CN109635311A - A kind of l-G simulation test data collection system based on DDS - Google Patents

A kind of l-G simulation test data collection system based on DDS Download PDF

Info

Publication number
CN109635311A
CN109635311A CN201811240532.7A CN201811240532A CN109635311A CN 109635311 A CN109635311 A CN 109635311A CN 201811240532 A CN201811240532 A CN 201811240532A CN 109635311 A CN109635311 A CN 109635311A
Authority
CN
China
Prior art keywords
data
module
acquisition
data acquisition
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811240532.7A
Other languages
Chinese (zh)
Inventor
王西宝
张臻
殷璐嘉
张昕
刘学全
王光磊
张弛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CETC 28 Research Institute
Original Assignee
CETC 28 Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CETC 28 Research Institute filed Critical CETC 28 Research Institute
Priority to CN201811240532.7A priority Critical patent/CN109635311A/en
Publication of CN109635311A publication Critical patent/CN109635311A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general
    • G06F15/02Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators
    • G06F15/025Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators adapted to a specific application
    • G06F15/0283Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators adapted to a specific application for data storage and retrieval

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computing Systems (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • Computer And Data Communications (AREA)

Abstract

The invention discloses one kind to be based on DDS (Data Distribution Service, Data distributing) l-G simulation test data collection system, this method, which specifically includes that, obtains pending data acquisition session, and the data acquisition session includes the model definition of acquisition data;According to the quality of service policy (Quality of Service, QoS) of the requirement setting data acquisition session of the model of the acquisition data;The data sample that the data model updates is acquired according to the quality of service policy of the data acquisition session, the data model includes at least the type identification of node system.The acquisition of test data and record in the associative simulation experimental enviroment that the present invention can be used for constructing based on DDS simplify the operating process of data acquisition, the real-time for promoting data acquisition and accuracy, the flexibility and scalability for increasing associative simulation experimental enviroment.

Description

A kind of l-G simulation test data collection system based on DDS
Technical field
The l-G simulation test data collection system based on DDS that the present invention relates to a kind of.
Background technique
Under the continuous promotion of new network, distributing emulation system has obtained extensive research and application.Tradition point Cloth system uses C/S (Client/Server) framework of close coupling interactive mode, so that the scalability and cutting of whole system Property is poor, for scale complex system.In order to adapt to the new need of extensive, decentralised control and dynamic reorganization It asks, the interactive mode of data-centered (Data-Centric) is more and more applied in distributed system, with It interacts between each component of the distributed system of data grid technology without directly establishing connection, only needs directly into distribution Between the publication of part platform or subscribe to corresponding data, that is, can reach between each group part the purpose of interaction.
Currently, distributed emulation Test Data Collecting is mostly used based on C/S frame both at home and abroad in the research achievement of related fields The acquisition method based on DIS (distributed interactive simulation) and HLA (High Level Architecture) standard of structure.In the emulation system based on DIS In system, although the structure of message is a part (such as protocol Data Unit PDU) of agreement, data acquisition is direct, DIS skill Art is in standard, agreement and application aspect Shortcomings and limitation, in order to make up the defect U.S. national defense modeling and simulation office of DIS Room (DMSO) proposes High Level Architecture (High Level Architecture), but HLA lacks to define data friendship The data interaction consensus standard (the protocol Data Unit PDU in such as DIS) for changing format, can only carry out indirect data acquisition, and And HLA is also unable to satisfy the demand of Large Scale Distributed Simulations system in terms of real-time.
Summary of the invention
The l-G simulation test data collection system that the purpose of the present invention is to provide a kind of based on DDS, software, overcome traditional C/ The deficiency and limitation of S (Client/Server) framework, the coupling between reduction system, increase the real-time for guaranteeing data interaction The scale of big system application.
First aspect present invention provides a kind of data collection system based on DDS, including task acquisition module, task solution Analyse module, configuration module and acquisition module;
The task acquisition module is used to receive the data acquisition planning file that host node sends over, and is sent to task Parsing module;Wherein, data acquisition planning file be l-G simulation test personnel acquire as needed data manual editing, production 's;The host node sends data acquisition planning tasks to node system of participating in the experiment, and the data acquisition planning tasks include data Acquisition tasks description;
The task parsing module is used for the parsing from data acquisition planning tasks and obtains pending data acquisition session, Data acquisition session includes the model definition of acquisition data;Wherein, data model is using Interface Definition Language (Interace Definition Language, IDL) structural body of acquisition data that defines;
What the configuration module was used to be arranged data acquisition session starts and terminates instruction;
The acquisition module is used for quality of service policy (QoS, the Quality of according to data acquisition session Service, service quality) data sample that collection model updates, the data model includes the type mark of node system of participating in the experiment Know, node system i.e. child node system of participating in the experiment.
The configuration module includes enabled instruction control module and END instruction control module;
The enabled instruction control module is used to control the starting, online for node system of participating in the experiment, and starts to transport with emulation platform Behavior starting point;
The END instruction control module is used to control the stopping, offline of child node system, terminates to run with emulation platform For terminating point.
The acquisition module includes starting control module, data acquisition module, finishing control module, control information collection mould Block and status information capture module;
When the starting control module enters operating status for child node system, starting executes data acquisition session;
The data acquisition module is used to acquire the sample data of the update of data model belonging to data acquisition session;
When the finishing control module enters shutdown status for child node system, stop executing data acquisition session;
The control information acquisition module is used to obtain the control instruction data sample according to control data model;
The status information capture module is used to obtain the control instruction data sample according to control data model.
Control information acquisition module and status information capture module belong to the submodule of data acquisition module, respectively acquisition control Information data and status information data processed, it is therefore an objective to convenient for distinguishing two distinct types of data.Control information is host node hair The director data of control child node system out, and status information is the data of the state of child node system real time execution, control Information and status information respectively correspond control Information Data model and status information model
The invention also includes receiving module, receiving module is deposited for collected test data to be uploaded to server Storage.
The receiving module includes data filtering module, format converting module and data loading module;
The data filtering module is for filtering out the redundant data for node system generation of participating in the experiment;The present invention takes ContentFilteredTopic class, i.e. content-based filtering theme, such support are selectively ordered according to filter condition Read the data sample of associated subject update;
The format converting module is used to the Data Format Transform of data model definitions be database table structure format;
The data loading module is for being written database for the data sample that data model updates in real time and being uploaded to clothes Business device completes acquisition data.
System executes following steps:
Step 1, task acquisition module receives the data acquisition planning file that host node sends over, and is sent to task solution Analyse module;
Step 2, task parsing module acquires parsing in planning file from data and obtains pending complete data acquisition Task;
Step 3, node system of participating in the experiment obtains respectively pending data acquisition session, data acquisition session packet from host node The model definition of acquisition data is contained, model definition includes control Information Data model and status information model;Wherein, data mould Type is the structural body of the acquisition data defined using Interface Definition Language;
Wherein, data acquisition session refers to that the sample data that acquisition data model updates, including control information data correspond to Sample data and the corresponding sample data of status information model;Wherein, sample data be participate in the experiment node system generation data.
Step 4, according to the quality of service policy of acquisition data demand setting data acquisition session, quality of service policy is several One group provided according to distribution service middleware is used to control the characteristic value of its service behavior;In general, setting quality of service policy There are two types of methods, one is the method (i.e. set_qos ()) provided using entity, the second is using the side of XML configuration file Method.
Step 5, starting runs node system of participating in the experiment, and then starting, which runs host node system and starts, executes data acquisition times Business;
Step 6, the status data sample of each node system operation, state are acquired during executing data acquisition session Data sample includes system control information sample data and system status information sample data;
Step 7, when node system of participating in the experiment is out of service, then stop executing data acquisition session;
Step 8, the data sample updated according to the quality of service policy acquisition data model of data acquisition session.
It is described to acquire what the acquisition data model updated during executing the data acquisition session in step 6 Data sample, comprising: the type identification for including according to data model distinguishes the type for node system of participating in the experiment, node of participating in the experiment System is divided into the Constructive three types of true Live, virtual Virtual and construction.
When executing step 8, i.e., during executing data acquisition session, or after executing step 8, that is, stop After executing data acquisition session, collected system control information sample data and system status information sample data are uploaded To server.Can include:
The utility model has the advantages that the present invention can obtain the pending data acquisition session comprising data model, and according to data Acquisition control instruction is believed according to the control information and state of the data model acquisition child node system of the data acquisition session Breath;Above scheme can establish model to data content collected, simplify data acquisition operations process, improve data acquisition Real-time and accuracy, guarantee data integrity.
The present invention is based on data-centered publish/subscribe (Data-Centric Publisher/Subscriber, DCPS) model, provides not only the data model for defining various data, and with asynchronous, multi-point and real-time Feature, so that the participant of communication is upper full decoupled in space, time and control stream.In addition, Data distributing DDS (Data Distribution Service, DDS) additionally provide quality of service policy abundant (QoS) facilitate customization data distribution it is each Kind service.
Detailed description of the invention
The present invention is done with reference to the accompanying drawings and detailed description and is further illustrated, it is of the invention above-mentioned or Otherwise advantage will become apparent.
Fig. 1 is a kind of collecting method flow chart provided by the invention.
Fig. 2 is a kind of data acquisition software structural schematic diagram provided by the invention.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and embodiments.
The l-G simulation test data collection system based on DDS that the present invention provides a kind of, the system execute following steps:
Step 1, the data acquisition planning file that host node sends over is received.
Step 2, parsing obtains pending data acquisition session from the data acquisition planning file.
Step 3, pending data acquisition session is obtained, the data acquisition session includes that the model of acquisition data is fixed Justice.
Wherein, data acquisition session is used to indicate the sample data for the acquisition data model that present example defines, including Control the corresponding sample data of Information Data model and the corresponding sample data of status information model.
In present example, host node can be regarded as a terminal, which controls it as overall control center His child node computer or system.Data acquire retouching for the collected each child node computer or system of planning file configuration Information is stated, such as: need which is acquired to the control instruction of each child node computer or system, each child node computer or system The status data etc. of seed type.Child node computer or system receive the data acquisition planning file that host node sends over, from Middle parsing obtains respectively pending data acquisition session, and the model definition of acquisition data is contained in data acquisition session.
Step 4, according to the quality of service policy of the requirement setting data acquisition session of the model of the acquisition data (QosPolicy)。
Wherein, quality of service policy (QosPolicy) is Data distributing (Data Distribution Service) One group of middleware offer is for controlling the characteristic value of its service behavior.It establishes and communicates between data publisher and data subscription person Other than defining and register identical data model (i.e. Topic), it is necessary to which the RxO being arranged between publisher and subscriber is special Property both (be respectively set quality of service policy), and it is simultaneous to meet quality of service policy between the two (QosPolicy) Capacitive.In general, there are two ways to setting quality of service policy, one is method (the i.e. set_qos provided using entity ()), the second is using the method for XML configuration file.
Step 5, starting runs node system of participating in the experiment first, and then starting, which runs host node system and starts, executes the number According to acquisition tasks.
Step 6, the status data sample of each node system operation is acquired during executing the data acquisition session.
The acquisition of two kinds of data is related generally to during executing data acquisition session, one is system control information sample Data, secondly being system status information sample data.
Step 7, when node system is out of service, then stop executing data acquisition session.In the specific implementation, node system When stopping or going offline, Data distributing middleware can handle it automatically and (disconnect or establish communication connection).
Step 8, the data sample that the data model updates is acquired according to the quality of service policy of the data acquisition session This, the data model includes at least the type identification of node system.
Wherein, node system may include true (Live), virtual (Virtual), (Constructive) constructed Analogue system, type identification can be IP address, be also possible to ID mark, be mainly used for distinguishing system of participating in the experiment.
In practical application, this method that is to say during executing data acquisition session when executing step 8;Or After executing 8, namely stop after executing data acquisition session, by collected system control information sample data and system Status information sample data is uploaded to server.Data upload process can occur during executing data acquisition session, tool Data from node system collected in time interval are directly uploaded to server for host node by body, so that collected Data are saved on database server in time, reduce the storage burden of host node.Certainly, data upload may also occur at stopping After executing data acquisition session, specially the collected data from node system are stored in local by host node, to certain The sequence data complete or collected works of all node systems are uploaded to server again after primary complete test process, so will increase master The storage burden of node, but can guarantee the integrality of test data.Collected test data can be not only used for ex ante analysis, such as The research or preview of simulation model;On-line analysis, such as to the monitoring of running situation or on-line debugging etc.;Ex-post analysis, Such as shown according to the recurrence that collected complete test data carries out different levels and granularity to entire simulation process and Detail analysis, and corresponding test report is generated for carrying out VV&A analysis verifying.
Above-mentioned collecting method simplifies data acquisition operations by establishing data model to data content collected Process, improve data acquisition real-time and accuracy, ensure that data acquisition integrality.
Collecting method shown in based on the above embodiment, the present invention include following module:
Task acquisition module 101 acquires planning tasks for obtaining pending data, and the data acquire planning tasks It is described comprising data acquisition session.
Task parsing module 102 obtains pending data acquisition session for parsing from data acquisition planning tasks, Data acquisition session includes the model definition of acquisition data.
Configuration module 103 starts and terminates instruction for be arranged data acquisition session.
Acquisition module 104, for acquiring the data model more according to the quality of service policy of the data acquisition session New data sample, the data model include at least the type identification of node system.
Further, the control instruction of the data acquisition session includes starting control instruction and finishing control instruction;It is based on This, software is in running configuration module 103, carrying out practically following module:
Enabled instruction configuration module 1001 is brought into operation for controlling the starting, online of child node system with emulation platform For starting point.
END instruction configuration module 1002 terminates to run for controlling the stopping, offline of child node system with emulation platform For terminating point.
In the specific implementation, software is when running acquisition module 104, carrying out practically following module:
Start control module 2001, when entering operating status for child node system, starting executes the data and adopts Set task.
Data acquisition module 2002, the sample number updated for acquiring data model belonging to the data acquisition session According to.
Finishing control module 2003 when entering shutdown status for child node system, stops the data described in executing and adopts Set task.
Further, which can also the following module that includes of operation data acquisition module 2002:
Information acquisition module 2221 is controlled, for obtaining the control instruction data sample according to control data model.
Status information capture module 2222, for obtaining the status data sample according to status data model.
In the specific implementation, the software can also run receiving module 105, for collected test data to be uploaded to service Device is stored.
Further, which can also run the following module that receiving module 105 includes:
Data filtering module 3001, it is newest for being constituted according to final required data, filtering and obtaining child node system Status data;
Format converting module 3002, for being database table structure format by the Data Format Transform of data model definitions;
Database is written in real time and is uploaded to clothes for data loading module 3003, the data sample for updating data model Business device completes acquisition data.
Data acquisition software provided in an embodiment of the present invention can obtain pending comprising acquisition data model definitions Data acquisition session, and the quality of service policy of the requirement setting data acquisition session according to the model of the acquisition data (QoS), the data sample of the data model, the data mould are acquired according to the quality of service policy of the data acquisition session Type includes at least the type identification of node system.Above scheme can be good at the data model provided using Data distributing Definition, the quality of service policy abundant provided by Data distributing, flexible on-demand customization Data distributing.
The l-G simulation test data collection system based on DDS that the present invention provides a kind of, implements the side of the technical solution There are many method and approach, the above is only a preferred embodiment of the present invention, it is noted that for the common skill of the art For art personnel, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications Also it should be regarded as protection scope of the present invention.All undefined components in this embodiment can be implemented in the prior art.

Claims (8)

1. a kind of l-G simulation test data collection system based on DDS, which is characterized in that parsed including task acquisition module, task Module, configuration module and acquisition module;
The task acquisition module is used to receive the data acquisition planning file that host node sends over, and is sent to task parsing Module;Wherein, the host node sends data acquisition planning tasks to node system of participating in the experiment, and the data acquire planning tasks packet It is described containing data acquisition session;
The task parsing module is used for the parsing from data acquisition planning tasks and obtains pending data acquisition session, data Acquisition tasks include the model definition of acquisition data;Wherein, data model is the acquisition data defined using Interface Definition Language Structural body;
What the configuration module was used to be arranged data acquisition session starts and terminates instruction;
The acquisition module is used for the data sample updated according to the quality of service policy collection model of data acquisition session, described Data model includes the type identification of node system of participating in the experiment, node system i.e. child node system of participating in the experiment.
2. the system as claimed in claim 1, which is characterized in that the configuration module includes enabled instruction control module and end Instruction control module;
The enabled instruction control module is used to control the starting, online for node system of participating in the experiment, with emulation platform bring into operation for Starting point;
The END instruction control module is used to control the stopping, offline of child node system, terminates to operate to end with emulation platform Stop.
3. system as claimed in claim 2, which is characterized in that the acquisition module includes starting control module, data acquisition Module, finishing control module, control information acquisition module and status information capture module;
When the starting control module enters operating status for child node system, starting executes data acquisition session;
The data acquisition module is used to acquire the sample data of the update of data model belonging to data acquisition session;
When the finishing control module enters shutdown status for child node system, stop executing data acquisition session;
Control information acquisition module and status information capture module belong to the submodule of data acquisition module, respectively acquisition control letter Data and status information data are ceased, control information is the director data for the control child node system that host node issues, and state is believed Breath is the data of the state of child node system real time execution, controls information and status information respectively corresponds control Information Data model With status information model.
4. system as claimed in claim 3, which is characterized in that further include receiving module, receiving module is used for will be collected Test data is uploaded to server and is stored.
5. system as claimed in claim 4, which is characterized in that the receiving module includes data filtering module, format conversion Module and data loading module;
The data filtering module is for filtering out the redundant data for node system generation of participating in the experiment;The format converting module is used for It is database table structure format by the Data Format Transform of data model definitions;
The data loading module is used to that database to be written in the data sample that data model updates in real time and is uploaded to server, Complete acquisition data.
6. system as claimed in claim 5, which is characterized in that system executes following steps:
Step 1, task acquisition module receives the data acquisition planning file that host node sends over, and is sent to task parsing mould Block;
Step 2, task parsing module acquires parsing in planning file from data and obtains pending complete data acquisition session;
Step 3, node system of participating in the experiment obtains respectively pending data acquisition session from host node, and data acquisition session contains The model definition of data is acquired, model definition includes control Information Data model and status information model;
Step 4, according to the quality of service policy of acquisition data demand setting data acquisition session, quality of service policy is data point One group of hair service middleware offer is for controlling the characteristic value of its service behavior;
Step 5, starting runs node system of participating in the experiment, and then starting runs host node system and starts execution data acquisition session;
Step 6, the status data sample of each node system operation, status data are acquired during executing data acquisition session Sample includes system control information sample data and system status information sample data;
Step 7, when node system of participating in the experiment is out of service, then stop executing data acquisition session;
Step 8, the data sample updated according to the quality of service policy acquisition data model of data acquisition session.
7. system as claimed in claim 6, which is characterized in that described in the mistake for executing the data acquisition session in step 6 The data sample that the acquisition data model updates is acquired in journey, comprising: the type identification for including according to data model is to participating in the experiment The type of node system distinguishes, and node system of participating in the experiment is divided into true Live, virtual Virtual and construction Constructive three types.
8. system as claimed in claim 7, which is characterized in that when executing step 8, i.e., in the mistake for executing data acquisition session Cheng Zhong, or after executing step 8, that is, stop after executing data acquisition session, by collected system control information sample Notebook data and system status information sample data are uploaded to server.
CN201811240532.7A 2018-10-24 2018-10-24 A kind of l-G simulation test data collection system based on DDS Pending CN109635311A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811240532.7A CN109635311A (en) 2018-10-24 2018-10-24 A kind of l-G simulation test data collection system based on DDS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811240532.7A CN109635311A (en) 2018-10-24 2018-10-24 A kind of l-G simulation test data collection system based on DDS

Publications (1)

Publication Number Publication Date
CN109635311A true CN109635311A (en) 2019-04-16

Family

ID=66066636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811240532.7A Pending CN109635311A (en) 2018-10-24 2018-10-24 A kind of l-G simulation test data collection system based on DDS

Country Status (1)

Country Link
CN (1) CN109635311A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112511358A (en) * 2021-02-02 2021-03-16 湖南高至科技有限公司 Heterogeneous interconnection simulation system, method, computer device and storage medium
CN113268436A (en) * 2021-07-21 2021-08-17 航天中认软件测评科技(北京)有限责任公司 Multi-granularity computer simulation operation information acquisition method based on hook points

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102340802A (en) * 2010-07-14 2012-02-01 中国联合网络通信集团有限公司 Service quality monitoring method and system
CN104243331A (en) * 2014-09-24 2014-12-24 国家电网公司 Intelligent collecting router and implementing method thereof
CN104753735A (en) * 2013-12-31 2015-07-01 ***通信集团上海有限公司 Dialing testing system and method
CN105119950A (en) * 2014-01-16 2015-12-02 国网山东省电力公司青岛供电公司 Power distribution network communication method
CN105205183A (en) * 2015-10-29 2015-12-30 哈尔滨工业大学 Automatic establishing method of DDS (data distribution service) distributive system based on XML
CN106713010A (en) * 2016-11-23 2017-05-24 北京润科通用技术有限公司 Communication method and system for avionics network system
CN106708815A (en) * 2015-07-15 2017-05-24 中兴通讯股份有限公司 Data processing method, device and system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102340802A (en) * 2010-07-14 2012-02-01 中国联合网络通信集团有限公司 Service quality monitoring method and system
CN104753735A (en) * 2013-12-31 2015-07-01 ***通信集团上海有限公司 Dialing testing system and method
CN105119950A (en) * 2014-01-16 2015-12-02 国网山东省电力公司青岛供电公司 Power distribution network communication method
CN104243331A (en) * 2014-09-24 2014-12-24 国家电网公司 Intelligent collecting router and implementing method thereof
CN106708815A (en) * 2015-07-15 2017-05-24 中兴通讯股份有限公司 Data processing method, device and system
CN105205183A (en) * 2015-10-29 2015-12-30 哈尔滨工业大学 Automatic establishing method of DDS (data distribution service) distributive system based on XML
CN106713010A (en) * 2016-11-23 2017-05-24 北京润科通用技术有限公司 Communication method and system for avionics network system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张庆杰等: "基于DCPS的分布式多UCAV协同控制半物理仿真***", 《2009中国控制与决策会议论文集》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112511358A (en) * 2021-02-02 2021-03-16 湖南高至科技有限公司 Heterogeneous interconnection simulation system, method, computer device and storage medium
CN112511358B (en) * 2021-02-02 2021-04-30 湖南高至科技有限公司 Heterogeneous interconnection simulation system, method, computer device and storage medium
CN113268436A (en) * 2021-07-21 2021-08-17 航天中认软件测评科技(北京)有限责任公司 Multi-granularity computer simulation operation information acquisition method based on hook points

Similar Documents

Publication Publication Date Title
CN106790455B (en) A kind of distributed cloud management system and method based on mixed mode
CN108427992A (en) A kind of machine learning training system and method based on edge cloud computing
CN103248512B (en) The generation method and system of application layer topological structure in communication network
CN105376101B (en) A kind of method and system of material object equipment access of virtual network
CN105468735A (en) Stream preprocessing system and method based on mass information of mobile internet
CN101082970A (en) Method for realizing government affairs examination and approval workflow engines system
CN110769032B (en) System and method for rapidly detecting and maintaining power grid equipment fault
CN102411540B (en) Automatic management system of workflow-based common software testing process
CN104572444A (en) Cloud testing platform for game performance and testing method for cloud testing platform
CN105872068A (en) Cloud platform and automatic operation check method based on same
CN112925646A (en) Electric power data edge calculation system and calculation method
CN111525698A (en) Automatic data access method, device and system for low-voltage distribution network
CN106802947B (en) The data processing system and method for entity relationship diagram
CN109635311A (en) A kind of l-G simulation test data collection system based on DDS
CN110391949A (en) A kind of method and relevant apparatus of configuration change
CN108989385A (en) A kind of implementation method based on Zabbix monitoring collection automatic synchronization CMDB
WO2013159586A1 (en) Distributed simulation data processing method and device
CN110458528A (en) A kind of full-service configuration management platform based on CMDB operation management
CN104298761A (en) Implementation method for master data matching between heterogeneous software systems
CN108229816A (en) Management method is matched by the battalion of Internet of Things networking based on distributed management
CN105550504B (en) A kind of portable medical information system and medical information processing method
CN109636095A (en) A kind of grid equipment Unified Model management system based on regulation cloud framework
CN104113580A (en) hadoop cluster automatic deployment technology based on virtual machine template
CN109299196A (en) Data managing method, network and data acquisition storage application method and its system
CN116090847A (en) User identity data management system based on cloud platform and readable medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No.1 Lingshan South Road, Qixia District, Nanjing, Jiangsu Province, 210000

Applicant after: THE 28TH RESEARCH INSTITUTE OF CHINA ELECTRONICS TECHNOLOGY Group Corp.

Address before: 210007 No. 1 East Street, alfalfa garden, Jiangsu, Nanjing

Applicant before: THE 28TH RESEARCH INSTITUTE OF CHINA ELECTRONICS TECHNOLOGY Group Corp.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416

RJ01 Rejection of invention patent application after publication