CN109630093A - A kind of flow rate test method in oil reservoir logging - Google Patents

A kind of flow rate test method in oil reservoir logging Download PDF

Info

Publication number
CN109630093A
CN109630093A CN201910054281.1A CN201910054281A CN109630093A CN 109630093 A CN109630093 A CN 109630093A CN 201910054281 A CN201910054281 A CN 201910054281A CN 109630093 A CN109630093 A CN 109630093A
Authority
CN
China
Prior art keywords
pressure
flow
pit shaft
yield
present
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910054281.1A
Other languages
Chinese (zh)
Inventor
陈永昌
郭发军
徐东辉
张淑娟
林作华
陈小琴
吴青芳
闫爱华
黄美兰
赵玉芝
魏鹏
陈辉
邢军
刘建魁
郭常伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
China Petroleum Logging Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
China Petroleum Logging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd, China Petroleum Logging Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201910054281.1A priority Critical patent/CN109630093A/en
Publication of CN109630093A publication Critical patent/CN109630093A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Abstract

A kind of flow rate test method in oil reservoir logging of the present invention, belongs to field of oil development, according to indicative curve expression formula: Q=J (Δ P)=J (PR‑Pwf).It is P by controlling Liquid output to obtain pit shaft stream pressurewf1、Pwf2When corresponding yield be respectively Q1、Q2.It is calculated by indicative curve expression formula to production capacity index J and strata pressure PR.Again by J and PRIn generation, returns to indicative curve expression formula and has just obtained pit shaft stream pressure PwfWith the relational expression of flow Q.The present invention is chosen by a series of measurement and parameter, so that the pressure of near wellbore and the yield on stratum or injection rate establish relationship, and has sought flow using pressure.Pressure and the relationship of flow can correct the accurate of to guarantee measurement of discharge at any time.Pressure gauge is seperated layer water injection and the essential instrument of seperated layer water injection, and it is to have obtained flow in the case where any instrument of no increases that the present invention, which utilizes pressure test flow, has saved cost, the operation is stable, reliably.

Description

A kind of flow rate test method in oil reservoir logging
[technical field]
The invention belongs to field of oil development, especially a kind of flow rate test method in oil reservoir logging.
[background technique]
Flow used in oil reservoir logging is in respect of turbine flowmeter, electromagnetic flowmeter, ultrasonic flowmeter, tagging stream Meter and suspended body flowmeter etc..Due to being limited by size etc., at present these instruments have not been used in cable controlled separate layer recover the oil or In seperated layer water injection.The flowmeter for being currently used for cable controlled separate layer water filling only has differential pressure flowmeter one kind.Differential pressure flowmeter exists The problem of be to be easy to produce drift.In addition, in cable controlled separate layer oil recovery, there are no use flowmeter.Cable controlled separate layer note Water and seperated layer water injection need the flowmeter that precision is high, stability is good, can work long hours.
[summary of the invention]
It is an object of the invention to overcome the above-mentioned prior art, a kind of flow survey in oil reservoir logging is provided Method for testing accurately measures flow by easy method.
In order to achieve the above objectives, the present invention is achieved by the following scheme:
A kind of flow rate test method in oil reservoir logging, includes the following steps:
Step 1, fetching shows curve linear section, i.e. n=1;According to seepage theory, indicative curve expression formula is as follows:
Q=J (Δ P)n=J (PR-Pwf)n
Wherein, Q is yield or injection rate;J is productivity index;N is seepage index, 0.5≤n≤1;
Δ P is producing pressure differential;PRFor strata pressure;PwfFor pit shaft stream pressure;Obtain following formula:
Q=J (Δ P)=J (PR-Pwf)
Step 2, yield or injection rate Q are given and measures corresponding flow and pit shaft stream pressure, obtains two groups of corresponding datas, packet Include Pwf1、Pwf2、Q1、Q2
Step 3, it is calculated by difference:
Q1=J (Δ P1)=J (PR-Pwf1)
Q2=J (Δ P2)=J (PR-Pwf2)
Then,Substitution obtains:
Step 4, measurement pit shaft stream presses Pwf, obtain yield or injection rate Q:
Compared with prior art, the invention has the following advantages:
The present invention is chosen by a series of measurement and parameter, so that the pressure of near wellbore and the yield on stratum or injection Amount establishes relationship, and has sought flow using pressure.Pressure and the relationship of flow can correct the flow measurement to guarantee at any time That measures is accurate.Pressure gauge is seperated layer water injection and the essential instrument of seperated layer water injection, and the present invention utilizes pressure test flow, be Flow has been obtained in the case where not increasing any instrument, has saved cost, it is the operation is stable, reliable.
[Detailed description of the invention]
Fig. 1 is the flow chart of the method for the present invention.
[specific embodiment]
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
It should be noted that term " includes " and " having " and their any deformation, it is intended that covering is non-exclusive Include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to clearly arrange Those of out step or unit, but may include be not clearly listed or it is solid for these process, methods, product or equipment The other step or units having.
With reference to the accompanying drawing and particular experiment system and existing experimental result the present invention is further illustrated.
In cable controlled separate layer recovers the oil or seperated layer water injection is constructed, need to be separated oil reservoir with packer, each section all Equipped with switch and pressure gauge.Ground instrument can read each pressure by the size of any one adjustable switch of cable The data of power instrument.The present invention utilizes pressure, any one section of Liquid output can be tested out in separate-zone producer, in water injection well In can test out any one section of injection rate, the specific method is as follows:
According to indicative curve expression formula: Q=J (Δ P)=J (PR-Pwf).Pit shaft stream is obtained by control yield or injection rate Pressure is Pwf1、Pwf2When corresponding yield be respectively Q1、Q2.It is calculated by indicative curve expression formula to productivity index J and strata pressure PR.Again by J and PRIn generation, returns to indicative curve expression formula and has just obtained pit shaft stream pressure PwfWith the relational expression of flow Q.
Embodiment 1
Each layer yield of oil production by layer well test: the well for implementing oil production by layer closes any one layer of switch and passes through survey Measure pressure recovery, the strata pressure P of this available layerR.The switch of this layer is opened, individually when exploitation, available stream presses Pwf1 With corresponding production Q1.Then,
Q1=J (Δ P1)=J (PR-Pwf1)
When commingling production, the stream pressure P of this layer is measuredwf, available corresponding flow, the side of other each layers calculating flows Method is identical.Therefore, by manual calculation or computer programming, it can be pressed by the stream of each layer and obtain their yield.
Embodiment 2
The verification of separate water injection well underground calculates each layer injection rate: when underground each layer be equipped with flowmeter (such as turbine flowmeter, Differential pressure flowmeter) when, for each layer by the size of regulating switch, obtaining pit shaft stream pressure is Pwf1、Pwf2Corresponding injection rate Q1、Q2.By formula:
It is obtained with the injection rate of this layer.The injection rate that calculation of pressure obtains can mutually be confirmed with other flows.It is special It is not, when other flows break down, to remain to provide the water absorption of this layer by the present invention.
Embodiment 3
The verification of separate water injection well underground calculates each layer injection rate: when underground is not equipped with flowmeter or Causing Flowmeter Damages, Turn off other water filling layers.Recording pit shaft stream pressure is Pwf1With corresponding ground injection rate Q1.Adjust this layer of down-hole switch size or The size of floor switches is adjusted, record pit shaft stream presses Pwf2With corresponding ground injection rate Q2.Equally, by formula:
It is obtained with the injection rate of this layer.
The above content is further detailed description of the invention, and it cannot be said that a specific embodiment of the invention only It is limited to this, for those of ordinary skill in the art to which the present invention belongs, without departing from the inventive concept of the premise, also Several simple deduction or replace can be made, all shall be regarded as belonging to present invention guarantor determined by the appended claims Protect range.

Claims (1)

1. a kind of flow rate test method in oil reservoir logging, which comprises the steps of:
Step 1, fetching shows curve linear section, i.e. n=1;According to seepage theory, indicative curve expression formula is as follows:
Q=J (Δ P)n=J (PR-Pwf)n
Wherein, Q is yield or injection rate;J is productivity index;N is seepage index, 0.5≤n≤1;
Δ P is producing pressure differential;PRFor strata pressure;PwfFor pit shaft stream pressure;Obtain following formula:
Q=J (Δ P)=J (PR-Pwf)
Step 2, yield or injection rate Q are given and measures corresponding flow and pit shaft stream pressure, obtains two groups of corresponding datas, including Pwf1、Pwf2、Q1、Q2
Step 3, it is calculated by difference:
Q1=J (Δ P1)=J (PR-Pwf1)
Q2=J (Δ P2)=J (PR-Pwf2)
Then,Substitution obtains:
Step 4, measurement pit shaft stream presses Pwf, obtain yield or injection rate Q:
CN201910054281.1A 2019-01-21 2019-01-21 A kind of flow rate test method in oil reservoir logging Pending CN109630093A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910054281.1A CN109630093A (en) 2019-01-21 2019-01-21 A kind of flow rate test method in oil reservoir logging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910054281.1A CN109630093A (en) 2019-01-21 2019-01-21 A kind of flow rate test method in oil reservoir logging

Publications (1)

Publication Number Publication Date
CN109630093A true CN109630093A (en) 2019-04-16

Family

ID=66061527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910054281.1A Pending CN109630093A (en) 2019-01-21 2019-01-21 A kind of flow rate test method in oil reservoir logging

Country Status (1)

Country Link
CN (1) CN109630093A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796719A (en) * 2021-01-15 2021-05-14 大庆石油管理局有限公司 Drilling and closing method for oil field encryption adjusting well

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1508388A (en) * 2002-12-19 2004-06-30 大庆油田有限责任公司 Layering injection amount and layering pressure test-free storage direct-reading method
WO2012122470A1 (en) * 2011-03-09 2012-09-13 Prad Research And Development Limited Method for charcterizing subsurface formations using fluid pressure response during drilling operations
CN105626036A (en) * 2014-11-07 2016-06-01 中国石油化工股份有限公司 Oil reservoir engineering calculation method for determining reasonable oil reservoir liquid yield

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1508388A (en) * 2002-12-19 2004-06-30 大庆油田有限责任公司 Layering injection amount and layering pressure test-free storage direct-reading method
WO2012122470A1 (en) * 2011-03-09 2012-09-13 Prad Research And Development Limited Method for charcterizing subsurface formations using fluid pressure response during drilling operations
CN105626036A (en) * 2014-11-07 2016-06-01 中国石油化工股份有限公司 Oil reservoir engineering calculation method for determining reasonable oil reservoir liquid yield

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
崔树清等: "《钻井地质》", 31 January 2008 *
李青等: "《机械采油技术管理方法》", 31 December 1994 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796719A (en) * 2021-01-15 2021-05-14 大庆石油管理局有限公司 Drilling and closing method for oil field encryption adjusting well

Similar Documents

Publication Publication Date Title
CN103413030B (en) A kind of fracture-cavity type carbonate gas reservoir protection analysis method and system
CN100432372C (en) Method for determining pressure of earth formations
US7580797B2 (en) Subsurface layer and reservoir parameter measurements
CN105464652A (en) Dynamic reserve calculation method and system for fracture and cave type carbonatite oil reservoir fracture and cave unit
CN104504604B (en) A kind of method of qualitative Wellbore of Gas Wells hydrops
CN106153862B (en) Slurry shield model test mudcake thickness real-time determining device and assay method
EP3152391B1 (en) Method of estimating well productivity along a section of a wellbore
CN105956938B (en) Method for calculating dynamic reserves of fracture-cavity oil reservoir
CN104265281A (en) Method for predicting well yield of sealed, unsaturated oil reservoirs through elastic driving water-flooding extraction
CN108222902A (en) Intelligent water injection device and method
CN108222903A (en) Separate water injection well downhole flow measures device and method
CN105649603A (en) Method for measuring accumulated liquid quantity of well bore of gas well in real time
CN109697538A (en) Carbonate Reservoir Caves-constant volume physical efficiency amount indicative curve interpretation model
CN109630093A (en) A kind of flow rate test method in oil reservoir logging
CN109594965A (en) A kind of difference producing pressure differential carbon dioxide drive technical limit well space optimization method
CN107269265A (en) A kind of system and method for optimizing and revising oilwell produced fluid amount
CN107605474B (en) Method and device for predicting gas formation yield while drilling
CN106595813B (en) Oil-water interface detector for salt cavern gas storage cavity making and oil-water interface detection method
CN103590828B (en) A kind of well logging dck index method evaluates the method for strata pressure
CN110766562B (en) Method for determining oil well interval pumping time
CN105569623B (en) Well head combined measuring device and its method for water injection well
CN105909240A (en) Bottom hole pressure testing, polymer displacement front edge position monitoring and reservoir assessment method
US20210109251A1 (en) Determination of a surface leak rate in an injection well
CN115045644B (en) Method for rapidly predicting shale gas well fracturing fluid return displacement based on production data
CN109100307A (en) For monitoring the experimental provision and system of simulation oil reservoir rock deformation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416

RJ01 Rejection of invention patent application after publication