, then granulation material is subjected to cloth, igniting, sintering, cooling, broken, screening on sintering machine, obtains finished product sintering Mine (partial size 5-40mm) and return mine (partial size be less than 5mm).
In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min, sinter bed height 700mm are burnt It ties negative pressure 12kPa, is sintered under conditions of cooling negative pressure 5kPa, cooling time 5min, gained sinter yield rate is 67.21%, drum strength 59.93%, usage factor 1.40tm-2·h-1, solid burnup 38.56kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 29.21%, RDI+3.15It is 66.16%.
Compared with embodiment 1- embodiment 3, it is reduced to 15% by 30%-60% due to shunting iron ore concentrate ratio, granulation material Middle green-ball ratio is relatively low, and material grain partial size is less than normal, and permeability of sintering material bed is bad, and sintering velocity is caused to be decreased obviously, and is sintered mineral products Amount and intensity decline.And low-temperature reduction disintegration energy RDI+6.3And RDI+3.15Also it is decreased obviously, cannot meet the requirements.
Compared with comparative example 3-4,1.8, content of MgO is dropped to by 2.4-2.6 in sinter basicity and is declined by 2.0-2.4% When to 1.6%, since shunt ratio is relatively low, not only sinter strength, yield are decreased obviously, but also low-temperature reduction disintegration energy RDI+6.3And RDI+3.15Slightly above comparative example, but be not able to satisfy into furnace requirement.Therefore, when iron ore concentrate shunt ratio is as low as 15% When, obtained sinter cannot enter furnace.
To sum up embodiment 1-4 is as it can be seen that the shunt ratio that iron ore concentrate is suitable for should be controlled in 30-50%.
Embodiment 5
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 1.8%.In iron ore concentrate total amount 30% iron ore concentrate is diverted, is added accounts for the smart iron ore 2.5% of shunting gained thereto Fine grinding quick lime, 2.7% lime stone and 0.6% solid fuel (anchracite duff) carry out ingredient, mix, obtain mixture 1, wherein iron ore concentrate granularity -0.074mm > 40%, iron content are greater than 62.5%.Mixture 1 is made in disc balling machine It is directly the green-ball of 8mm-20mm, green-ball basicity is 1.0, and content of MgO 1.3%, solid fuel mass ratio is 0.6%.
By 70% iron ore concentrate in iron ore concentrate total amount and iron-bearing auxiliary material (iron content pelletizing) with return mine, it is quick lime, lime stone, white Marble and solid fuel carry out weighing and ingredient by following mass fraction (60:5:29:3:14:7:6), and press conventional sintering technique Mixed once processing is carried out, mixture 2 is obtained.
Then green-ball and mixture 2 are subjected in trommel mixer second of mixing granulation, obtain granulation material, finally will Granulation material carries out cloth, igniting, sintering, cooling, broken, screening on sintering machine, and obtaining finished product sinter, (partial size is less than 5- 40mm) and return mine (partial size 5mm).
In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min is sintered negative pressure 12kPa, cooling negative Press 5kPa, cooling time 5min.Gained sinter yield rate is 69.70%, drum strength 57.52%, and usage factor is 1.62t·m-2·h-1, solid burnup 36.16kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 41.20%, RDI+3.15It is 71.32%.
Compared with Example 1, since in iron ore concentrate total amount 30% iron ore concentrate is diverted made of the mixture 1 of composition Solid fuel ratio drops to 0.6% by 1.4% in green-ball, and content of MgO drops to 1.3% by 1.8%, leads to ball in sinter Group's partial heat is inadequate, so that Sintering Yield and intensity decline.The decline of solid fuel proportion, ferrous oxide content in green-ball It reduces, low-temperature reduction disintegration can be deteriorated.Finally it is embodied in the intensity and low-temperature reduction disintegration energy of sintering mineral products RDI+6.3And RDI+3.15Also it is decreased obviously, cannot meet the requirements.
Embodiment 6
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 1.8%.In iron ore concentrate total amount 30% iron ore concentrate is diverted, is added accounts for the smart iron ore 2.5% of shunting gained thereto Fine grinding quick lime, 3.0% serpentine and 1.0% solid fuel (anchracite duff) carry out ingredient, mix, obtain mixture 1, wherein iron ore concentrate granularity -0.074mm > 40%, iron content are greater than 62.5%.Mixture 1 is made in disc balling machine It is directly the green-ball of 8mm-20mm, green-ball basicity is 1.0, and content of MgO 1.5%, solid fuel mass ratio is 1.0%.
By 70% iron ore concentrate in iron ore concentrate total amount and iron-bearing auxiliary material (including steel mill's iron dust containing and containing under iron ore sieve Powder) with return mine, quick lime, lime stone, magnesite and solid fuel are carried out by following mass fraction (60:5:29:3:13:7:7) Weighing and ingredient, and mixed once processing is carried out by conventional sintering technique, obtain mixture 2.
Then green-ball and mixture 2 are subjected in trommel mixer second of mixing granulation, obtain granulation material, finally will Granulation material carries out cloth, igniting, sintering, cooling, broken, screening on sintering machine, obtains finished product sinter (partial size 5- 40mm) and return mine (partial size is less than 5mm).
In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min is sintered negative pressure 12kPa, cooling negative Press 5kPa, cooling time 5min.Gained sinter yield rate is 70.25%, drum strength 60.68%, and usage factor is 1.59t·m-2·h-1, solid burnup 37.16kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 50.20%, RDI+3.15It is 73.32%.
Compared with Example 1, since in iron ore concentrate total amount 30% iron ore concentrate is diverted made of the mixture 1 of composition Solid fuel ratio drops to 1.0% by 1.4% in green-ball, and content of MgO drops to 1.5% by 1.8%, leads to ball in sinter Group's partial heat is inadequate, so that Sintering Yield and intensity decline.The decline of solid fuel proportion, ferrous oxide content in green-ball It reduces, low-temperature reduction disintegration can be deteriorated.Finally it is embodied in the intensity and low-temperature reduction disintegration energy of sintering mineral products RDI+6.3And RDI+3.15Decline, but can also meet the requirements.
Compared with Example 5, solid fuel ratio by 0.6% is increased to 1.0% in green-ball, and content of MgO is improved by 1.3% To 1.5%, green-ball sintering institute's calorific requirement is increased, while being conducive to improve the ferrous oxide content of pelletizing, therefore, be sintered mineral products The intensity and low-temperature reduction disintegration energy RDI of product+6.3And RDI+3.15Improved.
Embodiment 7
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 1.8%.In iron ore concentrate total amount 30% iron ore concentrate is diverted, is added accounts for the smart iron ore 2% of shunting gained thereto Fine grinding quick lime, 3% dolomite and 1% solid fuel (coke powder) carry out ingredient, mix, and obtain mixture 1, wherein iron essence Ore particle degree -0.074mm > 40%, iron content are greater than 62.5%.Mixture 1 is made directly as 8mm- in disc balling machine The green-ball of 20mm, green-ball basicity are 0.8, and content of MgO 1.5%, solid fuel mass ratio is 1.0%.
70% iron ore concentrate in iron ore concentrate total amount and iron-bearing auxiliary material (including iron dust containing, iron content pelletizing and are contained into iron ore Minus sieve) with return mine, quick lime, lime stone, dolomite and solid fuel are by following mass fraction (60:5:27:3:16:7:6) Weighing and ingredient are carried out, and carries out mixed once processing by conventional sintering technique, obtains mixture 2.
Then green-ball and mixture 2 are subjected in trommel mixer second of mixing granulation, obtain granulation material, finally will Granulation material carries out cloth, igniting, sintering, cooling, broken, screening on sintering machine, obtains finished product sinter (partial size 5- 40mm) and return mine (partial size is less than 5mm).
In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min is sintered negative pressure 12kPa, cooling negative Press 5kPa, cooling time 5min.Gained sinter yield rate is 69.29%, drum strength 58.68%, and usage factor is 1.45t·m-2·h-1, solid burnup 38.19kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 46.23%, RDI+3.15It is 68.33%.
Compared with Example 1, when green-ball basicity by 1.0 drop to 0.8 and content of MgO by 1.8% drop to 1.5%, When other conditions are constant, sinter strength decline, low-temperature reduction disintegration energy RDI+6.3And RDI+3.15It cannot meet the requirements.
As it can be seen that the desired solid fuel ratio in green-ball is 1.0-1.4%, basicity is by integrated embodiment 1 and embodiment 4-7 1.0-1.2, content of MgO 1.2-1.8% shunt sinter strength and low-temperature reduction disintegration energy index that pelletizing is sintered It is able to satisfy the requirement of subsequent smelting.
Embodiment 8
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 2.1%.In iron ore concentrate total amount 30% iron ore concentrate is diverted, is added accounts for the smart iron ore 3% of shunting gained thereto Fine grinding quick lime, 2.8% dolomite and 1% solid fuel (anchracite duff) carry out ingredient, mix, and obtain mixture 1, Middle iron ore concentrate granularity -0.074mm > 40%, iron content are greater than 62.5%.Mixture 1 is made directly in disc balling machine For the green-ball of 8mm-20mm, green-ball basicity is 1.2, and content of MgO 1.5%, solid fuel mass ratio is 1.0%.
By account for all iron-bearing material percentages 70% iron ore concentrate and iron-bearing auxiliary material (including iron dust containing, iron content pelletizing and Minus sieve containing iron ore) with return mine, quick lime, lime stone, serpentine and fuel by following mass fraction (57:5:30:3:14: Weighing and burden 9:6) is carried out, and carries out mixed once processing by conventional sintering technique, obtains mixture 2.
Then green pellets and mixture 2 are mixed, carries out mixing granulation in trommel mixer by conventional sintering technique, obtains Expect to granulation, then granulation material is subjected to cloth, igniting, sintering, cooling, broken, screening on sintering machine, obtains finished product sintering Mine (partial size 5-40mm) and return mine (partial size be less than 5mm).In sinter bed height 700mm, firing temperature 1100, the duration of ignition 1.5min, is sintered negative pressure 12kPa, cooling negative pressure 5kPa, is sintered under conditions of cooling time 5min.Gained sinter finished product Rate is 70.06%, drum strength 58.60%, usage factor 1.72tm-2·h-1, solid burnup 37.40kgt-1, COREX shaft furnace low-temperature reduction disintegration energy RDI+6.3For 67.62%, RDI+3.15It is 85.45%.
Compared with embodiment 1, embodiment 2, when sinter totality content of MgO is increased to 2.1% by 1.6%, sinter Intensity decline is more, but low-temperature reduction disintegration energy index makes moderate progress, and is much better than index of correlation requirement, is able to satisfy and wants into furnace It asks.
Embodiment 9
Requirement according to subsequent smelting to furnace sinter quality percentage 50% is entered, design sinter basicity are 1.8, MgO Content 2.1%.In iron ore concentrate total amount 30% iron ore concentrate is diverted, is added accounts for the smart iron ore 3% of shunting gained thereto Fine grinding quick lime, 3.5% dolomite and 1.5% solid fuel (anchracite duff) carry out ingredient, mix, and obtain mixture 1, Wherein iron ore concentrate granularity -0.074mm > 40%, iron content are greater than 62.5%.Mixture 1 is made directly in disc balling machine It is connected in the green-ball of 8mm-20mm, green-ball basicity is 1.2, and content of MgO 1.7%, solid fuel mass ratio is 1.5%.
By account for all iron-bearing material percentages 70% iron ore concentrate and iron-bearing auxiliary material (including iron dust containing, iron content pelletizing and Minus sieve containing iron ore) with return mine, quick lime, lime stone, dolomite and fuel by following mass fraction (60:5:26:3:14: Weighing and burden 10:6) is carried out, and carries out mixed once processing by conventional sintering technique, obtains mixture 2.
Then green pellets and mixture 2 are mixed, carries out mixing granulation in trommel mixer by conventional sintering technique, obtains Expect to granulation, then granulation material is subjected to cloth, igniting, sintering, cooling, broken, screening on sintering machine, obtains finished product sintering Mine (partial size 5-40mm) and return mine (partial size be less than 5mm).
In sinter bed height 700mm, firing temperature 1100, duration of ignition 1.5min is sintered negative pressure 12kPa, cooling negative 5kPa is pressed, is sintered under conditions of cooling time 5min.Gained sinter yield rate is 70.10%, and drum strength is 59.20%, usage factor 1.70tm-2·h-1, solid burnup 38.85kgt-1, COREX shaft furnace low temperature reduction degradation Performance RDI+6.3For 69.62%, RDI+3.15It is 87.45%.
Compared with embodiment 8 and embodiment 1, when sinter totality content of MgO is increased to 2.1% by 1.6%, in green-ball Content of MgO accordingly increase, it is necessary to the fuel ratio in green-ball is improved, so that the sintering temperature of pelletizing is improved, so as to improve it Intensity and low-temperature reduction disintegration energy.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principles of the present invention, it can also make several improvements and retouch, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of preparation method of the high quality sinter for COREX ironmaking technique of fusion and reduction, which is characterized in that including such as Lower step:
1) preparation of green pellets
The iron ore concentrate that 30-50% is distributed from iron ore concentrate total amount, by the flux 1 and 1.0- of the smart iron ore and 4-7% 1.5% solid fuel carries out ingredient, and green pellets is made after mixing;
Wherein, the flux 1 includes quick lime, further includes one of lime stone, dolomite, magnesite or serpentine or more Kind;
2) preparation of mixture
By iron ore concentrate remaining after shunting and iron-bearing auxiliary material, return mine, flux 2 and solid fuel by mass parts ratio are (50- 60): 5:(25-30): (16-29): (4-8) carries out ingredient, obtains mixture after mixing;
Wherein, the iron-bearing auxiliary material is one of steel mill's iron dust containing, iron content pelletizing and minus sieve containing iron ore or a variety of;Institute Stating flux 2 includes lime stone, further includes one of quick lime, dolomite, magnesite or serpentine or a variety of;
3) preparation of sinter
Green pellets obtained by step 1) is mixed and pelletized with mixture obtained by step 2) again, obtains granulation material;To gained system Pellet carries out cloth, igniting, sintering, cooling, broken and screening process, obtains sinter and returns mine;Wherein, gained is returned mine return Step 2) continues to use.
2. preparation method according to claim 1, which is characterized in that iron content is greater than 62.5% in the iron ore concentrate; Grade mass content in the iron ore concentrate granularity less than 0.074mm is greater than 40%.
3. preparation method according to claim 1, which is characterized in that the solid fuel includes coke powder or anchracite duff.
4. preparation method according to claim 1, which is characterized in that the basicity of green pellets described in step 1) is 0.8-1.2; The mass fraction of MgO is 1.2-1.8% in the green pellets.
5. preparation method according to claim 1, which is characterized in that the diameter of green pellets described in step 1) is 8-20mm.
6. a kind of sinter for COREX ironmaking technique of fusion and reduction, which is characterized in that the sinter is by claim 1- 5 any one the methods are prepared.
7. sinter according to claim 6, which is characterized in that the granularity of the sinter is 5-40mm;The sinter Basicity be 1.6-2.0;The content of MgO is 1.6-2.1% in the sinter.
8. sinter described according to claim 6 or 7, which is characterized in that energy when the sinter charge quality ratio is higher than 50% Meet requirement of the COREX shaft furnace to sinter low-temperature reduction disintegration energy.
CN201910091107.4A 2019-01-30 2019-01-30 High-quality sinter for COREX smelting reduction iron-making process and preparation method thereof Active CN109652643B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910091107.4A CN109652643B (en) 2019-01-30 2019-01-30 High-quality sinter for COREX smelting reduction iron-making process and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910091107.4A CN109652643B (en) 2019-01-30 2019-01-30 High-quality sinter for COREX smelting reduction iron-making process and preparation method thereof

Publications (2)

Publication Number Publication Date
CN109652643A true CN109652643A (en) 2019-04-19
CN109652643B CN109652643B (en) 2020-09-01

Family

ID=66121009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910091107.4A Active CN109652643B (en) 2019-01-30 2019-01-30 High-quality sinter for COREX smelting reduction iron-making process and preparation method thereof

Country Status (1)

Country Link
CN (1) CN109652643B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110257579A (en) * 2019-06-20 2019-09-20 新疆八一钢铁股份有限公司 A kind of technique for smelting schreyerite with Ou Ye furnace
CN112824547A (en) * 2019-11-21 2021-05-21 上海梅山钢铁股份有限公司 Method for producing sintered ore from high-alumina iron ore powder
CN113943858A (en) * 2021-09-13 2022-01-18 包头钢铁(集团)有限责任公司 Method for improving low-temperature reduction degradation index of sinter
CN114540615A (en) * 2022-01-19 2022-05-27 中南大学 Sintering process of iron ore powder pellets
CN114763583A (en) * 2021-01-15 2022-07-19 宝山钢铁股份有限公司 Preparation method of iron ore powder cold briquetting and application of iron ore powder cold briquetting

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61288022A (en) * 1985-06-13 1986-12-18 Nisshin Steel Co Ltd Sintering method for iron ore
JP2002226920A (en) * 2001-01-31 2002-08-14 Nkk Corp Sintered ore manufacturing method, and sintered ore
CN1392273A (en) * 2001-06-15 2003-01-22 中南大学 Process for preparing high iron low silicon agglomerate
CN1844420A (en) * 2006-03-14 2006-10-11 中南大学 Method for producing sintered mineral with middle and low basicity
CN1924035A (en) * 2005-09-01 2007-03-07 中南大学 Composite agglomeration technology of iron powdered ore
CN103409616A (en) * 2013-09-05 2013-11-27 中南大学 Method for inhibiting low-temperature reduction degradation of sintering ore of iron ore

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61288022A (en) * 1985-06-13 1986-12-18 Nisshin Steel Co Ltd Sintering method for iron ore
JP2002226920A (en) * 2001-01-31 2002-08-14 Nkk Corp Sintered ore manufacturing method, and sintered ore
CN1392273A (en) * 2001-06-15 2003-01-22 中南大学 Process for preparing high iron low silicon agglomerate
CN1924035A (en) * 2005-09-01 2007-03-07 中南大学 Composite agglomeration technology of iron powdered ore
CN1844420A (en) * 2006-03-14 2006-10-11 中南大学 Method for producing sintered mineral with middle and low basicity
CN103409616A (en) * 2013-09-05 2013-11-27 中南大学 Method for inhibiting low-temperature reduction degradation of sintering ore of iron ore

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110257579A (en) * 2019-06-20 2019-09-20 新疆八一钢铁股份有限公司 A kind of technique for smelting schreyerite with Ou Ye furnace
CN110257579B (en) * 2019-06-20 2020-12-25 新疆八一钢铁股份有限公司 Process for smelting schreyerite by using Ou smelting furnace
CN112824547A (en) * 2019-11-21 2021-05-21 上海梅山钢铁股份有限公司 Method for producing sintered ore from high-alumina iron ore powder
CN114763583A (en) * 2021-01-15 2022-07-19 宝山钢铁股份有限公司 Preparation method of iron ore powder cold briquetting and application of iron ore powder cold briquetting
CN114763583B (en) * 2021-01-15 2023-09-12 宝山钢铁股份有限公司 Preparation method of iron ore powder cold-pressed pellet and application of iron ore powder cold-pressed pellet
CN113943858A (en) * 2021-09-13 2022-01-18 包头钢铁(集团)有限责任公司 Method for improving low-temperature reduction degradation index of sinter
CN114540615A (en) * 2022-01-19 2022-05-27 中南大学 Sintering process of iron ore powder pellets
CN114540615B (en) * 2022-01-19 2023-08-22 中南大学 Sintering process of iron ore powder pellets

Also Published As

Publication number Publication date
CN109652643B (en) 2020-09-01

Similar Documents

Publication Publication Date Title
CN100537794C (en) Composite agglomeration technology of iron powdered ore
CN109652643A (en) High quality sinter and preparation method thereof for COREX ironmaking technique of fusion and reduction
CN106591575B (en) Low energy consumption coal-pressing ball and preparation method thereof
CN102206744B (en) Method for granulating sinter mixture
CN102102146B (en) Method for sintering high-aluminum refractory limonite
CN104232822B (en) The method of high-phosphor oolitic hematite vanadium titano-magnetite blast furnace ironmaking
CN102586589B (en) Method for applying Bayan Obo ore ultra-fine iron powder in sintering
CN105087907B (en) A kind of ferrochrome powder mine sintering technique
CN104726696B (en) Middle basicity deep-bed sintering production method
CN102220440A (en) Vanadium-titanium magnetite blast furnace smelting method capable of improving vanadium yield
CN105219953B (en) A kind of ferric manganese ore powder sintering matches somebody with somebody the method for ore deposit
CN108774683B (en) A kind of high magnesium composite sinter and its production method
CN103882224B (en) A kind of manifold type sintering method of low-grade laterite nickel ore
CN105132674A (en) Ferrochrome preparation method
CN103451421B (en) A kind of preparation method of blast furnace gas mud pre-reduced pellet
CN107488784B (en) A kind of blast furnace ironmaking superfluxed pellets and its production method
CN103160687A (en) Method for manufacturing crushing pellet sinter
CN104004905A (en) Production process for metalized burden suitable for blast furnace ironmaking
CN101660064B (en) Technique for preparing nickel-iron alloy
CN101967530B (en) Method for reducing iron by smelting reduction in electrometallurgy
CN103031430B (en) Method for making sintering bed charge by returning mine at high mixture ratio
CN107142120A (en) A kind of high response coke and preparation method thereof
CN107739819A (en) A kind of method of coal base shaft furnace process processing iron content red mud
CN100582256C (en) Method for preparing low-silicon superhigh-alkalinity sintered ore
CN110042227B (en) Sintered ore and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant