CN109633333A - All kinds of cutting load amount collision detection of provincial and above power grid and coordinate method of calibration - Google Patents

All kinds of cutting load amount collision detection of provincial and above power grid and coordinate method of calibration Download PDF

Info

Publication number
CN109633333A
CN109633333A CN201811617010.4A CN201811617010A CN109633333A CN 109633333 A CN109633333 A CN 109633333A CN 201811617010 A CN201811617010 A CN 201811617010A CN 109633333 A CN109633333 A CN 109633333A
Authority
CN
China
Prior art keywords
load
control
amount
kinds
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811617010.4A
Other languages
Chinese (zh)
Other versions
CN109633333B (en
Inventor
万芳茹
罗凯明
徐泰山
鲍颜红
郑亮
孙才峰
李振宇
项震
陈刚
宋东阔
李成伟
黄曲粲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
State Grid Liaoning Electric Power Co Ltd
NARI Group Corp
Nari Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
State Grid Liaoning Electric Power Co Ltd
NARI Group Corp
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, State Grid Liaoning Electric Power Co Ltd, NARI Group Corp, Nari Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811617010.4A priority Critical patent/CN109633333B/en
Publication of CN109633333A publication Critical patent/CN109633333A/en
Application granted granted Critical
Publication of CN109633333B publication Critical patent/CN109633333B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses all kinds of cutting load amount collision detection of a kind of provincial and above power grid and coordinate method of calibration, to under the real-time grid method of operation, all types load shedding scheme is combed, to large capacity multi-infeed DC, under extensive new-energy grid-connected background, there are mismatches and deficient control risk to be analyzed and be assessed for load shedding strategy, this method can tight tracking power grid real time operation mode, configuration conflict between all kinds of cutting load information of quantitative analysis, the whether full-amount online judgement of control amount is carried out to power grid controlled amounts, and cutting load is carried out to forecast failure collection on this basis and is accurately simulated, accurately calculate the amount of collisions of cutting load, for management and running, personnel provide technical support.

Description

All kinds of cutting load amount collision detection of provincial and above power grid and coordinate method of calibration
Technical field
The present invention relates to all kinds of cutting load amount collision detection of a kind of provincial and above power grid and coordinate method of calibration, belongs to electricity Force system control technology field.
Background technique
The previous provincial and above power grid load shedding scheme is analyzed based on offline mode, carries out stability control equipment automatic load-reducing plan It is slightly formulated with regulation load shedding prediction scheme, with operation of power networks side under large capacity multi-infeed DC, extensive new-energy grid-connected background Formula is complicated and changeable, and load shedding strategy is there are mismatch and owes control risk.
The main formulation for considering safety and stability constraint and carrying out load shedding strategy of scheduling at different levels, second and third road defence line subtracts automatically Load strategy, regulation emergency load shedding prediction scheme are independently formulated, and the unification for lacking the measure of multiclass load shedding effectively monitors and comprehensive association Decision support is adjusted, there are mismatch and owes control risk.
Currently, needing to propose all kinds of cutting load amount collision detection of provincial and above power grid and method of calibration can be coordinated, use In electric system on-line analysis and control.
Summary of the invention
Purpose: in order to overcome the deficiencies in the prior art, the present invention provides that a kind of provincial and above power grid is all kinds of to be cut Load collision detection and coordination method of calibration.
A kind of technical solution: in order to solve the above technical problems, the technical solution adopted by the present invention are as follows: provincial and above power grid All kinds of cutting load amount collision detection and coordination method of calibration, the specific steps are as follows:
Step 1: combing is provincial and above each voltage class of power grid can cutting load type, round information, specifying power grid can cut Except load can be divided into following 5 class: 1. Millisecond responds, can be quickly by stable control device (referred to as peace is controlled) by the negative of round excision Lotus belongs to second defence line;2. second grade response, can be by load control system (referred to as negative control) by the load of round excision;3. low Frequency load-shedding equipment, low-voltage load sheding device meet the load cut off after operation condition by round, belong to three lines of defence;4. drawing of rationing the power supply Accident, which is rationed the power supply, in the tagmeme table of road draws road load;Super power supply capacity is drawn in the tagmeme table of road to ration the power supply load 5. rationing the power supply;Every class is resectable For load according to operation condition difference, excision timing difference is divided into a wheel or more wheel excisions.
Step 2: carrying out low-voltage-grade load extremely for system real-time working condition, the bus mode of connection, switch tool state Power supply line's topological analysis, specifies 110kV route to the quantity of load curtailment (control load object) power supply, to being lower than The load curtailment and load of 110kV voltage class, will according to power convert formula by its power supply line of topological analysis The load curtailment amount of low-voltage-grade is converted to power supply line's performance number of 110kV voltage class.
Step 3: all kinds of load curtailments (control load object) cross-over configuration situation, system are analyzed according to current real-time working condition Count all kinds of load curtailment measure amount of collisions, the specific steps are as follows:
3.1: analysis and Control load object belongs to the anti-line apparatus of second, load control system, three lines of defence device, thing Therefore ration the power supply and draw road charge circuit, transfinite to ration the power supply which kind of control object in the charge circuit of road drawn, in the controllable amounts of all kinds of measures It is how many;
3.1.1: when controlling load object and being controlled by the anti-line apparatus of second, it is more whether analysis and Control load object belongs to A stable system strategy model is recognized when the same control load object belongs to two or more stable system strategy models For this control load object, in the anti-line apparatus of second, there are configuration conflicts;
3.1.2: when control load object is controlled by three lines of defence device, whether analysis and Control load object belongs to Low-frequency load shedding control object, and belong to low-voltage load sheding control object, when same control load object belongs to both the above control class Type, then it is assumed that there are configuration conflicts in three lines of defence device for this control load object.
3.1.3: when control load object belong to ration the power supply draw road tagmeme table when, whether Statisti-cal control load object belongs to load Control system or accident, which are rationed the power supply, draws road tagmeme table control object, when same control load object belongs to two or more control classes When type, it is believed that this control load object draws road tagmeme table there are configuration conflicts rationing the power supply.
3.2: counting control load object conflict amount between the anti-line apparatus of multiple seconds, multiclass three lines of defence device Between control load object conflict amount, the control load object conflict amount drawn between the tagmeme table of road of rationing the power supply;
3.3: statistics second defence line and three lines of defence control load object conflict amount, second defence line and ration the power supply and draw road Tagmeme table control load object conflict amount, three lines of defence and the amount of collisions for drawing road tagmeme table control load object of rationing the power supply.
3.4: (can basis when any two control load object conflict amounts reach alarm threshold in step 3.2, step 3.3 Actual conditions setting), management and running personnel are reminded in alarm, there is control load object conflict.
Step 4: being directed to system real-time working condition, preset multiple catastrophe failure collection calculates each after analyzing forecast failure Type load resection according to configuration conflict amount between each type load of most serious cutting load amount situation statistics, and calculates conflict ratio;
Step 5: being based on system real-time working condition, carry out simulation analysis to multiple catastrophe failure collection is preset, cut to all kinds of Load measure is accurately simulated, after cutting off load, if still having safety and stability problem, and there are cutting load information configuration conflict, Judge whether cutting load measure is full-amount, if insufficient, management and running personnel are reminded in alarm.
It is as follows not higher than the control load object Reduction of 110kV voltage class in the step 2:
2.1: if control load object is 110kV route, directly using line power as equivalent load;
2.2:, need to be according to control load object voltage V, wattful power if control load object is the following route of 110kV route Rate P, reactive power Q, branch impedance parameter R+jX, calculate site power P on 110kV ', as load amount of collisions.
Each type load cross-over configuration situation is analyzed according to current real-time working condition in the step 3, amount of collisions calculates step such as Under:
3.5: for the load of determining all types of load curtailments, according to the bus mode of connection and switch cutter in plant stand Lock state carries out topological analysis, determines this type load curtailment user/route and other types load curtailment user/line Road whether there is configuration conflict, and configuration conflict has referred to same 110kV and Above Transmission Lines public.
(1) control object amount of collisions between multiple anti-line apparatus of second is counted, between the device of multiclass three lines of defence Control object amount of collisions, the control object amount of collisions drawn between the tagmeme table of road of rationing the power supply;It is anti-to count second defence line and third road Line traffic control object conflict amount, second defence line and rationing the power supply draw road tagmeme table control object amount of collisions, three lines of defence and drawing of rationing the power supply The amount of collisions of road tagmeme table control object.
The load that stable control device excision is respectively set is P1, the load of load control system excision is P2, low-frequency load shedding Device, low-voltage load sheding device load curtailment are P3And P4, it is P that accident, which rations the power supply and draws road load,5, super power supply capacity load of rationing the power supply is P6, setting round is k, and round sum is n, k ∈ n.PikRepresent i-th kind of kth wheel excision load, i ∈ (1,2,3,4,5,6).Example Such as, if P1The load of stable control device excision is divided into 6 wheels, then is calculated as P respectively11-P16
(2) for some anticipation catastrophe failure, the limited load of all kinds of measures of analogue simulation or negative control measure movement is cut, according to Each type load acts precedence, all kinds of configuration of load amount of collisions is counted, for example, reaching stable control device after DC Line Fault Quickly cut off big load user action condition, resection P1, about 400ms, which is acted, to be terminated;There are still cross section limits, according to load control System second grade control excision load large user processed, former load control system second grade can the amount of cutting P2It need to subtract and P1Conflict the amount configured, Its actual act load P 2For actual act load.
Its formula is as follows: setting stable load user Ke Qie amount as PlmIf second stage load user Ke Qie amount is P2k, by opening up Analysis is flutterred, judges P2kWith PlmWhether a upper cable is shared, if sharing, by movement time-series, stability control equipment is first moved Make, then negative control system is cut off after second grade, these two types of load amount of collisions be two classes share control object can the sum of the amount of cutting.Amendment The practical control amount P of second grade afterwards 2=∑ P2k(k:1...n)-∑Plm(m:1...j).N is second stage load user Ke Qie total load number, and j is Stable control object and the consistent load number of negative control system control object.
System real-time working condition data are directed in the step 4, preset multiple catastrophe failure collection calculates analysis anticipation All kinds of load resection after failure determine configuration conflict amount and ratio between each type load according to most serious cutting load amount situation.
Certain type load conflict ratio=complete regional the type with act the former controllable total amount ╳ in amount of collisions/full area before 100%.
It is based on system real-time working condition in the step 5, simulation analysis is carried out to preset multiple catastrophe failure, to each Class cutting load measure is precisely simulated, cut off load after, if there are still all kinds of safety and stability problems (apparatus overload, cross section limit, Transient Instability, frequency are dangerous or voltage is dangerous etc.), then illustrate control measure deficiency, exports all kinds of cutting load information and match Amount of collisions is set, management and running personnel are reminded in alarm.
The utility model has the advantages that all kinds of cutting load amount collision detection of provided by the invention provincial and above power grid and coordinating verification side Method, under the real-time grid method of operation, all types load shedding scheme is combed, to large capacity multi-infeed DC, on a large scale Under new-energy grid-connected background, there are mismatches and deficient control risk to be analyzed and be assessed for load shedding strategy, and this method can tight tracking Power grid real time operation mode, the configuration conflict between all kinds of cutting load information of quantitative analysis carry out control amount to power grid controlled amounts Whether in full amount online judgement, and cutting load is carried out to forecast failure collection on this basis and is accurately simulated, accurately calculate cutting load Amount of collisions, for management and running, personnel provide technical support.
Detailed description of the invention
Fig. 1 is method flow schematic diagram of the invention.
Specific embodiment
The present invention will be further explained with reference to the accompanying drawing.
As shown in Figure 1, all kinds of cutting load amount collision detection of a kind of provincial and above power grid and coordinate method of calibration, it is specific to wrap Include following steps:
Step 1 in Fig. 1: combing is provincial and above each voltage class of power grid can cutting load type, round information, specify power grid Load curtailment can be divided into following 5 class: 1. Millisecond responds, and can quickly be cut off by stable control device (referred to as peace is controlled) by round Load, belong to second defence line;2. second grade response, can be by load control system (referred to as negative control) by the load of round excision; 3. low frequency load shedding equipment, low-voltage load sheding device meet the load cut off after operation condition by round, belong to three lines of defence;4. limiting Accident, which is rationed the power supply, in the tagmeme table of the road electricity La draws road load;Super power supply capacity is drawn in the tagmeme table of road to ration the power supply load 5. rationing the power supply.Every class can be cut For the load removed according to operation condition difference, excision timing difference is divided into a wheel or more wheel excisions.
Every resectable load of class is as shown in table 1 according to operation condition or actuation time:
1 load curtailment classification of type table of table
The load that stable control device excision is respectively set is P1, the load of load control system excision is P2, low-frequency load shedding Device, low-voltage load sheding device load curtailment are P3And P4, it is P that accident, which rations the power supply and draws road load,5, super power supply capacity load of rationing the power supply is P6, setting round is k, and round sum is n, k ∈ n.PikRepresent i-th kind of kth wheel excision load, i ∈ (1,2,3,4,5,6).Example Such as, if P1The load of stable control device excision is divided into 6 wheels, then is calculated as P respectively11-P16
Step 2 in Fig. 1: being directed to real-time working condition data, based on topological analysis in 110kV and above plant stand, really Determine load curtailment and power supply line's topological relation, determines each type load cross-over configuration situation under current working.
Step 3 is directed to system real-time working condition data in Fig. 1, and preset multiple catastrophe failure collection calculates analysis anticipation All kinds of load resection after failure determine configuration conflict amount and ratio between each type load according to most serious cutting load amount situation, Certain type load conflict ratio=complete regional the type with act the former controllable total amount ╳ 100% in amount of collisions/full area before.
Step 4 is based on system real-time working condition in Fig. 1, simulation analysis is carried out to preset multiple catastrophe failure, to each Class cutting load measure is precisely simulated, cut off load after, if there are still all kinds of safety and stability problems (apparatus overload, cross section limit, Transient Instability, frequency are dangerous or voltage is dangerous etc.), then illustrate control measure deficiency, exports all kinds of cutting load information and match Amount of collisions is set, management and running personnel are reminded in alarm.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (7)

1. all kinds of cutting load amount collision detection of a kind of provincial and above power grid and coordinating method of calibration, it is characterised in that: including such as Lower step:
Step 1: combing is provincial and above each voltage class of power grid can cutting load type, round information, specify power grid can cut off it is negative Lotus can be divided into following 5 class: 1. Millisecond responds, and the load of round excision can be quickly pressed by stable control device, belongs to second Defence line;2. second grade response, can be pressed the load of round excision by load control system;3. low frequency load shedding equipment, low-voltage load sheding device Meet the load cut off after operation condition by round, belongs to three lines of defence;Road is drawn 4. rationing the power supply and accident being drawn in the tagmeme table of road to ration the power supply Load;Super power supply capacity is drawn in the tagmeme table of road to ration the power supply load 5. rationing the power supply;Every resectable load of class is cut according to operation condition difference Except timing difference is divided into a wheel or more wheel excisions;
Step 2: carrying out low-voltage-grade load to power supply for system real-time working condition, the bus mode of connection, switch tool state Line topological analysis, specifies the quantity that 110kV route is powered to load curtailment, to cutting off lower than 110kV voltage class Load and load, by its power supply line of topological analysis, according to power convert formula, by the load curtailment of low-voltage-grade Amount is converted to power supply line's performance number of 110kV voltage class;
Step 3: all kinds of load curtailment cross-over configuration situations being analyzed according to current real-time working condition, all kinds of load curtailments is counted and arranges Apply amount of collisions;
Step 4: being directed to system real-time working condition, preset multiple catastrophe failure collection calculates all kinds of negative after analyzing forecast failure Lotus resection according to configuration conflict amount between each type load of most serious cutting load amount situation statistics, and calculates conflict ratio;
Step 5: being based on system real-time working condition, simulation analysis is carried out to multiple catastrophe failure collection is preset, to all kinds of cutting loads Measure is accurately simulated, after cutting off load, if still having safety and stability problem, and there are cutting load information configuration conflict, judgements Whether cutting load measure is full-amount, if insufficient, management and running personnel are reminded in alarm.
2. all kinds of cutting load amount collision detection of according to claim 1 provincial and above power grid and coordinate method of calibration, Be characterized in that: every resectable load of class is divided into a wheel or more according to operation condition difference, excision timing difference in the step poly- 1 Wheel excision;It is as shown in table 1:
1 load curtailment classification of type table of table.
3. all kinds of cutting load amount collision detection of according to claim 1 provincial and above power grid and coordinate method of calibration, It is characterized in that: the step 3, the specific steps are as follows:
3.1: analysis and Control load object belongs to the anti-line apparatus of second, load control system, three lines of defence device, accident limit The road electricity La charge circuit transfinites to ration the power supply which kind of control object in the charge circuit of road drawn, and is more in the controllable amounts of all kinds of measures It is few;
3.1.1: when controlling load object and being controlled by the anti-line apparatus of second, whether analysis and Control load object belongs to multiple peaces Steady system strategy model, when the same control load object belongs to two or more stable system strategy models, it is believed that this Controlling load object, there are configuration conflicts in the anti-line apparatus of second;
3.1.2: when control load object is controlled by three lines of defence device, whether analysis and Control load object belongs to low frequency Control of decreasing load object, and belong to low-voltage load sheding control object, when same control load object belongs to both the above Control Cooling, then Thinking this control load object, there are configuration conflicts in three lines of defence device.
3.1.3: when control load object belong to ration the power supply draw road tagmeme table when, whether Statisti-cal control load object belongs to load control system System or accident, which are rationed the power supply, draws road tagmeme table control object, when same control load object belongs to two or more Control Coolings When, it is believed that this control load object draws road tagmeme table there are configuration conflicts rationing the power supply.
3.2: counting control load object conflict amount between the anti-line apparatus of multiple seconds, between the device of multiclass three lines of defence Control load object conflict amount, the control load object conflict amount drawn between the tagmeme table of road of rationing the power supply;
3.3: statistics second defence line and three lines of defence control load object conflict amount, second defence line and ration the power supply and draw Lu Xuwei Table control load object conflict amount, three lines of defence and the amount of collisions for drawing road tagmeme table control load object of rationing the power supply.
3.4: when any two control load object conflict amounts reach alarm threshold in step 3.2, step 3.3, alarm, which is reminded, is adjusted Operations staff is spent, there is control load object conflict.
4. all kinds of cutting load amount collision detection of according to claim 1 provincial and above power grid and coordinate method of calibration, It is characterized in that: as follows not higher than the control load object Reduction of 110kV voltage class in the step 2:
2.1: if control load object is 110kV route, directly using line power as equivalent load;
2.2: if control load object be the following route of 110kV route, need to according to control load object voltage V, active-power P, Reactive power Q, branch impedance parameter R+jX, calculate site power P on 110kV ', as load amount of collisions;
5. all kinds of cutting load amount collision detection of according to claim 1 provincial and above power grid and coordinate method of calibration, It is characterized in that: each type load cross-over configuration situation being analyzed according to current real-time working condition in the step 3, amount of collisions calculates step such as Under:
3.5: for the load of determining all types of load curtailments, according to the bus mode of connection in plant stand and switch tool shape State carries out topological analysis, determines this type load curtailment user/route and other types load curtailment user/route is It is no there are configuration conflict, configuration conflict has referred to same 110kV and Above Transmission Lines public;
3.5.1: counting control object amount of collisions between the anti-line apparatus of multiple seconds, between the device of multiclass three lines of defence Control object amount of collisions, the control object amount of collisions drawn between the tagmeme table of road of rationing the power supply;Count second defence line and three lines of defence Control object amount of collisions, second defence line and rationing the power supply, which draw road tagmeme table control object amount of collisions, three lines of defence and ration the power supply, draws road The amount of collisions of tagmeme table control object;
The load that stable control device excision is respectively set is P1, the load of load control system excision is P2, low-frequency load shedding dress It sets, low-voltage load sheding device load curtailment is P3And P4, it is P that accident, which rations the power supply and draws road load,5, super power supply capacity ration the power supply load be P6, Setting round is k, and round sum is n, k ∈ n;PikRepresent i-th kind of kth wheel excision load, i ∈ (1,2,3,4,5,6);For example, If P1The load of stable control device excision is divided into 6 wheels, then is calculated as P respectively11-P16
3.5.2: for some anticipation catastrophe failure, the limited load of all kinds of measures of analogue simulation or negative control measure movement is cut, according to Each type load acts precedence, all kinds of configuration of load amount of collisions is counted, for example, reaching stable control device after DC Line Fault Quickly cut off big load user action condition, resection P1, about 400ms, which is acted, to be terminated;There are still cross section limits, according to load control System second grade control excision load large user processed, former load control system second grade can the amount of cutting P2It need to subtract and P1Conflict the amount configured, Its actual act load P '2For actual act load;Its formula is as follows:
If stable load user Ke Qie amount is PlmIf second stage load user Ke Qie amount is P2k, by topological analysis, judge P2kWith PlmWhether a upper cable is shared, if sharing, by movement time-series, stability control equipment is first acted, and then negative control system exists Cut off after second grade, these two types of load amount of collisions be two classes share control object can the sum of the amount of cutting;The second practical control amount of grade after amendment P’2=∑ P2k(k:1...n)-∑Plm(m:1...j).N is second stage load user Ke Qie total load number, and j is stable control object and negative control The consistent load number of system control object.
6. all kinds of cutting load amount collision detection of according to claim 1 provincial and above power grid and coordinate method of calibration, Be characterized in that: for system real-time working condition data in the step 4, it is pre- to calculate analysis for preset multiple catastrophe failure collection Think all kinds of load resection after failure, determines configuration conflict amount and ratio between each type load according to most serious cutting load amount situation Example, formula are as follows:
Certain type load conflict ratio=complete regional the type with act the former controllable total amount ╳ 100% in amount of collisions/full area before.
7. all kinds of cutting load amount collision detection of according to claim 1 provincial and above power grid and coordinate method of calibration, It is characterized in that: based on system real-time working condition in the step 5, simulation analysis being carried out to preset multiple catastrophe failure, it is right All kinds of cutting load measures are precisely simulated, and after cutting off load, if still having all kinds of safety and stability problems, illustrate control measure not In full amount, all kinds of cutting load information configuration amount of collisions are exported, management and running personnel are reminded in alarm.
CN201811617010.4A 2018-12-27 2018-12-27 Provincial and above power grid various load shedding amount conflict detection and coordination check method Active CN109633333B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811617010.4A CN109633333B (en) 2018-12-27 2018-12-27 Provincial and above power grid various load shedding amount conflict detection and coordination check method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811617010.4A CN109633333B (en) 2018-12-27 2018-12-27 Provincial and above power grid various load shedding amount conflict detection and coordination check method

Publications (2)

Publication Number Publication Date
CN109633333A true CN109633333A (en) 2019-04-16
CN109633333B CN109633333B (en) 2021-07-23

Family

ID=66078524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811617010.4A Active CN109633333B (en) 2018-12-27 2018-12-27 Provincial and above power grid various load shedding amount conflict detection and coordination check method

Country Status (1)

Country Link
CN (1) CN109633333B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110350595A (en) * 2019-06-19 2019-10-18 国网河南省电力公司 The load high-speed decision control method for maintaining subregion section stable under accident condition
CN113346476A (en) * 2021-04-23 2021-09-03 浙江华云电力工程设计咨询有限公司 Load terminal device with multi-time scale control fusion and working method thereof

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4117537A (en) * 1977-02-09 1978-09-26 Borg-Warner Corporation System and method for limiting energy consumption
CN102629760A (en) * 2011-12-13 2012-08-08 国网电力科学研究院 Method adaptive for coordinated optimization of low-frequency pump sheadding and load shedding with secure and stable frequency
CN102880172A (en) * 2012-10-16 2013-01-16 国网电力科学研究院 Real-time control strategy checking method of safety stability control device
CN103166219A (en) * 2013-01-30 2013-06-19 中国电力科学研究院 Power grid on-line decision-stabilizing control system and control method based on super real-time emulation
CN104578047A (en) * 2013-10-11 2015-04-29 国家电网公司 Method and device for controlling micro grid system
US20150378380A1 (en) * 2007-08-21 2015-12-31 Electro Industries/Gauge Tech System and method for synchronizing multiple generators with an electrical power distribution system
CN105281320A (en) * 2015-09-16 2016-01-27 河海大学 Economical efficiency and load shedding rate fairness coordination emergency load control optimization method
US20160118790A1 (en) * 2011-06-17 2016-04-28 Siemens Industry, Inc. Automated demand response system
CN105653764A (en) * 2015-12-22 2016-06-08 中国南方电网有限责任公司 Method for online estimating and pre-warning grid safety accident risk levels
CN106408438A (en) * 2015-07-31 2017-02-15 中国电力科学研究院 Method for automatically checking safety and stability control strategy based on dynamic simulation of whole process
CN106532684A (en) * 2016-10-20 2017-03-22 燕山大学 Active distribution network multi-fault repair method based on multi-agent system
CN106936147A (en) * 2017-04-14 2017-07-07 南瑞(武汉)电气设备与工程能效测评中心 A kind of optimization operation management method of micro-capacitance sensor based on dual-layer optimization towards electric heat storage boiler
CN108123439A (en) * 2018-01-03 2018-06-05 燕山大学 A kind of repairing of active distribution network multiple faults and restoration methods based on multi-agent system

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4117537A (en) * 1977-02-09 1978-09-26 Borg-Warner Corporation System and method for limiting energy consumption
US20150378380A1 (en) * 2007-08-21 2015-12-31 Electro Industries/Gauge Tech System and method for synchronizing multiple generators with an electrical power distribution system
US20160118790A1 (en) * 2011-06-17 2016-04-28 Siemens Industry, Inc. Automated demand response system
CN102629760A (en) * 2011-12-13 2012-08-08 国网电力科学研究院 Method adaptive for coordinated optimization of low-frequency pump sheadding and load shedding with secure and stable frequency
CN102880172A (en) * 2012-10-16 2013-01-16 国网电力科学研究院 Real-time control strategy checking method of safety stability control device
CN103166219A (en) * 2013-01-30 2013-06-19 中国电力科学研究院 Power grid on-line decision-stabilizing control system and control method based on super real-time emulation
CN104578047A (en) * 2013-10-11 2015-04-29 国家电网公司 Method and device for controlling micro grid system
CN106408438A (en) * 2015-07-31 2017-02-15 中国电力科学研究院 Method for automatically checking safety and stability control strategy based on dynamic simulation of whole process
CN105281320A (en) * 2015-09-16 2016-01-27 河海大学 Economical efficiency and load shedding rate fairness coordination emergency load control optimization method
CN105653764A (en) * 2015-12-22 2016-06-08 中国南方电网有限责任公司 Method for online estimating and pre-warning grid safety accident risk levels
CN106532684A (en) * 2016-10-20 2017-03-22 燕山大学 Active distribution network multi-fault repair method based on multi-agent system
CN106936147A (en) * 2017-04-14 2017-07-07 南瑞(武汉)电气设备与工程能效测评中心 A kind of optimization operation management method of micro-capacitance sensor based on dual-layer optimization towards electric heat storage boiler
CN108123439A (en) * 2018-01-03 2018-06-05 燕山大学 A kind of repairing of active distribution network multiple faults and restoration methods based on multi-agent system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
ZHE WANG,等: "Design of a precise load shedding system and its simulation test method", 《 2018 2ND IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2)》 *
李兆伟 等: "计及电力安全事故风险的电网动态分区与切负荷协调控制研究", 《电力***保护与控制》 *
董希建 等: "交直流混联受端电网频率紧急协调控制技术及应用", 《电力***保护与控制》 *
薛禹胜: "时空协调的大停电防御框架(三) 各道防线内部的优化和不同防线之间的协调", 《电力***自动化》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110350595A (en) * 2019-06-19 2019-10-18 国网河南省电力公司 The load high-speed decision control method for maintaining subregion section stable under accident condition
CN110350595B (en) * 2019-06-19 2023-10-27 国网河南省电力公司 Load fast decision control method for maintaining stable section of subarea in accident state
CN113346476A (en) * 2021-04-23 2021-09-03 浙江华云电力工程设计咨询有限公司 Load terminal device with multi-time scale control fusion and working method thereof

Also Published As

Publication number Publication date
CN109633333B (en) 2021-07-23

Similar Documents

Publication Publication Date Title
CN105449719B (en) Distributed energy power control method, apparatus and system
CN102938587B (en) Intelligent power grid safety and stability early-warning and control method
Salehi et al. Laboratory-based smart power system, part II: Control, monitoring, and protection
CN110011422A (en) Intelligent power distribution operation monitoring system and regulation method based on artificial neural network
CN109435739A (en) New energy charging station system and its control method, electronic equipment, storage medium
CN108134394B (en) Optimized load shedding method considering distributed power supply influence
CN102868164B (en) Low-frequency voltage load-reducing linkage coordination control method
CN107134785B (en) Power transmission network voltage coordination optimization control method considering network structure optimization
CN104505855B (en) A kind of wind farm grid-connected characteristic online rating system
CN107516903B (en) Accurate load control method considering economy and safety and stability of multiple time scales
CN107681780A (en) A kind of power network section monitors and turns to supply tactful intelligent generating system and method
CN103632311A (en) Fault examining system and method for power grid operation
CN109633333A (en) All kinds of cutting load amount collision detection of provincial and above power grid and coordinate method of calibration
CN105186496B (en) A kind of microgrid group running status appraisal procedure and system
CN109921110A (en) A kind of battery management system and method based on big data cloud platform
CN113109656A (en) Low-voltage transformer area line loss fine analysis system and analysis method
CN109063963A (en) A kind of responsible consumer power supply methods of risk assessment based on unit style electricity distribution network model
Hu et al. Measurement-based voltage stability assessment and control on CURENT hardware test bed system
CN215180572U (en) Low-voltage transformer area line loss fine analysis system
CN106786527B (en) Distribution network loop closing risk analysis method based on provincial and allocation integration
Quilumba et al. Distributed energy resources placement in distribution networks considering proximity to voltage collapse
CN213243563U (en) Energy storage energy management system
Wang et al. Optimization Algorithm Design of Short-Circuit Current Grid Based on High-Speed Breaking Technology
CN109412141A (en) A kind of method of power grid 220kV main transformer N-1 risk power grid automatically scanning analysis
CN110445158A (en) Energy-accumulating power station system and transient state control method based on more net unifications

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant